ANNEX 1606000 SECTION F WATER.doc
DOC document 54 KB Posted
- Solicitation number
- N62473-21-R0020
About this file
This document outlines the delivery schedule and performance requirements for a multiple award service contract to provide facility services at various locations in six Western states. Key requirements include providing proof of certifications and licenses within 30 days of award, submitting a critical spare parts inventory and standard operating procedures within initial timeframes, and reporting unsafe conditions and various operational records on recurring schedules. Preventative maintenance, integrated maintenance, inspection and testing programs are to be submitted within initial periods. Recurring deliverables such as monthly meter reading and maintenance status reports are due at month's end. The contract will be awarded through the 8(a) program and involves services such as facility investment, pest control, integrated solid waste management, and grounds maintenance at Marine Corps Base Camp Pendleton, California under an initial task order.
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1606000 – Water
SECTION F: DELIVERIES OR PERFORMANCE
Annex/
Spec Item Form
Attachment Number
| Deliverable Title |
| Date (s) of Submission |
| Distribution |
| Frequency |
| Original/ Copies |
| Number of Copies (including original) |
| 1606000/2.2.1 |
| N/A |
| Proof of all Certification, Training, and Licensing Requirements |
| Within 30 days following award |
| KO |
| 2 |
| Once. Update as changes occur. |
| 1606000/3 |
| N/A |
| Critical Spare Parts Inventory |
| Within 30 days following award |
| KO |
| 4 |
| Once. Update if the requirements change. |
| 1606000/3.1 |
| N/A |
| Standard Operating Procedures |
| 15 days after award and 5 days after changes |
| KO |
| 4 |
| As required |
| 1603000/3.1 |
| N/A |
| Notification of Unsafe Conditions Report |
| Within 24 hours of occurrence |
| KO |
| 4 ea per occurrence |
| As Specified |
| 1606000/3.1.3 |
| Specified in each Task Order |
| Operating Records, Logs, and Reports |
| 3 days following the end of the month |
| KO |
| 4 |
| Monthly |
| 1606000/3.2 |
| N/A |
| Preventive Maintenance Program |
| Within 15 days following award |
| KO |
| 4 |
| As specified |
| 1606000/3.3 |
| N/A |
| Integrated Maintenance Program (IMP) |
| Within 15 days following award |
| KO |
| 4 |
| As specified |
| 1606000/3.3 |
| N/A |
| Monthly IMP Schedule and IMP Maintenance and Repair Status Report |
| 3 days following the end of the month |
| KO |
| 4 |
| Monthly |
| 1606000/3.4 |
| N/A |
| Inspection, Testing and Certification Program and Schedule |
| Within 30 days following award |
| KO |
| 4 |
| As Specified |
| 1606000/3.4 |
| N/A |
| Inspection, Testing, and Certification Program Summary Report |
| As specified |
| KO |
| 4 |
| As specified |
| 1606000 / 3.5.1 |
| N/A |
| Monthly meter reading report |
| By the 25th day of each month |
| KO |
| 4 |
| Monthly |
<<Note to Spec Writer:
DELIVERABLES FORM PREPARATION INSTRUCTION
1.
Prepare a Deliverable Report Preparation Instruction for each deliverable requirement. Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable. If specific Government forms are to be used by the Contractor, prepare and insert the blank forms into Section J. Only insert forms that are required for Contractor use. If a Contractor-provided form is acceptable, no Government form is required.
2.
Instruction form preparation (see sample form below):
Government Approval Required:
Check “yes” if you want the Contractor to submit a “draft” document for Government approval, before a “final” document is submitted.
Check “no” if you do not need the Contractor to submit a “draft” document for Government approval before a “final” document is submitted, or if Government approval is not required even for a “draft”.
For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
Media:
Check the type(s) of document you want the Contractor to submit (hard copy, electronic and/or direct input into a system). For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.
For “Electronic” specify in the preparation instructions if you want the report by e-mail, diskette or CD.
Direct system input means inputting the information into an established Government system such as DCPDS or MODERN (for HRO) and SPM. It does not mean inputting into an Access( or Excel( database, etc.
Instructions:
Do not include contract performance requirements here that belongs in the PWS
Include any other special instructions or information the Contractor needs to prepare the deliverable (e.g., data must be input into a specific system).
If report is required electronically, note if the report should be e-mailed or submitted on CD or diskette (3.5 diskette, 100MB or 250MB zip disk). If applicable, specify the required file format (i.e. Excel(, Word(, Access(, etc.).
Include description of approval chain (if required).
An example of unclear instructions: “As determined by the Contractor to include all applicable regulatory information.”
Deliverables Form Preparation Instructions
Deliverable Title: Trouble Call Summary Report
Form Attachment No.: J-1606000-XX
Government Approval Required:
X Yes ___ No
Media:
Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word( software.
The Trouble Call Summary Report shall be a compilation of the previous months trouble call reports with the following information:
a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.
b. Brief description of material and parts used, including quantities and cost.
c. Date and time work began.
d. Date and time work was completed.
e. Total hours of labor (by craft) expended, including travel time.
f. Name of person accepting the work and any comments written on the trouble ticket.
g. Last name and first initial of the Contractor employee(s) performing the work.
Submit a copy of the summary report via email to KO for Government review and comment.