This solicitation seeks proposals for an Indefinite Delivery Indefinite Quantity (IDIQ), Firm Fixed Price (FFP) Multiple Award Service Contract (MASC) to provide Facility Investment, Pest Control, Integrated Solid Waste Management, and Grounds Maintenance and Landscaping services at Marine Corps Base Camp Pendleton, California. The contract has an 8(a) set-aside and will be awarded to small businesses located in Arizona, California, Colorado, Nevada, New Mexico, and Utah. The initial task order is for recurring FFP services at MCB Camp Pendleton, with additional non-recurring work in Facility Investment, Pest Control, and Integrated Solid Waste Management. Proposals are due by June 14, 2021. The total contract value is not to exceed $99 million over the life of the contract.

View the file

Other files

File Type Posted
RFI 133_Attachment J-1503050-09 MFSC 2021 FOR MCAS CAMP PENDLETON_Amendment 0002_6.1.21_jb 06072021.docx DOCX document
AMD 0005.pdf PDF
Amendment 0004.pdf PDF
EXHIBIT D _ FACTOR 3 SAFETY.docx DOCX document
EXHIBIT A _ FINANCIAL QUESTIONNAIRE.docx DOCX document
UPDATED REFUSE COLLECTION SERVICE LOCATIONS AND FREQUENCIES.pdf PDF
EXHIBIT D _ FACTOR 3 SAFETY.docx DOCX document
DBA Wage Determination _ CA20210001 04 23 2021.pdf PDF
NAVFAC MO-200 Manual.pdf PDF
EXHIBIT B _ FACTOR 1 RECENT RELEVANT EXPERIENCE OF FIRM.docx DOCX document
PreProposal Attendance Sheet _12 May 2021.pdf PDF
EXHIBIT C _ FACTOR 2 MANAGEMENT APPROACH.docx DOCX document
EXHIBIT E _ FACTOR 4 NAVFAC PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
MFSC 2021 FOR MCAS CAMP PENDLETON_Amendment 0002_6.1.pdf PDF
ANNEX 0501050 SECTION F AIRFIELD FACILITIES.doc DOC document
ANNEX 1503020 SECTION C PEST CONTROL.docx DOCX document
ANNEX 0402000 SECTION F FIRE AND EMERGENCY SERVICES.doc DOC document
EXHIBIT A _ FINANCIAL QUESTIONNAIRE.pdf PDF
ANNEX 1604000 SECTION F WASTEWATER.doc DOC document
ANNEX 1603000 SECTION F NATURAL GAS.doc DOC document
ANNEX 1503060 SECTION F PAVEMENT CLEARANCE.doc DOC document
ANNEX 0100000 SECTION C GENERAL INFORMATION.docx DOCX document
ANNEX 0200000 SECTION C MANAGEMENT AND ADMINISTRATION.docx DOCX document
ATTACHMENT B _ ACRONYMS.docx DOCX document
ANNEX 1402000 SECTION C UNACCOMPANIED HOUSING.docx DOCX document
ANNEX 0401000 SECTION F FORCE PROTECTION.doc DOC document
ANNEX 0501070 SECTION C PASSENGER TERMINAL AND CARGO HANDLING.docx DOCX document
ANNEX 1607000 SECTION F CHILLER.doc DOC document
ANNEX 1503010 SECTION F CUSTODIAL.docx DOCX document
ANNEX 0404000 SECTION F SAFETY.doc DOC document
ANNEX 0501030 SECTION F AVIATION FUEL SUPPORT.docx DOCX document
ANNEX 0600000 SECTION C PORT OPERATIONS.doc DOC document
ANNEX 1503040 SECTION C OTHER (TRAINING POOLS).doc DOC document
EXHIBIT B _ FACTOR 1 RECENT RELEVANT EXPERIENCE.pdf PDF
EXHIBIT E _ NAVFAC PAST PERFORMANCE QUESTIONNAIRE PPQ.pdf PDF
ANNEX 0501030 SECTION C AVIATION FUEL SUPPORT.docx DOCX document
ANNEX 1606000 SECTION F WATER.doc DOC document
EXHIBIT D _ FACTOR 3 SAFETY.pdf PDF
ANNEX 1503020 SECTION F PEST CONTROL.docx DOCX document
ANNEX 0501050 SECTION C AIRFIELD FACILITIES.docx DOCX document
ANNEX 1700000 SECTION C BSVE.doc DOC document
ANNEX 1502000 SECTION F FACILITY INVESTMENT.doc DOC document
ANNEX 1604000 SECTION C WASTEWATER.doc DOC document
ANNEX 0304010 SECTION C IT SUPPORT AND MANAGEMENT.docx DOCX document
ANNEX 0501070 SECTION F PASSENGER TERMINAL AND CARGO HANDLING.doc DOC document
MFSC 2021 FOR MCAS CAMP PENDLETON_Rev. 3_05.11.21.pdf PDF
ANNEX 0404000 SECTION C SAFETY.doc DOC document
ANNEX 1601000 SECTION C UTILITY MANAGEMENT.docx DOCX document
ANNEX 0304010 SECTION F IT SUPPORT AND MANAGEMENT.doc DOC document
ANNEX 1700000 SECTION F BSVE.doc DOC document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R5810302

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Purpose of Amendment 0002 is to:

1. Provide responses to Requests for Information (RFIs);

2. Provide Exhibits A – E in Word format;

3. Provide updated and new Attachments;

4. Provide DBA Wage Determination; and

5. Update Clauses.

6. The proposal due date is hereby extended to Monday, June 14, 2021 at 12:00 pm Pacific Daylight Time (PDT).

7. All other terms and conditions remain unchanged.

The POC for this Amendment is Sunshine Hernandez, sunshine.hernandez@navy.mil, 619-705-4933

1. CONTRACT ID CODE PAGE OF PAGES

J 1 27

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247321R0020

X 9B. DATED (SEE ITEM 11)

05-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jun-2021

CODE

NAVFAC SOUTHWEST

PW CONTRACTS CORE - FSC

CODE RAQ10-FSC

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247321R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of Amendment 0002 is to:

1. Revise Section A – Solicitation/Contract Form, INSTRUCTION TO OFFERORS/GENERAL

INFORMATION, to reflect the following:

FROM:

PROPOSAL SUBMITTAL REQUIREMENTS

All Offerors are invited to submit their proposals. Instructions for submission using the DoD SAFE “Drop-off” feature are provided below:

1) There are no user accounts for DoD SAFE. In order to submit a proposal in response to this solicitation, Offerors shall submit their point of contact (POC) name and email address via email to the Contract Specialist identified below to obtain a “Request Code” for DoD SAFE “Drop-off”:

Sunshine Hernandez at sunshine.hernandez@navy.mil

Note: The Government does not intend to respond to emails for drop-off request codes submitted less than 5 calendar days before the due date shown in the solicitation.

