About this file

This file is a comprehensive set of architectural and engineering drawings for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine. The drawings cover multiple volumes and disciplines including general, equipment removal, plumbing, mechanical, fire protection, and fire alarm systems for a full renovation of the historic facility. Key details include complete demolition and replacement of mechanical systems, sprinkler systems, electrical infrastructure, and interior finishes across multiple floors (first floor, mezzanine, second floor, and attic).

The project involves detailed documentation for removing existing industrial equipment, hazardous materials, and legacy systems while preserving the building's historic character. The renovation includes installing new HVAC systems with dedicated outside air systems, fire protection infrastructure with a new electric fire pump, upgraded plumbing systems, and comprehensive fire alarm and notification systems. The work is part of a larger Naval Facilities Engineering Command contract for renovation and repair projects at Portsmouth Naval Shipyard, with a final submission date of October 1, 2025.

View the file

Other files

File Type Posted
_B60_Continuation Sheet_Amendment 010_03-31-26.pdf PDF
74_SP101_R1_AMENDMENT 010.pdf PDF
96_AE105_R2_AMENDMENT 010.pdf PDF
114_AE401_R1_AMENDMENT 010.pdf PDF
120_AE441_R1_AMENDMENT 010.pdf PDF
178_P-401_R2_AMENDMENT 010.pdf PDF
179_P-402_R1_AMENDMENT 010.pdf PDF
01 91 19_R1_AMENDMENT 009.pdf PDF
116_AE411_R1_AMENDMENT 009.pdf PDF
238_FX400_R1_AMENDMENT 009.pdf PDF
256_EP502_R1_AMENDMENT 009.pdf PDF
260_EP601_R1_AMENDMENT 009.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att.pdf PDF
Solicitation Amendment N6247026R00120008 SF 30.pdf PDF
Att. S) FFE Final Package-R1_AMENDMENT 008.pdf PDF
_ATTAC1.PDF PDF
02 82 00.00 22_R1_AMENDMENT 008.pdf PDF
31_CS101_R1_AMENDMENT 008.pdf PDF
47_SD102_R1_AMENDMENT 008.pdf PDF
65_SF105_R1_AMENDMENT 008.pdf PDF
68_SF502_R1_AMENDMENT 008.pdf PDF
152_G-004B_R1_AMENDMENT 008.pdf PDF
182_P-601_R1_AMENDMENT 008.pdf PDF
190_MD106_R1_AMENDMENT 008.pdf PDF
192_MD108_R1_AMENDMENT 008.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Att. W) DBIDS 5512 FORM.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA.

VT.

MAINECANADA

CANADA

U.S. NAVAL ACTIVITIES

KITTERY, ME

PORTSMOUTH

AUGUSTA

PORTLAND

N.H.

L

OA

D

C

EN

TE

R

L O A D

C

EN

TE

R

L O

AD

C

EN

TER

LOA

D

CEN

TER

LOAD

CENTER

LOAD CEN TER 8

LOAD

CENTER

L

OA

D

C

EN

TE

R

LOAD CENTER 11

LOA

D

C EN

TER

1 4

LOA

D C

EN TER

LOA

D

CEN TER

LOA

D

CEN TER

LOAD

CEN TER

NET

WO RK 2

&7

LOA

D C

EN TER

(VA

ULT

BELO

W )

FRANKLIN

SUB-STATION

LOAD

CENTER

LOAD CEN TER 29

LOA

D

CEN TER

B R

ID

G E

DE

CA

TU

R

AV

E.

MEADE AVE.

PR

IO

R

ST

JO

H N

P A U L

JO

N E S

A V E

S E A V E Y

S T

S

LO

A T

A V E

GOODRIC

H AVE.

BEAUMONT ST.

PARKER AVE.

WYMA

N AV

E.

SL

OA

T

AV

E. MEADE AVE.

W

IN

S

LO

W

S T

S

IC

A R D

S T

WY

MA

N

AV

E.

W

IN

S L O W

S T

IS

A A C

H U

LL

S T

R

ID

G E

LE

Y

S T

B R

ID

G E

DEW

EY

AVE

GOODRICH AVE.

G O O D R

IC

H

A V E

G O R G E S

S T

CHA

RLE

S M

ORR

IS A

VE

C R A N E

S T

MAC

DON

OUG

H A

VE.

RANGER

ST.

S

LO

A T

A V E

BUR

ROWS

AVE

DENN

ET S

T.

SQ.

RALEIGH

TB19

236103

1B

KITTERY

PORTSMOUTH

U.S.NAVAL

ACTIVITIES

PORTSMOUTH

HARBOR

M A

IN

E

N

EW

H A M P

SH

IR

E

P

IS

C A T A Q U A

R

IV

E R

RT

.1

BY

PA

SS

NORTH

AREA MAP

NOT TO SCALE

NORTH

SHIPYARD PLAN

NOT TO SCALE

PROJECT LOCATION:

BUILDING 60

BUILDING 46

CONTRACTOR VEHICLE

INSPECTION AREA

GATE #1

PASS OFFICE

BUILDING 59 PUBLIC

WORKS DEPARTMENT

BUILDING 13

BUILDING 86A

GATE #2

JAMAICA ISLAND PARKING LOT

(CONTRACTOR EMPLOYEE

PARKING)

NORTH

VICINITY MAP

NOT TO SCALE

B60 REPAIRS

(DBB)

VOLUME 2

PORTSMOUTH NAVAL SHIPYARD

KITTERY, ME

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

G-001B

B

R

E P

A

IR

S

C O

V E

R S

H E

E T

V

O L U

M E

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

G -0

B

SIGNATURE DATE PROFESSIONAL SEAL

HAVING PARTICIPATED IN THE DESIGN OF EPROJECT NO. 1740579, PORTSMOUTH NAVAL SHIPYARD, KITTERY MAINE, AND HAVING THOROUGHLY REVIEWED THE COMPLETED PROJECT DOCUMENTS, I

DECLARE THAT THE FACILITY DESIGN INCLUDED HEREIN COMPLIES WITH ALL APPLICABLE UNITED STATES

CODES AND LAWS.

10/01/2025 blend

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

G-002B

B

R

E P

A

IR

S

L

IS

T O

F D

R A

W

IN

G S

V O

L U

M E

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

G -0

B

LIST OF DRAWINGS 1 - VOLUME 2

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO.

