152_G-004B_R1_AMENDMENT 008.pdf
PDF 296 KB Posted
- Solicitation number
- N6247026R0012
About this file
This document is an architectural drawing legend and general notes sheet for Building 60 renovation work at a Naval facility. The sheet provides symbols, abbreviations, and comprehensive notes governing hazardous materials management, building removals, masonry restoration, and construction sequencing for a historic structure.
Key requirements include: contractors must obtain permits for hazardous materials removal and disposal at no additional cost; a Qualified Personal (PQP) must be hired to coordinate implementation, perform independent inspections, and verify removal of asbestos, lead-, cadmium-, and chromium-containing paint, and PCBs in accordance with EM 385-1-1 and applicable specifications (sections 02 82 00.00 22, 02 83 00.00 22, 02 84 16.00 22, and 02 84 33.00 22). Existing paint is assumed to contain heavy metals requiring separate management and disposal per federal, state, and local regulations. The work includes four contract line items: base bid, industrial equipment removal and hazardous materials abatement (CLIN 002), hazardous materials management/abatement (CLIN 003), and existing trailer utilities (CLIN 004). Building 60 is designated as historic and a contributing resource to the Portsmouth Naval Shipyard Historic District; removals must protect mortar joints, granite, brick, and wood elements, with damaged materials repaired at contractor cost. Historic items must be salvaged for reinstallation. The project must comply with UFC standards (1-200-01, 1-200-02, 3-101-01, 3-110-03), UFAS, ABA, ADA, ADAAG, IMC 2021, NFPA 70, and IPC 2021. Eleven optional line items are available, including furniture/fixtures/equipment, additional window restorations, additional annex repairs, and resinous flooring.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL SYMBOLS LEGEND
A1
A-301
A-401
INTERIOR ELEVATION INDICATOR
INTERIOR ELEVATION
NUMBER
SHEET WHERE ELEVATION
IS DRAWN
EXTERIOR ELEVATION INDICATOR
ELEVATION NUMBER
INDICATES DIRECTION OF VIEW
SHEET WHERE ELEVATION IS DRAWN
A1
A-301
WALL / PARTIAL BUILDING SECTION INDICATOR
SECTION NUMBER
SHEET WHERE SECTION IS DRAWN
A1
A-301
BUILDING SECTION INDICATOR
A1
A-301
BUILDING
A1
A1
A1
A
A1
ROOM
ROOM IDENTIFIER
DETAIL NUMBER
SHEET WHERE
DETAIL IS DRAWN
DETAIL INDICATOR
ROOM NAME
ROOM NUMBER
A-501
DETAIL NUMBER
SHEET REFERENCED FROM
KEYNOTE INDICATOR
EXISTING ITEM OR SPECIALTY KEYNOTE
PLAN NUMBER
A1
PLAN TITLE
SCALE: 1/8" = 1'-0"
A1
PLAN TITLE
SCALE: 1/8" = 1'-0" (A-101)
SECTION NUMBER
SHEET WHERE DRAWN
MATCH LINE
A
A
INDICATES
DIRECTION OF VIEW
NA WALL TYPE INDICATOR ELEVATION TARGET
WINDOW TYPE
SIGN TYPE
REMOVALS KEYNOTE NUMBER
NEW WORK KEYNOTE NUMBER
ACCESSIBILITY SYMBOL
DOOR NUMBER
REVISION
WINDOW NUMBERACCESSORY ITEM
A 1i
IMAGE INDICATOR
IMAGE NUMBER
SHEET WHERE
DETAIL IS DRAWN
AE201
ACM
ACT
AFF
AHJ