2) No later than 4 calendar days prior to the proposal due date, the Contract Specialist will send a “Request Code” to the Offeror’s specified POC via the email address provided. Only the Offeror’s identified POC will be able to drop off the proposal or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.

TO:

1) Offerors are required to electronically submit their complete proposal in two (2) separate files, using DoD SAFE as follows:

Volume I Price Proposal (Excel Format) Exhibit Line Item Number (ELIN Pricing). Leave ALL excel formulas open in the spreadsheet.

Exhibit Line Item Number (ELIN) Pricing: Complete a excel copy of Exhibit Line Item Number (ELIN) for the proposed initial task order. Price Proposal is to be submitted in Microsoft Excel 2007 or latest version, with all formulas and links to detail worksheets intact.

Volume II Technical Proposal (PDF Format) The format for the electronic proposal shall be submitted in the exact order as follows:

a) Cover Letter and Standard Form (SF) 33 Solicitation/Offer and Award (Offeror to complete Blocks 12 thru 18).

b) Factor 1 – Recent, Relevant Experience of the Firm (EXHIBIT B)

c) Factor 2 – Management Approach (EXHIBIT C)

d) Factor 3 Safety (EXHIBIT D)

e) Factor 4 – Past Performance (EXHIBIT E: One for each project submitted under

Factor 1, EXHIBIT B)

f) Representations and Certifications from the SAM. Completed provision 52.204-

24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020).

g) If the Offeror is proposing as a Joint Venture (JV) and/or Mentor-Protégé, the Offeror shall provide a copy of the JV agreement and, if the JV is with a Mentor-Protégé, a copy of the relevant Mentor-Protégé agreement approved by the SBA.

h) VETS-4212 annual report

The Government will not rate Representations and Certifications, Financial Questionnaires, and Surety Forms.

However, the Government will consider the information in assessing the Offeror’s responsibility.

The Offeror should submit only the information/exhibits required. Do not submit any additional information

The financial institution should send the completed questionnaire via email directly to Sunshine Hernandez at sunshine.hernandez@navy.mil, see RFI #107.

2) In order to submit a proposal in response to this solicitation, Offerors shall submit their point of contact (POC) name and email address via email to the Contract Specialist identified below to obtain a “Request Code” for DoD SAFE “Drop-off”:

Sunshine Hernandez at sunshine.hernandez@navy.mil

3) No later than 4 calendar days prior to the proposal due date, the Contract Specialist will send a “Request Code” to the Offeror’s specified POC via the email address provided. Only the Offeror’s identified POC will be able to drop off the proposal or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.

2. Revise SECTION M – EVALUATION FACTORS FOR AWARD, Clause 52.212-2 EVALUATION - - COMMERCIAL ITEMS (OCT 2014) to reflect the following:

FROM:

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Factor 1 – Recent, Relevant Experience of the Firm Factor 2 – Management Approach Factor 3 – Safety Factor 4 – Past Performance

The distinction between Recent, Relevant Experience of the Firm and past performance is Recent, Relevant Experience of the Firm pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

1. Basis of Evaluation and Submittal Requirements for Each Factor.

a. Price – Based on Proposed initial task order: Submit original and one (1) copy. A copy of the Price Proposal shall be placed on one (1) CD-ROM and inserted in the original Price Proposal Binder – Volume 1

i. Solicitation Submittal Requirements: The price proposals will be evaluated to determine that proposed prices are reasonable, balanced, and complete. Price proposal shall be submitted in separate binders from the Technical Proposal, and clearly marked “Volume 1 – Price Proposal.” Include a separate tab for each item shown below:

TAB #1: Cover Letter, and Standard Form (SF) 1449 Solicitation/Contract/Order for

Commercial Items (Offeror to complete blocks 12, 17, 23, 24 and 30a thru 30c). Include telephone number, facsimile (fax) number, email address, tax identification number

(TIN), Dun & Bradstreet (DUNs) Number, and Commercial and Government Entity (CAGE) Code on the SF 1449, in Block 17a. Include the following on the cover letter:

• Solicitation Number N62473-21-R-0016.

• Name, address, telephone, and fax numbers, and email address of the Offeror.

• Point(s) of contact with title, telephone, fax, email address of person(s) authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

• The cover letter signed by an authorized representative

Note: The Offeror contact information should match what is shown on the Offeror’s System for Award Management (SAM) profile.

TAB #2: Exhibit Line Item Number (ELIN) Pricing: Complete a paper copy of

Exhibit Line Item Number (ELIN) for the proposed initial task order, and an electronic version on a CD-ROM using Excel worksheets that the Government will post online at the following website: https://www.neco.navy.mil/ and/or http://www.fbo.gov . Leave all excel formulas open in the spreadsheet.

TAB #3: Completed Exhibit D, “Financial Questionnaire” from banking institution.

TAB #4: Copy of the Online Representations and Certifications from the SAM, at the following website: www.sam.gov , including all completed applicable sections of the FAR Clause 52.212-3, Offeror Representations and Certifications – Commercial Items (Mar 2015).

Completed provision 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020).