SHEET TITLE

NO. SHEET

GENERAL

1 G-001A COVER SHEET - VOLUME 1

2 G-002A LIST OF DRAWINGS 1 - VOLUME 1

3 G-003A LIST OF DRAWINGS 2 - VOLUME 1

4 G-004A ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1

5 G-005 ARCHAEOLOGICAL CONSTRAINTS AND REQUIREMENTS PLAN

6 G-006 SITE CONSTRAINTS AND REQUIREMENTS PLAN

7 G-007 CONSTRUCTION SEQUENCE STRATEGY

8 G-008 OUTAGE SCHEDULE

9 G-009 OUTAGE SCHEDULE CONTINUED

10 G-010 CONSTRUCTION BARRIER DETAILS

11 G-100 CODE SUMMARY

12 G-101 FIRST FLOOR PART PLAN - EAST - LIFE SAFETY

13 G-102 FIRST FLOOR PART PLAN - WEST - LIFE SAFETY

14 G-103 FIRST FLOOR MEZZANINE - LIFE SAFETY

15 G-104 SECOND FLOOR - LIFE SAFETY

16 G-105 ATTIC - LIFE SAFETY

HAZARDOUS MATERIALS

17 HM001 HAZARDOUS MATERIALS NOTES

18 HM101 FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST

19 HM102 FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - WEST

20 HM103 FIRST FLOOR MEZZANINE HAZARDOUS MATERIALS PLAN

21 HM104 SECOND FLOOR HAZARDOUS MATERIALS PLAN

22 HM105 SECOND FLOOR MEZZANINE HAZARDOUS MATERIALS PLAN

23 HM106 SECTION HAZARDOUS MATERIALS

24 HM601 FIRST FLOOR HAZARDOUS MATERIAL - SAMPLING KEYPLAN

25 HM602 SECOND FLOOR HAZARDOUS MATERIAL - SAMPLING KEYPLAN

26 HM603 HAZARDOUS MATERIALS SCHEDULES 1

27 HM604 HAZARDOUS MATERIALS SCHEDULES 2

CIVIL

28 C-001 CIVIL LEGEND, NOTES AND ABBREVIATIONS

29 CX101 SITE EXISTING CONDITIONS PLAN

30 CR101 SITE REMOVALS PLAN

31 CS101 SITE AND UTILITIES PLAN

32 CG101 GRADING, DRAINAGE AND EROSION CONTROL PLAN

33 C-201 UTILITY PROFILES 1

34 C-501 EROSION AND SEDIMENT CONTROL NOTES

35 C-502 SITE DETAILS 1

36 C-503 SITE DETAILS 2

37 C-504 SITE DETAILS 3

38 B-001 BORING LOGS 1

39 B-002 BORING LOGS 2

40 B-003 BORING LOGS 3

41 B-004 HISTORICAL RECORD BORING LOGS AND TEST PITS

42 B-005 ENVIRONMENTAL TEST RESULTS

STRUCTURAL

43 S-001 STRUCTURAL NOTES

44 S-002 STRUCTURAL DESIGN LOADS, GENERAL NOTES, AND ABBREVIATIONS

45 S-003 WALL AND ROOF COMPONENT AND CLADDING WIND PRESSURE DIAGRAMS

46 SD101 FOUNDATION REMOVALS PART PLAN - EAST

47 SD102 FOUNDATION REMOVALS PART PLAN - WEST

48 SD103 FIRST FLOOR MEZZANINE FRAMING REMOVALS PART PLAN - EAST

49 SD104 FIRST FLOOR MEZZANINE REMOVALS PART PLAN - WEST

50 SD105 ROOF FRAMING REMOVALS PART PLAN - EAST

51 SD106 SECOND FLOOR FRAMING REMOVALS PLAN

52 SD107 ROOFTOP EQUIPMENT PLATFORM FRAMING REMOVALS PART PLAN - EAST

53 SD108 SECOND FLOOR MEZZANINE FRAMING REMOVALS PLAN

54 SD109 CEILING FRAMING REMOVALS PART PLAN - WEST

55 SB101 FOUNDATION PART PLAN - EAST

56 SB102 FOUNDATION PART PLAN - WEST

57 SB401 NORTH MEZZANINE PILE CAP PLAN AND DETAILS

58 SB501 FOUNDATION DETAILS 1

59 SB502 FOUNDATION DETAILS 2

60 SB503 FOUNDATION DETAILS 3

61 SF101 FIRST FLOOR MEZZANINE FRAMING PART PLAN - EAST

62 SF102 FIRST FLOOR MEZZANINE FRAMING PART PLAN - WEST

63 SF103 SECOND FLOOR FRAMING PLAN

64 SF104 ROOFTOP EQUIPMENT PLATFORM FRAMING PART PLAN - EAST

65 SF105 SECOND FLOOR CEILING FRAMING PLAN

66 SF201 ELEVATOR MASONRY WALL ELEVATIONS

67 SF501 STRUCTURAL DETAILS 1

68 SF502 STRUCTURAL DETAILS 2

69 SF503 STRUCTURAL DETAILS 3

70 SF504 STRUCTURAL DETAILS 4

71 SF505 STRUCTURAL DETAILS 5

72 SF506 STRUCTURAL DETAILS 6

73 SF601 COLUMN AND CONNECTION SCHEDULES AND BASE PLATE DETAILS

74 SP101 STRUCTURAL PROTECTION PART PLAN AND DETAILS

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO.

SHEET TITLE

NO. SHEET

ARCHITECTURAL

75 AD101 FIRST FLOOR REMOVALS PART PLAN - EAST

76 AD102 FIRST FLOOR REMOVALS PART PLAN - WEST

77 AD103 FIRST FLOOR MEZZANINE REMOVALS PLAN

78 AD104 SECOND FLOOR REMOVALS PLAN

79 AD105 SECOND FLOOR MEZZANINE REMOVALS PLAN

80 AD120 ROOF REMOVALS PART PLAN - EAST

81 AD121 ROOF REMOVALS PART PLAN - WEST

82 AD201 EXTERIOR ELEVATION REMOVALS 1

83 AD202 EXTERIOR ELEVATION REMOVALS 2

84 AD203 EXTERIOR ELEVATION REMOVALS 3

85 AD221 BUILDING SECTION REMOVALS 1

86 AD222 BUILDING SECTION REMOVALS 2

87 AD401 ENLARGED REMOVAL PART PLANS

88 AD521 ROOF REMOVALS DETAILS 1

89 AD522 ROOF REMOVALS DETAILS 2

90 AE001 WALL & CEILING TYPES AND DETAILS

91 AE002 FIRESTOPPING DETAILS AND STANDARD MOUNTING HEIGHTS

92 AE101 FIRST FLOOR PART PLAN - EAST

93 AE102 FIRST FLOOR PART PLAN - WEST

94 AE103 FIRST FLOOR MEZZANINE PART PLAN - EAST

95 AE104 FIRST FLOOR MEZZANINE PART PLAN - WEST

96 AE105 SECOND FLOOR PLAN

97 AE106 SECOND FLOOR MEZZANINE PLAN

98 AE107 ATTIC FLOOR PLAN

99 AE108 B59 FIRST FLOOR PLAN

100 AE120 ROOF PART PLAN - EAST

101 AE121 ROOF PART PLAN - WEST

102 AE131 TYPICAL SIGNAGE DETAILS

103 AE132 SIGNAGE SCHEDULE AND DETAILS

104 AE201 BUILDING AXONS

105 AE202 EXTERIOR ELEVATIONS 1

106 AE203 EXTERIOR ELEVATIONS 2

107 AE204 EXTERIOR ELEVATIONS 3

108 AE205 MASONRY REPAIR DETAILS

109 AE221 BUILDING SECTIONS 1

110 AE222 BUILDING SECTIONS 2

111 AE223 BUILDING SECTIONS 3

112 AE301 WALL SECTIONS

113 AE302 SECTION DETAILS

114 AE401 ENLARGED FIRST FLOOR TOILET ROOM AND INTERIOR ELEVATION

115 AE402 ENLARGED SECOND FLOOR TOILET ROOM PLANS AND ELEVATIONS

116 AE411 ENLARGED ELEVATOR PLANS AND SECTIONS

117 AE412 ELEVATOR DETAILS

118 AE421 ENLARGED ELECTRICAL ROOM PLAN AND SECTION

119 AE440 ENLARGED STAIR PLANS 1

120 AE441 ENLARGED STAIR PLANS 2

121 AE442 STAIR SECTIONS

122 AE443 LADDER SECTIONS

123 AE444 STAIR DETAILS

124 AE445 RAILING DETAILS

125 AE501 PLAN DETAILS

126 AE511 METAL PANEL DETAILS

127 AE521 ROOF DETAILS 1

128 AE522 ROOF DETAILS 2

129 AE530 EXPANSION JOINT DETAILS 1

130 AE531 EXPANSION JOINT DETAILS 2

131 AE540 CASEWORK DETAILS

132 AE601 DOOR SCHEDULE AND DETAILS

133 AE602 DOOR DETAILS

134 AE621 WINDOW TYPES

135 AE622 WINDOW AND DOOR REPAIR AND RESTORATION NOTES AND SCHEDULE

136 AE623 WINDOW AND DOOR REPAIR AND RESTORATION TYPES

137 AE626 WINDOW DETAILS

138 AE640 ROOM FINISH SCHEDULE

139 AE701 FIRST FLOOR REFLECTED CEILING PART PLAN - EAST

140 AE702 FIRST FLOOR REFLECTED CEILING PART PLAN - WEST

141 AE703 FIRST FLOOR MEZZANINE REFLECTED CEILING PLAN

142 AE704 SECOND FLOOR REFLECTED CEILING PLAN

143 AE720 CEILING AND SOFFIT DETAILS

144 AE741 INTERIOR ELEVATIONS

145 AE801 FIRST FLOOR FF&E PART PLAN - EAST (OPTION 1)

146 AE802 FIRST FLOOR FF&E PART PLAN - WEST (OPTION 1)

147 AE803 FIRST FLOOR MEZZANINE FF&E PART PLAN - WEST (OPTION 1)

148 AE804 SECOND FLOOR FF&E PLAN (OPTION 1)

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

G-003B

B

R

E P

A

IR

S

L

IS

T O

F D

R A

W

IN

G S

V O

L U

M E

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

G -0

B

LIST OF DRAWINGS 2 - VOLUME 2

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO.

