This is a Building 60 Equipment Schedule for an industrial manufacturing facility, detailing equipment procurement and installation requirements. The schedule lists over 50 distinct equipment items required for sewing, material handling, fabrication, and support operations, with specifications for utilities including electrical power, compressed air, exhaust systems, and dust collection needs. Equipment status designations indicate items to be purchased as new by the contractor (marked "NEW") or relocated by the government from existing locations (marked "EXIST"). Key production equipment includes sewing machines (medium weight, lightweight, and long-arm variants), heat sealers, RF heat sealer pedestals, grommet machines, CNC fabric cutters with blowers, embroidery machines, poly bag sealers, and a roll slitter. Support equipment comprises shop-built tables, storage units, work benches, heavy-duty racks, shelving, tool boxes, carts, and extension cord reels.
The contractor is responsible for installing all industrial equipment at final locations in Building 60 and coordinating utility connections with mechanical, plumbing, fire protection, and electrical systems. Equipment disconnection and relocation is coordinated by the government, with the contractor responsible for scheduling equipment testing to confirm working condition before and after relocation, witnessed by shop representatives. Certain items require sole sourcing and are not subject to full and open competition due to being commercially unavailable off-the-shelf or requiring manufacturer customization. The contractor must coordinate all sequencing, equipment installation, utility connections, and testing procedures with the contracting officer and follow manufacturer's standard testing procedures for new equipment. Schedule information is based on available data at contract document preparation and requires contractor coordination with the contracting officer for any additional requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT SCHEDULE GENERAL NOTES
1. SEE SHEET G-007 FOR CONSTRUCTION SEQUENCING INFORMATION.
2. SEE SHEETS QD101 THRU QD602 FOR EXISTING EQUIPMENT TO BE
DISCONNECTED AND REMOVED.
3. PATCH ANCHORAGE HOLES IN THE SLAB WITH NON-SHRINK GROUT
ONCE THE EQUIPMENT IS REMOVED.
4. COORDINATE EQUIPMENT LAYOUT WITH MECHANICAL, PLUMBING, FIRE
PROTECTION, AND ELECTRICAL PLANS AND EQUIPMENT SCHEDULE.
5. EQUIPMENT LOCATIONS ARE FOR PLANNING AND COORDINATION
PURPOSES. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING THE
INDUSTRIAL EQUIPMENT AS INDICATED AND IS RESPONSIBLE FOR
COORDINATING THE RELOCATION OF EXISTING EQUIPMENT BY THE
GOVERNMENT. COORDINATE SEQUENCING AND CONNECTION OF
UTILITIES TO THE EQUIPMENT WITH THE CONTRACTING OFFICER.
6. COORDINATE TESTING OF EXISTING EQUIPMENT TO BE RELOCATED TO
CONFIRM WORKING CONDITION BEFORE AND AFTER RELOCATION.
TESTS MUST BE WITNESSED BY SHOP REPRESENTATIVE AND
COORDINATED WITH THE CONTRACTING OFFICER.
B60 BUILDING 60
NEW CONTRACTOR PURCHASED AND INSTALLED EQUIPMENT
EXIST GOVERNMENT RELOCATED EQUIPMENT, CONTRACTOR INSTALLED
SHIPYARD SHIPYARD PROVIDED AND INSTALLED EQUIPMENT
A. INSTALL EQUIPMENT AT FINAL LOCATION IN BUILDING 60.
B. PROVIDE INDUSTRIAL EQUIPMENT UTILITIES INDICATED. COORDINATE WITH MECHANICAL, PLUMBING, FIRE
PROTECTION, AND ELECTRICAL SHEETS.
C. COORDINATE THE EQUIPMENT DISCONNECTION AND RELOCATION BY THE GOVERNMENT.
D. COORDINATE EQUIPMENT INSTALLATION BY GOVERNMENT.
E. EXHAUST TO SPACE. PROVIDE MANUFACTURER'S DUCT SILENCER AND COORDINATE WITH MECHANICAL SHEETS.
F. TURN EQUIPMENT OVER TO THE GOVERNMENT FOR STORAGE. COORDINATE STORAGE LOCATION WITHIN BUILDING
60 WITH THE CONTRACTING OFFICER.
G. THIS ITEM REQUIRES SOLE SOURCING AND IS NOT SUBJECT TO FULL AND OPEN COMPETITION. THIS ITEM IS NOT COMMERCIALLY AVAILABLE "OFF THE SHELF", AND REQUIRES CUSTOMIZED MODIFICATION. SEE ATTACHED SPECIFICATION AND/OR MANUFACTURER'S QUOTE INDICATING EQUIPMENT OPTIONS AT THE END OF THIS PACKAGE.
H. THIS ITEM REQUIRES SOLE SOURCING AND IS NOT SUBJECT TO FULL AND OPEN COMPETITION. PROVIDE SPECIFIC
MAKE, MODEL, AND CONFIGURATION INDICATED.
I. PROVIDED WITH CNC CUTTER - EQ10SA.
EQUIP SCHEDULE REMARKS NOTES
6. SEE CIVIL, STRUCTURAL, ARCHITECTURAL, MECHANICAL, PLUMBING,
ELECTRICAL, AND SPRINKLER SHEETS FOR EQUIPMENT UTILITY
CONNECTIONS.
7. PROCURE AND INSTALL EQUIPMENT STATUS MARKED "NEW"
(EQUIPMENT TO BE PURCHASED BY THE CONTRACTOR).
8. INSTALL EQUIPMENT STATUS MARKED "EXIST" (EQUIPMENT TO BE
RELOCATED BY THE GOVERNMENT).
9. COORDINATE AND PERFORM NEW EQUIPMENT MANUFACTURER'S
STANDARD TESTING PROCEDURES.
10. SCHEDULE INFORMATION IS BASED ON AVAILABLE INFORMATION AT
THE TIME OF CONTRACT DOCUMENT PREPARATION. COORDINATE WITH
CONTRACTING OFFICER FOR ADDITIONAL INFORMATION.
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:4
:1
P
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
Q-601
B
R
E P
A
IR
S
E Q
U
IP
M E
N T
S C
H E
D U
L E
O
P T
IO
N
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
Q -6
SCHEDULE KEY
BUILDING 60 EQUIPMENT SCHEDULE
EQUIPMENT
TAG NO.
ALPHA NO. (SHIPYARD TAG) QTY DESCRIPTION EXISTING
LOCATION
UTILITIES STATUS MANUFACTURER MODEL NUMBER REMARKS
ELECTRICAL (SEE
ELECTRICAL SHEETS)
SY AIR PSI GAS EXHAUST EXHAUST
TYPE
CFM DUST
COLLECTION
WATER FIRE
PROTECTION
DRAIN STEAM NRTL FND
102D - 15 CABLE PROTECTOR RAMP N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW ATLAS CP9896 F
EQ100A - 4 MEDIUM WEIGHT SEWING MACHINE N/A YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW JUKI LU-1510N-7 A,B,H
EQ100C - 1 LIGHT WEIGHT SEWING MACHINE N/A YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW JUKI DDL 5550N A,B,H
EQ100D NDD, ENR, EWY, EXA, EXB, EYH, EYP, EYQ, EYS, FAJ, OR FAS 8 LONG ARM SEWING MACHINE OFF SITE YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST JUKI LU-2216N-7 A,B,C
EQ100D - 4 LONG ARM SEWING MACHINE N/A YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW JUKI LU-2216N-7 A,B,H
EQ100E NDD, ENR, EWY, EXA, EXB, EYH, EYP, EYQ, EYS, FAJ, OR FAS 2 LONG ARM SEWING MACHINE - LG158 OFF SITE YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST JUKI LG158 A,B,C
EQ101A FPT, FPS, OR EXC 1 BOX STITCHER OFF SITE YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST JUKI AMS-210EN A,B,C
EQ101A - 1 BOX STITCHER N/A YES 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW JUKI AMS-210EN A,B,H
EQ102A FFF 2 HEAT SEALER OFF SITE YES 100 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CONC/PVMT EXIST THERMEX THERMATRON F15-30 A,B,C
EQ102A - 8 HEAT SEALER N/A YES 100 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CONC/PVMT NEW THERMEX THERMATRON F15-30 A,B,G
EQ102B - 2 RF HEAT SEALER PEDESTAL OFF SITE N/A N/A N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST THERMEX THERMATRON M23933 A,B,C
EQ102B - 8 RF HEAT SEALER PEDESTAL N/A N/A N/A N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW THERMEX THERMATRON M23933 A,B,G
EQ104A MVY, FHN, EPH, OR MXD 1 GROMMET MACHINE OFF SITE YES 80 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A LEVEL FLOOR EXIST EDWARD SEGAL 92GW A,B,C
EQ104A - 1 GROMMET MACHINE N/A YES 80 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A LEVEL FLOOR NEW EDWARD SEGAL 92GW A,B
EQ105A FPX 1 CNC FABRIC CUTTER OFF SITE YES 100 N/A N/A N/A 1500 N/A N/A N/A N/A N/A N/A LEVEL FLOOR EXIST GERBER INDUSTRIAL Z1 A,B,C
EQ105A - 1 CNC FABRIC CUTTER N/A YES 100 N/A N/A N/A 1500 N/A N/A N/A N/A N/A N/A LEVEL FLOOR NEW GERBER INDUSTRIAL Z1 A,B,G
EQ105B - 1 CNC BLOWER OFF SITE YES N/A N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST GERBER INDUSTRIAL Z1-15HP A,B,C,E
EQ105B - 1 CNC BLOWER N/A YES N/A N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GERBER INDUSTRIAL Z1-15HP A,B,E,G
FSR - 1 EMBROIDERY MACHINE OFF SITE YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST MELCO EMT16 A,B,C
GQU ASJ 1 POLY BAG SEALER OFF SITE YES 80 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST PAC MACHINERY 48PS-KN A,B,C
GQU - 1 POLY BAG SEALER N/A YES 80 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW PAC MACHINERY 48PS-KN A,B
MC100B 20 SHOP BUILT TABLE - 8x3 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC100J 1 SHOP BUILT TABLE - 8X6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC100K 2 SHOP BUILT TABLE - GERBER N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC102D 1 SHOP BUILT STORAGE - 10X4 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC103A 7 SEWING TABLE LARGE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D,B
MC103B 2 SEWING TABLE MEDIUM N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D,B
MC103C 4 SEWING TABLE - MEDIUM LONG N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D,B
MC103D 2 SEWING TABLE - SMALL N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D,B
MC104A 1 LAYOUT TABLE 24'x8' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC104C 1 LAYOUT TABLE - 24'X5' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MC105A 6 SHOP BUILT DIE RACK - 5X3 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD CUSTOM CUSTOM D
MS104G 22 HEAVY DUTY RACK - 6'X24" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 35UR59 A
MS104H 1 HEAVY DUTY RACK - 6'X36" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 35UR60 A
MS104K 7 HEAVY DUTY RACK - 8'X36" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 35UT09 A
MS106A 7 CABINET - SHELVES - 6'X24"X78" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GLOBAL INDUSTRIES WBB495262 A
MS106I 2 CABINET - DRAWERS 30"X28"X59" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GLOBAL INDUSTRIES WBB527756 A
MS107C 69 TOOL BOX - ROLLING BASE - 34" OFF SITE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST GRAINGER 48VA11 A,C
MS107C 10 TOOL BOX - ROLLING BASE - 34" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 48VA11 A
MS108A 2 HAZARDOUS MATERIAL CABINET - SMALL N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 55EA93 A
MS109A 6 CANTELEVER RACK OFF SITE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST GLOBAL INDUSTRIES WB248383L A,C
MS109A 2 CANTELEVER RACK N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GLOBAL INDUSTRIES WB248383L A
MS112A 4 CLOTH UNWINDING TRUCK - 102 INCHES OFF SITE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST Southwest Sewing Machine LLC 125G A,C
MS113A 2 PLASTIC WASTE CONTAINER N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW MCMASTER CARR 4052T11 A
MS119B 2 SHELVING - CLOSED - 36"x24" N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW MCMASTER CARR 4829T325 A
MVF 1 ROLL SLITTER OFF SITE YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A EXIST COLLINS CRAFT 76-24AR A,B,C
SP102A 12 EXTENSION CORD REEL (25' LENGTH) N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW KH INDUSTRIES RTBB3LB-1DD520-J12F A,B
SP102B 9 EXTENSION CORD REEL (50' LENGTH) N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW KH INDUSTRIES RTBB3LB-1GB520-J12K A,B
SP102C 9 COMPRESSED AIR REEL (50' LENGTH) N/A N/A 65-75 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW REELCRAFT RS7650 OPL A,B
SP103C 1 COMPUTER - STANDALONE N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SHIPYARD N/A N/A B,D
SP103D 2 CNC - CONTROLLER N/A YES N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GERBER INDUSTRIAL N/A A,B,I
WT103A 1 WORKBENCH - HARDWOOD TOP - 4' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 35UX04 A
WT103C 2 WORKBENCH - HARDWOOD TOP - 6' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GRAINGER 35UX07 A
WT103G 2 WORKBENCH - HARDWOOD TOP - 8' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NEW GLOBAL INDUSTRIAL WB183170 A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
0/
R
S H
| Sheets |
| AE102 - FIRST FLOOR PART PLAN - WEST |
| AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST |
| AE131 - TYPICAL SIGNAGE DETAILS |
| AE202 - EXTERIOR ELEVATIONS 1 |
| AE804 - SECOND FLOOR FF&E PLAN (OPTION 1) |
| G-004A - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1 |
| G-004B - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2 |
| Q-601 - EQUIPMENT SCHEDULE (OPTION 2) |
File details come from the government source that posted it. Updated .