TAB #5: If the Offeror is proposing as a joint venture (JV) and/or Mentor-Protégé, the

Offeror shall provide a copy of the JV agreement and, if the JV is with a mentor-protégé, a copy of the relevant mentor- protégé agreement approved by the SBA.

TAB #6: Copy of the VETS-4212 annual report. Legislatively mandated under 38

U.S. Code, Section 4212, codified at 41 CFR Section 61-300, respectively, contractors and subcontractors who enter into, or modify a contract or subcontract with the Federal Government, and whose contract meets the criteria set forth in the above legislation/regulations, are required to report annually on their affirmative action efforts in employing veterans. Veterans’ Employment and Training Service (VETS) has a legislative requirement to collect, and make available to OFCCP, reported data contained on the VETS- 4212 report for compliance enforcement. http://www.dol.gov/vets/vets4212.htm.

TO:

1) Offerors are required to electronically submit their complete proposal in two (2) separate files, using DoD SAFE as follows:

Volume I Price Proposal (Excel Format)

Exhibit Line Item Number (ELIN Pricing). Leave ALL excel formulas open in the spreadsheet.

Exhibit Line Item Number (ELIN) Pricing: Complete a excel copy of Exhibit Line Item Number (ELIN) for the proposed initial task order. Price Proposal is to be submitted in Microsoft Excel 2007 or latest version, with all formulas and links to detail worksheets intact.

Volume II Technical Proposal (PDF Format) The format for the electronic proposal shall be submitted in the exact order as follows:

a) Cover Letter and Standard Form (SF) 33 Solicitation/Offer and Award (Offeror to complete Blocks 12 thru 18).

b) Factor 1 – Recent, Relevant Experience of the Firm Exhibit B- Experience

c) Factor 2 – Management Approach Exhibit C- Management Approach

d) Factor 3 Safety Exhibit D - Safety Data Sheet

e) Factor 4 – Past Performance Exhibit E – Past Performance (one for each project submitted under Factor 1

Exhibit B)

f) Representations and Certifications from the SAM. Completed provision 52.204-

24 presentation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020).

g) If the Offeror is proposing as a Joint Venture (JV) and/or Mentor-Protégé, the Offeror shall provide a copy of the JV agreement and, if the JV is with a Mentor-Protégé, a copy of the relevant Mentor-Protégé agreement approved by the SBA.

h) VETS-4212 annual report

3. Revise Section A – Financial Questionnaire (EXHIBIT A) to reflect the following:

Proposal Submission Requirements, the format for the Financial Questionnaire proposal is revised to reflect the electronic submission of EXHIBIT A as follows:

Financial Questionnaire (to be completed and submitted by financial institution)

Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should send the completed questionnaire via email directly to Sunshine Hernandez at sunshine.hernandez@navy.mil. Please ensure the financial institution utilizes the form provided in order to submit the requested information. Links to websites and/or files with .zip file extensions may not be accepted.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

4. Provide Responses to Requests for Information (RFIs).

5. Provide EXHIBITS A – E in Word format.

6. Provide the NAVFAC MO-200 Manual.

7. Provide updated Refuse Collection Service Locations and Frequencies.

8. Provide updated MFSC 2021 FOR MCAS CAMP PENDLETON-Amendment 0002_6.1.21.

9. Provide Davis Bacon Act (DBA) Wage Determination.

10. Provide the list of attendees to the Pre-proposal Conference.

11. Provide updated Clauses.

12. The proposal due date has been extended to Monday, June 14, 2021 at 12PM Pacific Daylight

Time (PDT).

13. All other terms and conditions remain unchanged.

A. The following are responses to Requests for Information:

RFI #01: RFP states: "Proposal due date and delivery location: Proposal due date information is identified in block 8 on the SF 1449 and/or as amended on the SF 30." No SF 1449 was provided with the original RFP and no amendments have been released to date. Will the Govt provide an SF 1449 with the due date or release an amendment with the due date noted on an SF30?

RESPONSE: The Government will not provide an SF 1449. Block 9 Standard Form (SF) 33 is amended as follows:

9. Sealed offers in original and copies for furnishing the supplies and services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in until 12:00 pm local time 14 Jun 2021.

(Hour) (Date)

RFI #02: RFP states: "Completed Exhibit D, “Financial Questionnaire” from banking institution" Section J states Exhibit D is the SAFETY PROJECT DATA SHEET (Factor 3). Section J also states Exhibit A is the FINANCIAL QUESTIONNAIRE, however, no Exhibit A was provided with the original RFP. Will the Govt provide the required Exhibit A? Also, Request the Government correct the statement to read "Completed Exhibit A, “Financial Questionnaire” from banking institution"

RESPONSE: See Amendment 0001 issued May 18, 2021.

RFI #03: RFP states: "The attached offeror Recent, Relevant Experience of Firm Project Data Sheets, Exhibit B, is MANDATORY and SHALL be used to submit project information." No Exhibit B was provided with the original RFP. Will the Govt provide the required Exhibit B?

RESPONSE: See Amendment 0001 issued May 18, 2021.

RFI #04: RFP states: "Exhibit C is MANDATORY." No Exhibit C was provided with the original RFP. Will the Govt provide the required Exhibit C?

RFI #05: RFP states: "Completed Exhibit D, “Financial Questionnaire” from banking institution" No Exhibit D was provided with the original RFP. Will the Govt provide the required Exhibit D?

RFI #06: RFP states: "Submit Exhibit E (Past Performance Questionnaire (PPQ) and CPARS evaluations under Tab #4 of the Technical Proposal Volume 2." No Exhibit E was provided with the original RFP. Will the Govt provide the required Exhibit E?

RFI #07: RFP states: "...Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other solicitations." Exhibit E states: "… THE OFFEROR WILL SUBMIT THE COMPLETED

QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS

QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS." Request the Government clarify seemingly contradictory statements.

RESPONSE: The term “shall not incorporate by reference” means the Offeror shall not provide the Government with a response to refer to a previous submission. An actual PPQ and/or CPARS shall be submitted with the Proposal package.