SHEET TITLE

NO. SHEET

215 M-504 MECHANICAL DETAILS 4

216 M-505 MECHANICAL DETAILS 5

217 M-601 MECHANICAL SCHEDULES 1

218 M-602 MECHANICAL SCHEDULES 2

219 M-603 MECHANICAL SCHEDULES 3

220 M-701 MECHANICAL CONTROL DIAGRAMS 1

221 M-702 MECHANICAL CONTROL DIAGRAMS 2

222 M-703 MECHANICAL CONTROL DIAGRAMS 3

223 M-704 MECHANICAL CONTROL DIAGRAMS 4

224 M-705 MECHANICAL CONTROL DIAGRAMS 5

FIRE PROTECTION

225 FA001 FIRE ALARM NOTES

226 FA101 FIRST FLOOR PART PLAN - EAST - FIRE ALARM

227 FA102 FIRST FLOOR PART PLAN - WEST - FIRE ALARM

228 FA103 FIRST FLOOR MEZZANINE - FIRE ALARM

229 FA104 SECOND FLOOR - FIRE ALARM

230 FA105 ATTIC - FIRE ALARM

231 FA501 DETAILS - FIRE ALARM

232 FX001 FIRE PROTECTION NOTES

233 FX101 FIRST FLOOR PART PLAN - EAST - FIRE PROTECTION

234 FX102 FIRST FLOOR PART PLAN - WEST - FIRE PROTECTION

235 FX103 FIRST FLOOR MEZZANINE - FIRE PROTECTION

236 FX104 SECOND FLOOR - FIRE PROTECTION

237 FX105 ATTIC - FIRE PROTECTION

238 FX400 ENLARGED FIRE PUMP ROOM

239 FX501 DETAILS - FIRE PROTECTION

ELECTRICAL

240 E-001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES

241 ED101 FIRST FLOOR ELECTRICAL REMOVALS PART PLAN - EAST

242 ED102 FIRST FLOOR ELECTRICAL REMOVALS PART PLAN - WEST

243 ED103 FIRST FLOOR MEZZANINE ELECTRICAL REMOVALS PART PLAN

244 ED104 SECOND FLOOR ELECTRICAL REMOVALS PLAN

245 ED105 SECOND FLOOR MEZZANINE ELECTRICAL REMOVALS PLAN

246 ES101 ELECTRICAL SITE PLAN

247 ES102 ELECTIRCAL SITE PLAN 2

248 EP101 FIRST FLOOR POWER PART PLAN - EAST

249 EP102 FIRST FLOOR POWER PART PLAN - WEST

250 EP103 FIRST FLOOR MEZZANINE POWER PART PLAN - EAST

251 EP104 FIRST FLOOR MEZZANINE POWER PART PLAN - WEST

252 EP105 SECOND FLOOR POWER PLAN

253 EP106 SECOND FLOOR MEZZANINE POWER PLAN

254 EP107 ATTIC POWER PART PLAN - WEST

255 EP501 ONE-LINE DIAGRAM AND SCHEDULES

256 EP502 ELECTRICAL POWER DETAILS

257 EP503 MECHANICAL, PLUMBING, AND MISCELLANEOUS EQUIPMENT WIRING SCHEDULE

258 EP504 MECHANICAL, PLUMBING, AND MISCELLANEOUS EQUIPMENT SCHEDULE CONTINUATION

259 EP505 SYSTEMS FURNITURE POWER AND POKE THROUGH DETAILS

260 EP601 PANELBOARD SCHEDULES - 1

261 EP602 PANELBOARD SCHEDULES - 2

262 EP603 PANELBOARD SCHEDULES - 3

263 EP604 PANELBOARD SCHEDULES - 4

264 EP701 ELECTRICAL EQUIPMENT SCHEDULES

265 EL101 FIRST FLOOR LIGHTING PART PLAN - EAST

266 EL102 FIRST FLOOR LIGHTING PART PLAN - WEST

267 EL103 FIRST FLOOR MEZZANINE LIGHTING PART PLAN - EAST

268 EL104 FIRST FLOOR MEZZANINE LIGHTING PART PLAN - WEST

269 EL105 SECOND FLOOR LIGHTING PLAN

270 EL106 SECOND FLOOR MEZZANINE LIGHTING PLAN

271 EL107 ATTIC LIGHTING PART PLAN - WEST

272 EL701 LIGHTING FIXTURE SCHEDULE AND DETAILS

273 EL702 LIGHTING FIXTURE DETAILS 1

274 ET101 FIRST FLOOR TECHNOLOGY AND SECURITY PART PLAN - EAST

275 ET102 FIRST FLOOR TECHNOLOGY AND SECURITY PART PLAN - WEST

276 ET103 FIRST FLOOR MEZZANINE TECHNOLOGY AND SECURITY PART PLAN - EAST

277 ET104 FIRST FLOOR MEZZANINE TECHNOLOGY AND SECURITY PART PLAN - WEST

278 ET105 SECOND FLOOR TECHNOLOGY AND SECURITY PLAN

279 ET106 B59 FIRST FLOOR TECHNOLOGY PLAN

280 ET501 TELECOMMUNICATIONS RISER DIAGRAMS

281 ET502 TELECOMMUNICATIONS DETAILS

282 EY501 SECURITY SYSTEM RISER AND DETAILS

SHEET NO. NAVFAC

DWG. NO.

PWD

DWG. NO.