ALUM
BF
BLDG
CJ
C
CLG
CLR
CMU
COL
CONC
CON
CONT
CPT
CT
CWT
DIA
DN
DWG
E
EA
EF
EJ
ELEC
ELEV
EMR
EQ
EXIST
EXT
FCO
FD
FND
FE
FEC
FF
FIN
FL,FLR
FT
GA
GALV
GYP BD
H,HT,HGT
HM
HORIZ
HP
IN
INSUL
INCH, INCHES
FOOT, FEET
PLUS OR MINUS
ASBESTOS CONTAINING
MATERIAL
ACOUSTICAL CEILING
TILE
ABOVE FINISH FLOOR
AUTHORITY HAVING
JURISDICTION
ALUMINUM
BARRIER FREE
BUILDING
CONTROL JOINT
CENTERLINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONNECTION
CONTINUOUS
CARPET
CERAMIC TILE
CERAMIC WALL TILE
DIAMETER
DOWN
DRAWING
EAST
EACH
EXHAUST FAN
EXPANSION JOINT
ELECTRIC/ELECTRICAL
ELEVATION
ELEVATOR MACHINE ROOM
EQUAL
EXISTING
EXTERIOR
FLOOR CLEANOUT
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FLOOR
FINISH
FLOOR
FOOT, FEET
GAUGE
GALVANIZED
GYPSUM BOARD
HEIGHT
HOLLOW METAL
HORIZONTAL
HIGH POINT
INCHES, INCH
INSULATION,
INSULATED
ABBREVIATIONS
L
INT
IR
LBP
MAX
MECH
MFR
MIN
MIR
MTL
N
NAT
NIC
NMCI
NO.#
OC
PCB'S
PETG
PMI
PNT
PLAM
PLY
PQP
PT
PWD
R
RCB
RCP
REINF
RO
S
SIM
SF
STL
STRUCT
TYP
UL
UON
VERT
VIF
W W/
WB
WD
WP
INTERIOR
INSTALLATION
RESTORATION
LEAD-BASED PAINT
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MIRROR
METAL
NORTH
NATURAL FINISH
NOT IN CONTRACT
NAVY/MARINE CORPS
INTRANET
NUMBER
ON CENTER
POLYCHLORINATED
BIPHENYLS
POLYETHYLENE
TEREPHTHALATE
GLYCOL
PLANNED
MODIFICATION
ITEM
PAINT, PAINTED
PLASTIC LAMINATE
PLYWOOD
PRIVATE QUALIFIED
PERSON
PRESSURE TREATED
PUBLIC WORKS
DEPARTMENT
RADIUS
RUBBER COVE BASE
REFLECTED CEILING
PLAN
REINFORCED
ROUGH OPENING
SOUTH
SIMILAR
SQUARE FEET
STEEL
STRUCTURAL
TYPICAL
UNDERWRITERS
LABORATORIES
UNLESS OTHERWISE
NOTED
VERTICAL
VERIFY IN FIELD
WEST, WIDE
WITH
WOOD BASE
WOOD
WALL PROTECTION
1. ITEMS IDENTIFIED ON THE HAZARDOUS MATERIALS DRAWINGS ARE EXISTING. SEE SHEETS HM001-HM604 FOR ADDITIONAL HAZARDOUS MATERIALS INFORMATION. COORDINATE HAZARDOUS MATERIALS WORK
WITH BUILDING REMOVALS AND CONSTRUCTION SEQUENCE PLAN.
2. OBTAIN PERMITS AND LICENSES REQUIRED FOR THE REMOVAL, TRANSPORT, AND DISPOSAL OF
HAZARDOUS MATERIALS AND DEBRIS AT NO ADDITIONAL COST TO THE GOVERNMENT.
3. CONTRACTOR MUST PERFORM NECESSARY MANAGEMENT OF IDENTIFIED HAZARDOUS MATERIALS, IN ACCORDANCE WITH EM 385-1-1, APPLICABLE PROJECT SPECIFICATIONS, AND FEDERAL, STATE, AND LOCAL
REGULATIONS.
4. CONTRACTOR MUST SUBMIT WORK PLANS AND HIRE PQP TO COORDINATE IMPLEMENTATION OF THE WORK PLAN, PERFORM INDEPENDENT INSPECTIONS, TESTING, AND VERIFICATION OF THE HAZARDOUS COMPONENTS WORK INCLUDING, BUT NOT LIMITED TO: ASBESTOS, LEAD-, CADMIUM, AND CHROMIUM- CONTAINING PAINT, AND PCBs.
5. EXISTING PAINT IS ASSUMED TO CONTAIN LEAD, CADMIUM, AND CHROMIUM (VI) (HEAVY METALS). MANAGE HEAVY METALS PAINT IN AREAS INDICATED FOR REMOVAL SEPARATE FROM THE SUBSTRATE AND TREAT THE REMOVED PAINT AS HAZARDOUS MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS. HEAVY METALS MUST BE MANAGED, REMOVED, AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE, AND
LOCAL REGULATIONS.