RFI #08: Will the Government provide a reference to Technical Exhibit (TE) and the Technical Exhibit of Storm Drainage Systems so this requirement can be priced and staffed? If this not available, historically what has the government found to keep this at an acceptable level?

RESPONSE: Incumbent has two-man grounds maintenance crew who works daily on MCAS. Following weekly schedule satisfies contract requirements: Monday & Tuesday - Zone B; Wednesday - Zone A, C, D; Thursday & Friday – Zones E, G, F.

RFI #09: What TE is associated with the BASH requirement as not is listed in this paragraph?

RESPONSE: Servicing parts of Zone E for two hours each on Thursdays and Fridays before flight operations begin will meet requirements for Spec item 3.2.3

RFI #10: What TE is associated with the Ammunition Storage requirement as not is listed in this paragraph?

RESPONSE: Magazines are part of Zone E. See comments for Spec Item 3.2.3

RFI #11: Will the SQ FT be provide for Bldgs. 2394 and 23122 and Gazebo Area as they are currently blank?

RESPONSE: The square footage is as follows: B2394: 13,320 SF; B23122: 5,880 SF; Gazebo area: 14,220 SF.

RFI #12: Will the SQ FT be provide for Bldgs. 23123, 23215, 2331 and Memorial Park, 2394, 2399, 23122 and Blast Wall as they are currently blank?

RESPONSE: B23123: 23,270 SF; B23215: 20,773 SF; B2331 & Memorial Park: 16,245 SF; Blast Wall: 13,510 SF; B2394, 2399, 23122 in Zone B deals with servicing Palm Trees (quantity is addressed in RFI #13), SF is insignificant.

RFI #13: How many Palm trees are to be trimmed for Bldg 2394, 2399 and 23122?

RESPONSE: B2394: 8 Queen Palm; B2399: 2 Queen Palm; B23122: 8 Queen Palm; B23123: 6 Canary Palm; Blast Wall: 1 Canary Palm

RFI #14: Will the SQ FT be provided for Bldg Alfa and Bravo Gates as they are currently blank?

RESPONSE: See Remarks column for requirements. Dead fronds shall be removed as needed throughout the life of contract or as directed by PAR/COR. There are total of 4 Canary Palm trees and 4 Queen Palm trees in Alfa and Bravo gates. A plant bed of approximately 50 SF.

RFI #15: The Second Weed Control of 6136 SQ FT has COL of 4 but J-1503050-02 Week control in the tabs has N/A for Lawns and Fields. Will this requirement be dropped from MCAS-A? Will the COL be updated to COL 3 or not? Please clarify.

RESPONSE: Note 5 is added in Attachment J-1503050-02 COL Table. Follow COL 3 requirements and instruction in remarks column.

RFI #16: Building 23215 2nd line has Prestige with COL 3. In J-1503050-02 Prestige is only COL 2. Will this requirement be update to correct Description and or COL?

RESPONSE: COL column corrected to COL2. Follow COL 2 requirements for Weed Control.

RFI #17: Building 2331 & Memorial Park 2nd line has Prestige with COL 3. In J-1503050-02 Prestige is only COL

2. Will this requirement be update to correct Description and or COL?

RESPONSE: COL column corrected to COL2. Follow COL 2 requirements for Weed Control.

RFI #18: Building 2394, 2399, 23122 has Prestige with COL 3. In J-1503050-02 Prestige is only COL 2. Will this requirement be update to correct Description and or COL?

RESPONSE: COL column corrected to COL2. Follow COL 2 requirements and instructions in remarks column.

RFI #19: Historically, how many repairs are done on yearly average?

RESPONSE: Three

RFI #20: How many Plant Bed are there that must be maintained? Will a TE be provided with the location and of each bed and size?

RESPONSE: B23215: 4,567 SF; B23122: 800 SF; B2398: 350 SF; B2394: 4,775; Field Training Area: 6,090 SF

RFI #21: How many shrubs and Hedges are there to be maintained by quantity and or linear feet? Will a TE be provided with the locations of each?

RESPONSE: B23123, 23122, 2399, 2396: combined total of 1,090 LF; B23215: 442 LF

RFI #22: How many ornamental trees are there that have to be maintained and what are there locations?

RESPONSE: B23123: 4; B2394: 5; B23122: 3; B23194: 3

RFI #23: What is the linear feet of edging that must be accomplished? Will a TE be provided showing the linear feet that is required to be edged and their locations?

RESPONSE: B23123: 2,125 LF; B23700: 730 LF; B23215: 825 LF; Field Training Area: 475 LF

RFI #24: What is the amount of Artificial Turf that must be maintained? Will a TE be provided showing the sq. ft.

of each area and location?

RESPONSE: CFT: 4,914 SF; PFT: 2,624 SF; Both locations are in Zone E

RFI #25: In the Description Column Semi-improved, Hardscape Surface and Improved terms are used but in Attachment J-1503050-02 COL Table only Prestige, Lawns and Fields are used. Will government adjust Attachment J-1503050-09 to match up with J-1503050-02?

RESPONSE: Note 5 is added in Attachment J-1503050-02 COL Table. Follow COL 3 requirements and instruction in remarks column.

RFI #26: In the COL Column Special Requirement term is used but in Attachment J-1503050-02 COL Table there is not Special Requirement call out. Will government adjust Attachment J-1503050-09 to match up with J-1503050- 02?

RESPONSE: Specifications for Special Requirements shall remain stated in the 'Remarks' column of Attachment J- 1503050-09.

RFI #27: The first 2 Carrier items have the same Serial Number. Will this be corrected or one of them deleted?

RESPONSE: One of the serial numbers is a typo, but there are two Carrier units in B2394.

RFI #28: Will the government add the sizes of the units as the Models numbers are not coming up in searches?

RESPONSE: B2394: Carrier #1 80 ton, Carrier #2 - 80 ton; B2399: Carrier #1 80 ton, Carrier #2; B23194: Daiken #1 - 63 Ton, Daiken #2 - 63 Ton, York #3 - 61 Ton; B23670: York #1 - 155 Ton

RFI #29: Is the DDCS monitored from a single station or at each location?