SHEET TITLE

NO. SHEET

GENERAL

149 G-001B COVER SHEET - VOLUME 2

150 G-002B LIST OF DRAWINGS 1 - VOLUME 2

151 G-003B LIST OF DRAWINGS 2 - VOLUME 2

152 G-004B ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2

EQUIPMENT

153 QD101 FIRST FLOOR EQUIPMENT REMOVALS PART PLAN - EAST (CLIN 002)

154 QD102 FIRST FLOOR EQUIPMENT REMOVALS PART PLAN - WEST (CLIN 002)

155 QD103 FIRST FLOOR MEZZANINE EQUIPMENT REMOVALS PLAN (CLIN 002)

156 QD601 EQUIPMENT REMOVALS SCHEDULE 1 (CLIN 002)

157 QD602 EQUIPMENT REMOVALS SCHEDULE 2 (CLIN 002)

158 Q-101 FIRST FLOOR EQUIPMENT PART PLAN - EAST (OPTION 2)

159 Q-102 FIRST FLOOR EQUIPMENT PART PLAN - WEST (OPTION 2)

160 Q-103 SECOND FLOOR EQUIPMENT PLAN (OPTION 2)

161 Q-601 EQUIPMENT SCHEDULE (OPTION 2)

PLUMBING

162 P-001 PLUMBING LEGENDS, ABBREVIATIONS AND GENERAL NOTES

163 PD101 UNDERSLAB AND FIRST FLOOR TRENCH PLUMBING REMOVALS PLAN - WEST

164 PD102 FIRST FLOOR PLUMBING REMOVALS PLAN - EAST

165 PD103 FIRST FLOOR PLUMBING REMOVALS PLAN - WEST

166 PD104 FIRST FLOOR MEZZANINE PLUMBING REMOVALS PLAN - WEST

167 PD105 SECOND FLOOR PLUMBING REMOVALS PLAN

168 PD106 SECOND FLOOR MEZZANINE PLUMBING REMOVALS PLAN

169 P-101 UNDERSLAB PLUMBING PLAN - EAST

170 P-102 UNDERSLAB PLUMBING PLAN - WEST

171 P-103 FIRST FLOOR PLUMBING PLAN - EAST

172 P-104 FIRST FLOOR PLUMBING PLAN - WEST

173 P-105 FIRST FLOOR MEZZANINE PLUMBING PLAN - EAST

174 P-106 FIRST FLOOR MEZZANINE PLUMBING PLAN - WEST

175 P-107 SECOND FLOOR PLUMBING PLAN

176 P-108 SECOND FLOOR MEZZANINE PLUMBING PLAN

177 P-109 ATTIC PLUMBING PLAN

178 P-401 ENLARGED PLUMBING PART PLANS 1

179 P-402 ENLARGED PLUMBING PART PLANS 2

180 P-403 ENLARGED PLUMBING PART PLANS 3

181 P-501 PLUMBING DETAILS

182 P-601 PLUMBING SCHEDULES AND DETAIL

183 P-701 PLUMBING RISER DIAGRAM

MECHANICAL

184 M-001 MECHANICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES

185 MD101 FIRST FLOOR TRENCH MECHANICAL PIPING REMOVALS PLAN - WEST

186 MD102 FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - EAST

187 MD103 FIRST FLOOR MECHANICAL DUCTWORK REMOVALS PLAN - WEST

188 MD104 FIRST FLOOR MECHANICAL PIPING REMOVALS PLAN - EAST

189 MD105 FIRST FLOOR MECHANICAL PIPING REMOVALS PLAN - WEST

190 MD106 FIRST FLOOR MEZZANINE MECHANICAL REMOVALS PLAN - WEST

191 MD107 SECOND FLOOR MECHANICAL REMOVALS PLAN

192 MD108 SECOND FLOOR MEZZANINE MECHANICAL REMOVALS PLAN

193 MD109 ATTIC MECHANICAL REMOVALS PLAN

194 MD120 ROOF MECHANICAL REMOVALS PLAN - EAST

195 MD201 MECHANICAL EXTERIOR ELEVATION REMOVALS

196 MD221 MECHANICAL BUILDING SECTION REMOVALS 1

197 MD222 MECHANICAL BUILDING SECTION REMOVALS 2

198 MD223 MECHANICAL BUILDING SECTION REMOVALS 3

199 MH101 FIRST FLOOR MECHANICAL DUCTWORK PLAN - WEST

200 MH102 FIRST FLOOR MEZZANINE MECHANICAL DUCTWORK PLAN - WEST

201 MH103 SECOND FLOOR MECHANICAL DUCTWORK PLAN

202 MH104 SECOND FLOOR MEZZANINE MECHANICAL DUCTWORK PLAN

203 MH105 ATTIC MECHANICAL DUCTWORK PLAN

204 MP101 FIRST FLOOR MECHANICAL PIPING PLAN - EAST

205 MP102 FIRST FLOOR MECHANICAL PIPING PLAN - WEST

206 MP103 FIRST FLOOR MEZZANINE MECHANICAL PIPING PLAN - EAST

207 MP104 FIRST FLOOR MEZZANINE MECHANICAL PIPING PLAN - WEST

208 MP105 SECOND FLOOR MECHANICAL PIPING PLAN

209 MP106 SECOND FLOOR MEZZANINE MECHANICAL PLAN

210 MP107 ATTIC MECHANICAL PIPING PLAN

211 M-401 ENLARGED MECHANICAL PART PLANS

212 M-501 MECHANICAL DETAILS 1

213 M-502 MECHANICAL DETAILS 2

214 M-503 MECHANICAL DETAILS 3

GENERAL SYMBOLS LEGEND

A1

A-301

A-401

INTERIOR ELEVATION INDICATOR

INTERIOR ELEVATION

NUMBER

SHEET WHERE ELEVATION

IS DRAWN

EXTERIOR ELEVATION INDICATOR

ELEVATION NUMBER

INDICATES DIRECTION OF VIEW

SHEET WHERE ELEVATION IS DRAWN

A1

A-301

WALL / PARTIAL BUILDING SECTION INDICATOR

SECTION NUMBER

SHEET WHERE SECTION IS DRAWN

A1

A-301

BUILDING SECTION INDICATOR

A1

A-301

BUILDING

A1

A1

A1

A

A1

ROOM

ROOM IDENTIFIER

DETAIL NUMBER

SHEET WHERE

DETAIL IS DRAWN

DETAIL INDICATOR

ROOM NAME

ROOM NUMBER

A-501

DETAIL NUMBER

SHEET REFERENCED FROM

KEYNOTE INDICATOR

EXISTING ITEM OR SPECIALTY KEYNOTE

PLAN NUMBER

A1

PLAN TITLE

SCALE: 1/8" = 1'-0"

A1

PLAN TITLE

SCALE: 1/8" = 1'-0" (A-101)

SECTION NUMBER

SHEET WHERE DRAWN

MATCH LINE

A

A

INDICATES

DIRECTION OF VIEW

NA WALL TYPE INDICATOR ELEVATION TARGET

WINDOW TYPE

SIGN TYPE

REMOVALS KEYNOTE NUMBER

NEW WORK KEYNOTE NUMBER

ACCESSIBILITY SYMBOL

DOOR NUMBER

REVISION

WINDOW NUMBERACCESSORY ITEM

A 1i

IMAGE INDICATOR

IMAGE NUMBER

SHEET WHERE

DETAIL IS DRAWN

AE201

ACM

ACT

AFF

AHJ

ALUM

BF

BLDG

CJ

C

CLG

CLR

CMU

COL

CONC

CON

CONT

CPT

CT

CWT

DIA

DN

DWG

E

EA

EF

EJ

ELEC

ELEV

EMR

EQ

EXIST

EXT

FCO

FD

FND

FE

FEC

FF

FIN

FL,FLR

FT

GA

GALV

GYP BD

H,HT,HGT

HM

HORIZ

HP

IN

INSUL

INCH, INCHES

FOOT, FEET

PLUS OR MINUS

ASBESTOS CONTAINING

MATERIAL

ACOUSTICAL CEILING

TILE

ABOVE FINISH FLOOR

AUTHORITY HAVING

JURISDICTION

ALUMINUM

BARRIER FREE

BUILDING

CONTROL JOINT

CENTERLINE

CEILING

CLEAR

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONNECTION

CONTINUOUS

CARPET

CERAMIC TILE

CERAMIC WALL TILE

DIAMETER

DOWN

DRAWING

EAST

EACH

EXHAUST FAN

EXPANSION JOINT

ELECTRIC/ELECTRICAL

ELEVATION

ELEVATOR MACHINE ROOM

EQUAL

EXISTING

EXTERIOR

FLOOR CLEANOUT

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FLOOR

FINISH

FLOOR

FOOT, FEET

GAUGE

GALVANIZED

GYPSUM BOARD

HEIGHT

HOLLOW METAL

HORIZONTAL

HIGH POINT

INCHES, INCH

INSULATION,

INSULATED

ABBREVIATIONS

L

INT

IR

LBP

MAX

MECH

MFR

MIN

MIR

MTL

N

NAT

NIC

NMCI

NO.#

OC

PCB'S

PETG

PMI

PNT

PLAM

PLY

PQP

PT

PWD

R

RCB

RCP

REINF

RO

S

SIM

SF

STL

STRUCT

TYP

UL

UON

VERT

VIF

W W/

WB

WD

WP

INTERIOR

INSTALLATION

RESTORATION

LEAD-BASED PAINT

MAXIMUM

MECHANICAL

MANUFACTURER

MINIMUM

MIRROR

METAL

NORTH

NATURAL FINISH

NOT IN CONTRACT

NAVY/MARINE CORPS

INTRANET

NUMBER

ON CENTER

POLYCHLORINATED

BIPHENYLS

POLYETHYLENE

TEREPHTHALATE

GLYCOL

PLANNED

MODIFICATION

ITEM

PAINT, PAINTED

PLASTIC LAMINATE

PLYWOOD

PRIVATE QUALIFIED

PERSON

PRESSURE TREATED

PUBLIC WORKS

DEPARTMENT

RADIUS

RUBBER COVE BASE

REFLECTED CEILING

PLAN

REINFORCED

ROUGH OPENING

SOUTH

SIMILAR

SQUARE FEET

STEEL

STRUCTURAL

TYPICAL

UNDERWRITERS

LABORATORIES

UNLESS OTHERWISE

NOTED

VERTICAL

VERIFY IN FIELD

WEST, WIDE

WITH

WOOD BASE

WOOD

WALL PROTECTION

1. ITEMS IDENTIFIED ON THE HAZARDOUS MATERIALS DRAWINGS ARE EXISTING. SEE SHEETS HM001-HM604 FOR ADDITIONAL HAZARDOUS MATERIALS INFORMATION. COORDINATE HAZARDOUS MATERIALS WORK

WITH BUILDING REMOVALS AND CONSTRUCTION SEQUENCE PLAN.

2. OBTAIN PERMITS AND LICENSES REQUIRED FOR THE REMOVAL, TRANSPORT, AND DISPOSAL OF

HAZARDOUS MATERIALS AND DEBRIS AT NO ADDITIONAL COST TO THE GOVERNMENT.

3. CONTRACTOR MUST PERFORM NECESSARY MANAGEMENT OF IDENTIFIED HAZARDOUS MATERIALS, IN ACCORDANCE WITH EM 385-1-1, APPLICABLE PROJECT SPECIFICATIONS, AND FEDERAL, STATE, AND LOCAL

REGULATIONS.

4. CONTRACTOR MUST SUBMIT WORK PLANS AND HIRE PQP TO COORDINATE IMPLEMENTATION OF THE WORK PLAN, PERFORM INDEPENDENT INSPECTIONS, TESTING, AND VERIFICATION OF THE HAZARDOUS COMPONENTS WORK INCLUDING, BUT NOT LIMITED TO: ASBESTOS, LEAD-, CADMIUM, AND CHROMIUM- CONTAINING PAINT, AND PCBs.

5. EXISTING PAINT IS ASSUMED TO CONTAIN LEAD, CADMIUM, AND CHROMIUM (VI) (HEAVY METALS). MANAGE HEAVY METALS PAINT IN AREAS INDICATED FOR REMOVAL SEPARATE FROM THE SUBSTRATE AND TREAT THE REMOVED PAINT AS HAZARDOUS MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS. HEAVY METALS MUST BE MANAGED, REMOVED, AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE, AND

LOCAL REGULATIONS.

6. EXISTING LIGHT FIXTURE BALLASTS ARE ASSUMED TO CONTAIN PCB'S AND EXISTING LAMPS ARE ASSUMED TO CONTAIN MERCURY. SEE ELECTRICAL DRAWINGS FOR EXTENT OF REMOVALS. REMOVE IN ACCORDANCE

WITH SPECIFICATIONS.

7. EXISTING INDUSTRIAL EQUIPMENT/PROCESSES HAVE PRODUCED HEAVY METALS RESIDUE. REFER TO

HAZARDOUS MATERIAL SHEETS FOR FURTHER INFORMATION.