6. EXISTING LIGHT FIXTURE BALLASTS ARE ASSUMED TO CONTAIN PCB'S AND EXISTING LAMPS ARE ASSUMED TO CONTAIN MERCURY. SEE ELECTRICAL DRAWINGS FOR EXTENT OF REMOVALS. REMOVE IN ACCORDANCE
WITH SPECIFICATIONS.
7. EXISTING INDUSTRIAL EQUIPMENT/PROCESSES HAVE PRODUCED HEAVY METALS RESIDUE. REFER TO
HAZARDOUS MATERIAL SHEETS FOR FURTHER INFORMATION.
8. THE FOLLOWING SPECIFICATIONS APPLY:
02 82 00.00 22 ASBESTOS REMEDIATION (PNSY PROJECTS)
02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING
RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNSY PROJECTS)
02 84 16.00 22 HANDLING OF LIGHTING BALLASTS AND LAMPS
CONTAINING PCB'S AND MERCURY (PNSY PROJECTS)
02 84 33.00 22 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) (PNSY PROJECTS)
CONTRACT LINE ITEM NUMBERS (CLIN)
CLIN 001 BASE BID
CLIN 002 (IDENTIFIED AS LINE ITEM 1H IN PRICE SCHEDULE) INDUSTRIAL EQUIPMENT REMOVAL AND PROCESS
HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT
CLIN 003 (IDENTIFIEDAS LINE ITEM 1I IN PRICE SCHEDULE) HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT CLIN 004 (IDENTIFIED AS LINE ITEM 1J IN PRICE SCHEDULE) EXISTING TRAILER UTILITIES
OPTION ITEMS
1. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E)
2. INDUSTRIAL EQUIPMENT
3. RADON FANS
4. SECURITY DEVICES
5. ADDITIONAL WINDOW RESTORATIONS
6. NOT APPLICABLE
7. ADDITIONAL ANNEX REPAIRS
8. ADDITIONAL FINISHES
9. ELECTRICAL SERVICE INFRASTRUCTURE
10. RESINOUS FLOORING
11. COMMUNICATION SERVICE ROUTING
GENERAL HAZARDOUS MATERIALS NOTES
1. COMPLY WITH STATE, FEDERAL, NATIONAL, AND OTHER CODES AND ORDINANCES THAT
APPLY TO THIS PROJECT.
2. COMPLETE WORK IN ACCORDANCE WITH INDUSTRY STANDARDS AND PERFORM WORK IN
A WORKMANLIKE AND PROFESSIONAL MANNER.
3. WHERE CONFLICTS EXIST WITHIN THE DOCUMENTS OR BETWEEN THE DOCUMENTS AND
APPLICABLE CODES, ORDINANCES, OR INDUSTRY STANDARDS, THE MORE STRINGENT, AS
DETERMINED BY THE CONTRACTING OFFICER, MUST BE PROVIDED AT NO ADDITIONAL
COST TO THE GOVERNMENT.
4. MAINTAIN BUILDING EGRESS PATHS DURING THE ENTIRE CONTRACT PERIOD. PROVIDE
TEMPORARY PATHS TO MAINTAIN BUILDING EGRESS. COMPLY WITH NFPA 241, STANDARD
FOR SAFEGUARDING CONSTRUCTION, ALTERATIONS, AND DEMOLITION OPERATIONS.
5. MAINTAIN THE CONSTRUCTION SITE IN A SECURE, NEAT, WATER TIGHT, CLEAN, AND SAFE
CONDITION DURING THE ENTIRE CONTRACT PERIOD. EXTERIOR ENVELOPE WORK MUST
BE PERFORMED IN A MANNER TO MAINTAIN WEATHER TIGHTNESS.
6. PROVIDE ITEMS AND COMPONENTS SHOWN ON THE DRAWINGS UNLESS NOTED AS
"EXISTING" (EXIST).
7. WORK FROM GIVEN DIMENSIONS AND LARGE SCALE DETAILS. DO NOT SCALE DRAWINGS.
8. DIMENSIONING SYSTEM: UNLESS OTHERWISE NOTED, PLAN DIMENSIONS ARE TO/FROM
FINISHED FACE OF EXISTING WALLS, TO/FROM FACE OF FRAMING FOR STUD FRAMED
WALLS, AND TO/FROM THE FACE OF MASONRY FOR MASONRY WALLS. DIMENSIONS
INDICATED AS "CLEAR" (CLR) MUST BE MAINTAINED AND ARE MEASURED FROM THE FACE
OF FINISH. CENTERLINE DIMENSIONS ARE INDICATED BY CENTERLINE SYMBOL (C).