RESPONSE: Single station located in B23122

RFI #30: Is the contractor required to physically monitor the DDCS 24/7 or not?

RESPONSE: No. Incumbent contractor provides DDC technician three 8-hr days per week during Government regular working hours to conduct PM and monitor DDC and it satisfies contract requirements.

RFI #31: The last 2 items in the WHE Inventory have no quantity. Will the quantity be added in or the lines be deleted?

RESPONSE: There is one (1) WHE in B23670A and one (1) WHE in B23670B

RFI #32: Historically, NAVFAC SW the spend has been approximately $24M/year.

1. Would the Government please confirm if the contract vehicle is expected to be used for at least $20M/year?

2. Would the Government please provide the projected spend plan per year on this contract vehicle by base and/or locale?

3. Would the Government please identify which base/locale the Government plans to use the MASC for recurring work?

RESPONSE:

1. The government anticipates performance up to $25M/year with a Not To Exceed amount of $99M over the life of the contract.

2. An IDIQ is specifically for Indefinite Delivery Indefinite Quantity, because it is unknown what each Base will require in a given year.

3. Again, the Government cannot identify which Base/Locale plans to use the MASC for recurring work. This is a new requirement, and thus, no historical data available. It is very difficult to extrapolate what each Base may use the MASC for in the future.

RFI #33: Would the Government please release the Government and Industry attendees (Name, Company, Position, Email, Phone number) at the pre-solicitation conference.

RESPONSE: Please refer to the “Preproposal Conference Attendees” document included as an attachment to this Amendment 0002.

RFI #34: The RFP does not indicate a minimum Company Facility Clearance Level. Given the NAVFAC SW AOR and the range of customers, it is highly probable that recurring and non-recurring work may be required in a controlled facility. The Navy and Marine Corps operations in many cases are highly classified.

We have many customers who on a base or complex have the majority of the space allocated to unclassified facilities where a FCL and a personnel security clearance is not required. On the same facility/base complex there is also a highly controlled facility to include sensitive compartmented information facilities (SCIFs). Ongoing maintenance and services is required.

Recommendation – We recommend the Government modify the RFP to include the requirement for a Facility Clearance Level of Top Secret in order to support unforeseen requirements and support a range of customer requirements. By issuing a DD254 with a TS FCL, NAVFAC SW provides flexibility by ensuring all awardees have the capability to support all base/facility future requirements.

RESPONSE: If a requirement project requires Top Secret Clearance access, the Solicitation for the project will be identified in the RFP and will be issued at the Task Order level.

RFI #35: Paragraph (b) states “A table of contents, list of acronyms, and any relevant/associated tables or figures is required.” Would the Government please confirm that the table of contents, list of acronyms and any relevant/associated tables or figures are exempt from page count?”

RESPONSE: The Table of Contents, list of acronyms and any relevant/associated tables or figures are exempt from the total page limits.

RFI #36: Appears Amendment 0001 there was a transposition and a large section of Section B is missing. Would the Government please confirm that the Amendment 0001 reduction of Section B is correct?

RESPONSE: The purpose of Amendment 0001 in regards to Section B – Supplies or Services and Prices, was to add by full text certain language. It did not remove anything previously noted in Section B in the Solicitation. All other terms in Section B remained unchanged.

RFI #37: Tab #1 Factor 1 Recent Relevant experience indicates “Submit a minimum of three (3) and a maximum of four (4) relevant projects performed by the offeror as the Prime Contractor that best describes the offeror’s experience on projects that are similar in size, scope, and complexity to the projects that may be ordered under the solicited contract.”

Comment – The phrase “minimum of three (3) and a maximum of four (4)” is very restrictive for small businesses and limits the ability to provide an offer.

Question - Would the Government please consider the modification of the phrase “minimum of three (3) and a maximum of four (4)” and replace with “up to four?”

Thereby making the requirement read: “(i) Submit up to four (4) relevant projects performed by the offeror as the Prime Contractor that best describes the offeror’s experience on projects that are similar in size, scope, and complexity to the projects that may be ordered under the solicited contract.”

RESPONSE: Factor 1 Recent Relevant Experience remains unchanged.

RFI #38: Background – The RFP requires offerors to complete Exhibit B for each relevant experience contract. The instructions state, “Individual blocks on this form may be expanded; however, total page limit for each project data sheet shall not exceed three single-sided pages.

Comment – When blank, Exhibit B is almost a full three pages. This significantly restricts an offeror’s ability to demonstrate that projects “are similar in size, scope, and complexity to the projects that may be ordered under the solicited contract.” This limited ability to expand blocks also prevents adequate responses to items 9 and 10, which require “detailed” explanation and description.

Questions –

1. Will the Government consider increasing the page limitation for Exhibit B from three pages to four pages to allow offerors to provide adequate detail?

2. Would the Government release a Microsoft Word Version of the document as the PDF file is exceedingly difficult to edit?

1. The page limitation for Exhibit B remains unchanged.

2. The Microsoft Word version of Exhibit B is included with Amendment 0002.

RFI #39: RFI #38 was the exact same question as RFI #37.

RESPONSE: See Response to RFI #37.

RFI #40: Background - The solicitation alternates between requiring the submission of an (SF) 1449 (which was not provided) and an (SF) 33.

Questions

1. Please confirm that the required document is the (SF) 33 provided with the original solicitation?

2. Would the Government please confirm the date and time for proposal submission?

1. The required document is the Standard Form (SF) 33.

2. The date and time for proposal submission has been extended as follows: Monday, June 14, 2021 at

12:00pm PDT.

RFI #41: Background - Amendment 0001 Exhibits A through F were provided in Adobe Acrobat format and do not allow editing. We are having difficulty preparing the proposal.

