B B
G G
GENERAL
REMOVALS KEYNOTE ON ES101 AND REMOVALS SHEETS.
# EXISTING KEYNOTE
OBJECTS ON DRAWINGS AT THIS LINETYPE ARE CATEGORIZED AS
NEW OR PROPOSED FOR CONSTRUCTION, UON.
OBJECTS ON DRAWINGS AT THIS LINETYPE ARE CATEGORIZED AS
EXISTING TO BE REMOVED-DEMOLISHED, UON.
OBJECTS ON DRAWINGS AT THIS LINETYPE ARE CATEGORIZED AS
EXISTING TO REMAIN, UON.
NEW WORK KEYNOTE#
WIRE TAG ON NEW WORK SHEETS. (SEE EP501)
LIGHTING
LED EXIT LUMINAIRE. ARROW, WHEN USED, INDICATES DIRECTION.
( INDICATES BRACKET, WALL MOUNTED.) FILLED IN QUADRANT(S)
OF SYMBOL INDICATES NUMBER AND ORIENTATION OF ILLUMINATED
FACES.
EMERGENCY BATTERY POWERED LED LIGHTING UNIT.
LED LUMINAIRE. ( INDICATES BRACKET, WALL MOUNTED.)
ON DEMO SHEETS FIXTURES ARE FLUORESCENT
TOGGLE SWITCH, 20A, 120/277V. MOUNT 48" AFF UON.
SUBSCRIPT "3" = 3 WAY, "4" = 4 WAY.
H = HAZARDOUS LOCATION
LOW VOLTAGE, MANUAL LIGHTING CONTROL
VACANCY SENSOR, DUAL TECHNOLOGY. CEILING MOUNTED UON.
BRACKET INDICATES WALL MOUNTED
SUBSCRIPT "H" INDICATES HIGH BAY
LV
LED DOWNLIGHT
ON DEMO SHEETS FIXTURES ARE HID
LUMINAIRE TYPE. SEE LUMINAIRE SCHEDULE, SHEET EL701.
LOWER CASE SUBSCRIPT INDICATES CONTROL.
WALL MOUNTED 15 MIN TIMER SWITCH WITH NO "HOLD"T
LED EXTERIOR WALL MOUNTED FIXTURE
ON DEMO SHEETS FIXTURES ARE HID
W
PE
PI
EXTERIOR PHOTO SENSOR
INTERIOR PHOTO SENSOR
LIGHTING CONTACTOR
XX
LED LUMINAIRE WITH INTEGRAL EMERGENCY DRIVER
LC
LIGHTING CONTROL PANELLCP
UL924 INVERTER, SIZED FOR LOADINV
COMBINATION EXIT SIGN AND EMERGENCY LIGHTING
POWER
20A, 120V, NEMA 5-20R, DUPLEX CONVENIENCE RECEPTACLE.
MOUNT 18" AFF UON. 'G' DENOTES INTERNAL GROUND FAULT
INTERRUPTER, 'WP' DENOTES GROUND FAULT, WEATHER
RESISTANT (WR) RECEPTACLE AND WEATHERPROOF IN-USE COVER
QUADRUPLEX CONVENIENCE RECEPTACLE MOUNTED IN TWO-GANG
OUTLET BOX - EACH RATED 20A, 120V, NEMA 5-20R, WITH SINGLE
COVER PLATE, MOUNT 18" AFF, UON.
SPECIAL PURPOSE RECEPTACLE
JUNCTION BOX, SIZE PER NECJ
POKE THROUGH OR FLOOR BOX, 20A, 120V, NEMA 5-20R,
QUADRUPLEX RECEPTACLE, PROVIDE IN COMBINATION WITH
COMMUNICATIONS OUTLET
GROUND BAR
PUSH BUTTON
20A, 120V, NEMA 5-20R, SIMPLEX RECEPTACLE. "TL" DENOTES TWIST
LOCK, "C" DENOTES CEILING MOUNTED
EQUIPMENT CONNECTIONS
MOTOR CONNECTION
DISCONNECT SWITCH PROVIDED INTEGRAL WITH EQUIPMENT,
LOCKABLE.
J JUNCTION BOX, EQUIPMENT CONNECTION
MOTOR RATED SWITCH, LOCKABLEM
MANUAL MOTOR STARTER WITH OVERLOADS, LOCKABLE
DISCONNECT SWITCH. REFER TO SCHEDULES FOR RATINGS.
VFD VARIABLE FREQUENCY DRIVE (ADJUSTABLE SPEED DRIVE, ASD),
INTEGRAL WITH EQUIPMENT WHERE INDICATED, WITH LOCKABLE
DISCONNECT
COMBINATION STARTER AND DISCONNECT SWITCH
M
WIRE, CONDUIT, AND RACEWAY
HOMERUN TO PANELBOARD. PANELBOARD & CIRCUIT
DESIGNATIONS AS INDICATED.
BRANCH CIRCUIT OR FEEDER WIRING IN CONDUIT.
LADDER RACK CABLE TRAY, SIZE AS INDICATED.
CONDUIT TURNED DOWN
CONDUIT TURNED UP
L2A-1,3
DISTRIBUTION
480V PANELBOARD.
208Y/120V PANELBOARD.
DRY-TYPE TRANSFORMER, PLANS. 'T#' DENOTES TRANSFORMER
IDENTIFICATION
T
SURGE PROTECTIVE DEVICESPD
M ELECTRIC METER
DRY-TYPE TRANSFORMER, ONE-LINE.
CIRCUIT BREAKER
AT = AMP TRIP
AF = AMP FRAME
COMMUNICATIONS OUTLET - CAT 6, 2 JACKS (1 NETWORK N JACK & 1
NETWORK P JACK)
# = QUANTITY OF JACKS (OTHER THAN 2)
REFER TO B4/ET502
TELEPHONE/DATA
PRIMARY GROUNDING BUSBARPBB
SECONDARY GROUNDING BUSBAR
TELEPHONE OUTLET - CAT 6, 1 JACK
W = WALL TYPE
# = QUANTITY OF JACKS (OTHER THAN 1)
REFER TO A4/ET502
BONDING CONDUCTOR - DESCRIPTION AS INDICATED.
SBB
AP WIRELESS ACCESS POINT
SPEAKERSP
POKE THROUGH, COMMUNICATIONS OUTLET, PROVIDE IN
COMBINATION POKE THROUGH WITH POWER OUTLET
LIGHTNING PROTECTION
DRIVEN GROUND ROD.
AIR TERMINAL
BOND CONNECTION EXOTHERMICALLY WELD, UON.
GROUND CONDUCTOR - AS INDICATED.
SECURITY (ESS)
CARD READER, WP = WEATHERPROOF
REQUEST TO EXITREX
ELECTRIC DOOR STRIKE
BALANCED MAGNETIC SWITCH
BR
SC SECURITY PANEL AND POWER SUPPLIES
FIRE ALARM
FA ADDRESSABLE INTERFACE MODULEAIM
FAMN FIRE ALARM, MASS NOTIFICATION CONTROL UNIT
RT
RA
RADIO TRANSMITTER
REMOTE ANNUNCIATOR
FACP FIRE ALARM CONTROL PANEL
NOTIFICATION APPLIANCE PANELNAP
ELEVATOR LANDING TWO-WAY
COMMUNICATION SYSTEM
MASTER STATION
CALL BOX
"AREA OF REFUGE" ILLUMINATED SIGN
ARCM
ARCR
AOR
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:5
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
E-001
B R
E P
A
IR
S
E L E
C T
R
IC
A L L
E G
E N
D
A B
B R
E V
IA
T
IO
N
S
A N
D N
O T
E S
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E -0
GENERAL NOTESELECTRICAL LEGEND ABBREVIATIONS
1. ELECTRICAL WORK AND MATERIAL MUST BE NEW AND MUST BE PROVIDED BY
THE CONTRACTOR UON.
2. PROVIDE AN INSULATED EQUIPMENT GROUNDING CONDUCTOR WITH FEEDERS
AND BRANCH CIRCUITS.
3. WIRING MUST BE PER NATIONAL ELECTRICAL CODE (NEC), (MIN).
4. IDENTIFY AND LABEL ELECTRICAL EQUIPMENT.
5. IDENTIFY FEEDERS AND BRANCH CIRCUITS AT EACH END OF EACH
CONDUCTOR AND AT EVERY SPLICE AND EVERY JUNCTION AND PULL BOX.
6. CONDUITS MUST NOT PENETRATE HISTORIC FEATURES OF THE BUILDING
SUCH AS WINDOW AND DOOR SURROUNDS, STAIRWELLS, CRANE RAILS, AND
OTHER CHARACTER DEFINING FEATURES. CONDUIT THAT MUST BE EXPOSED
MUST BE PAINTED TO MATCH THE ADJACENT SURFACE. COORDINATE WITH
THE ARCHITECTURAL TRADE.