9. LOCATE DOOR OPENINGS 6 INCHES FROM ADJACENT WALL (FACE OF FRAMING TO
ROUGH OPENING), UNLESS OTHERWISE DIMENSIONED.
10. VERIFY EXISTING CONDITIONS AND DIMENSIONS AND REPORT DISCREPANCIES TO THE
CONTRACTING OFFICER. PROCEED WITH THE WORK AFTER THE DISCREPANCIES HAVE
BEEN RESOLVED BY THE GOVERNMENT.
11. DO NOT PENETRATE JOISTS, BEAMS, OR OTHER STRUCTURAL MEMBERS. OBTAIN
WRITTEN APPROVAL FROM THE ENGINEER OF RECORD FOR UNAVOIDABLE
PENETRATIONS OF STRUCTURAL MEMBERS.
12. PROVIDE SOLID BLOCKING BEHIND SURFACE APPLIED FIXTURES, TRIM, GRAB BARS,
SHELVES, WOOD WALL BASE, BASE AND WALL CABINETS, MARKER BOARDS,
TELEVISIONS, AND OTHER ACCESSORIES AND EQUIPMENT INCLUDING GOVERNMENT
SUPPLIED ITEMS WHEN MOUNTED TO STUD WALLS.
13. DISPOSE OF AND/OR RECYCLE CONSTRUCTION DEBRIS FROM THE PROJECT SITE AS
REQUIRED BY THE STATE OF MAINE AND AS REQUIRED BY THE CONTRACT. OBTAIN
REQUIRED DISPOSAL PERMITS.
14. PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. REPAIR OR REPLACE DAMAGE
RESULTING FROM PROJECT OPERATIONS, AS APPROVED BY THE CONTRACTING OFFICER,
AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. OBTAIN APPROVAL FROM THE CONTRACTING OFFICER FOR THE SEQUENCE AND TIMING
OF OPERATIONS PRIOR TO COMMENCING WORK AND PER OUTAGE REQUIREMENTS
DETAILED IN THE SPECIFICATIONS.
16. FIRESTOP CONDUIT/PIPE/DUCT PENETRATIONS THROUGH FIRE-RATED WALLS, CEILINGS,
AND FLOORS. PROVIDE SMOKE BARRIER SEALANT AT FLOOR PENETRATIONS AND
PENETRATIONS THROUGH SMOKE PARTITIONS.
17. DO NOT INTERRUPT UTILITY SERVICES WITHOUT AN APPROVED OUTAGE REQUEST. DO
NOT RESTORE UTILITIES WITHOUT AN APPROVED 'ONAGE' REQUEST. REFER TO
SPECIFICATION SECTION 01 14 00.00 22 WORK RESTRICTIONS (PWD ME) AND SHEETS
G-008 AND G-009.
18. BUILDING 60 IS A HISTORIC FACILITY. PERFORM WORK IN COMPLIANCE WITH THE US
DEPARTMENT OF THE INTERIOR "SECRETARY OF THE INTERIOR'S STANDARDS FOR THE
TREATMENT OF HISTORIC PROPERTIES." HISTORIC ITEMS INDICATED OR SPECIFIED TO BE
SALVAGED FOR REINSTALLATION OR TO REMAIN IN PLACE MUST BE PROTECTED DURING
CONSTRUCTION.
19. WHEN ATTACHING FASTENERS, BLOCKING, OR ACCESSORIES TO EXISTING HISTORIC
BRICK OR STONE, PLACE FASTENERS IN MORTAR JOINTS. EXCEPTION: LIGHTNING
PROTECTION.
20. SYSTEMS AND THEIR ASSOCIATED CONDUIT MUST NOT PENETRATE HISTORIC FEATURES
OF THE BUILDING (WINDOW AND DOOR SURROUNDS, STAIRWELLS, WOOD BASE, CRANE
RAILS, ETC.). MAXIMIZE THE PLACEMENT OF CONDUIT IN SECONDARY SPACES WHERE
PRACTICABLE.
21. PRIOR TO INSTALLING FIRE PROTECTION PIPING, MECHANICAL DUCTWORK, PIPING,
ELECTRICAL CONDUIT, AND OTHER ASSOCIATED SYSTEM ELEMENTS, SUBMIT
COORDINATION DRAWINGS AND OBTAIN APPROVAL BY THE CONTRACTING OFFICER AND
THE PWD ME CULTURAL RESOURCES MANAGER. REFER TO SPECIFICATION SECTION 01
30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS (PWD ME).
22. PROVIDE LIGHTNING PROTECTION SYSTEM TYPICAL. SEE ELECTRICAL SHEETS FOR
INFORMATION.
23. ACCESS TO THE INTERIOR OF BUILDING 60 MUST BE VIA EXISTING OPENINGS IN
EXTERIOR FACADE. UNDER NO CIRCUMSTANCES WILL NEW TEMPORARY OPENINGS BE
ENTERTAINED AND MUST NOT BE INCLUDED AS BASIS OF BID.
24. CONTRACTOR MUST PROVIDE PAVEMENT AND ASSOCIATED SELECT SUB BASE FOR
AREAS BEYOND THOSE IDENTIFIED ON THE CONTRACT DOCUMENTS THAT ARE IMPACTED
AS A RESULT OF THE CONTRACTORS MEANS AND METHODS AS REQUIRED TO PERFORM
THE CONTRACT SCOPE OF WORK.
L
GENERAL CONSTRUCTION NOTES
GENERAL MASONRY CLEANING/REPAIR/REPOINTING NOTES
1. BUILDING 60 AND ITS MASONRY ARE HISTORIC. COMPLY WITH SPECIFICATION SECTION 04 01
00.91 22 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).
2. PROTECT MASONRY AND STRUCTURE THROUGHOUT PROJECT. USE THE GENTLEST MEANS
TO PERFORM THE WORK.
3. ENGAGE THE SERVICES OF A HISTORIC MASONRY CONSULTANT TO DETERMINE THE
CONDITION OF THE EXISTING MASONRY AND MATERIALS AND TO RECOMMEND CLEANING
AND RESTORATION PROCEDURES. REFER TO SPECIFICATION SECTION 04 01 00.91 22
RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).
4. PREPARE A MOCK-UP FOR MASONRY REPAIR/RESTORATION WORK. REVIEW WITH
CONTRACTING OFFICER AND PWD-ME CULTURAL RESOURCES MANAGER.
BUILDING CODE:
UNIFIED FACILITIES CRITERIA (UFC) 1-200-01 (26 FEB. 2024)
UNIFIED FACILITIES CRITERIA (UFC) 1-200-02 (01 JUNE 2022)
UNIFIED FACILITIES CRITERIA (UFC) 3-101-01 (08 JAN. 2024)
UNIFIED FACILITIES CRITERIA (UFC) 3-110-03 (01 MAY 2012)
ACCESSIBILITY CODE:
UNIFORM ACCESSIBILITY STANDARDS (UFAS)
ARCHITECTURAL BARRIERS ACT (ABA)
AMERICANS WITH DISABILITIES ACT (ADA)
ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAAG)
MECHANICAL CODE:
INTERNATIONAL MECHANICAL CODE (IMC) 2021
ELECTRICAL CODE:
NFPA 70, NATIONAL ELECTRIC CODE
PLUMBING CODE:
INTERNATIONAL PLUMBING CODE (IPC) 2021
FIRE PREVENTION & LIFE SAFETY CODE:
SEE SHEET G-100.
CODE SUMMARY
GENERAL REMOVALS NOTES
1. COORDINATE REMOVAL OF DEBRIS WITH THE CONTRACTING OFFICER TO MINIMIZE DISRUPTION OF
BASE ACTIVITIES. COORDINATE WITH WASTE MANAGEMENT PLAN.
2. ITEMS DEPICTED FOR REMOVAL OR DEMOLITION ARE SHOWN FOR INFORMATIONAL PURPOSES.
THESE DRAWINGS DO NOT INDICATE EACH AND EVERY ITEM TO BE REMOVED OR DEMOLISHED.
(EX: VALVE, HANGER, FASTENER, ETC.) VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH
REMOVALS OR DEMOLITION.
3. WHERE MATERIALS THAT ARE SUSPECTED TO CONTAIN HAZARDOUS MATERIALS ARE
ENCOUNTERED, IMMEDIATELY STOP THAT WORK AND REPORT THE CONDITION TO THE
CONTRACTING OFFICER. SEE HAZARDOUS MATERIALS NOTES AND HAZARDOUS MATERIALS
REMOVALS PLANS.
4. REMOVALS KEYNOTES INDICATED ON "AD" SHEETS ARE REPRESENTATIVE OF GENERAL ITEMS TO BE REMOVED AND ARE NOT INTENDED TO IDENTIFY EACH ITEM ON EVERY WALL, FLOOR, CEILING, OR
ELEVATION. VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH REMOVALS.
5. BUILDING 60 IS A HISTORIC FACILITY AND IS A CONTRIBUTING RESOURCE TO THE PORTSMOUTH NAVAL SHIPYARD HISTORIC DISTRICT. REMOVE ITEMS IN SUCH A MANNER THAT THE HISTORIC STRUCTURE (e.g. MORTAR JOINTS, GRANITE, BRICK, WOOD WINDOW AND DOOR TRIM, ETC.) TO
REMAIN IS NOT DAMAGED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ANY ITEMS
DAMAGED BY THE CONTRACTOR MUST BE REPAIRED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL
COST TO THE GOVERNMENT. SUBMIT A WORK PLAN TO ADDRESS REPAIRS TO DAMAGED ITEMS.
PWD MAINE CULTURAL RESOURCES MANAGER MUST REVIEW AND APPROVE THE CONTRACTOR'S
QUALITY CONTROL PLAN PRIOR TO COMMENCING REPAIR WORK.
6. HISTORIC ITEMS INDICATED ARE TO BE SALVAGED FOR REINSTALLATION OR ARE TO REMAIN IN PLACE (e.g. WOOD TRIM, METAL DOOR, PAINTED SIGNAGE, WINDOWS, AND STRUCTURAL ELEMENTS, ETC). PROTECT HISTORIC ITEMS DURING DEMOLITION AND CONSTRUCTION. ITEMS TO BE STORED FOR REINSTALLATION OR TURNED OVER TO GOVERNMENT MUST BE STORED ON SITE IN SAFE AND
SECURE LOCATION.
7. COORDINATE GENERAL BUILDING REMOVAL CONSTRUCTION SEQUENCE WITH HAZARDOUS
MATERIALS REMOVALS.
8. PATCH ANCHORAGE LOCATIONS AT REMOVED ITEMS. CUT FLUSH TO FLOOR/WALLS ANY EQUIPMENT
ATTACHMENT/ANCHORAGE AS TO PROVIDE THE REQUIRED FLOOR/WALL FINISH.
SATISFACTORY TO DATE
APPROVED
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SHEET
NAVFAC DRAWING NO.
DESIGNER
DRAWN BY
CHECKED BY
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 14 SEP 2023
DESIGN MANAGER
PROJECT MANAGER
FEAD/PM&E
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
P O
R T
S M
O U
T H
N A
V A
L S
H
IP
Y A
R D
K
IT
T
E R
Y M
E
UNCLASSIFIED
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
ACTIVITY
1740579
T. CARLETON
L. LYONS
S. RUCINSKI
/1
/2
:4
:0
P
M
C U s e rs \m d o n o v a n \D o c u m e n ts \2
.2
B L
D G
A
R C
H
IT
E C
T U
R A
L -V m d o n o v a n
V F
X R
.r v t
G-004B
B
R
E P
A
IR
S
A B
B R
E V
IA
T
IO
N
S
L E
G E
N D
A
N D
G E
N E
R A
L P
R O
J E
C T
N O
T E
S
V
O L U
M E
RSH
JMR
MJD
K
IT
T E
R Y
M
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
R O
IC
C
-M E
G -0
B
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
F
IN
A L
S U
B M
IS
S
IO
N
/0
1/
R
S H
A
M E
N D
M E
N T
/1
0/
R
S H
| Sheets |
| AE102 - FIRST FLOOR PART PLAN - WEST |
| AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST |
| AE131 - TYPICAL SIGNAGE DETAILS |
| AE202 - EXTERIOR ELEVATIONS 1 |
| AE804 - SECOND FLOOR FF&E PLAN (OPTION 1) |
| G-004A - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1 |
| G-004B - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2 |
| Q-601 - EQUIPMENT SCHEDULE (OPTION 2) |
File details come from the government source that posted it. Updated .