Questions

1. Will the Government release Microsoft Word or Microsoft Excel versions of Exhibits?

2. Will the Government confirm that offerors may recreate the forms into editable versions?

3. If no to questions #1 and #2

a. Would the Government allow for offerors to remove the instructional narrative from the forms as long as the main headings are visible? For example: KEEP: “1. Workload Management Plan:”

and REMOVE “Provide the proposed plan that is detailed, specific, and demonstrates how the Offeror has the necessary capability to successfully manage surges in workload and perform multiple TO concurrently at various locations within the NAVFAC SW AOR.”

b. Would the Government confirm that offerors may remove the headers/footers of the provided PDFs and insert the recreated forms/tables into a custom file which includes the general disclaimer language plus offeror name/logo along with the solicitation name and number?

RESPONSE:

1. The Microsoft Word version of Exhibits A through F are included with this Amendment 0002.

2. Offerors may not recreate the forms.

3. a. Offerors may not remove the instructional narrative from the forms.

b. Offerors may not remove the headers and footers.

RFI #42: Background - On pages 8 and 84 the requirements state: “Font size shall be 10 or 12 point.” On page 77 they state “…using 12-point Times New Roman font.”

Questions

1. Will the Government clarify what exactly the font type/size requirements are?

2. For tables, graphics, headers and footers, will the Government allow for an 8 point font or “legible” text?

1. The font shall be Times New Roman and shall be no smaller than 10-point and no larger than 12-point.

2. For tables, graphics, headers and footers, the same font and point sizes apply; i.e., Times New Roman font no smaller than 10-point and no larger than 12-point.

RFI #43: When are questions/requests for information due?

RESPONSE: Requests for Information (RFIs) were due May 24, 2021 by 3:00pm PDT.

RFI #44: Background - Attachment E – Annex specific to seed project, paragraph 2.16.1 requires submission of a phase-in plan on the proposal due date. We don’t see the requirement in Section L Questions

1. Is phase in plan required for submission?

2. If so, will the Government provide a specific Exhibit on the phase-in plan with a structure and page count?

RESPONSE:

1. Yes, a phase-in plan is required for submission.

2. No, the Government will not provide a specific Exhibit on the phase-in plan with a structure and page count.

RFI #45: Would the Government provide Davis Bacon Act wage determination?

RESPONSE: See attached Davis Bacon Act (DBA) Wage Determination General Decision Number: CA20210001 issued 04/23/2021.

RFI #46: Background – The RFP identifies a relevant project as “At least 50% complete within the last five (5) years prior to the solicitation issuance date” and “at least 50% complete in terms of amount paid for contract performance.”

Comment – These phrases are very restrictive for small businesses and limit the ability to provide an offer. As written, for example, a contract with an eight-year period of performance will likely require four years of completed performance to reach 50% of the amount paid for contract performance in order to make it relevant for consideration.

Question

1. Would the Government consider removing the 50% completion requirement and replacing it with one year of performance?

RESPONSE: Factor 1 – Recent, Relevant Experience of the Firm remains unchanged.

RFI #47: Background – The requirements state that past performance contracts must be “at least 50% complete in terms of amount paid for contract performance,” and “project Data Sheets submitted for projects that are not at least 50% complete within five (5) years prior to the solicitation issuance date will be removed prior to evaluation.”

Question

1. If a base contract (IDIQ) allows ordering over and above work, and receives all or most funding on the base contract/IDIQ level, is it permissible (compliant) to submit the entire IDIQ as a past performance contract reference if Task Orders are not individually awarded?

RESPONSE: It is not permissible to submit the entire IDIQ as a past performance contract reference if Task Orders.

For details, refer to Factor 1 – Recent, Relevant Experience of the Firm.

RFI #48: The questions submitted to the Government are critical to the completion of offerors’ proposals and until then several items remain pending. When answers are released, offerors will need time to review all the answers, analyze any updated attachments, and adjust and finalize proposals, including developing and finalizing our pricing.

In order to give offeror’s sufficient time to adjust, complete, and submit compliant proposals, we request that the Government extend the due date until at least two weeks after the release of the Q&As.

RESPONSE: The Proposal Due Date is hereby extended to Monday, June 14, 2020 at 12:00PM Pacific Daylight Time (PDT).

RFI #49: This spec item contains language requiring specific personnel be trained under NAVFAC MO-200. Is this training available through NAVFAC? Are there other resources qualified to provide this certification?

RESPONSE: No, NAVFAC does not provide training on the MO-200 manual. The Navy, Air Force, and Army all reference this same “Facilities Engineering Electrical Exterior Facilities” technical manual. Contractors will need to meet the requirements. See provided MO-200 manual.

RFI #50: Will the Government please provide Exhibit C in Microsoft Word format so that the offeror may expand the block. If the Government’s intent is for the offeror to re-create the form in Microsoft Word within their proposal, please clarify.

RESPONSE: See RESPONSE to RFI #40.

RFI #51: In Amendment 0001, the submission format was changed to reflect utilization of SAFE System electronic submission. Page 6 of the amendment, #3 states that the offeror is required to submit their proposal in two (2) separate files. Is it the Government's intent for the offeror to submit two (2) ZIP files with multiple documents for the corresponding volume in each? If so, will the Government please clarify if it is requesting that each "TAB" be a separate document, or if a single PDF consolidating all documents, with the exclusion of Excel spreadsheets, is acceptable?

RESPONSE: Amendment 0002 has revised Clause 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) and Section A – Solicitation/Contract Form, INSTRUCTION TO OFFERORS/GENERAL INFORMATION.

See above.

RFI #52: Will the Government please clarify whether Project Experience references are limited to a maximum of 4 (as stated in paragraph (i) of page 80) or 5 (as stated in (iv) of page 81) of the original solicitation?

RESPONSE: The correct maximum is 4. The 5 stated in the original Solicitation is hereby changed.

RFI #53: Regarding the Seed Project, have there been material changes to the scope of work for this task order?

RESPONSE: Please clarify the question.

RFI #54: Section 0200000 - 2.7.1.2 and 2.7.1.2.1 list both a Quality Manager and Quality Control Personnel who "shall be on site at all times" with this contract being their "primary duty and responsibility." Is it the government's intent for this contract to have two full time, dedicated QC employees who perform no field work, only management of the quality program?