7. CONDUCTORS MUST BE COPPER.
8. COORDINATE LOCATION AND POWER REQUIREMENTS FOR EQUIPMENT WITH
CIVIL, MECHANICAL, PLUMBING, ARCHITECTURAL, AND FIRE PROTECTION
INSTALLERS.
9. PROVIDE ARC FLASH LABELS ON PANELBOARDS, DISCONNECT SWITCHES AND
VFD'S PER UFC 3-560-01 AND NFPA 70E. SEE DETAIL PLATE ON SHEET EP502.
10. SINGLE PHASE (120/208V) 15A AND 20A BRANCH CIRCUITS MUST CONSIST OF 2
#12 &1#12 GND. IN 3/4 INCH CONDUIT UON. THREE PHASE 15A AND 20A BRANCH
CIRCUITS MUST CONSIST OF 3#12 & 1#12 GND IN 3/4 INCH CONDUIT UON.
11. COMPLY WITH THE FOLLOWING FOR LONGER CONDUCTOR RUN LENGTHS: 20A,
120V CIRCUITS LONGER THAN 100 FEET - USE #10 AWG TO LIMIT VOLTAGE
DROP ON BRANCH CIRCUITS TO 3%. 20A, 120V CIRCUITS LONGER THAN 150
FEET - USE #8 AWG TO LIMIT VOLTAGE DROP ON BRANCH CRCUITS TO 3%.
12. COORDINATE ELECTRICAL WORK WITH CIVIL, ARCHITECTURAL, STRUCTURAL,
MECHANICAL, PLUMBING, AND FIRE PROTECTION WORK PRIOR TO
FABRICATION AND INSTALLATION TO PREVENT CONFLICTS. NOTIFY
CONTRACTING OFFICER WHERE CONFLICTS ARE DISCOVERED PRIOR TO
CONSTRUCTION AND BEFORE BEGINNING WORK. CONFLICTS THAT ARISE DUE
TO LACK OF COORDINATION MUST BE RECTIFIED BY THE CONTRACTOR AT NO
COST TO THE GOVERNMENT.
13. COORDINATE WITH STRUCTURAL, MECHANICAL, PLUMBING, AND FIRE
PROTECTION INSTALLERS AND PREVENT INSTALLATION OF DUCTWORK,
PIPING, EQUIPMENT OR SUPPORTS FROM BEING INSTALLED ABOVE
SWITCHBOARDS, PANELBOARDS, MOTOR CONTROLLERS, VFD'S, AND CONTROL
PANELS.
14. REFER TO SHEET G-007 FOR THE CONSTRUCTION SEQUENCE STRATEGY.
15. REFER TO SHEETS G-008 AND G-009 FOR THE OUTAGE SCHEDULE.
16. COORDINATE FIRESTOPPING WITH FIRESTOPPING INSTALLER. PENETRATIONS
OF FIRE-RATED PARTITIONS, WALLS, OR FLOORS BY DATA AND
COMMUNICATION WIRING OR CABLE MUST BE THROUGH MODULAR, RE-
ENTERABLE FIRE STOPPING DEVICE(S) CONTAINING SELF SEALING
INTUMESCENT MATERIALS PER SPECIFICATION SECTION 07 84 00.
17. SEAL CONDUIT INTERIOR AT PENETRATIONS THROUGH BUILDING ENVELOPE
TO PREVENT PASSAGE OF AIR AND MOISTURE. PROVIDE SEALANT PRODUCT
INTENDED FOR SUCH USE. PROVIDE AT CONDUITS PENETRATING EXTERIOR
WALLS, ATTICS, AND EXTENDING THROUGH ROOF. PROVIDE AT EXTERIOR
LIGHT FIXTURES, RECEPTACLES, SECURITY DEVICES, AND EXTERIOR FIRE
ALARM DEVICES. COMPLY WITH NEC 300.7(A).
18. PROVIDE 120V AND 208V STARTERS, VFD'S, CONTROL PANELS, AND
ELECTRICAL EQUIPMENT WITH MINIMUM 10,000 AIC RATING, UON. COORDINATE
WITH EQUIPMENT INSTALLERS.
19. PROVIDE 480V STARTERS, VFD'S, CONTROL PANELS, AND ELECTRICAL
EQUIPMENT WITH MINIMUM 35,000 AIC RATING, UON. COORDINATE WITH
EQUIPMENT INSTALLERS.
20. PRIOR TO INSTALLING FIRE PROTECTION PIPING, MECHANICAL DUCTWORK,
PIPING, ELECTRICAL CONDUIT, AND OTHER ASSOCIATED SYSTEM ELEMENTS,
SUBMIT COORDINATION DRAWINGS AND OBTAIN APPROVAL BY THE
CONTRACTING OFFICER AND THE PWD ME CULTURAL RESOURCES MANAGER.
REFER TO SPECIFICATION SECTION 01 30 10.00 22 COORDINATION
PROCEDURES AND COORDINATION DRAWINGS (PWD ME).
21.SURFACE MOUNTED ELECTRICAL ITEMS AND STEEL SLOTTED SUPPORTS AT
HISTORIC MASONRY WALLS MUST BE FASTENED TO MORTAR JOINTS.
COORDINATE WORK WITH SPECIFICATION SECTION 04 01 00.91 22.
1/C ONE CONDUCTOR
A AMPERAGE OR AMPS
AC ALTERNATING CURRENT, AUTO CONTROLLED
ACS ACCESS CONTROL SYSTEM
AF AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AIC AMPERES
AIM ADDRESSABLE INTERFACE MODULE
ASD(S) ADJUSTABLE SPEED DRIVE
AWG AMERICAN WIRE GUAGE
BAS BUILDING AUTOMATION SYSTEM
BKR BREAKER
BL BREAKER LOCK
BMS BALANCED MAGNETIC SWITCH
BOD BASIS OF DESIGN
C CONDUIT
CB CIRCUIT BREAKER
CH CHILLER
CKT CIRCUIT
CLG CEILING
DWG DRAWING
EA EACH
ELEC ELECTRICAL
ELU EMERGENCY LIGHTING UNIT
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EQUIP EQUIPMENT
ESS ELECTRONIC SECURITY SYSTEMS
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FMCU FIRE ALARM, MASS NOTIFICATION CONTROL UNIT
FO FIBER OPTIC
FT FEET
GF GROUND FAULT
GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFE GOVERNMENT FURNISHED EQUIPMENT
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
GFI GROUND FAULT INTERRUPTER
GND GROUND
HH HANDHOLE
HID HIGH INTENSITY DISCHARGE
HP HORSEPOWER
HZ HERTZ
IG ISOLATED GROUND
IP INTERNET PROTOCOL
JB JUNCTION BOX
KA KILO-AMPERE
KCMIL KILO-CIRCULAR MILS
KV, KVA KILO-VOLTS, KILO-VOLT-AMPERE
KW KILO-WATT
KWH KILO-WATT-HOUR
LED LIGHT EMITTING DIODE
LPS LIGHTNING PROTECTION SYSTEM
LM LUMEN
LTS LIGHTS, LUMINAIRES
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MLO MAIN LUGS ONLY
MM MULTIMODE (FIBER OPTIC)
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MV MEDIUM VOLTAGE
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE, NFPA 70
NF NON FUSIBLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NRPA NATURAL RESOURCES PROTECTION ACT
NTS NOT TO SCALE
P POLE
PNL PANEL, PANELBOARD
PSNY PORTSMOUTH NAVAL SHIPYARD
PVC POLYVINYL CHLORIDE CONDUIT
SCCR SHORT CIRCUIT CURRENT RATING
STP SHIELDED TWISTED PAIR
REC RECEPTACLE
REQ'D REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMC RIGID METALLIC CONDUIT
SM SINGLE MODE (FIBER OPTIC)
SPD SURGE PROTECTIVE DEVICE
SS STAINLESS STEEL
STP SHEILDED TWISTED PAIR
STS SHUNT TRIP SWITCH
TBD TO BE DETERMINED
TR TELECOM ROOM
TV TELEVISION MONITOR/VIDEO MONITOR
TYP TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
UV ULTRA VIOLET
V VOLTAGE, VOLTS
VFD/VSD SEE ASD
VOIP VOICE OVER IP, TELEPHONE SYSTEM
VFD VARIABLE FREQUENCY DRIVE (SEE ASD)
W WIRE, WATT
W/,W/O WITH, WITHOUT
WP WEATHERPROOF, NEMA 4X STAINLESS STEEL
XFMR TRANSFORMER
⌀ PHASE
24/7 24 HOURS A DAY/7 DAY A WEEK
blend
AA
HILMO
E6
E7
E8
E9
E10
E11
E12
DUST COLLECTOR 60A
AIR DRYER CWX
SAND BLAST BOOTH CWX
UNIT HEATER
UNIT HEATER
UNIT HEATER
EF
PAINT BOOTH AND CONTROL PANEL
UNIT HEATER
AHU
(ON ROOF)
WP
UNIT HEATER
PANEL L
LATHE
BAND SAW
DRILL CMB
DRILL PRESS 480V
NCT DRILL PRESS 240V
T
DUST COLLECTOR CLZ
SANDER NJD
SAW MYA
DISC SANDER
UNIT HEATER
UNIT HEATER
EF
J
PAINT/VARNISH BOOTH
CONTROL PANEL
PANEL F
PANEL A
T
45KVA TRANSFORMER
XFMR DISCONNECT 60A
CRANE DISCONNECT 60A
LC
C C
C C
C C
C C
C C
MULTIBUTTON
CRANE CONTROLS
BRIDGE CRANE
M
M
HIGH BAY LIGHTS
PLUG INTO A
CEILING MOUNTED
REC (TYP)
M
M
UNIT HEATERT
T
M
DUST COLLECTOR, CLZ & CMA
M
3KVA
MRR
5KVA
3KVA
FMW
T
SAND BLAST BOOTH
WP
DUST COLLECTOR CWX 440V, 60A
45KVA "NAJ"
100A, 120/208V
TO EXISTING TRAILER 2
DURALINE CONNECTION
T
SP
FAN
EF-E
SHOP
SHOP
SHOP
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:0
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
ED101
B R
E P
A
IR
S
F
IR
S T
F L O
O R
E L E
C T
R
IC
A L R
E M
O V
A L S
P A
R T
P L A
N
E A
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E D
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
REMOVALS KEYNOTES
GENERAL NOTES
1 [CLIN 004] PROVIDE TEMPORARY POWER TO EXISTING TRAILER 2.
