About this file

This document is a mechanical removals plan for Building 60 at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing (MD108) depicts the Second Floor Mezzanine and shows the locations and scope of mechanical equipment, ductwork, and piping to be removed as part of the B60 Repairs project (Project No. 1740579).

The general scope of work requires removal of all HVAC and industrial process equipment throughout the spaces shown, including air handling units, fans, controls, wiring, ductwork, hoods, and piping. Specific removals identified under CLIN 002 include industrial process exhaust and make-up air systems, ceiling fans with associated controls and wiring, and exhaust fans with associated ductwork, hoods, controls, and wiring. The mechanical subcontractor is responsible for identifying, making safe, cutting loose, and capping all items specified for demolition, while the general contractor shall be responsible for actual demolition and removal to an authorized salvage facility. Additional requirements include coordinating with architectural drawings for patching of floor, wall, and ceiling penetrations; coordinating removal with hazmat requirements; and conducting testing of the existing pumped steam condensate system return line back pressure, with results reported to the contracting officer prior to commencing removals. The drawing was finalized on October 1, 2025, with Amendment 008 dated March 10, 2026.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

3/4" HWS/R

DROP TO UH-E

3/4" HWS/R

DROP TO FTR-E

HWS/R ABOVE

STAIRWELL IN SOFFIT

EF

E

10x12 EA

12ø EA

12ø DN

EF

E

4ø EA

SEE MD107 FOR

CONTINUATION

SEE MD107 FOR

CONTINUATION

3/4" HWS/R

3/4" HWS/R DN

3/4" HWS/R DN

1 1/2"

HWS/R DN

ROOF BELOW

STORAGE

M201

STORAGE

M202

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOWOPEN TO BELOW

OPEN TO BELOW

2" HWS UP

(CAPPED, ABANDONED)

2" HWS UP

(CAPPED, ABANDONED)

HWS/R

UP&DN

20ø EA

UP&DN

20ø SA

UP&DN

8ø EA

UP&DN

CF

E

A1

MD223

C1

MD223

B1

MD222

m l i h e7 p e6 n k j g.1 g f.1 f

M3

5.6

4.2 e4 e3

3.5

2.8 n.9 n.5 k.9 k.5

2.5

2.4

2.1 e2 e1 k.1 e d c b a i.1

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/2

/2

:1

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B

L D

G

M

E C

H A

N

IC

A L

-V m d o n o v a n

V F

X R

.r v t

MD108

B R

E P

A

IR

S

S E

C O

N D

F L O

O R

M E

Z Z

A N

IN

E

M E

C H

A N

IC

A

L R

E M

O V

A L S

P L A

N

MSA

RNC

CBM

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

M D

GENERAL NOTES REMOVALS KEYNOTES

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE

KEY PLAN

CHECK GRAPHIC SCALE BEFORE USING

MATCH LINE

PLAN

NORTH

1 [CLIN 002] REMOVE INDUSTRIAL PROCESS EXHAUST AND MAKE UP AIR SYSTEMS, INCLUDING BUT NOT LIMITED TO AIR HANDLING UNITS, FANS, CONTROLS, MIRING, DUCTWORK, HOODS, AND PIPING.

REMOVE CEILING FAN, ASSOCIATED CONTROLS AND WIRING.

[CLIN 002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK HOODS, CONTROLS AND WIRING.

SCALE: 1/8" = 1'-0"

B1

SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST

(THIS SHEET ONLY)

1.

2.

3.

4.

5.

6.

7.

8.

SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES.

REMOVE ALL HVAC AND INDUSTRIAL PROCESS EQUIPMENT AND ASSOCIATED CONTROLS, WIRING AND DUCTWORK THROUGHOUT THE SPACES SHOWN

ON THIS SHEET UNLESS OTHERWISE NOTED.

COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF OPEN FLOOR, WALL AND CEILING PENETRATIONS ASSOCIATED WITH REMOVALS.

MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE, CUT LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.

REFER TO CLIN 002 FOR LIST OF INDUSTRIAL EQUIPMENT REMOVAL REQUIREMENTS.

COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND REQUIREMENTS.

EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE NOTED.

CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO CONTRACTING

OFFICER PRIOR TO COMMENCING WITH REMOVALS IN BUILDING 60.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/10 /2

R S

H

Sheets
M-701 - MECHANICAL CONTROL DIAGRAMS 1
MD106 - FIRST FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST
MD108 - SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN
MD109 - ATTIC MECHANICAL REMOVALS PLAN
MP107 - ATTIC MECHANICAL PIPING PLAN
P-401 - ENLARGED PLUMBING PART PLANS 1
P-601 - PLUMBING SCHEDULES AND DETAIL

File details come from the government source that posted it. Updated .