RESPONSE: No. One FTE for QC/ Site Safety is sufficient. Per 0200000 - Spec Item 2.7.1.2 : 'The Quality Manager or designated alternate may be the same person as the SSHO.”

RFI #55: Block 9 of the SF 33 is blank. Would the Government please provide a completed SF 33 for the offer to complete and submit with the proposal?

RESPONSE: See RESPONSE to RFI #01.

RFI #56: Section A requires a completed SF 33 be provided with Tab #1 of the Price Proposal. Section M requires an SF 1449 to be submitted with Tab #1 of the Price Proposal. No SF 1449 has been provided; a partially completed SF 33 has been provided. Please clarify.

RESPONSE: SECTION M – EVALUATION FACTORS FOR AWARD has been modified in Amendment 0002. See attached.

RFI #57: Pages 81 through 128 appear to be duplicates of portions from pages 5 through 81 Please clarify.

RFI #58: Section A of Amendment 0001 states proposals are to be submitted electronically via DoD Secure Access File Exchange Services (SAFE). Section M of Amendment 0001 requires print (original + one copy) of the Price Proposal with an electronic copy on CD and print (original + four copies) of the Technical Proposal with an electronic copy on CD. Additionally, for Tab #2 of the Price Proposal on page 74, both a completed paper copy and an electronic version on a CD of the ELIN Pricing is required. Please clarify how the proposal is to be submitted.

RESPONSE: Amendment 0002 has revised Proposal submission requirements and Financial Questionnaire submission requirements.

RFI #59: This paragraph (52.212-2 (a) 1.a., Tab 1) includes the instruction of referencing Solicitation Number N62473-21-R-0016. The solicitation number is N62473-21-R-0020. Please clarify.

RESPONSE: The correct Solicitation number N62473-21-R-0020. All references to N62473-21-R-0016 should read N62473-21-R-0020.

RFI #60: Amendment 0001, Section A states font size shall be 10 or 12 point. Section M and Exhibit C state that Times New Roman 12-point font must be used in Exhibit C. Please clarify the font requirements.

RESPONSE: See Response to RFI #41.

RFI #61: Section M and Exhibit C state that Times New Roman 12-point font must be used in Exhibit C. May graphics utilize smaller than 12-point font so long as legibility is maintained? Please clarify.

RESPONSE: See Response to RFI #41.

RFI #62: Paragraphs (i), (vii), and (viii) require a minimum of three and a maximum of four references. Paragraph

(iv) limits the total number of project references to five. Please clarify the maximum number of references permitted.

RESPONSE: See RESPONSE to RFI #52.

RFI #63: Amendment 0001, Section A states font size of 10 or 12 point may be used, with margins of 1” on top, bottom, left, and right required. Amendment 0001, Section M and Exhibit C state that Times New Roman 12-point font must be used in Exhibit C, yet the text in Exhibit C is in 10 point. Exhibits A through E appear to have custom margins of 1” on the top and 0.5 inch on the left, right, and bottom. Exhibit D spans the full width of the page from left to right. Exhibits A, B, and C contain text in 10-point font. Exhibit D contains a mix of 10- and 11-point fonts.

Exhibit E contains a mixture of sizes (ranging from 8 to 12) and types (Times New Roman and Tahoma) of font.

Please clarify and confirm the margin and font size and type requirements and confirm whether the Offeror is responsible for reformatting the Government-provided exhibits to ensure they meet the Government-required margin and font requirements and restrictions.

Alternatively, would the Government provide the Exhibits in Word format, in their required font size, type, and margin requirements?

RESPONSE: See Responses to RFI #40 and RFI #41.

RFI #64: The Safety Narrative (limit 2 pages total) is listed twice; first on pages 2 through 4 (numbered items 6a, 6b, and 6c) and again on page 5 (numbered items 7a, 7b, and 7c). The items listed for discussion in Block 6 (pages 2 through 4) differ from those required in Block 7 (page 5). Is the Offeror to complete two different Safety Narratives, each limited to no more than 2 pages each? Please clarify.

RESPONSE: Response Pending.

RFI #65: The last item on page 1 is numbered 3.c. On page 2, the first item is numbered 6.a. Are there items/sub-items (4 and 5) missing? Please clarify.

RFI #66: Section M requires the Safety Narrative to address the following three requirements: ” a. Offeror describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS. b. Offeror describes a methodical process of evaluating subcontractor’s safety performance in their selection process. c. Offeror describes a logical management plan to hold both themselves and their subcontractors accountable for adhering to the safety requirements of the contract.” These three items seem to pair with the requirements of Block 6 (pages 2 through 4) of Exhibit D, but not with Block 7 (page 5) of Exhibit D.

Please clarify.

RFI #667 Page 1 states a Contractor’s Work Plan (CWP) is required to be submitted with the proposal. This requirement is not listed or referenced in Exhibits B through E. Please clarify.

RESPONSE: Contractor's Work Plan is a deliverable requirement, as stated in 1503020 Section C, and 1503020 Section F.

RFI #68: This requires Planned Pesticide Use Sheets and Safety Data Sheets be submitted with the proposal.

Exhibits B through E make no reference or mention of Pest Control Sheets. Please clarify.

RESPONSE: Refer to Attachment J-1503020-02 for the only Planned Pesticide Use Sheet required per NAVFAC's current template. Per 1503020 Section C Spec Item 2.3.5:'All pesticides used by the Contractor in the US shall be registered with the EPA and applicable state lead agency for the use intended. New Pesticide Request and Planned Pesticide Use Sheet, provided in Attachment J-1503020-02 including labels and SDS for each pesticide intended for use, shall be submitted per Section F with the Contractor’s Work Plan. Approvals may be made for and limited to specific pests and sites. Any proposed changes in pesticide usage shall be submitted per Section F for approval prior to use.'/The following are acceptable submittals for Safety Data Sheets - Per Attachment J-1503020- 01 Definitions : Safety Data Sheet (SDS): A document (Occupational Safety and Health Administration (OSHA) Form 174, or equivalent) that accompanies a pesticide product, providing the handler with chemical information on ingredients, handling instructions, potential hazards, and manufacturer address and emergency contact information.