COORDINATE WITH THE CONTRACTING OFFICER. REMOVE EXISTING
POWER FEEDER TO EXISTING TRAILER 2 AFTER TEMPORARY POWER
IS ESTABLISHED. REFER TO SHEETS ES101 AND EP501. FOR BIDDING
PURPOSES, ASSUME AN OFF HOURS OUTAGE OF 8 HOURS WILL BE
PERMITTED TO ACCOMMODATE POWER SERVICE SWAP OVER.
[CLIN 004] PROVIDE TEMPORARY PHONE SERVICE TO EXISTING
TRAILER 2. COORDINATE WITH THE CONTRACTING OFFICER.
TEMPORARILY RELOCATE EXISTING PHONE SERVICE SERVING
EXISTING TRAILER 2 AFTER TEMPORARY SYSTEMS ARE ESTABLISHED.
PROTECT EXISTING TELEPHONE BACKBONE CABLE FOR REUSE. REFER
TO SHEETS ES101, ED104, AND ET501. FOR BIDDING PURPOSES,
ASSUME AN OFF HOURS OUTAGE OF 8 HOURS WILL BE PERMITTED TO
ACCOMMODATE TELEPHONE SERVICE SWAP OVER.
REMOVE EXISTING BRIDGE CRANE FEEDER. EXISTING CRANE TO
REMAIN AND BE ABANDONED IN PLACE.
REMOVE AND SALVAGE EXISTING EXTERIOR RECEPTACLE SERVING
EXISTING TRAILER 2.
EXISTING 480V PANELBOARD FEEDS EXISTING TRAILER 1 VIA A 100A
CIRCUIT BREAKER AND EXISTING TRAILER 2 VIA A 60A CIRCUIT
BREAKER.
1. REMOVE THE ENTIRETY OF THE ELECTRICAL, LIGHTING, AND
TELECOMMUNICATIONS SYSTEMS, UNLESS OTHERWISE NOTED.
REMOVALS INCLUDE, BUT ARE NOT LIMITED TO: PANELBOARDS,
CONDUIT, WIRE, DISCONNECT SWITCHES, RECEPTACLES, LIGHTING
FIXTURES, LIGHTING CONTROLS, TELEPHONE AND DATA OUTLETS
WITH ASSOCIATED CONDUIT AND CABLING.
2. [CLIN 002]: REMOVE THE ENTIRETY OF THE ELECTRICAL
CONNECTIONS SERVING INDUSTRIAL EQUIPMENT. REFER TO QD
SHEETS FOR ADDITIONAL INFORMATION. REMOVALS INCLUDE, BUT
ARE NOT LIMITED TO: CONDUIT, WIRE, DISCONNECT SWITCHES,
RECEPTACLES, AND CONTROL PANELS.
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR ELECTRICAL REMOVALS PART PLAN - EAST
MATCH LINE
EXISTING KEYNOTES
EXISTING TRANSFORMER AND DISCONNECTS SERVING EXISTING
TRAILER 2 TO REMAIN FOR REUSE. REFER TO SHEET EP501.
EXISTING DURALINE CONNECTION SERVING EXISTING TRAILER 2 TO
REMAIN FOR REUSE.
AA
FGHIJKLMNOP
E6
E7
AP
T
25KVA 1 PHASE
UNIT HEATER
NETWORK N
CABINET
NETWORK P CABINET
PANEL B
P
100A EXISTING TRAILER 1
PT
PANEL FPE
UNIT HEATER
UNIT HEATER
PANEL LPMA
PANEL LPM
PANEL C
PANEL DP-N
EF-1 VFD
ENT RUBBER PRESS +
JIB CRANE
FTB, 150 TON PRESS
FSP FSP, OIL SKID
PANEL PP-1
PANEL PP0
PANEL M
PANEL LP-2 PANEL LP-1
WP
FRV, 100A
60A
30A
480V FEEDS T1
T
T1, 2KVA
FIRE ALARM
T
FIRE ALARM
T
3KVA
PANEL D
PANEL L (SECTION 2)
PANEL L (SECTION 1)
200A, OVEN
RUBBER MILL 200A
PANEL PPK 240V
300KVA FOR PANEL PPK
EF-2
T
UNIT HEATER
5KVA T1
PANEL PP-H
FACP
T
45KVA
G
G
G
SPARE FED FROM
ANNEX PANEL
30/2
J
TO WATER HEATER
J
J
J
G
J
D
CRU 60
MCP 60
PUMP 1
PUMP 2
M
G
J
J
PP0A
100A
300 TON PRESS
FSY OIL SKID
T
2KVA
SP
W
G
TELEPHONE PROTECTOR
P
PORT PLANER
WATER PUMP
J
J
CA-5402/RFI 2 WAY SPLITTER
100A 400A
TTT
30KVA
45KVA
G
B
BELL
B
BB
PANEL LPMA
OVERHEAD DOOR
CONTROLS
TO ANNEX
EYM 200A
WPWP
WP G WP
T
37.5KVA 1 PHASE
FEEDS EXISTING
TRAILER 1
TO ANNEX
FOR CTW 60A
T
5KVA
SP
B
EF
ERS
TEMP FEED
BLOWER
60A
PANEL LPM-B
60A
EF-3
H
H
H
100A
ERN
H
H H H
DOWN DRAFT
H
EKG RUBBER MILL
200A
(2) 20/1
M100A100A100A
PANEL PP-1
FRV, HEATER
FRV CHILLER
DUST COLLECTOR MRR
SPARE
LIEC MACHINE
CWY
CWY 200A
ATW
ATS
ATP
60A
60A
JB WITH 2 CONDUITS THRU SLAB
DC RECTIFIER
JUNCTION BOX
60A 125/250 VDC FEED TO BLDG 74ANNEX EXHAUST
SYS. ON ROOF
200A
FLOOD LIGHTS
100A
J
60A, POWER
SUPPLY TO LPMA
FEEDS PANEL F UPSTAIRS
T
CWY
TO P1080 37.5KVA
TRANSFORMER
EXK
J
DDC
LPM-B
LPM-B
EF-E
EF-E
EF-E
EF-E
EF-E
WP
EF-E
EF-E
K
STORAGE
STAIR
SHOP
STORAGE
STAIRS
STORAGE
MENS
WOMENS
OFFICE
OFFICE
SHOP
SHOP
SHOP
SHOP
STORAGE
STORAGE
STORAGE
STORAGE
STAIR
CORRIDOR
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:0
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
ED102
B R
E P
A
IR
S
F
IR
S T
F L O
O R
E L E
C T
R
IC
A L R
E M
O V
A L S
P A
R T
P L A
N
W E
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E D
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES REMOVALS KEYNOTES
11. REMOVE THE ENTIRETY OF THE ELECTRICAL, LIGHTING, AND
TELECOMMUNICATIONS SYSTEMS, UNLESS OTHERWISE NOTED.
REMOVALS INCLUDE, BUT ARE NOT LIMITED TO: PANELBOARDS,
SWITCHBOARD, CONDUIT, WIRE, DISCONNECT SWITCHES,
RECEPTACLES, LIGHTING FIXTURES, LIGHTING CONTROLS,
TELEPHONE AND DATA OUTLETS WITH ASSOCIATED CONDUIT AND
CABLING. WHERE CONDUITS EXTEND INTO THE FLOOR SLAB, CUT
FLUSH WITH THE SLAB AND REMOVE ASSOCIATED WIRES. WHERE
CONDUITS EXTEND INTO THE BELOW FLOOR TRENCH, REMOVE
CONDUIT AND WIRE IN ITS ENTIRETY.