8. THE FOLLOWING SPECIFICATIONS APPLY:

02 82 00.00 22 ASBESTOS REMEDIATION (PNSY PROJECTS)

02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING

RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNSY PROJECTS)

02 84 16.00 22 HANDLING OF LIGHTING BALLASTS AND LAMPS

CONTAINING PCB'S AND MERCURY (PNSY PROJECTS)

02 84 33.00 22 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) (PNSY PROJECTS)

CONTRACT LINE ITEM NUMBERS (CLIN)

001 BASE BID

002 INDUSTRIAL EQUIPMENT REMOVAL AND PROCESS HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT

003 HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT

004 EXISTING TRAILER UTILITIES

OPTION ITEMS

1. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E)

2. INDUSTRIAL EQUIPMENT

3. RADON FANS

4. SECURITY DEVICES

5. ADDITIONAL WINDOW RESTORATIONS

6. NOT APPLICABLE

7. ADDITIONAL ANNEX REPAIRS

8. ADDITIONAL FINISHES

9. ELECTRICAL SERVICE INFRASTRUCTURE

10. RESINOUS FLOORING

11. COMMUNICATION SERVICE ROUTING

GENERAL HAZARDOUS MATERIALS NOTES

1. COMPLY WITH STATE, FEDERAL, NATIONAL, AND OTHER CODES AND ORDINANCES THAT

APPLY TO THIS PROJECT.

2. COMPLETE WORK IN ACCORDANCE WITH INDUSTRY STANDARDS AND PERFORM WORK IN

A WORKMANLIKE AND PROFESSIONAL MANNER.

3. WHERE CONFLICTS EXIST WITHIN THE DOCUMENTS OR BETWEEN THE DOCUMENTS AND

APPLICABLE CODES, ORDINANCES, OR INDUSTRY STANDARDS, THE MORE STRINGENT, AS

DETERMINED BY THE CONTRACTING OFFICER, MUST BE PROVIDED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

4. MAINTAIN BUILDING EGRESS PATHS DURING THE ENTIRE CONTRACT PERIOD. PROVIDE

TEMPORARY PATHS TO MAINTAIN BUILDING EGRESS. COMPLY WITH NFPA 241, STANDARD

FOR SAFEGUARDING CONSTRUCTION, ALTERATIONS, AND DEMOLITION OPERATIONS.

5. MAINTAIN THE CONSTRUCTION SITE IN A SECURE, NEAT, WATER TIGHT, CLEAN, AND SAFE

CONDITION DURING THE ENTIRE CONTRACT PERIOD. EXTERIOR ENVELOPE WORK MUST

BE PERFORMED IN A MANNER TO MAINTAIN WEATHER TIGHTNESS.

6. PROVIDE ITEMS AND COMPONENTS SHOWN ON THE DRAWINGS UNLESS NOTED AS

"EXISTING" (EXIST).

7. WORK FROM GIVEN DIMENSIONS AND LARGE SCALE DETAILS. DO NOT SCALE DRAWINGS.

8. DIMENSIONING SYSTEM: UNLESS OTHERWISE NOTED, PLAN DIMENSIONS ARE TO/FROM

FINISHED FACE OF EXISTING WALLS, TO/FROM FACE OF FRAMING FOR STUD FRAMED

WALLS, AND TO/FROM THE FACE OF MASONRY FOR MASONRY WALLS. DIMENSIONS

INDICATED AS "CLEAR" (CLR) MUST BE MAINTAINED AND ARE MEASURED FROM THE FACE

OF FINISH. CENTERLINE DIMENSIONS ARE INDICATED BY CENTERLINE SYMBOL (C).

9. LOCATE DOOR OPENINGS 6 INCHES FROM ADJACENT WALL (FACE OF FRAMING TO

ROUGH OPENING), UNLESS OTHERWISE DIMENSIONED.

10. VERIFY EXISTING CONDITIONS AND DIMENSIONS AND REPORT DISCREPANCIES TO THE

CONTRACTING OFFICER. PROCEED WITH THE WORK AFTER THE DISCREPANCIES HAVE

BEEN RESOLVED BY THE GOVERNMENT.

11. DO NOT PENETRATE JOISTS, BEAMS, OR OTHER STRUCTURAL MEMBERS. OBTAIN

WRITTEN APPROVAL FROM THE ENGINEER OF RECORD FOR UNAVOIDABLE

PENETRATIONS OF STRUCTURAL MEMBERS.

12. PROVIDE SOLID BLOCKING BEHIND SURFACE APPLIED FIXTURES, TRIM, GRAB BARS,

SHELVES, WOOD WALL BASE, BASE AND WALL CABINETS, MARKER BOARDS,

TELEVISIONS, AND OTHER ACCESSORIES AND EQUIPMENT INCLUDING GOVERNMENT

SUPPLIED ITEMS WHEN MOUNTED TO STUD WALLS.

13. DISPOSE OF AND/OR RECYCLE CONSTRUCTION DEBRIS FROM THE PROJECT SITE AS

REQUIRED BY THE STATE OF MAINE AND AS REQUIRED BY THE CONTRACT. OBTAIN

REQUIRED DISPOSAL PERMITS.

14. PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. REPAIR OR REPLACE DAMAGE

RESULTING FROM PROJECT OPERATIONS, AS APPROVED BY THE CONTRACTING OFFICER,

AT NO ADDITIONAL COST TO THE GOVERNMENT.

15. OBTAIN APPROVAL FROM THE CONTRACTING OFFICER FOR THE SEQUENCE AND TIMING

OF OPERATIONS PRIOR TO COMMENCING WORK AND PER OUTAGE REQUIREMENTS

DETAILED IN THE SPECIFICATIONS.

16. FIRESTOP CONDUIT/PIPE/DUCT PENETRATIONS THROUGH FIRE-RATED WALLS, CEILINGS,

AND FLOORS. PROVIDE SMOKE BARRIER SEALANT AT FLOOR PENETRATIONS AND

PENETRATIONS THROUGH SMOKE PARTITIONS.

17. DO NOT INTERRUPT UTILITY SERVICES WITHOUT AN APPROVED OUTAGE REQUEST. DO

NOT RESTORE UTILITIES WITHOUT AN APPROVED 'ONAGE' REQUEST. REFER TO

SPECIFICATION SECTION 01 14 00.00 22 WORK RESTRICTIONS (PWD ME) AND SHEETS

G-008 AND G-009.

18. BUILDING 60 IS A HISTORIC FACILITY. PERFORM WORK IN COMPLIANCE WITH THE US

DEPARTMENT OF THE INTERIOR "SECRETARY OF THE INTERIOR'S STANDARDS FOR THE

TREATMENT OF HISTORIC PROPERTIES." HISTORIC ITEMS INDICATED OR SPECIFIED TO BE

SALVAGED FOR REINSTALLATION OR TO REMAIN IN PLACE MUST BE PROTECTED DURING

CONSTRUCTION.

19. WHEN ATTACHING FASTENERS, BLOCKING, OR ACCESSORIES TO EXISTING HISTORIC

BRICK OR STONE, PLACE FASTENERS IN MORTAR JOINTS. EXCEPTION: LIGHTNING

PROTECTION.

20. SYSTEMS AND THEIR ASSOCIATED CONDUIT MUST NOT PENETRATE HISTORIC FEATURES

OF THE BUILDING (WINDOW AND DOOR SURROUNDS, STAIRWELLS, WOOD BASE, CRANE

RAILS, ETC.). MAXIMIZE THE PLACEMENT OF CONDUIT IN SECONDARY SPACES WHERE

PRACTICABLE.

21. PRIOR TO INSTALLING FIRE PROTECTION PIPING, MECHANICAL DUCTWORK, PIPING,

ELECTRICAL CONDUIT, AND OTHER ASSOCIATED SYSTEM ELEMENTS, SUBMIT

COORDINATION DRAWINGS AND OBTAIN APPROVAL BY THE CONTRACTING OFFICER AND

THE PWD ME CULTURAL RESOURCES MANAGER. REFER TO SPECIFICATION SECTION 01

30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS (PWD ME).

22. PROVIDE LIGHTNING PROTECTION SYSTEM TYPICAL. SEE ELECTRICAL SHEETS FOR

INFORMATION.

23. ACCESS TO THE INTERIOR OF BUILDING 60 MUST BE VIA EXISTING OPENINGS IN

EXTERIOR FACADE. UNDER NO CIRCUMSTANCES WILL NEW TEMPORARY OPENINGS BE

ENTERTAINED AND MUST NOT BE INCLUDED AS BASIS OF BID.

24. CONTRACTOR MUST PROVIDE PAVEMENT AND ASSOCIATED SELECT SUB BASE FOR

AREAS BEYOND THOSE IDENTIFIED ON THE CONTRACT DOCUMENTS THAT ARE IMPACTED

AS A RESULT OF THE CONTRACTORS MEANS AND METHODS AS REQUIRED TO PERFORM

THE CONTRACT SCOPE OF WORK.

L

GENERAL CONSTRUCTION NOTES

GENERAL MASONRY CLEANING/REPAIR/REPOINTING NOTES

1. BUILDING 60 AND ITS MASONRY ARE HISTORIC. COMPLY WITH SPECIFICATION SECTION 04 01

00.91 22 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).

