EXHIBIT C _ FACTOR 2 MANAGEMENT APPROACH.pdf

PDF 14 KB Posted

Attached to
N62473-21-R-0020: NAVFAC SW MULTI-FUNCTION MASC AT VARIOUS LOCATIONS IN ARIZONA, CALIFORNIA, COLORADO, NEVADA, NEW MEXICO & UTAH
Solicitation number
N62473-21-R0020
Issued by

About this file

This document provides details for a solicitation seeking proposals for an Indefinite Delivery Indefinite Quantity, Firm Fixed Price, 8(a) set-aside Multiple Award Service Contract to provide facility-related services at various locations within the Naval Facilities Engineering Command Southwest Area of Responsibility, including Arizona, California, Colorado, Nevada, New Mexico, and Utah. Services include facility investment, pest control, integrated solid waste management, grounds maintenance and landscaping. The initial task order encompasses recurring services for these functions at Marine Corps Base Camp Pendleton, California as well as indefinite-delivery, indefinite-quantity non-recurring facility investment, pest control and integrated solid waste management. Offerors must demonstrate the capability to successfully manage multiple task orders simultaneously across different locations. Subcontractor oversight, quality control procedures, and plans for meeting limitations on subcontracting of more than 50% of the amount paid are also required.

View the file

Other files

File Type Posted
RFI 133_Attachment J-1503050-09 MFSC 2021 FOR MCAS CAMP PENDLETON_Amendment 0002_6.1.21_jb 06072021.docx DOCX document
AMD 0005.pdf PDF
Amendment 0004.pdf PDF
EXHIBIT D _ FACTOR 3 SAFETY.docx DOCX document
EXHIBIT A _ FINANCIAL QUESTIONNAIRE.docx DOCX document
UPDATED REFUSE COLLECTION SERVICE LOCATIONS AND FREQUENCIES.pdf PDF
EXHIBIT D _ FACTOR 3 SAFETY.docx DOCX document
DBA Wage Determination _ CA20210001 04 23 2021.pdf PDF
NAVFAC MO-200 Manual.pdf PDF
AMENDMENT 0002.pdf PDF
EXHIBIT B _ FACTOR 1 RECENT RELEVANT EXPERIENCE OF FIRM.docx DOCX document
PreProposal Attendance Sheet _12 May 2021.pdf PDF
EXHIBIT C _ FACTOR 2 MANAGEMENT APPROACH.docx DOCX document
EXHIBIT E _ FACTOR 4 NAVFAC PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
MFSC 2021 FOR MCAS CAMP PENDLETON_Amendment 0002_6.1.pdf PDF
ANNEX 0501050 SECTION F AIRFIELD FACILITIES.doc DOC document
ANNEX 1503020 SECTION C PEST CONTROL.docx DOCX document
ANNEX 0402000 SECTION F FIRE AND EMERGENCY SERVICES.doc DOC document
EXHIBIT A _ FINANCIAL QUESTIONNAIRE.pdf PDF
ANNEX 1604000 SECTION F WASTEWATER.doc DOC document
ANNEX 1603000 SECTION F NATURAL GAS.doc DOC document
ANNEX 1503060 SECTION F PAVEMENT CLEARANCE.doc DOC document
ANNEX 0100000 SECTION C GENERAL INFORMATION.docx DOCX document
ANNEX 0200000 SECTION C MANAGEMENT AND ADMINISTRATION.docx DOCX document
ATTACHMENT B _ ACRONYMS.docx DOCX document
ANNEX 1402000 SECTION C UNACCOMPANIED HOUSING.docx DOCX document
ANNEX 0401000 SECTION F FORCE PROTECTION.doc DOC document
ANNEX 0501070 SECTION C PASSENGER TERMINAL AND CARGO HANDLING.docx DOCX document
ANNEX 1607000 SECTION F CHILLER.doc DOC document
ANNEX 1503010 SECTION F CUSTODIAL.docx DOCX document
ANNEX 0404000 SECTION F SAFETY.doc DOC document
ANNEX 0501030 SECTION F AVIATION FUEL SUPPORT.docx DOCX document
ANNEX 0600000 SECTION C PORT OPERATIONS.doc DOC document
ANNEX 1503040 SECTION C OTHER (TRAINING POOLS).doc DOC document
EXHIBIT B _ FACTOR 1 RECENT RELEVANT EXPERIENCE.pdf PDF
EXHIBIT E _ NAVFAC PAST PERFORMANCE QUESTIONNAIRE PPQ.pdf PDF
ANNEX 0501030 SECTION C AVIATION FUEL SUPPORT.docx DOCX document
ANNEX 1606000 SECTION F WATER.doc DOC document
EXHIBIT D _ FACTOR 3 SAFETY.pdf PDF
ANNEX 1503020 SECTION F PEST CONTROL.docx DOCX document
ANNEX 0501050 SECTION C AIRFIELD FACILITIES.docx DOCX document
ANNEX 1700000 SECTION C BSVE.doc DOC document
ANNEX 1502000 SECTION F FACILITY INVESTMENT.doc DOC document
ANNEX 1604000 SECTION C WASTEWATER.doc DOC document
ANNEX 0304010 SECTION C IT SUPPORT AND MANAGEMENT.docx DOCX document
ANNEX 0501070 SECTION F PASSENGER TERMINAL AND CARGO HANDLING.doc DOC document
MFSC 2021 FOR MCAS CAMP PENDLETON_Rev. 3_05.11.21.pdf PDF
ANNEX 0404000 SECTION C SAFETY.doc DOC document
ANNEX 1601000 SECTION C UTILITY MANAGEMENT.docx DOCX document
ANNEX 0304010 SECTION F IT SUPPORT AND MANAGEMENT.doc DOC document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MULTI-FUNCTION MASC N62473-21-R-0020

NAVFAC SW AOR SOURCE SELECTION PLAN

REV JAN 2018

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

EXHIBIT C

FACTOR 2 - MANAGEMENT APPROACH

PROJECT DATA SHEET

Submit Exhibit C (MANAGEMENT APPROACH) under Tab 2 of the Technical Proposal in accordance with solicitation submittal requirements. EXHIBIT C IS MANDATORY. Individual blocks on this form may be expanded; however, total page limit shall not exceed ten single-sided 8.5” x 11” pages using 12-point Times New Roman font.

1. Workload Management Plan: Provide the proposed plan that is detailed, specific, and demonstrates how the Offeror has the necessary capability to successfully manage surges in workload and perform multiple TO concurrently at various locations within the NAVFAC SW AOR.

2. Subcontractor Management Plan: Provide a detailed and structured plan with methods for monitoring and controlling subcontractors and methods to be implemented to correct poor performing subcontractors. Offeror shall address how it will ensure that high quality services are provided that meet or exceed contract requirements.

3. Quality Control Management Plan: Offeror shall provide a detailed and structured plan for addressing customer complaints and marginal or unsatisfactory performance. Offeror shall address quality control methods that will be implemented to ensure performance meets or exceeds contract requirements.

4. Self-Performance Management Plan: Offeror shall provide the proposed plan to ensure not more than 50% of the amount paid by the Government is for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50% subcontract amount that cannot be exceeded in accordance with FAR 52.219-14 Limitations on Subcontracting (Jan 2019) (DEVIATION 2019-O0003).

File details come from the government source that posted it. Updated .