2. REFER TO SHEETS EP501 AND ET501 FOR ONE-LINE AND RISER
DIAGRAMS.
3. [CLIN 002]: REMOVE THE ENTIRETY OF THE ELECTRICAL
CONNECTIONS SERVING INDUSTRIAL EQUIPMENT. REFER TO QD
SHEETS FOR ADDITIONAL INFORMATION. REMOVALS INCLUDE, BUT
ARE NOT LIMITED TO: CONDUIT, WIRE, DISCONNECT SWITCHES,
RECEPTACLES, AND CONTROL PANELS.
REMOVE DC FEEDER BETWEEN BUILDING 60 AND BUILDING 74. FOR
BIDDING PURPOSES ASSUME REMOVAL OF 1000 FEET OF CABLE AND
ENTERING 4 MANHOLES. FIELD VERIFY.
[CLIN 004]: MAINTAIN TEMPORARY POWER TO EXISTING TRAILER 1
DURING CONSTRUCTION. COORDINATE WITH THE CONTRACTING
OFFICER. RELOCATE EXISTING TEMPORARY EQUIPMENT SERVING THE
TRAILER, TO ACCOMMODATE B60 RENOVATION. REFER TO SHEETS
ES101, EP102, AND G-007. FOR BIDDING PURPOSES, ASSUME AN OFF
HOUR OUTAGE OF 8 HOURS WILL BE PERMITTED TO ACCOMMODATE
POWER SERVICE SWAP OVER.
REMOVE EXISTING CABLE BACK TO BUILDING 59 VIA DUCTBANK
LOCATED BETWEEN BUILDINGS 59 AND 60. REFER TO SHEET ES101.
REMOVE MAIN DISTRIBUTION SWITCHBOARD AND ASSOCIATED PULL
BOX, ABOVE.
REMOVE CONDUIT AND WIRE ROUTED WITHIN THE BELOW FLOOR
TRENCH.
MATCH LINE
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR ELECTRICAL REMOVALS PART PLAN - WEST
EXISTING KEYNOTES
EXISTING ELECTRIC VEHICLE CHARGERS.
EXISTING PULL BOX WITH CONDUIT/DUCTBANK TO MANHOLE AC603A
AND CONDUIT THROUGH THE WALL . BOX CONTAINS EXISTING
NETWORK N AND NETWORK P OUTSIDE PLANT CABLES.
[BASE BID]: PROTECT EXISTING NETWORK N, 12 STRAND SINGLE MODE
OUTSIDE PLANT FIBER OPTIC CABLE FOR REUSE.
[BASE BID]: PROTECT EXISTING NETWORK P, 12 STRAND MULTIMODE,
OUTSIDE PLANT FIBER OPTIC CABLE FOR REUSE.
PROTECT EXISTING 25 PAIR OUTSIDE PLANT COPPER TELEPHONE
CABLE FOR REUSE.
TO MANHOLE AC811 AND LOAD CENTER 4. PROTECT EXISTING FEEDER
FOR REUSE. CONDUITS TO REMAIN. REFER TO SHEETS ES101, EP102,
AND EP501.
LC
E6
E7
PANEL M-1
CFE, CHILLER
PANEL PP1A
T
UNIT HEATER UNIT HEATER UNIT HEATER UNIT HEATER
UNIT HEATER UNIT HEATER
EF-EEF-E
UNIT HEATER
LP-M204
J
G
J C
SP
J
UNIT HEATER
SP
J J J
T
45KVA
M
TC
AC-2
HV-1 EF-1
SP
H
H
100A
GE CONTROL CFE, RUBBER
MIXER DISCONNECT
BOLLING CONTROLLER
CFE, RUBBER MIXER
J
EF-E
CU-E
EF-E
STAIR
OFFICE
M108
CUH
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:1
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
ED103
B R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
E L E
C T
R
IC
A L R
E M
O V
A L S
P A
R T
P L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E D
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR MEZZANINE ELECTRICAL REMOVALS PART PLAN
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES
1. REMOVE THE ENTIRETY OF THE ELECTRICAL, LIGHTING, AND
TELECOMMUNICATIONS SYSTEMS, UNLESS OTHERWISE NOTED.
REMOVALS INCLUDE, BUT ARE NOT LIMITED TO: PANELBOARDS,
CONDUIT, WIRE, DISCONNECT SWITCHES, RECEPTACLES, LIGHTING
FIXTURES, LIGHTING CONTROLS, TELEPHONE AND DATA OUTLETS
WITH ASSOCIATED CONDUIT AND CABLING.
2. [CLIN 002]: REMOVE THE ENTIRETY OF THE ELECTRICAL
CONNECTIONS SERVING INDUSTRIAL EQUIPMENT. REFER TO QD
SHEETS FOR ADDITIONAL INFORMATION. REMOVALS INCLUDE, BUT
ARE NOT LIMITED TO: CONDUIT, WIRE, DISCONNECT SWITCHES,
RECEPTACLES, AND CONTROL PANELS.
MATCH LINE
SCALE: 1/8" = 1'-0"
D4
INTERMEDIATE MEZZANINE ELECTRICAL REMOVALS PLAN
BREAKER
LOCKER
M101
STAIR
LOCKERS
M102
OPEN
OFFICE
M103
OPEN
OFFICE
M104
CORRIDOR
M105 SPRINKLER
M106
MECH
MEZZ
M109
MEZZANINE
M107
FG
HI
JK
LM
N
O
P
E6
E7
EXHAUST FAN
PANEL A.A.
PANEL I
PANEL J
T
45KVA
CRANE
PANEL PNL-F
PANEL DD
T
45KVA
RECESSED SUBPANEL (4)20A, 1P
GASKET CUTTER
NETWORK N CABINET
TELEPHONE PUNCH
DOWN BLOCKS
PE
UNIT HEATER UNIT HEATER UNIT HEATER
UNIT HEATER
UNIT HEATER
UNIT HEATERUNIT HEATER
G
WP
(ON ROOF)
T
15KVA
J
COMMUNICATIONS BOX
SP SP
PANEL PP1
400A
BRIDGE CRANE (EXIST)
MULTIBUTTON CRANE
CONTROLS (EXIST)
BANDSAW ACC
J 60A
J 60A
J
J
NETWORK P
CABINET
TELEPHONE
PUNCHDOWN
66 BLOCKS
(TYP 2)
G20A
AP
200A
UH-E
CF-E
UH-E
EF-E
EF-E
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:2
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
ED104
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
E L E
C T
R
IC
A L R
E M
O V
A L S
P L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E D
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES REMOVALS KEYNOTES
11. REMOVE THE ENTIRETY OF THE ELECTRICAL, LIGHTING, AND
TELECOMMUNICATIONS SYSTEMS, UNLESS OTHERWISE NOTED.
REMOVALS INCLUDE, BUT ARE NOT LIMITED TO: PANELBOARDS,
CONDUIT, WIRE, DISCONNECT SWITCHES, RECEPTACLES, LIGHTING
FIXTURES, LIGHTING CONTROLS, TELEPHONE AND DATA OUTLETS
WITH ASSOCIATED CONDUIT AND CABLING. WHERE CONDUITS
EXTEND BELOW THE WOOD FLOOR, CUT FLUSH WITH THE FLOOR
AND REMOVE ASSOCIATED WIRES.
2. [CLIN 002]: REMOVE THE ENTIRETY OF THE ELECTRICAL
CONNECTIONS SERVING INDUSTRIAL EQUIPMENT. REFER TO QD
SHEETS FOR ADDITIONAL INFORMATION. REMOVALS INCLUDE, BUT
ARE NOT LIMITED TO: CONDUIT, WIRE, DISCONNECT SWITCHES,
RECEPTACLES, AND CONTROL PANELS.
REMOVE COPPER TELEPHONE CABLE, "AMI B60 TO B74-1".
COORDINATE WITH THE CONTRACTING OFFICER.
REMOVE FLEXIBLE CONDUIT WHIP.
REMOVE EXISTING BRIDGE CRANE FEEDER. DOCUMENT EXISTING
FEEDER SIZE. PREPARE TO REFEED EXISTING CRANE. CRANE NOT
SHOWN FOR CLARITY.
ORIGIN OF THE TELEPHONE BACKBONE CABLE SERVING EXISTING
TRAILER 2. PROVIDE TEMPORARY TELEPHONE SERVICE TO THE
TRAILER DURING CONSTRUCTION. PROTECT EXISTING CABLE FOR
RECONNECTION AT THE COMPLETION OF CONSTRUCTION. REFER TO
SHEETS ED101 AND ET501.
