This document is a Contract Data Requirements List (CDRL) outlining receipt reporting requirements for a contractor providing H-53E aircraft maintenance and repair services. The contractor must submit weekly receipt reports in Microsoft Excel listing all received Government Furnished Materials with information including document number, NIIN, quantity, date and condition of receipt, and comments. Reports for PMID and reset inductions shall be separated into different worksheets and clearly distinguishable. The reports are due every Friday via email to the Fleet Readiness Center Western Pacific Supply department. The Government has five days to review each submission before it is considered accepted if no response is provided. This CDRL pertains to solicitation N6264920R0003 for H-53E aircraft planned and unplanned depot maintenance, repair, and overhaul services issued by the Naval Supply Systems Command on behalf of the Fleet Logistics Center Yokosuka and Fleet Readiness Center Western Pacific.

View the file

Other files

File Type Posted
N6264920R0003 AMD 0004.docx DOCX document
N6264920R0003 AMD 0004 CONFORMED.docx DOCX document
ANSWERS H-53E_Q_AND_A_23MAR2020.xlsx XLSX spreadsheet
N6264920R0003_AMD_0003.pdf PDF
N6264920R0003 AMD 0002.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION H-53 v2.pdf PDF
Q and A N6264920R0003 AMD 0002.pdf PDF
N6264920R0003 AMD 0002 CONFORMED.docx DOCX document
H-53E Att 01 Performance Work Statement (PWS) (2020-01-21).docx DOCX document
N6264920R0003 MOD 0001.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT H-53 v1.pdf PDF
N6264920R0003 MOD 0001 Conformed.docx DOCX document
CDRL C002 PRESENTATION DOCUMENTATION H-53 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT H-53 v1.pdf PDF
CDRL A003 TDC KIT RECEIPT AND REPORTING OF KIT DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL A010 MAINTENANCE HISTORY SUMMARY REPORT H-53 v1.pdf PDF
H-53E Att 06 LMR Process at Contractor Facilities (2020-01-09).docx DOCX document
CDRL G001 MONTHLY MATERIAL EXPENSE REPORT H-53 v1.pdf PDF
CDRL D004 CONTRACTOR TRAINING PLAN H-53 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE H-53 v1.pdf PDF
N6264920R0003 H-53 RFP.docx DOCX document
H-53E Att 10 GFP List (2020-01-09).xlsx XLSX spreadsheet
CDRL B003 AIRCRAFT AWAITING PARTS (AWP) REPORT H-53 v1.pdf PDF
CDRL B012 COST PER BUNO REPORT H-53 v1.pdf PDF
CDRL B005 SUPPLY EFFECTIVENESS REPORT H-53 v1.pdf PDF
CDRL B008 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY REPORT H-53 v1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LIST H-53 v1.pdf PDF
H-53E Att 09 Fac and AF Req (2020-01-09).docx DOCX document
H-53E Att 08 PEMA Specs (2020-01-09).docx DOCX document
H-53E_Att_14_Price_Summary_Spreadsheet_(2020-01-09).xlsx XLSX spreadsheet
H-53E Att 12 H-53E PMID Induction Schedule (2020-01-29).xlsx XLSX spreadsheet
CDRL D001 PHASE-IN TRANSITION PLAN H-53 v1.pdf PDF
CDRL C001 MEETING MINUTES H-53 v1.pdf PDF
H-53E_Att_13_Past_Performance_Questionnaire_(2020-01-09).docx DOCX document
CDRL A008 EXAMINATION & EVALUATION (E&E) DISCREPANCY REPORT H-53 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT H-53 v1.pdf PDF
H-53E Att 07 TEI Process at Contarctor Facilities (2020-01-09).docx DOCX document
H-53E Att 02 Gov Relationships&Resp (2020-01-09).docx DOCX document
CDRL B013 PARTS REQUIRED REPORT (PRR) H-53 v1.pdf PDF
H-53E Att 03 QASP (2020-01-09).docx DOCX document
CDRL A006 SCHEDULED REMOVAL CARDS H-53 v1.pdf PDF
CDRL B010 ANNUAL PHYSICAL INVENTORY H-53 v1.pdf PDF
CDRL B001 DAILY REQUISITION REPORT (DRR) H-53 v1.pdf PDF
CDRL B007 FINAL MATERIAL CONSUMPTION REPORT H-53 v1.pdf PDF
CDRL A005 NOTIFICATION OF AIRCRAFT DELAY H-53 v1.pdf PDF
H-53E Att 04 OSH and Env (2020-01-16).docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT H-53 v1.pdf PDF
CDRL A009 NOTED BUT NOT CORRECTED (NBNC) REPORT H-53 v1.pdf PDF
CDRL B006 ACTIVE ITEM REPORT H-53 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (STAND-DOWN) H-53 v1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Adobe Professional 8.0

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

H-53E PMID AIRCRAFT

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

RECEIPT REPORT H-53E

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

FRCWP Supply

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

No

10. FREQUENCY

Block 16

12. DATE OF FIRST SUBMISSION

Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

Block 16 Draft

Final

Reg Repro

16. REMARKS

(1) Description: Contractor shall submit a list of all Government Furnished Materials (GFM) received in the previous week.

(2) Purpose: To document receipt of all Government Furnished Materials (GFM)

(3) Format: The Receipt Report shall be submitted in Microsoft Excel or compatible software.

The following information shall be represented:

- Document Number

- Suffix

- NIIN

- Quantity (QTY)

- Date of Receipt

- Material Condition (RFI or NRFI)

- Comments

For PMID/Reset Concurrent inductions, Reset reports shall be on a separate worksheet from the PMID reports and clearly distinguishable: add RESET tab to mirror CDRL A004 Tab; add nomenclature and P/N columns; include BUNO number preceding the document number in Column A.

(4) Frequency: every week on Friday.

Shall be emailed to FRCWP at: usn.atsugi.frcwp.mbx.h53-contract@mail.mil Subject line of email shall include CDRL Number and Title

(5) Acceptance: The Government shall have five working days for review and acceptance/ rejection of each submission. No response will indicate acceptance.

FRCWP Supply 1 FRCWP Production 1 FRCWP Bus Ops 1

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP