Section C – 0100000 General Information 0100000 – General Information
| 1.3 |
| Acquisition of Additional Work |
| 1.4 |
| Background Information |
| 1.8 |
| Verification of Workload and Conditions |
| 1.9 |
| Contractor's Knowledge |
| 1.10 |
| Technical Proposal Certification |
0100000 – General Information
| Spec Item |
| Title |
| Description |
| 1.1 |
| Outline of Services |
| Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at various locations throughout the Southwest Area of Responsibility (AOR) and by means of performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items. |
The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page). The Annexes listed is for information only but will be Task Order specific depending on customer requirements.
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff Annex 4 Public Safety Annex 5 Air Operations Annex 6 Port Operations Annex 7 Ordnance Annex 8 Range Operations Annex 9 Health Care Support Annex 10 Supply Annex 11 Personnel Support Annex 12 Morale, Welfare and Recreation Support Annex 13 Galley Annex 14 Housing Annex 15 Facilities Support Annex 16 Utilities Annex 17 Base Support Vehicles and Equipment Annex 18 Environmental
| 1.2 |
| Project Location |
| The work shall be performed at various locations within the footprint of the Naval Facilities Engineering Command Southwest Division region. This area covers Naval And Marine Corps bases on West Coast states, which may include Alaska, Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Washington, Wyoming and Utah. |
| 1.3 |
| Acquisition of Additional Work |
| The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of each Task Order. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract. |
| 1.4 |
| Background Information |
| The intent of this solicitation is to obtain facility maintenance management and services. The contract is a performance-based specification relying on the Contractor’s experience and expertise determining the best method of service operations. It is expected that the Contractor will develop an aggressive sub-contracting program supporting Government small business programs. The Contractor is required to have in place a Quality Management System, providing quality control and quality assurance measures of both the Prime Contractor operations and all Task Order requirements. |
| 1.5 |
| Navy PBSA Approach |
| The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan. |
| 1.6 |
| Standard Template |
| Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. |
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.
| 1.7 |
| Related Information |
| There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows: |
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
| 1.8 |
| Verification of Workload and Conditions |
| Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided. |
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
| 1.9 |
| Contractor's Knowledge |
| The Navy expects to receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level. |
| 1.10 |
| Technical Proposal Certification |
| The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract. |