MATCH LINE
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR ELECTRICAL REMOVALS PLAN
WOMENS
MENS
STAIR
STOR
CORR
CONF
OFFICE
SHOP
STOR
OFFICE
SHOP
STAIR
CLASSROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR
STAIR
F
G
HI
JK
LM
N
O
P
E6
E7
AP
(ABOVE)
(ABOVE)
C
(ABOVE)
EF60-2
EF-E
4 4
EXISTING BRIDGE CRANE
STORAGE
M201
STORAGE
M202
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:2
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
ED105
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
M E
Z Z
A N
IN
E
E L E
C T
R
IC
A L R
E M
O V
A L S
P L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E D
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR MEZZANINE ELECTRICAL REMOVALS PLAN
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES REMOVALS KEYNOTES
11. REMOVE THE ENTIRETY OF THE ELECTRICAL, LIGHTING, AND
TELECOMMUNICATIONS SYSTEMS, UNLESS OTHERWISE NOTED.
REMOVALS INCLUDE, BUT ARE NOT LIMITED TO: PANELBOARDS,
CONDUIT, WIRE, DISCONNECT SWITCHES, RECEPTACLES, LIGHTING
FIXTURES, LIGHTING CONTROLS, TELEPHONE AND DATA OUTLETS
WITH ASSOCIATED CONDUIT AND CABLING.
REMOVE SWITCH AND ASSOCIATED LIGHTS, CONDUIT, BOXES, AND
WIRE IN THE ATTIC. FOR BIDDING PURPOSES ASSUME (10) TYPE A
SOCKET TYPE FIXTURES WITH COMPACT FLUORESCENT SCREW IN
LAMPS.
COORDINATE WITH THE MECHANICAL TRADE BEFORE REMOVAL OF
THE JACE ANTENNA.
DISCONNECT HISTORICAL LIGHTING FIXTURE AND SALVAGE FOR
REINSTALLATION.
DISCONNECT AND REMOVE POWER TO EXHAUST FAN IN THE ATTIC.
COORDINATE WITH THE MECHANICAL TRADE.
MATCH LINE
EA
E
EUE
EUE(3W)
EUE(6W) EUC
EUE(2W)
EUE(2W)
EU
E(
2W
AB EUC(4W)
AB EUC(2W)EU
E(
2W
EU
E(
6W
) EUE(20W)
EUEEUE
EUE
EU
E
EUC
EUE(6W)
EUE(6W)
UE
(6
W
EUE(6W)
EUE(3W)
AB
EU
E(8 W)
AB EUC(2W)
EU
E
EUC(3W) AB EUC(2W)
EUE
AB EUE
EUE(3W)
EOW
UE(6W
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
B6 0 R
EP
AI
RS
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
KI
TT
ER
Y, M E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
SY
S
DE
SC
RI
PT
IO
N
DA
TE
AP
R
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
KI
TT
ER
Y, M
E
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
R O
IC
C
-M E
GRAPHIC SCALE
CHECK GRAPHIC SCALE BEFORE USING
50'20' 40'20' 10'
GENERAL NOTES
1"=20'
PLAN
NORTH
ELECTRICAL SITE PLAN
(THIS SHEET ONLY)
ST
O
RE
R
ST
RE
ET
SMOOT STREET
TU
RN
ER
S
TR
EE
T
PISCATAQUA RIVER
BLDG 59
BLDG 62A
BLDG 62
BLDG 43BLDG 65
EEOP
BLDG 60
1. REFER TO SHEET CS101 FOR LIMITS OF WORK REQUIRING A NRPA PERMIT BY
RULE.
2. REFER TO SHEET ET501 FOR TELECOMMUNICATIONS RISER DIAGRAMS.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM.
4. REFER TO SHEET ES102 FOR TELECOMMUNICATIONS SITE PLAN SCOPE.
KEYNOTES(THIS SHEET ONLY)
1 PROVIDE DIESEL GENERATOR WITH SUB BASE FUEL TANK. REFER TO SHEET
EP501.
PROVIDE LIGHTNING PROTECTION SYSTEM. REFER TO LIGHTNING PROTECTION
SYSTEM NOTES, THIS SHEET.
[BASE BID]: PROVIDE FUSION SPLICE TO EXISTING 6MM NETWORK P CABLE IN
BUILDING 59. COORDINATE EXACT ROUTING THROUGH B59 WITH THE
CONTRACTING OFFICER. REFER TO SHEET ET106.
[CLIN 004]: PROVIDE TEMPORARY POWER TO EXISTING TRAILER 2 DURING
CONSTRUCTION. REESTABLISH POWER, FROM BUILDING 60, TO THE EXISTING
TRAILER. REFER TO SHEET EP501 ONE-LINE DIAGRAM.
[BASE BID]: ROUTE 6 STRAND MULTIMODE FIBER OPTIC NETWORK P CABLE
BETWEEN B59 AND B60. REFER TO SHEETS ET106 AND ET501. [OPTION 11]:
ROUTE 36 STRAND SINGLE MODE FIBER OPTIC NETWORK N AND NETWORK P
CABLES BETWEEN B59 AND B60. REFER TO SHEETS ES102, ET106, AND ET501.
UTILIZE ONE SET OF EXISTING CONDUCTORS FEEDING B60 TO MAINTAIN POWER
TO EXISTING TRANSFORMER SERVING EXISTING TRAILER 2. PROVIDE
TEMPORARY POWER TO BUILDING 60 CONSTRUCTION TRAILER VIA EXISTING
TRANSFORMER. REFER TO SHEET G-008 FOR OUTAGE SCHEDULE. COORDINATE
WITH THE CONTRACTING OFFICER.
[CLIN 004]: MAINTAIN TEMPORARY POWER TO EXISTING TRAILER 1. RELOCATE
EXISTING TEMPORARY EQUIPMENT SERVING THE TRAILER, AS REQUIRED, TO
ACCOMMODATE B60 RENOVATION. REFER TO SHEETS ED102 AND EP102.
SEAL CONDUIT INTERIORS.
EXISTING KEYNOTES(THIS SHEET ONLY)
EXISTING TRAILER 2 AND ASSOCIATED 45KVA TRANSFORMER.
EXISTING LOAD CENTER 4 AND ASSOCIATED VAULT. REFER TO SHEET ES102 FOR
CONTINUATION.
EXISTING MANHOLE AC801, INCORPORATED INTO LOAD CENTER 4 VAULT.
EXISTING MANHOLE AC811.
EXISTING MANHOLE AC603A.
EXISTING PIT, UNDER CARPET, WITHIN PRIVATE OFFICE. COORDINATE ACCESS
WITH THE CONTRACTING OFFICER.
EXISTING NETWORK N OUTSIDE PLANT CABLE IS ROUTED THROUGH THIS
DUCTBANK/MANHOLE.
APPROXIMATE LOCATION OF EXISTING TRAILER 1.
EXISTING EXTERIOR JUNCTION BOX CONTAINING EXISTING NETWORK N AND
NETWORK P OUTSIDE PLANT CABLES.
EXISTING NETWORK P OUTSIDE PLANT CABLE IS ROUTED THROUGH THIS
DUCTBANK/MANHOLE.
EXISTING 25-PAIR COPPER TELEPHONE OUTSIDE PLANT CABLE IS ROUTED
THROUGH THIS DUCTBANK.
EXISTING FEEDERS (3 SETS OF #500) BETWEEN LOAD CENTER 4 AND BUILDING 60
SWITCHBOARD TO REMAIN.
APPROXIMATE LOCATION OF EXISTING 6MM NETWORK P CABLE ROUTED BACK
TO B46.
LIGHTNING PROTECTION SYSTEM NOTES
1. DELEGATED DESIGN: PROVIDE LIGHTNING PROTECTION SYSTEM DESIGNED BY
A CERTIFIED LIGHTNING PROTECTION SYSTEM MASTER DESIGNER IN
ACCORDANCE WITH NFPA 780 AND UFC 5-575-01. PROVIDE UL LIGHTNING
PROTECTION INSPECTION CERTIFICATE FOR THE BUILDING, CERTIFIED TO
NFPA 780. INSTALL LIGHTING PROTECTION SYSTEM IN ACCORDANCE WITH
APPROVED SHOP DRAWINGS.
2. SEE ARCHITECTURAL SHEETS FOR ROOF PLAN, BUILDING SECTIONS, AND
EXTERIOR BUILDING ELEVATIONS. SEE CIVIL SHEETS FOR UNDERGROUND
UTILITIES AND PERMIT INFORMATION.
3. PROVIDE LIGHTING PROTECTION SYSTEM SHOP DRAWINGS, INCLUDING ROOF
PLAN, AND BUILDING EXTERIOR ELEVATIONS, AND CLEARLY INDICATE DOWN
CONDUCTOR LOCATIONS FOR GOVERNMENT REVIEW AND APPROVAL. DOWN
CONDUCTORS MUST BE ROUTED ALONG BUILDING CONTOURS AND MUST NOT
CROSS IN FRONT OF WINDOWS, SILLS, OR LINTELS. EXTERIOR ELEVATIONS
INDICATE POTENTIAL DOWN CONDUCTOR LOCATIONS. FINAL LOCATIONS
MUST BE DETERMINED BY THE DELEGATED DESIGNER AND APPROVED BY THE
GOVERNMENT.
4. REFER TO SHEETS CR101 AND CS101 FOR LOCATIONS WHERE PAVEMENT IS
BEING REPAIRED. SUCH AREAS ARE SUGGESTED LOCATIONS FOR PLACING
GROUND RODS/PLATES. IN AREAS WHERE PAVEMENT IS NOT IDENTIFIED FOR
PAVEMENT REPAIR, REPAIR THE PAVEMENT AFTER GROUND ROD/PLATE
INSTALLATION IN ACCORDANCE WITH DETAIL C1/C502. THE WORK REQUIRED
TO INSTALL GROUND RODS/PLATES IS NOT PERMITTED BELOW THE TOP OF
THE SLOPE/RIVER BANK. REFER TO SHEET CX101.
5. REFER TO GENERAL CONSTRUCTION NOTES ON SHEET G-004A FOR WORK
RELATED TO HISTORIC BUILDINGS.
6. FASTEN LIGHTNING PROTECTION DOWN CONDUCTORS TO CENTER OF BRICK,
NOT WITHIN MORTAR JOINTS, PER REQUIREMENTS OF NFPA 780 AND UL.
PROVIDE BRICK DRILLING AT EXISTING BRICK.
3 4
HRM
BPD
DCL
ES101
REMOVALS KEYNOTES(THIS SHEET ONLY)
FIELD VERIFY AND REMOVE CABLES WITHIN EXISTING DUCTBANK LOCATED
BETWEEN LOAD CENTER 4 VAULT AND BUILDING 60. FOR BIDDING PURPOSES,
ASSUME REMOVAL OF 1,000 LINEAR FEET OF COPPER CABLE. COORDINATE
WITH THE CIVIL TRADE. [OPTION 9]: THE DUCTBANK IS BEING REMOVED IN
PREPARATION FOR A NEW DUCTBANK TO BE INSTALLED.
HRM
DP
JAT
ES102
TELECOMMUNICATIONS SITE PLAN
PLAN
NORTH
NORTH
NAD83
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
B6 0 R
EP
AI
RS
UNCLASSIFIED
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
KI
TT
ER
Y, M E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
SY
S
DE
SC
RI
PT
IO
N
DA
TE
AP
R
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
KI
TT
ER
Y, M
E
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
R O
IC
C
-M E
GRAPHIC SCALE
GENERAL NOTES
REMOVAL NOTES
[OPTION 11]: REMOVE EXISTING NETWORK P OUTSIDE PLANT CABLE INSTALLED
BETWEEN BUILDING 60 AND BUILDING 46.
[OPTION 11]: REMOVE EXISTING NETWORK N OUTSIDE PLANT CABLE INSTALLED
BETWEEN BUILDING 60 AND SPLICE LOCATED IN MANHOLE AC9A.
[OPTION 11]: REMOVE CABLES BETWEEN MANHOLES DC4 AND DC5, PREVIOUSLY
LABELED BY THE GOVERNMENT AS "SAVE FOR THE B60 PROJECT" FOR REMOVAL
UNDER THIS PROJECT, TO CREATE A PATHWAY FOR NEW CABLES. COORDINATE
WITH THE CONTRACTING OFFICER.
[OPTION 11]: APPROXIMATELY 265 FEET BETWEEN EXISTING MANHOLE AC
8 AND EXISTING MANHOLE AC 9A. REMOVE EXISTING NETWORK N OUTSIDE
PLANT CABLE BACK TO EXISTING SPLICE. EXISTING NETWORK N SPLICE IS
LOCATED IN EXISTING MANHOLE AC 9A.
KEYNOTES
[OPTION 11]: PROVIDE NETWORK P 36 STRAND SINGLE MODE OUTSIDE PLANT FIBER
OPTIC CABLE BETWEEN BUILDING 60 AND BUILDING 13. PROVIDE AND INSTALL WITHIN
INNERDUCT IN THE STEAM TUNNEL.
[OPTION 11]: PROVIDE NETWORK N 36 STRAND SINGLE MODE OUTSIDE PLANT FIBER
OPTIC CABLE BETWEEN BUILDING 60 AND BUILDING 86A, SECOND FLOOR. PROVIDE
AND INSTALL WITHIN INNERDUCT IN THE STEAM TUNNEL.
1. REFER TO SHEET ET501 FOR TELECOMMUNICATIONS RISER DIAGRAMS.
2. REFER TO SHEET ET106 FOR WORK WITHIN BUILDING 59.
3. REFER TO SHEET ES101 FOR ADDITIONAL SITE PLAN WORK BETWEEN B59 AND
B60.
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
QTRS
O
BLDG
BLDG
60A
BLDG
BLDG 76
BLDG
MATCH LINE
MATCH LINE
MACDONOUGH AVE
REMEY ST
CHARLES MORRIS AVE
MACDONOUGH AVE
IS
AA
C
HU
LL
S
T
WYMAN AVE
BLDG
BLDG 55
BLDG
CR
EI
G
HT
O N
ST
RI
DG
EL
EY
S T
TU
RN
ER
S
T
EXISTING
MANHOLE
AC 801AX
EXISTING DC
DUCTBANK
EXISTING STEAM/
UTILITY TUNNEL
EXISTING STEAM/
UTILITY TUNNEL
EXISTING
MANHOLE
DC 5A
EXISTING DC
DUCTBANK
EXISTING DC
DUCTBANK
EXISTING DC
DUCTBANK
EXISTING DC
DUCTBANK
EXISTING
MANHOLE
DC 5
EXISTING
MANHOLE
DC 5A
EXISTING
MANHOLE
DC 4
EXISTING
MANHOLE
DC 3
EXISTING
MANHOLE
DC 301
EXISTING
MANHOLE DC 303
EXISTING
MANHOLE
DC 304
LOAD
CENTER 4
EXISTING
MANHOLE DC
1053B EXISTING
MANHOLE DC
1053C
EXISTING
MANHOLE
DC 6
EXISTING
MANHOLE
AC 603A
EXISTING
MANHOLE AC 811
EXISTING
MANHOLE
AC 801
EXISTING
MANHOLE
AC 8
G
JK
M
NP
E6
E7
E8
E9
E10
E11
E12
AL1
AH1
T
T3
ANNEX
ANNEX
ANNEX
AL1-21
ANNEX LIGHTING CONTROL PANEL
AL1-1
J
AH1-1,3,5
N A
P
LCP
SPD
FA2-3
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:2
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP101
B R
E P
A
IR
S
F
IR
S T
F L O
O R
P O
W E
R P
A R
T P
L A
N
E A
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
KEYNOTES
GENERAL NOTES
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR POWER PART PLAN - EAST
MATCH LINE
1 REINSTALL SALVAGED EXTERIOR RECEPTACLE SERVING EXISTING
TRAILER 2. COORDINATE EXACT LOCATION WITH THE CONTRACTING
OFFICER. CONNECT EXISTING DURALINE CONNECTION. REFER TO ONE-
LINE DIAGRAM ON SHEET EP501.
FIRE PUMP FEEDER TO RISE UP BELOW THE FIRE PUMP
CONTROLLER/MEZZANINE WITHIN RATED CHASE. COORDINATE WITH
THE STRUCTURAL AND ARCHITECTURAL TRADE.
COORDINATE EXACT LOCATION WITH THE FIRE PROTECTION TRADE.
MAINTAIN NEC CLEARANCES.
DIESEL GENERATOR. REFER TO SHEETS ES101 AND EP501.
1. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
EXISTING KEYNOTES
APPROXIMATE LOCATION OF EXISTING BRIDGE CRANE ELECTRICAL
CONNECTION. NOTE: POWER IS NOT BEING RESTORED TO THE
EXISTING CRANE IN THE ANNEX.
J
J
J
J
J
J
F
G
HI
JK
LM
N
O
P
E6
E7
G
G
G
G
PL5
PL6
WP
STS
PL1 PL2
PBB
TPP1
MDP
MSBT
PL3
PL4
T1
PL6-11
MSB-1,3,5
PL5-7,9
PL5-1,3,5
PL5-11
PL5-19,21,23
PL5-25,27
FFF
CFY MWB CFX EQG
PL1-7,9,11 PL1-2,4,6
PL2-13
PL2-1,3,5
PL2-15
PL2-7,9,11
SPD PL3-7,9,11
PL3-15 PL3-1,3,5
---PL4-7,9,11---PL4-1,3,5
PL3-17,19
PL4-31,33,35
PL3-21,23
WOMEN
STAIR
003A
CORRIDOR
OFFICE
SHOP
ELEV
STAIR
002A
VEST
SHOP
ELECTRICAL
MECH
STORAGE
PL5-29
PL4-37
IU
EUH
1-1
MDP-2,4
MDP-6
PRODUCTION LIGHTING
CONTROL PANEL
FA1-4
FA1-2
PL1-1,3,5
TPP1-11
NETWORK
TPP1-9
TPP1-7
TLTLC C
TPP1-23
TPP1-21
PL3-35
PL3-2
PL3-4
PL3-6
PL3-8 PL3-10 PL3-12 PL3-14 PL3-16
PL6-5
PL6-19
PL5-13
INSPECTION
PL6-1
IU
16 6
PL6-21
LCP
PL5-31
PL5-17
FA1-7
NAC
FAMN
UH
1-7
PL6-23
PL1-25
UH
1-9
PL4-17
UH
1-8
P/O
PL4-37
P/O
PL4-39 G
PL4-41
TPP1-5
PL1-15
VFD
VFD
D D
C
MSB-2,4,6
MSB-8,10,12
PL2-19
PL2-21
PL2-23
UH
1-10
MSB-14,16,18 MSB-20,22,24
CR
1A
CR
1B
PL2-25
PL2-2,4,6
LCP
PL3-13
MDP-10
PL6-7
PL5-35
CUH
PL4-25,27,29
SBB
P
1A
P
1B
IU
TF
FA1
PL4-13
WP WP
PL6-3
PL6-15
WP
WP
WP
WP
PL5-10
PL6-9
G
PL1-13
PL6-13
TPA
CUSTODIAL
PL5-15
PL5-6 PL5-8
MH1-2,4,6
PL4-19
TPA
EWH
PL4-21
PL4-15
TPP1-3
TPP1-1
TPP1-17
C C
TL TL
TPP1-19
TPA
14 14 14 14
TPP1-2,4 EB
PL3-25
SPD
PL2-10
SPD
P/O
PL6-12 SPD
PL1-27
CORRIDOR
MDP-8
SPD
PL6-14
STAIR
004A
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:3
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP102
B R
E P
A
IR
S
F
IR
S T
F L O
O R
P O
W E
R P
A R
T P
L A
N
W E
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR POWER PART PLAN - WEST
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES
EXISTING KEYNOTES
1. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
EXISTING ELECTRIC VEHICLE CHARGERS.
MATCH LINE
KEYNOTES
1 INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.
INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET
WITHIN THE CABINET.
PROVIDE COPPER GROUND BAR. REFER TO DETAIL A4/EP502.
PROVIDE COPPER GROUND BAR, ALONG THE LENGTH OF THE
EXTERIOR WALL. COORDINATE EXACT INSTALLATION HEIGHT IN THE
FIELD WITH THE CONTRACTING OFFICER. REFER TO GROUNDING
DETAIL A4/EP502.
PROVIDE FOR ELEVATOR CAB LIGHTING AND RECEPTACLES.
PROVIDE 480V, 3 POLE, FUSIBLE, SHUNT TRIP SWITCH FOR ELEVATOR.
PROVIDE 120V CONTROL CIRCUIT. REFER TO ONE-LINE DIAGRAM ON
SHEET EP501.
PROVIDE POWER TO THE OVERHEAD DOOR. COORDINATE WITH THE
ARCHITECTURAL TRADE.
PROVIDE POWER TO THE FIRE ALARM, MASS NOTIFICATION CONTROL
PANEL AND ASSOCIATED TRANSMITTER. COORDINATE EXACT
LOCATION WITH THE CONTRACTING OFFICER.
FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO
DETAIL A3/ET501.
ROUTE CONDUIT THAT IS NOT SERVING THE HEAT SEALERS OR ADJACENT
RECEPTACLES A MINIMUM OF 15 FEET AWAY FROM THE HEAT SEALERS IN
SHOP 111.
UTILIZE THE EXISTING TEMPORARY EQUIPMENT (100A DISCONNECT AND
37.5KVA TRANSFORMER) AND CONNECT EXISTING TRAILER 1 TEMPORARY
POWER TO THE NEW BUILDING 60 DISTRIBUTION SYSTEM AT THE
COMPLETION OF CONSTRUCTION. REFER TO SHEET EP501. COORDINATE
WITH THE CONTRACTING OFFICER.
EXTEND 3 EXISTING CONDUITS AND ASSOCIATED CONDUCTORS BETWEEN
EXTERIOR WALL AND SWITCHBOARD. SEAL CONDUIT INTERIORS.
INSTALL 3' ABOVE PIT FLOOR.
PROVIDE RECEPTACLE, MOUNTED TO STEEL SLOTTED STRUT SUPPORT,
FOR ELECTRICAL CORD REEL. INSTALL RECEPTACLE AND CORD REEL
ADJACENT TO COMPRESSED AIR CORD REEL. REFER TO DETAIL C5/SF506
FOR MOUNTING. COORDINATE EXACT LOCATION WITH THE CONTRACTING
OFFICER. ADJUST THE ELECTRICAL CORD REEL STOP SO THE CORD IS 7'
AFF. CONFIRM FINAL STOP HEIGHT WITH THE CONTRACTING OFFICER.
FIRE PUMP FEEDER SECTION OF THE SWITCHBOARD. REFER TO SHEET
EP501. REFER TO SHEET CS101 FOR EXISTING, INCOMING, DUCTBANK.
PROVIDE FIRE PUMP FEEDER THAT EXITS THE BOTTOM OF THE
SWITCHBOARD. ROUTE WITHIN CONCRETE ENCASED DUCTBANK. REFER TO
SHEETS SB101 AND SB102.
INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE WITH
THE MECHANICAL TRADE.
FOR ELEVATOR SUMP PUMP, SP-1. MOUNT 5' ABOVE ELEVATOR PIT FLOOR.
PROVIDE LED LIGHT TO VERIFY CIRCUIT IS ENERGIZED. COORDINATE WITH
THE PLUMBING TRADE.
FOR CNC COMPUTER. COORDINATE EXACT LOCATION WITH THE
CONTRACTING OFFICER.
FOR SUMP PUMP CONTROL SYSTEM. COORDINATE WITH THE PLUMBING
TRADE.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT LOCATION
WITH THE PLUMBING TRADE.
FORK TRUCK CHARGER DISCONNECT. COORDINATE EXACT LOCATION WITH
THE CONTRACTING OFFICER.
PROVIDE SIMPLEX RECEPTACLE FOR POLYBAG SEALER.
FOR ELEVATOR SHUNT TRIP CONTROL POWER.
J
FGHIJKLMNOP
E6
E7
E8
E9
E10
E11
E12
AA
WP
WP
WP
WP
AL1-27
AL1-23
AL1-25
ANNEX
ANNEX
FA2-1
ANNEX
AL1-3
P/O
AL1-3
P/O
UH
1-2
UH
1-1
AL1-5
P/O
AL1-5
P/O
UH
1-3
UH
1-5
AL1-7
P/O
AL1-7
P/OUH
1-4
UH
1-6
MSB
FA2
AL1-14
TPA
FIRE PUMP
M107
UH
1-19
AL1-20
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:4
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP103
B R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
P O
W E
R P
A R
T P
L A
N
E A
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR MEZZANINE POWER PART PLAN - EAST
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
KEYNOTES
GENERAL NOTES
MATCH LINE
1 PROVIDE POWER TO GENERATOR BLOCK HEATER. COORDINATE
EXACT LOCATION WITH THE ARCHITECTURAL, CIVIL, AND FIRE
PROTECTION TRADES.
PROVIDE POWER TO GENERATOR BATTERY CHARGER. COORDINATE
EXACT LOCATION WITH THE ARCHITECTURAL, CIVIL, AND FIRE
PROTECTION TRADES.
PROVIDE POWER TO THE JOCKEY PUMP CONTROLLER. COORDINATE
WITH THE FIRE PROTECTION TRADE.
PROVIDE POWER TO THE FIRE PUMP CONTROLLER. COORDINATE WITH
THE FIRE PROTECTION TRADE. PROVIDE CONCRETE ENCASED FEEDER
THAT RISES UP WITHIN RATED CHASE FROM BELOW THE MEZZANINE.
REFER TO SHEETS AE101 AND EP501.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT
LOCATION WITH THE PLUMBING TRADE.
1. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
REF. REF. REF. REF.
JJJJ
J
J
F
G
HI
JK
LM
NP
E6
E7
WP WP
G
G
G
G
G
ML2
ML1 MH1T
G
ML2-3
ML2-5
ML2-7
ML2-8
T2
MECH MEZZ
M110
ANNEX
STAIR
003B
CORRIDOR
M103
LOCKERS
M105
ELEV
BLIND VENDING
M102
BREAK
M101
WP
TPP2-11,13
WP
CU
EWH
ML2-29
TV
WP
PH2-13,15,17
ML2-15 ML2-17
ML2-23 ML2-21
ML2-19
ML2-14
ML2-16
G
G
ML2-31
ML2-33
G
ML2-1
MECH
M106
CUSTODIAL
M104
STAIR
002B
SHOP
UTILITY
M108
STAIR
004B
ML2-6
ML2-2
ML2-4
G
G
ML2-35
UH
1-11
UH
1-18
ML2-37
P/O
P/O
ML2-11
ML2-37
P/O
ML2-37
P/O
UH
1-12
UH
1-13
UH
1-16
MH1-8,10,12
ML2-39
ML1-15
P/O
ML1-15
P/O
UH
1-14
UH
1-15
ML2-27
RP
ML2-10
ML2-12 1
FA1-7
UH
1-17
6 7
PL2-27
EF
PL1-23 MSB-37,39,41
AHU
BCU
ML2-25
MSB-31,33,35
CU
WP
CU
OU
WP
ML1-9
ML1-7
ML1-17
ML1-11
MH1-7,9,11
ML1-31,33ML1-35,37
WP
PL2-17
PH1-13,15,17
PH1-19,21,23
DOAS
ML2-20
TPA
ML2-13
ML2-9
ML2-37
TPA
ML1-39
WP
CUH
PL2-12
G
P/O
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:5
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP104
B R
E P
A
IR
S
F
IR
S T
F L O
O R
M E
Z Z
A N
IN
E
P O
W E
R P
A R
T P
L A
N
W E
S T
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
SCALE: 1/8" = 1'-0"
B1
FIRST FLOOR MEZZANINE POWER PLAN - WEST
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANGENERAL NOTES KEYNOTES
11. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.
INSTALL 4" ABOVE MICROWAVE SHELF. COORDINATE EXACT LOCATION
WITH THE CONTRACTING OFFICER.
PROVIDE STEEL SLOTTED STRUT SUPPORT FOR MOUNTING
EQUIPMENT AND DEVICES ON THE MECHANICAL MEZZANINE.
REFER TO DETAIL C1/ET502 FOR TV MONITOR AND AV INSTALLATION
DETAIL.
FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO
DETAIL A3/ET501.
FOR DOAS LIGHTS AND SWITCH. COORDINATE WITH THE MECHANICAL
TRADE.
FOR DOAS RECEPTACLE. COORDINATE WITH THE MECHANICAL TRADE.
FOR DOAS LEV CONTROLLER. COORDINATE WITH THE MECHANICAL
TRADE.
MATCH LINE
9 PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT
LOCATION WITH THE PLUMBING TRADE.
REF.
J
J
JJ
J
J
J
F
G
HI
JK
LM
N
O
P
E6
G
PH2
PL10
PL9
T
G
GG
PL8
PL7
PH1
T
TPP2
SBB
F
G
T5
ELEV
STAIR
003C
MEN
WOMEN
SHOP
STAIR
PH2-7,9,11
SPD
PL7-26
PL7-27
2F
F
WPWP
OU
CUH
T4
G
PL7-32
PL7-10
PL7-16
G
TV7
PL7-18
TV
TV
C TL CTL
PL7-19,21,23,25
TPP2-1
TPP2-9
TPP2-5
NETWORK
ELECTRICAL
STAIR
004C
MULTI-PURPOSE
OFFICE
TRAINING
OPEN OFFICE
CORRIDOR
UPHOLSTERY
CORRIDOR
EXPRESSING
PL7-29
PL7-13
PL7-31,33,35,37
PL7-38
PL7-36
PL9-37
PL9-5
PL9-3
G
CUSTODIAL
202 TPP2-7
G
PL10-5
UH
2-1
UH
2-2
PL10-7
PL10-9
P/O
PL10-9
P/O
P/O
PL10-11
PL9-1
PL9-25
PL10-13
PL10-15
PL10-9
UH
2-3
PL10-17
PL10-19
PL10-21
PL9-27
G
PL9-29
C
C PL10-25
PL10-23
TPP1-13,15 MH1-13,15,17
PL6-37,39
WPWPWP
OU
CU
OU
PL9-31 PL9-33 PL9-35
P/O
UH
2-4
PL9-35
P/O
UH
2-5
FA1-7
PL10-27 PL10-29
PL10-31 PL8-5 PL8-7 PL8-9 PL8-11 PL8-13
P/O
PL8-13
P/O
UH
2-7
UH
2-9
PL8-17
PL8-15
PL8-31
PL8-33
PL8-35 PL8-37
P/O
PL8-37
P/O
UH
2-8
UH
2-6
PL7-28 CUH
PL7-2,4,6,8
PL7-30
PL7-34
PL7-17
NAC
TPP2-19TPP2-21
PL7-15
PL7-42
PL7-40
C C C C C
CCCCC
PL10-33
PL10-35
PL10-37
PL10-39
PL8-39
PL8-41
PL8-2
PL8-4
PL8-6
PL8-8
TPP2-3
L C
P
PL9-20
PL10-41
PL7-43
F
PL7-30
IU
PL10-4
FSR
MVF
PL9-23
TPA
T15
PH2-2,4,6
PL6-33,35
12 12 12 12 12
12121212
TPP2-17
CCTL TL
TPP2-15
PL7-46
PL7-44
PL7-20
TPP2-2,4
EB
SPD
SPD
P/O
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:0
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP105
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
P O
W E
R P
L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANKEYNOTES
11. REFER TO SHEES EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
3. REFER TO SHEET EP501 FOR ONE-LINE DIAGRAM AND SCHEDULES.
4. REFER TO SHEET EP701 FOR SHOP EQUIPMENT SCHEDULE.
INSTALL 4" ABOVE COUNTERTOP BACKSPLASH.
PROVIDE RECEPTACLE FOR REFRIGERATOR. COORDINATE EXACT
LOCATION WITH THE CONTRACTING OFFICER.
PROVIDE DISCONNECT AND POWER TO EXISTING BRIDGE CRANE.
SPLICE AND EXTEND EXISTING WIRES SERVING THE BRIDGE CRANE TO
THE DISCONNECT. FIELD VERIFY. EXISTING CRANE CONTROLS TO
REMAIN.
PROVIDE COMBINATION POKE THROUGH DEVICE. REFER TO POKE
THROUGH DETAIL A1/EP505.
COORDINATE EXACT RECEPTACLE LOCATION WITH THE PLUMBING
TRADE AND WATER HEATER, EWH-3.
PROVIDE JUNCTION BOX AND 8-WIRE SYSTEMS FURNITURE
CONNECTION. REFER TO DETAIL C3/EP504.
REFER TO DETAIL C1/ET502 FOR TV MONITOR AND AV INSTALLATION
DETAIL.
MATCH LINE
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR POWER PLAN
8 INSTALL THE TWIST LOCK RECEPTACLE SERVING THE DATA CABINET
WITHIN THE CABINET.
FOR ELEVATOR LOBBY 2 WAY COMMUNICATIONS SYSTEM. REFER TO
DETAIL A3/ET501.
INDOOR UNIT IS POWERED FROM THE OUTDOOR UNIT. COORDINATE
WITH THE MECHANICAL TRADE.
FOR TRAP PRIMER. COORDINATE WITH THE PLUMBING TRADE.
PROVIDE SURFACE MOUNTED BOX WITH ASSOCIATED CONDUIT
CONCEALED WITHIN THE ATTIC SPACE ABOVE. PAINT THE JUNCTION
BOX TO MATCH THE ADJACENT SURFACE.
PROVIDE STEEL SLOTTED STRUT SUPPORT FOR MOUNTING
PANELBOARDS. COORDINATE WITH THE MECHANICAL TRADE TO AVOID
PIPING THAT IS ROUTED VERTICALLY ALONG THE WALL.
PROVIDE SIMPLEX RECEPTACLE FOR POLY BAG SEALER.
GENERAL NOTES
15 INSTALL ROLL SLITTER TRANSFORMER. REFER TO SHEET EP701.
COORDINATE EXACT LOCATION IN THE FIELD.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT
LOCATION WITH THE PLUMBING TRADE.
G
HIJKLMNOP
E6
E7
MEZZANINE
M201
PH1-7,9,11
PL7-22
PL7-41
UH
2-11
UH
2-10
BCU
BCU
PH1-1,3,5
PL7-48TPA
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
/1 /2
:2
:0
P
M
C U s e rs \b d a ig le \D o c u m e n ts
\2
.2
B
L D
G
E
L E
C -V b d a ig le
Q U
X G
.r v t
EP106
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
M E
Z Z
A N
IN
E
P O
W E
R P
L A
N
DCL
HRM
BPD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
E P
PLAN
NORTH
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLANKEYNOTES
11. REFER TO SHEETS EP503 AND EP504 FOR MECHANICAL, PLUMBING,
AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE.
2. REFER TO SHEETS EP601 - EP604 FOR PANELBOARD SCHEDULES.
PROVIDE POWER TO THE TRAP PRIMER. COORDINATE EXACT
LOCATION WITH THE PLUMBING TRADE.
MATCH LINE
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR MEZZANINE POWER PLAN
GENERAL NOTES
E6
UH
3-2
UH
3-3
UH
3-1
PL9-39
G
UH
3-4
PL7-12
PL10-1
PL7-14
G
G
PL10-3
G
PL7-24
G
1 1
PL8-1
PL8-3
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FI…