2. PROTECT MASONRY AND STRUCTURE THROUGHOUT PROJECT. USE THE GENTLEST MEANS

TO PERFORM THE WORK.

3. ENGAGE THE SERVICES OF A HISTORIC MASONRY CONSULTANT TO DETERMINE THE

CONDITION OF THE EXISTING MASONRY AND MATERIALS AND TO RECOMMEND CLEANING

AND RESTORATION PROCEDURES. REFER TO SPECIFICATION SECTION 04 01 00.91 22

RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).

4. PREPARE A MOCK-UP FOR MASONRY REPAIR/RESTORATION WORK. REVIEW WITH

CONTRACTING OFFICER AND PWD-ME CULTURAL RESOURCES MANAGER.

BUILDING CODE:

UNIFIED FACILITIES CRITERIA (UFC) 1-200-01 (26 FEB. 2024)

UNIFIED FACILITIES CRITERIA (UFC) 1-200-02 (01 JUNE 2022)

UNIFIED FACILITIES CRITERIA (UFC) 3-101-01 (08 JAN. 2024)

UNIFIED FACILITIES CRITERIA (UFC) 3-110-03 (01 MAY 2012)

ACCESSIBILITY CODE:

UNIFORM ACCESSIBILITY STANDARDS (UFAS)

ARCHITECTURAL BARRIERS ACT (ABA)

AMERICANS WITH DISABILITIES ACT (ADA)

ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAAG)

MECHANICAL CODE:

INTERNATIONAL MECHANICAL CODE (IMC) 2021

ELECTRICAL CODE:

NFPA 70, NATIONAL ELECTRIC CODE

PLUMBING CODE:

INTERNATIONAL PLUMBING CODE (IPC) 2021

FIRE PREVENTION & LIFE SAFETY CODE:

SEE SHEET G-100.

CODE SUMMARY

GENERAL REMOVALS NOTES

1. COORDINATE REMOVAL OF DEBRIS WITH THE CONTRACTING OFFICER TO MINIMIZE DISRUPTION OF

BASE ACTIVITIES. COORDINATE WITH WASTE MANAGEMENT PLAN.

2. ITEMS DEPICTED FOR REMOVAL OR DEMOLITION ARE SHOWN FOR INFORMATIONAL PURPOSES.

THESE DRAWINGS DO NOT INDICATE EACH AND EVERY ITEM TO BE REMOVED OR DEMOLISHED.

(EX: VALVE, HANGER, FASTENER, ETC.) VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH

REMOVALS OR DEMOLITION.

3. WHERE MATERIALS THAT ARE SUSPECTED TO CONTAIN HAZARDOUS MATERIALS ARE

ENCOUNTERED, IMMEDIATELY STOP THAT WORK AND REPORT THE CONDITION TO THE

CONTRACTING OFFICER. SEE HAZARDOUS MATERIALS NOTES AND HAZARDOUS MATERIALS

REMOVALS PLANS.

4. REMOVALS KEYNOTES INDICATED ON "AD" SHEETS ARE REPRESENTATIVE OF GENERAL ITEMS TO BE REMOVED AND ARE NOT INTENDED TO IDENTIFY EACH ITEM ON EVERY WALL, FLOOR, CEILING, OR

ELEVATION. VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH REMOVALS.

5. BUILDING 60 IS A HISTORIC FACILITY AND IS A CONTRIBUTING RESOURCE TO THE PORTSMOUTH NAVAL SHIPYARD HISTORIC DISTRICT. REMOVE ITEMS IN SUCH A MANNER THAT THE HISTORIC STRUCTURE (e.g. MORTAR JOINTS, GRANITE, BRICK, WOOD WINDOW AND DOOR TRIM, ETC.) TO

REMAIN IS NOT DAMAGED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ANY ITEMS

DAMAGED BY THE CONTRACTOR MUST BE REPAIRED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL

COST TO THE GOVERNMENT. SUBMIT A WORK PLAN TO ADDRESS REPAIRS TO DAMAGED ITEMS.

PWD MAINE CULTURAL RESOURCES MANAGER MUST REVIEW AND APPROVE THE CONTRACTOR'S

QUALITY CONTROL PLAN PRIOR TO COMMENCING REPAIR WORK.

6. HISTORIC ITEMS INDICATED ARE TO BE SALVAGED FOR REINSTALLATION OR ARE TO REMAIN IN PLACE (e.g. WOOD TRIM, METAL DOOR, PAINTED SIGNAGE, WINDOWS, AND STRUCTURAL ELEMENTS, ETC). PROTECT HISTORIC ITEMS DURING DEMOLITION AND CONSTRUCTION. ITEMS TO BE STORED FOR REINSTALLATION OR TURNED OVER TO GOVERNMENT MUST BE STORED ON SITE IN SAFE AND

SECURE LOCATION.

7. COORDINATE GENERAL BUILDING REMOVAL CONSTRUCTION SEQUENCE WITH HAZARDOUS

MATERIALS REMOVALS.

8. PATCH ANCHORAGE LOCATIONS AT REMOVED ITEMS. CUT FLUSH TO FLOOR/WALLS ANY EQUIPMENT

ATTACHMENT/ANCHORAGE AS TO PROVIDE THE REQUIRED FLOOR/WALL FINISH.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

G-004B

B

R

E P

A

IR

S

A B

B R

E V

IA

T

IO

N

S

L E

G E

N D

A

N D

G E

N E

R A

L P

R O

J E

C T

N O

T E

S

V

O L U

M E

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

G -0

B

AA

1. SEE QD601 - QD602 FOR EQUIPMENT REMOVALS SCHEDULES.

2. CONTRACTOR MUST VERIFY EXISTING CONDITIONS PRIOR TO

PERFORMING WORK.

3. COORDINATE WORK WITH CIVIL, STRUCTURAL, MECHANICAL,

PLUMBING AND ELECTRICAL SHEETS.

4. SUBMIT THE SEQUENCING OF REMOVALS AND DISCONNECTION OF

UTILITIES. WORK PLAN AND OUTAGES MUST BE APPROVED BY THE

CONTRACTING OFFICER PRIOR TO REMOVALS WORK.

5. EQUIPMENT SHOWN ON "QD" SHEETS ARE REPRESENTATIVE OF

EQUIPMENT AND ITS CURRENT LOCATION AT THE TIME OF

CONTRACT DOCUMENT PREPARATION FOR BIDDING PURPOSES.

6. PROVIDE HAZARDOUS MATERIALS SURVEY AT INDUSTRIAL

EQUIPMENT AND SURROUNDING PROCESS AREAS, SEE

HAZARDOUS MATERIALS (HM) SHEETS.

7. PATCH ANCHORAGE LOCATIONS AND EQUIPMENT FLOOR

DEPRESSIONS WITH NON-SHRINK GROUT ONCE THE EQUIPMENT IS

REMOVED. CUT FLUSH TO FLOOR ANY EQUIPMENT ATTACHMENT/

ANCHORAGE AS TO PROVIDE THE REQUIRED FINISHED FLOORING.

8. PROVIDE FOR REMOVAL OF (3)-20 CY DUMPSTERS WORTH OF

MISCELLANEOUS MATERIALS/ EQUIPMENT LEFT IN SPACE BEYOND

THE EQUIPMENT INDICATED.

EQUIPMENT TAG. SEE EQUIPMENT SCHEDULE ON SHEETS

QD601 AND QD602

REMOVE UTILITY CONNECTIONS AT INDUSTRIAL

EQUIPMENT. SEE ELECTRICAL, MECHANICAL, AND

PLUMBING REMOVALS SHEETS.

(SHEETS

QD101-QD103)

(SHEETS QD101-QD103)

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:2

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

QD101

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

E Q

U

IP

M E

N T

R E

M O

V A

L S

P A

R T

P L A

N

E A

S T

C

L

IN

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q D

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR EQUIPMENT REMOVALS PART PLAN - EAST

MATCH LINE

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES

GRAPHIC SCALE(S)

KEY PLAN

LEGEND

REMOVALS KEYNOTES

DN

UP

UP

AA

573 573

533B 590

533A

533C

532B

530A

530B

508 578

580 580

554A

554B

556544

530C

528B 518

44C 44B

528A

592 593

44A

537 541

556 540

114112

110109

2 2

1. SEE SHEET QD101 FOR GENERAL NOTES AND LEGEND. REMOVE UTILITY CONNECTIONS AT INDUSTRIAL EQUIPMENT. SEE

ELECTRICAL, MECHANICAL, AND PLUMBING REMOVALS SHEETS.

