This document is a mechanical removals plan for Building 60 at Portsmouth Naval Shipyard in Kittery, Maine, prepared by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic. The drawing (MD108) depicts the Second Floor Mezzanine and shows the locations and scope of mechanical equipment, ductwork, and piping to be removed as part of the B60 Repairs project (Project No. 1740579).
The general scope of work requires removal of all HVAC and industrial process equipment throughout the spaces shown, including air handling units, fans, controls, wiring, ductwork, hoods, and piping. Specific removals identified under CLIN 002 include industrial process exhaust and make-up air systems, ceiling fans with associated controls and wiring, and exhaust fans with associated ductwork, hoods, controls, and wiring. The mechanical subcontractor is responsible for identifying, making safe, cutting loose, and capping all items specified for demolition, while the general contractor shall be responsible for actual demolition and removal to an authorized salvage facility. Additional requirements include coordinating with architectural drawings for patching of floor, wall, and ceiling penetrations; coordinating removal with hazmat requirements; and conducting testing of the existing pumped steam condensate system return line back pressure, with results reported to the contracting officer prior to commencing removals. The drawing was finalized on October 1, 2025, with Amendment 008 dated March 10, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AA
3/4" HWS/R
DROP TO UH-E
3/4" HWS/R
DROP TO FTR-E
HWS/R ABOVE
STAIRWELL IN SOFFIT
EF
E
10x12 EA
12ø EA
12ø DN
EF
E
4ø EA
SEE MD107 FOR
CONTINUATION
SEE MD107 FOR
CONTINUATION
3/4" HWS/R
3/4" HWS/R DN
3/4" HWS/R DN
1 1/2"
HWS/R DN
ROOF BELOW
STORAGE
M201
STORAGE
M202
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOWOPEN TO BELOW
OPEN TO BELOW
2" HWS UP
(CAPPED, ABANDONED)
2" HWS UP
(CAPPED, ABANDONED)
HWS/R
UP&DN
20ø EA
UP&DN
20ø SA
UP&DN
8ø EA
UP&DN
CF
E
A1
MD223
C1
MD223
B1
MD222
m l i h e7 p e6 n k j g.1 g f.1 f
M3
5.6
4.2 e4 e3
3.5
2.8 n.9 n.5 k.9 k.5
2.5
2.4
2.1 e2 e1 k.1 e d c b a i.1
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/2
/2
:1
:3
P
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B
L D
G
M
E C
H A
N
IC
A L
-V m d o n o v a n
V F
X R
.r v t
MD108
B R
E P
A
IR
S
S E
C O
N D
F L O
O R
M E
Z Z
A N
IN
E
M E
C H
A N
IC
A
L R
E M
O V
A L S
P L A
N
MSA
RNC
CBM
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
M D
GENERAL NOTES REMOVALS KEYNOTES
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE
KEY PLAN
CHECK GRAPHIC SCALE BEFORE USING
MATCH LINE
PLAN
NORTH
1 [CLIN 002] REMOVE INDUSTRIAL PROCESS EXHAUST AND MAKE UP AIR SYSTEMS, INCLUDING BUT NOT LIMITED TO AIR HANDLING UNITS, FANS, CONTROLS, MIRING, DUCTWORK, HOODS, AND PIPING.
REMOVE CEILING FAN, ASSOCIATED CONTROLS AND WIRING.
[CLIN 002] REMOVE EXHAUST FAN AND ASSOCIATED DUCTWORK HOODS, CONTROLS AND WIRING.
SCALE: 1/8" = 1'-0"
B1
SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST
(THIS SHEET ONLY)
1.
2.
3.
4.
5.
6.
7.
8.
SEE M-001 FOR MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES.
REMOVE ALL HVAC AND INDUSTRIAL PROCESS EQUIPMENT AND ASSOCIATED CONTROLS, WIRING AND DUCTWORK THROUGHOUT THE SPACES SHOWN
ON THIS SHEET UNLESS OTHERWISE NOTED.
COORDINATE WITH ARCHITECTURAL DRAWINGS FOR PATCHING OF OPEN FLOOR, WALL AND CEILING PENETRATIONS ASSOCIATED WITH REMOVALS.
MECHANICAL SUBCONTRACTOR SHALL IDENTIFY, MAKE SAFE, CUT LOOSE AND CAP ALL ITEMS SPECIFIED TO BE DEMOLISHED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OFF SITE TO AN AUTHORIZED SALVAGE FACILITY.
REFER TO CLIN 002 FOR LIST OF INDUSTRIAL EQUIPMENT REMOVAL REQUIREMENTS.
COORDINATE REMOVAL WITH HAZMAT DRAWINGS AND REQUIREMENTS.
EXISTING MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING THROUGHOUT THE BUILDING TO BE REMOVED, UNLESS OTHERWISE NOTED.
CONDUCT TESTING OF EXISTING PUMPED STEAM CONDENSATE SYSTEM RETURN LINE BACK PRESSURE AND REPORT RESULTS TO CONTRACTING
OFFICER PRIOR TO COMMENCING WITH REMOVALS IN BUILDING 60.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/10 /2
R S
H
| Sheets |
| M-701 - MECHANICAL CONTROL DIAGRAMS 1 |
| MD106 - FIRST FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST |
| MD108 - SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN |
| MD109 - ATTIC MECHANICAL REMOVALS PLAN |
| MP107 - ATTIC MECHANICAL PIPING PLAN |
| P-401 - ENLARGED PLUMBING PART PLANS 1 |
| P-601 - PLUMBING SCHEDULES AND DETAIL |