Refer to Attachment J-1503020-12 for sample SDS.

RFI #69: This states a Phase-in Plan is required to be submitted as part of the proposal. Exhibits B through F do not reference or mention a Phase-in Plan. Please clarify.

RESPONSE: 0200000 Section C and Section F refer to requirement to provide a Phase-In Plan as stated for Spec Item 2.16.1.

RFI #70: This requires a Contractor’s Work Plan (CWP) for Pest Control with the proposal. Exhibits B through E do not reference or mention a CWP for Pest Control. Please clarify.

RESPONSE: Contractor is required to provide a CWP for Pest Control per requirements stated in 1503020 Sec C, Spec Item 3 , Attachment J-1503020-01

RFI #71: This Annex/Spec Item requires Planned Pesticide Use Sheets, including Pesticide Labels and Safety Data Sheets (SDS). Exhibits B through E do not reference or list this requirement. Please clarify.

RESPONSE: Refer to response to RFI #67 for information about Planned Pesticide Use Sheets and Safety Data Sheets. For Pesticide Labels, 'The Contractor shall maintain a book of labels and Safety Data Sheets (SDSs) for pesticides they use or intend to use, and have it readily available for the COR's inspection at all times.' Refer to 1503020 Spec Item 2.3.5 for full requirement.

RFI #72: Amendment 0001 states that part of its purpose is to “Remove and replace Attachment MFSC (Marine Coreps Facility Support Contract) 2021 for MCAS Camp Pendleton_Rev. 2_03.07.21.” The 251-page PDF file provided does not appear to be identical to the nearly 50 Word files of Annexes provided. Please clarify the difference, application, and precedence between the PDF Annex documents and the Word Annex documents.

RESPONSE: On Amendment 0001, please see Number 7 on Page 10 of 128. The Annexes provided under Number 7 on Page 10 of 128 of Amendment 0001 are associated solely with the Basic Contract. The attachment titled MFSC 2021 For MCAS Camp Pendleton is the PWS document for the Planned Task Order/Seed Project at MCAS Camp Pendleton.

The current PWS document for the MCAS Camp Pendleton Task Order ('MFSC 2021 FOR MCAS CAMP PENDLETON_Amendment 002_6.1.21' is comprised of Sec C, J, and F of Annexes 1502000 - Facility Investment;

1503020 – Pest Control; 1503030 – Integrated Solid Waste Management; 1503050 – Grounds Maintenance and Landscaping, Sec C of Annex 0100000 – General Information; and Sec C, J, and F of 0200000 – Management and Administration. The Contractor shall submit pricing solely for MCAS Camp Pendleton TO service requirements (The FI, Pest Control, ISWM, and Grounds requirements that have been tailored in the Annex documents for the Air Station).

RFI #73: Amendment 0001 states that part of its purpose is to “Remove and replace Attachment MFSC (Marine Corps Facility Support Contract) 2021 for MCAS Camp Pendleton_Rev. 2_03.07.21.” The 251-page PDF file provided with Amendment 0001 is actually titled MCAS Camp Pendleton_Rev. 3_05.11.21 as opposed to Rev. 2_

03.07.21. Does the Amendment mean to refer to Rev. 3_05.11.21? Please clarify.

RESPONSE: Amendment 0001 removed the attachment titled MFSC (Marine Corp Facility Support Contract) 2021 For MCAS Camp Pendleton_Rev. 2_03.07.21 and replaced it with the attachment titled MFSC 2021 For MCAS Camp Pendleton_Rev. 3_05.11.21.

RFI #74: Attachment C – MASC Frequently Asked Questions is listed as being provided, but we cannot locate the file. Would the Government please provide Attachment C – Frequently Asked Questions?

RESPONSE: Attachment C – MASC Frequently Asked Questions is deleted in its entirety and no longer exists.

RFI #75: Although the RFI PDF file and form are referred to as “Attachment A,” the form itself lists “Exhibit F” in its title block. Please clarify.

RESPONSE: Exhibits are the forms that must be submitted with the offeror’s proposal package; such as Safety Data Sheets. Attachments are for reference purposes; i.e., SCA and DBA wage decisions.

RFI #76: Page 6 states “Offerors are required to electronically submit their complete proposal in two (2) separate files, formatted in Portable Document Format (PDF) with a .pdf file extension and in an Excel Format (XLS) with a .xls file extension.” This is followed by a list of files, each with several “tabs” per file. Please explain what is meant by a “file” and a “tab” when dealing with pdf and Excel formats.

RESPONSE: See RESPONSE to RFI #51.

RFI #77: What is the current annual fixed price amount of the current task order?

RESPONSE: The Task Order award is NTE $3,563,095.14 for FFP and IDIQ for the Base Period (11.5 mos and 3 Option years.)

RFI #78: Is there a spec to review for AFFF Risers for OEM's or Service requirements?

RESPONSE: Refer to NFPA 16, 25, and 409.

RFI #79: Can the government provide a spec for the Original Equipment Manufacturer’s (OEM’s) or maintenances pertaining to the carbon dioxide systems?

RESPONSE: MCAS PWD does not have an OEM for CO2 systems. However, contractor should refer to NFPA 12 in developing PM program for this system.

RFI #80: Can the government provide a spec for the OEM’s or maintenances programs pertaining to the low expansion foam systems?

RESPONSE: MCAS PWD does not have an OEM for CO2 systems. However, contractor should refer to NFPA 12 in developing PM program for this system.

RFI #81: Is it the governments intentions for the contractor to have a permanent trailer onsite for the duration of the contract. If so, is there septic connections available or is the contractor responsible for a holding tank?

RESPONSE: Yes. There is no need for septic connections. A restroom facility is adjacent to KTR’s laydown area and KTR personnel are allowed to use this facility. Refer to Attachment J-02000000-06 for further information.

RFI #82: Will the government provide water for the trailer?

R…