REMOVE DUCTWORK ASSOCIATED WITH INDUSTRIAL EQUIPMENT.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

QD102

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

E Q

U

IP

M E

N T

R E

M O

V A

L S

P A

R T

P L A

N

W E

S T

C

L

IN

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q D

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR EQUIPMENT REMOVALS PART PLAN - WEST

MATCH LINE

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANGENERAL NOTE REMOVALS KEYNOTES

DN

DN

DN

UP

UP

UP

OPEN TO BELOWOPEN TO BELOW

OPEN TO

BELOW

OPEN TO BELOW

SEE BELOW

SEE BELOW

SEE

BELOW

AA

595B597

595A

1 1M101

M102

STAIR

M103 M104

M105

M107

STAIR

TRAINING OFFICE

M108

M106

2 2

1. SEE SHEET QD101 FOR GENERAL NOTES AND LEGEND. REMOVE UTILITY CONNECTIONS AT INDUSTRIAL EQUIPMENT. SEE

ELECTRICAL, MECHANICAL, AND PLUMBING REMOVALS SHEETS.

REMOVE DUCTWORK ASSOCIATED WITH INDUSTRIAL EQUIPMENT.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

QD103

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

M E

Z Z

A N

IN

E

E Q

U

IP

M E

N T

R E

M O

V A

L S

P L A

N

C L

IN

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q D

SCALE: 1/8" = 1'-0"

B1

FIRST FLOOR MEZZANINE EQUIPMENT REMOVALS PLAN

MATCH LINE

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

KEY PLANGENERAL NOTE REMOVALS KEYNOTES

BUILDING 60 EQUIPMENT REMOVALS SCHEDULE

40" MILL (MAIN UNIT)144A 480

REMARKSDESCRIPTION STATUS

A, B

EQUIP

TAG NO.

QTY EXISTING

LOCATION B60

VOLTAGE

102 3

PHASES

AMPS

NA

HP

NA

FREQ

UTILITIES

REMOTE

DISCONNECT

SY AIR

PSI

GAS EXHAUST EXHAUST

TYPE

CFM DUST

COLLECTION

WATER FIRE

PROTECTION

DRAIN STEAM NRTL FND

DEMON N N NA N NA N NA NA NA NA N

DIMENSIONS

66 x 90 x 72

WEIGHT (LBS)

15,000 -

CONNECTION/

FASTENER(INCHES)

40" MILL (CHILLER)144B 460 3 15 NA NA 30 DEMON N N NA N NA N NA NA NA NA N

40" MILL (TEMP CONTROLLER)144C 480 3 40 NA NA 60 DEMON N N NA N NA N NA NA NA NA N

501 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

502 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

503 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

504 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

505 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

506 120 1 - NA NA - DEMO- - - NA - NA - NA NA NA NA -

507 480 3 - NA NA - DEMO- - - NA - NA - NA NA NA NA -

508 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

509 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

510 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

511 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

513 460 3 - NA NA - DEMO- - - NA - NA - NA NA NA NA -

514 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

516 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

517 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

518 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

522 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

523 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

525 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

526 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

527 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

528A - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

528B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

530A - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

530B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

530C - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

532B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

533A - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

533B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

533C - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

534 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

535 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

536 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

537 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

539 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

540 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

541 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

543 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

BENCH 112

METAL RACK 112

MIXING VENT TABLE 114

CONTAINMENT PALLET 102

TOOL BOX 102

STORAGE CABINET 102

MILLING MACHINE 112

STORAGE CABINET 112

400 TON PRESS CONTROL PEDESTAL 102

HEATER FOR 500 TON PRESS 102

MILL 102

HEATER FOR MILL 102

CONTROL PEDESTAL FOR MILL 102

BENCH 102

BENCH 102

400 TON PRESS (3 COMPONENTS) 102

400 TON PRESS HEATER 102

BENCH 102

TABLE ON WHEEL WITH VISE 102

BENCH 102

ELECTRIC PRESS 75 TON 102

MOLD RACK 102

WOODEN MOLD RACK 102

OVEN, PRECISION QUINCY WITH HOOD 102

HOOD 102

PLASTISOL BOOTH 102

RUBBER SHEAR & HYDRAUL. UNIT 102

WATER POLISHING SYSTEM 103

FAN PLATFORM 102

DRILL PRESS 111

OVEN 111

DOWNDRAFT TABLE 111

BENCH FOR DOWNDRAFT TABLE 111

WATERJET 103

ABRASIVE TANK 103

COOLING 103

24 x 36 x 36 430 -

18 x 30 x 48 100 -

144 x 135.6 - -

48 x 48 - -

42 x 27.48 - -

66.48 x 36 - -

78 x 75.96 - -

71.04 x 35.28 x 81.48 - -

27 x 24 x 56.04 - -

72 x 33.96 x 33.96 - -

72 x 48 x 72 - -

146.04 x 32.04 x 68.04 - -

146.04 x 77.04 - -

48 x 36 - -

137.04 x 103.56 x 170.04 - -

62.52 x 54.84 x 96 - -

60 x 33.96 x 33.96 - -

32.04 x 30 x 36 - -

96 x 33.72 x 38.04 - -

39 x 27.96 - -

39 x 27.96 - -

39 x 27.96 - -

72 x 33.96 x 33.96 - -

96 x 33.72 - -

99.48 x 111.72 - -

60 X 36 - -

24 X 12 - -

54.96 x 26.52 - -

114 x 84.96 - -

60.96 x 36 - -

24 x 12 - -

53.04 x 53.04 x 12 - -

74.04 x 30.96 x 50.04 - -

42.96 x 18 x 65.04 - -

194.52 x 78 - -

36.48 x 25.56 - -

114 x 42 - -

38.04 x 18.96 - -

72 x 63.96 - -

ELECTRIC PRESS 75 TON

ELECTRIC PRESS 75 TON

23.04 x 18.96 x 66.96

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

ALPHA NO.

(SHIPYARD TAG)

FRV

EYM

CWY

MXU

ERS

ATP

ATS

ATN

FTB

FSP

FSY

EKG

EQUIPMENT REMOVALS SCHEDULE GENERAL NOTES

1. SEE SHEET G-007 FOR CONSTRUCTION SEQUENCING INFORMATION.

2. SEE SHEETS QD101 THRU QD103 FOR EXISTING EQUIPMENT LOCATIONS.

COORDINATE WITH EQUIPMENT SCHEDULE, FOR EXISTING INDUSTRIAL

EQUIPMENT TO BE DISCONNECTED AND REMOVED.

3. PATCH ANCHORAGE HOLES IN THE SLAB WITH NON-SHRINK GROUT ONCE THE

EQUIPMENT IS REMOVED.

4. SEE CIVIL, STRUCTURAL, ARCHITECTURAL, MECHANICAL, PLUMBING,

ELECTRICAL, AND SPRINKLER SHEETS FOR REMOVALS AND EQUIPMENT

UTILITY CONNECTIONS.

5. SCHEDULE INFORMATION IS BASED ON AVAILABLE INFORMATION AT THE TIME

OF CONTRACT DOCUMENT PREPARATION. COORDINATE WITH CONTRACTING

OFFICER FOR ADDITIONAL INFORMATION.

6. PROVIDE HAZARDOUS MATERIALS SURVEY AT INDUSTRIAL EQUIPMENT AND

SURROUNDING PROCESS AREAS, SEE HAZARDOUS MATERIALS (HM) SHEETS.

B60 BUILDING 60

DEMO CONTRACTOR TO REMOVE AND DISPOSE OF EQUIPMENT

A. REMOVE AND DISPOSE OF INDUSTRIAL EQUIPMENT.

B. REMOVE INDUSTRIAL EQUIPMENT UTILITIES INDICATED. COORDINATE WITH

MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL SHEETS.

EQUIP REMOVALS SCHEDULE REMARKS NOTES(SHEETS QD601-QD602)

(SHEETS

QD601-QD602)

(SHEETS QD601-QD602)

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

QD601

B

R

E P

A

IR

S

E Q

U

IP

M E

N T

R E

M O

V A

L S

S C

H E

D U

L E

C L

IN

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q D

SCHEDULE KEY

BUILDING 60 EQUIPMENT REMOVALS SCHEDULE (CONTINUED)

1563 460

REMARKSDESCRIPTION STATUSEQUIP

TAG NO.

QTY EXISTING

LOCATION B60

VOLTAGE

117 3

PHASES

AMPS

NA

HP

NA

FREQ

UTILITIES

REMOTE

DISCONNECT

SY AIR

PSI

GAS EXHAUST EXHAUST

TYPE

CFM DUST

COLLECTION

WATER FIRE

PROTECTION

DRAIN STEAM NRTL FND

- - - NA - NA - NA NA NA NA -

DIMENSIONS WEIGHT (LBS)

CONNECTION/

FASTENER(INCHES)

1564 460 - - NA NA - - - - NA - NA - NA NA NA NA -CABINET SAW

1565 - - - NA NA - - - - NA - NA - NA NA NA NA -

PAINT SHAKER1566 115/230 - - NA NA - - - - NA - NA - NA NA NA NA -

567 - - - NA NA - - - - NA - NA - NA NA NA NA -

568 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

569 - - - NA NA - - - - NA - NA - NA NA NA NA -

570 - - - NA NA - - - - NA - NA - NA NA NA NA -

572 - - - NA NA - - - - NA - NA - NA NA NA NA -

573 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

574 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

576 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

577 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

578 - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

579 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

580 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

583 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

584 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

585 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

586 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

587 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

588 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

589 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

590 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

591 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

592 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

593 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

594 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

595A - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

595B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

596 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

597 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

598 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

599 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

M107

BANBURY CONTROLS M107

DUST COLLECTOR M107

BANBURY MILL M107

TOOL CHEST 111

CONTROL PANEL 102

CONTROL PANEL 102

VIDMAR DUST COLLECTOR M107

RUBBER MIXER M107

M107

STORAGE CABINET 102

WOODEN WORK BENCH 102

STEEL RACK 102

METAL RACK SHELVES 117

FREESTANDING JIB CRANE 102/111

BENCH 111

BENCH 102

PAINT BOOTH 116

SHELVES 6680 CAPACITY 102

SHELVES 102

BENCH 116

TOOL BOX 106/102

BENCH 116

STORAGE CABINET 116

86.04 x 36 x 36.96 - -

30.96 x 17.04 x 51 - -

45 x 27 x 42 - -

72 x 33.96 x 33.96 - -

39.96 x 18 x 60.96 - -

120 x 48 x 35.04 - -

36 x 18 x 78 - -

99.96 x 60 x 87 - -

150 x 42 x 140.04 - -

48 x 24 x 84.96 - -

63.96 x 36.48 x 72 - -

37.56 x 24.48 x 84 - -

72 x 33.96 x 33.96 - -

96 x 36 x 33.96 - -

66 x 30 x 35.04 - -

30.96 x 17.04 x 36 - -

78 x 36 x 36 - -

36 x 18 x 78 - -

36 x 21 x 78 - -

143.04 x 36.96 x 39.96 - -

30 x 15.96 - -

96 x 36 - -

42 x 18 x 57.96 - -

42 x 9.96 - -

24 x 6 - -

32.04 x 36 x 80.04 - -

43.8 x 20.04 x 90 - -

39.96 x 54 x 63.96 - -

39.96 x 15.96 x 72 - -

39.96 x 44.04 x 57.96 - -

20.04 x 27.96 - -

RUBBER MIXER CONTROL PANEL

CHILLER DISCONNECT

DUST COLLECTOR

BENCH GRINDER

SHELVES

SHELVES

BENCH

BENCH

SHELVES

STORAGE CABINET

26.04 x 23.04 x 99.96

544 - A, B- - NA NA - DEMO- - - NA - NA - NA NA NA NA -

547 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

548 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

549 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

550 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

551 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

552 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

553 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

554A - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

554B - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

555 - - - NA NA - - - - NA - NA - NA NA NA NA -

556 - - - NA NA - DEMO- - - NA - NA - NA NA NA NA -

557 115 - - NA NA - DEMO- - - NA - NA - NA NA NA NA --

DRILL PRESS559 -117 - - NA NA - - - - NA - NA - NA NA NA NA -

BENCH560 -117 - - NA NA - - - - NA - NA - NA NA NA NA -

BAND SAW561 -117 - - NA NA - - - - NA - NA - NA NA NA NA -

WIRE RACK SHELVES 115

WOODEN SHELVES 115

WOODEN SHELVES 115

PAINT/VARNISH BOOTH 116

COMPOSITE PALLET 115/112/114/M107

FILE CABINET 114

METAL CABINET 115

STORAGE BOX 115

METAL RACK SHELVES 115

STORAGE CABINET 114 36 x 48 - -

24.96 x 15 x 72 - -

42.96 x 18 - -

52.56 x 29.04 - -

36 x 48 - -

36 x 18 - -

36 x 24 - -

48 x 24 - -

102 x 29.04 - -

92.04 x 29.04 - -

153 x 330.96 - -

32.04 x 29.04 - -

60 x 32.04 - -

32.04 x 21.96 x 80.04 - -

30.96 x 17.04 x 36 - -

66 x 41.04 x 110.04 - -

METAL RACK SHELVES

WIRE RACK SHELVES

COMPOSITE PALLET

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

A, B

ALPHA NO.

(SHIPYARD TAG)

AWU, AWG

NLT

PWG

CMA

MYA

MCS

FMW

FNE

CFE

CFE

1. SEE SHEET QD601 FOR EQUIPMENT REMOVALS SCHEDULE,

GENERAL NOTES, REMARKS NOTES, AND SCHEDULE KEY.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

QD602

B

R

E P

A

IR

S

E Q

U

IP

M E

N T

R E

M O

V A

L S

S C

H E

D U

L E

C L

IN

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q D

GENERAL NOTES

ANNEX

ANNEX

SHOP

ANNEX

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C

LA

S S

IF

IE

D

ACTIVITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

/1 /2

:2

:3

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

Q-101

B

R

E P

A

IR

S

F

IR

S T

F L O

O R

E Q

U

IP

M E

N T

P A

R T

P L A

N

E A

S T

O

P T

IO

N

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

Q -1

MATCH LINE

PLAN

NORTH

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES

GRAPHIC SCALE(S)

KEY PLAN

LEGEND

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR EQUIPMENT PART PLAN - EAST

1. PROVIDE UTILITIES FOR AND INSTALLATION OF INDUSTRIAL

EQUIPMENT. SEE EQUIPMENT SCHEDULE ON SHEET Q-601.

2. COORDINATE CONSTRUCTION SCHEDULE AND SEQUENCE WITH THE

CONTRACTING OFFICER FOR SCHEDULING INDUSTRIAL EQUIPMENT

RELOCATIONS. DURATION OF INDUSTRIAL EQUIPMENT MOVES ARE AS

FOLLOWS:

OFF SITE EQUIPMENT TO BUILDING 60: 60 DAYS

3. SEE SHEET G-007 FOR CONSTRUCTION SEQUENCING INFORMATION.

4. COORDINATE LIFTING, HANDLING, AND MOVING INDUSTRIAL EQUIPMENT

WITH PHYSICAL CONSTRAINTS, HISTORIC NATURE OF EXISTING

BUILDINGS, AND STRUCTURAL LIMITATIONS IDENTIFIED

5. PREPARE AND SUBMIT RELOCATION PLAN. COORDINATE AND VERIFY

OPERATIONAL CONDITION OF EXISTING INDUSTRIAL EQUIPMENT WITH

CONTRACTING OFFICER OR DESIGNATED GOVERNMENT

REPRESENTATIVE PRIOR TO DISCONNECTION AND RELOCATION.

6. PATCH ANCHORAGE HOLES IN THE SLAB WITH NON-SHRINK GROUT

ONCE THE EQUIPMENT IS REMOVED FROM ORIGINAL LOCATION.

7. SEE SHEETS AE801-AE804 FOR FF&E PLANS.

EQUIPMENT TAG. SEE EQUIPMENT SCHEDULE ON SHEET Q-601.100

(SHEETS Q-101 - Q-103)

(SHEETS

Q-101 - Q-103)

UP

UP

AA

VEST

STAIR

003A

WOMEN

CUSTODIAL

OFFICE

STAIR

004AMECH

ELECTRICAL

SHOP

CORRIDOR

STORAGE

MEN

ELEV MACHINE

001A

ELEV

EQ100D EQ100D

EQ102A

MS113A

MS112A

EQ102B

MC104C

MC103D

MC105A

MC100B

EQ105B

EQ100A

MS106A MS106A

MS107C

MC100B

EQ102B

MC100B

EQ102A

MC100B

EQ102A

MC100B MC100B

MC105A

EQ102B

MS106A MS106A

MC103D

EQ100A

EQ100D

MC103B

MC103A

MC100B

EQ102A

MC100B

EQ102B

MC105A

MC100B MC100B

EQ102A

MC103A

EQ100E

MC103A

EQ102B

EQ102A

MC100B

EQ102B

MC100B

WT103C

GQU

EQ102A

MC100B MC100B

MC105AMC105A

EQ102B

EQ102A

MC100B MC100B

EQ102B

MC105A

EQ102A

MC100BMC100B

EQ102B

MC100BMC100B

EQ102B

EQ102A

MS104K

MS104K

MS104K

MS104K

MS104K

MS104K

EQ105A

SP103D

EQ105B

SP103D

EQ105A

MS112A

MC102D

MS106I

MS106I

MS104H

MS104K

MS119B

MS107C

INSPECTION

NETWORK

MS109ACORRIDOR

SHOP

STAIR

002A

CORRIDOR

MS107C

MS108A

(TOTAL 7)

(TOTAL 16)

(TOTAL 38)

MS109A

MC100K

MC100K

SP102B

SP102C

SP102B

SP102C

SP102B

SP102C

SP102B

SP102C

SP102B

SP102C

SP102B

SP102C

SP102B

SP102C

102D

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .