About this file

This document is an architectural drawing legend and general notes sheet for Building 60 renovation work at a Naval facility. The sheet provides symbols, abbreviations, and comprehensive notes governing hazardous materials management, building removals, masonry restoration, and construction sequencing for a historic structure.

Key requirements include: contractors must obtain permits for hazardous materials removal and disposal at no additional cost; a Qualified Personal (PQP) must be hired to coordinate implementation, perform independent inspections, and verify removal of asbestos, lead-, cadmium-, and chromium-containing paint, and PCBs in accordance with EM 385-1-1 and applicable specifications (sections 02 82 00.00 22, 02 83 00.00 22, 02 84 16.00 22, and 02 84 33.00 22). Existing paint is assumed to contain heavy metals requiring separate management and disposal per federal, state, and local regulations. The work includes four contract line items: base bid, industrial equipment removal and hazardous materials abatement (CLIN 002), hazardous materials management/abatement (CLIN 003), and existing trailer utilities (CLIN 004). Building 60 is designated as historic and a contributing resource to the Portsmouth Naval Shipyard Historic District; removals must protect mortar joints, granite, brick, and wood elements, with damaged materials repaired at contractor cost. Historic items must be salvaged for reinstallation. The project must comply with UFC standards (1-200-01, 1-200-02, 3-101-01, 3-110-03), UFAS, ABA, ADA, ADAAG, IMC 2021, NFPA 70, and IPC 2021. Eleven optional line items are available, including furniture/fixtures/equipment, additional window restorations, additional annex repairs, and resinous flooring.

View the file

Other files

File Type Posted
Att. GG) Amendment 0011 Attachment Table of Contents.pdf PDF
Solicitation Amendment N6247026R00120010 SF 30.pdf PDF
Att. T) Price Schedule AMD 0010.pdf PDF
01 30 10.00 22_AMENDMENT 010.pdf PDF
115_AE402_R1_AMENDMENT 010.pdf PDF
161_Q-601_R2_AMENDMENT 010.pdf PDF
170_P-102_R1_AMENDMENT 010.pdf PDF
171_P-103_R1_AMENDMENT 010.pdf PDF
175_P-107_R1_AMENDMENT 010.pdf PDF
677 attach Attic_AFPR.pdf PDF
Att. Y) PPI responses AMD 0009.pdf PDF
_B60_Continuation Sheet_Amendment 0009.pdf PDF
07 27 10_AMENDMENT 009.pdf PDF
95_AE104_R1_AMENDMENT 009.pdf PDF
216_M505_R1_AMENDMENT 009.pdf PDF
217_M601_R1_AMENDMENT 009.pdf PDF
262_EP603_R1_AMENDMENT 009.pdf PDF
268_EL104_R1_AMENDMENT 009.pdf PDF
Att. Y) PPI responses AMD 0008.pdf PDF
_B60_Continuation Sheet_Amendment 008.pdf PDF
01 11 00.00 22_R1_AMENDMENT 008.pdf PDF
72_SF506_R1_AMENDMENT 008.pdf PDF
220_M-701_R1_AMENDMENT 008.pdf PDF
N6247026R00120007 SF 30.pdf PDF
Solicitation Amendment N6247026R00120006 SF 30.pdf PDF
Att. CC) Site Visit Log.pdf PDF
Att. R) B60 ISRL AMD 0004.XLSX XLSX spreadsheet
Att. Y) PPI responses AMD 0004.pdf PDF
Att. AA) B60 AMD 004 Drawings 012726.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
AMD 0002 PPI responses.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Att. A) - Construction Experience Project Data.docx DOCX document
Att. D) - Historical Small Business Utilization.docx DOCX document
Att. E) - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Att. F) - Individual Small Business Subcontracting Plan.docx DOCX document
Att. H) Specifications Volume 1.pdf PDF
Att. J) Specifications Volume 3.pdf PDF
Att. K) Drawings Volume 1a.pdf PDF
Att. R) B60 - ISRL.XLSX XLSX spreadsheet
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL SYMBOLS LEGEND

A1

A-301

A-401

INTERIOR ELEVATION INDICATOR

INTERIOR ELEVATION

NUMBER

SHEET WHERE ELEVATION

IS DRAWN

EXTERIOR ELEVATION INDICATOR

ELEVATION NUMBER

INDICATES DIRECTION OF VIEW

SHEET WHERE ELEVATION IS DRAWN

A1

A-301

WALL / PARTIAL BUILDING SECTION INDICATOR

SECTION NUMBER

SHEET WHERE SECTION IS DRAWN

A1

A-301

BUILDING SECTION INDICATOR

A1

A-301

BUILDING

A1

A1

A1

A

A1

ROOM

ROOM IDENTIFIER

DETAIL NUMBER

SHEET WHERE

DETAIL IS DRAWN

DETAIL INDICATOR

ROOM NAME

ROOM NUMBER

A-501

DETAIL NUMBER

SHEET REFERENCED FROM

KEYNOTE INDICATOR

EXISTING ITEM OR SPECIALTY KEYNOTE

PLAN NUMBER

A1

PLAN TITLE

SCALE: 1/8" = 1'-0"

A1

PLAN TITLE

SCALE: 1/8" = 1'-0" (A-101)

SECTION NUMBER

SHEET WHERE DRAWN

MATCH LINE

A

A

INDICATES

DIRECTION OF VIEW

NA WALL TYPE INDICATOR ELEVATION TARGET

WINDOW TYPE

SIGN TYPE

REMOVALS KEYNOTE NUMBER

NEW WORK KEYNOTE NUMBER

ACCESSIBILITY SYMBOL

DOOR NUMBER

REVISION

WINDOW NUMBERACCESSORY ITEM

A 1i

IMAGE INDICATOR

IMAGE NUMBER

SHEET WHERE

DETAIL IS DRAWN

AE201

ACM

ACT

AFF

AHJ

ALUM

BF

BLDG

CJ

C

CLG

CLR

CMU

COL

CONC

CON

CONT

CPT

CT

CWT

DIA

DN

DWG

E

EA

EF

EJ

ELEC

ELEV

EMR

EQ

EXIST

EXT

FCO

FD

FND

FE

FEC

FF

FIN

FL,FLR

FT

GA

GALV

GYP BD

H,HT,HGT

HM

HORIZ

HP

IN

INSUL

INCH, INCHES

FOOT, FEET

PLUS OR MINUS

ASBESTOS CONTAINING

MATERIAL

ACOUSTICAL CEILING

TILE

ABOVE FINISH FLOOR

AUTHORITY HAVING

JURISDICTION

ALUMINUM

BARRIER FREE

BUILDING

CONTROL JOINT

CENTERLINE

CEILING

CLEAR

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONNECTION

CONTINUOUS

CARPET

CERAMIC TILE

CERAMIC WALL TILE

DIAMETER

DOWN

DRAWING

EAST

EACH

EXHAUST FAN

EXPANSION JOINT

ELECTRIC/ELECTRICAL

ELEVATION

ELEVATOR MACHINE ROOM

EQUAL

EXISTING

EXTERIOR

FLOOR CLEANOUT

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FLOOR

FINISH

FLOOR

FOOT, FEET

GAUGE

GALVANIZED

GYPSUM BOARD

HEIGHT

HOLLOW METAL

HORIZONTAL

HIGH POINT

INCHES, INCH

INSULATION,

INSULATED

ABBREVIATIONS

L

INT

IR

LBP

MAX

MECH

MFR

MIN

MIR

MTL

N

NAT

NIC

NMCI

NO.#

OC

PCB'S

PETG

PMI

PNT

PLAM

PLY

PQP

PT

PWD

R

RCB

RCP

REINF

RO

S

SIM

SF

STL

STRUCT

TYP

UL

UON

VERT

VIF

W W/

WB

WD

WP

INTERIOR

INSTALLATION

RESTORATION

LEAD-BASED PAINT

MAXIMUM

MECHANICAL

MANUFACTURER

MINIMUM

MIRROR

METAL

NORTH

NATURAL FINISH

NOT IN CONTRACT

NAVY/MARINE CORPS

INTRANET

NUMBER

ON CENTER

POLYCHLORINATED

BIPHENYLS

POLYETHYLENE

TEREPHTHALATE

GLYCOL

PLANNED

MODIFICATION

ITEM

PAINT, PAINTED

PLASTIC LAMINATE

PLYWOOD

PRIVATE QUALIFIED

PERSON

PRESSURE TREATED

PUBLIC WORKS

DEPARTMENT

RADIUS

RUBBER COVE BASE

REFLECTED CEILING

PLAN

REINFORCED

ROUGH OPENING

SOUTH

SIMILAR

SQUARE FEET

STEEL

STRUCTURAL

TYPICAL

UNDERWRITERS

LABORATORIES

UNLESS OTHERWISE

NOTED

VERTICAL

VERIFY IN FIELD

WEST, WIDE

WITH

WOOD BASE

WOOD

WALL PROTECTION

1. ITEMS IDENTIFIED ON THE HAZARDOUS MATERIALS DRAWINGS ARE EXISTING. SEE SHEETS HM001-HM604 FOR ADDITIONAL HAZARDOUS MATERIALS INFORMATION. COORDINATE HAZARDOUS MATERIALS WORK

WITH BUILDING REMOVALS AND CONSTRUCTION SEQUENCE PLAN.

2. OBTAIN PERMITS AND LICENSES REQUIRED FOR THE REMOVAL, TRANSPORT, AND DISPOSAL OF

HAZARDOUS MATERIALS AND DEBRIS AT NO ADDITIONAL COST TO THE GOVERNMENT.

3. CONTRACTOR MUST PERFORM NECESSARY MANAGEMENT OF IDENTIFIED HAZARDOUS MATERIALS, IN ACCORDANCE WITH EM 385-1-1, APPLICABLE PROJECT SPECIFICATIONS, AND FEDERAL, STATE, AND LOCAL

REGULATIONS.

4. CONTRACTOR MUST SUBMIT WORK PLANS AND HIRE PQP TO COORDINATE IMPLEMENTATION OF THE WORK PLAN, PERFORM INDEPENDENT INSPECTIONS, TESTING, AND VERIFICATION OF THE HAZARDOUS COMPONENTS WORK INCLUDING, BUT NOT LIMITED TO: ASBESTOS, LEAD-, CADMIUM, AND CHROMIUM- CONTAINING PAINT, AND PCBs.

5. EXISTING PAINT IS ASSUMED TO CONTAIN LEAD, CADMIUM, AND CHROMIUM (VI) (HEAVY METALS). MANAGE HEAVY METALS PAINT IN AREAS INDICATED FOR REMOVAL SEPARATE FROM THE SUBSTRATE AND TREAT THE REMOVED PAINT AS HAZARDOUS MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS. HEAVY METALS MUST BE MANAGED, REMOVED, AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE, AND

LOCAL REGULATIONS.

6. EXISTING LIGHT FIXTURE BALLASTS ARE ASSUMED TO CONTAIN PCB'S AND EXISTING LAMPS ARE ASSUMED TO CONTAIN MERCURY. SEE ELECTRICAL DRAWINGS FOR EXTENT OF REMOVALS. REMOVE IN ACCORDANCE

WITH SPECIFICATIONS.

7. EXISTING INDUSTRIAL EQUIPMENT/PROCESSES HAVE PRODUCED HEAVY METALS RESIDUE. REFER TO

HAZARDOUS MATERIAL SHEETS FOR FURTHER INFORMATION.

8. THE FOLLOWING SPECIFICATIONS APPLY:

02 82 00.00 22 ASBESTOS REMEDIATION (PNSY PROJECTS)

02 83 00.00 22 MANAGEMENT OF LEAD, CADMIUM, AND CHROMIUM (VI) DURING

RENOVATION, DEMOLITION, REMOVAL, AND ABATEMENT (PNSY PROJECTS)

02 84 16.00 22 HANDLING OF LIGHTING BALLASTS AND LAMPS

CONTAINING PCB'S AND MERCURY (PNSY PROJECTS)

02 84 33.00 22 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBS) (PNSY PROJECTS)

CONTRACT LINE ITEM NUMBERS (CLIN)

CLIN 001 BASE BID

CLIN 002 (IDENTIFIED AS LINE ITEM 1H IN PRICE SCHEDULE) INDUSTRIAL EQUIPMENT REMOVAL AND PROCESS

HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT

CLIN 003 (IDENTIFIEDAS LINE ITEM 1I IN PRICE SCHEDULE) HAZARDOUS MATERIALS MANAGEMENT/ABATEMENT CLIN 004 (IDENTIFIED AS LINE ITEM 1J IN PRICE SCHEDULE) EXISTING TRAILER UTILITIES

OPTION ITEMS

1. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E)

2. INDUSTRIAL EQUIPMENT

3. RADON FANS

4. SECURITY DEVICES

5. ADDITIONAL WINDOW RESTORATIONS

6. NOT APPLICABLE

7. ADDITIONAL ANNEX REPAIRS

8. ADDITIONAL FINISHES

9. ELECTRICAL SERVICE INFRASTRUCTURE

10. RESINOUS FLOORING

11. COMMUNICATION SERVICE ROUTING

GENERAL HAZARDOUS MATERIALS NOTES

1. COMPLY WITH STATE, FEDERAL, NATIONAL, AND OTHER CODES AND ORDINANCES THAT

APPLY TO THIS PROJECT.

2. COMPLETE WORK IN ACCORDANCE WITH INDUSTRY STANDARDS AND PERFORM WORK IN

A WORKMANLIKE AND PROFESSIONAL MANNER.

3. WHERE CONFLICTS EXIST WITHIN THE DOCUMENTS OR BETWEEN THE DOCUMENTS AND

APPLICABLE CODES, ORDINANCES, OR INDUSTRY STANDARDS, THE MORE STRINGENT, AS

DETERMINED BY THE CONTRACTING OFFICER, MUST BE PROVIDED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

4. MAINTAIN BUILDING EGRESS PATHS DURING THE ENTIRE CONTRACT PERIOD. PROVIDE

TEMPORARY PATHS TO MAINTAIN BUILDING EGRESS. COMPLY WITH NFPA 241, STANDARD

FOR SAFEGUARDING CONSTRUCTION, ALTERATIONS, AND DEMOLITION OPERATIONS.

5. MAINTAIN THE CONSTRUCTION SITE IN A SECURE, NEAT, WATER TIGHT, CLEAN, AND SAFE

CONDITION DURING THE ENTIRE CONTRACT PERIOD. EXTERIOR ENVELOPE WORK MUST

BE PERFORMED IN A MANNER TO MAINTAIN WEATHER TIGHTNESS.

6. PROVIDE ITEMS AND COMPONENTS SHOWN ON THE DRAWINGS UNLESS NOTED AS

"EXISTING" (EXIST).

7. WORK FROM GIVEN DIMENSIONS AND LARGE SCALE DETAILS. DO NOT SCALE DRAWINGS.

8. DIMENSIONING SYSTEM: UNLESS OTHERWISE NOTED, PLAN DIMENSIONS ARE TO/FROM

FINISHED FACE OF EXISTING WALLS, TO/FROM FACE OF FRAMING FOR STUD FRAMED

WALLS, AND TO/FROM THE FACE OF MASONRY FOR MASONRY WALLS. DIMENSIONS

INDICATED AS "CLEAR" (CLR) MUST BE MAINTAINED AND ARE MEASURED FROM THE FACE

OF FINISH. CENTERLINE DIMENSIONS ARE INDICATED BY CENTERLINE SYMBOL (C).

9. LOCATE DOOR OPENINGS 6 INCHES FROM ADJACENT WALL (FACE OF FRAMING TO

ROUGH OPENING), UNLESS OTHERWISE DIMENSIONED.

10. VERIFY EXISTING CONDITIONS AND DIMENSIONS AND REPORT DISCREPANCIES TO THE

CONTRACTING OFFICER. PROCEED WITH THE WORK AFTER THE DISCREPANCIES HAVE

BEEN RESOLVED BY THE GOVERNMENT.

11. DO NOT PENETRATE JOISTS, BEAMS, OR OTHER STRUCTURAL MEMBERS. OBTAIN

WRITTEN APPROVAL FROM THE ENGINEER OF RECORD FOR UNAVOIDABLE

PENETRATIONS OF STRUCTURAL MEMBERS.

12. PROVIDE SOLID BLOCKING BEHIND SURFACE APPLIED FIXTURES, TRIM, GRAB BARS,

SHELVES, WOOD WALL BASE, BASE AND WALL CABINETS, MARKER BOARDS,

TELEVISIONS, AND OTHER ACCESSORIES AND EQUIPMENT INCLUDING GOVERNMENT

SUPPLIED ITEMS WHEN MOUNTED TO STUD WALLS.

13. DISPOSE OF AND/OR RECYCLE CONSTRUCTION DEBRIS FROM THE PROJECT SITE AS

REQUIRED BY THE STATE OF MAINE AND AS REQUIRED BY THE CONTRACT. OBTAIN

REQUIRED DISPOSAL PERMITS.

14. PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. REPAIR OR REPLACE DAMAGE

RESULTING FROM PROJECT OPERATIONS, AS APPROVED BY THE CONTRACTING OFFICER,

AT NO ADDITIONAL COST TO THE GOVERNMENT.

15. OBTAIN APPROVAL FROM THE CONTRACTING OFFICER FOR THE SEQUENCE AND TIMING

OF OPERATIONS PRIOR TO COMMENCING WORK AND PER OUTAGE REQUIREMENTS

DETAILED IN THE SPECIFICATIONS.

16. FIRESTOP CONDUIT/PIPE/DUCT PENETRATIONS THROUGH FIRE-RATED WALLS, CEILINGS,

AND FLOORS. PROVIDE SMOKE BARRIER SEALANT AT FLOOR PENETRATIONS AND

PENETRATIONS THROUGH SMOKE PARTITIONS.

17. DO NOT INTERRUPT UTILITY SERVICES WITHOUT AN APPROVED OUTAGE REQUEST. DO

NOT RESTORE UTILITIES WITHOUT AN APPROVED 'ONAGE' REQUEST. REFER TO

SPECIFICATION SECTION 01 14 00.00 22 WORK RESTRICTIONS (PWD ME) AND SHEETS

G-008 AND G-009.

18. BUILDING 60 IS A HISTORIC FACILITY. PERFORM WORK IN COMPLIANCE WITH THE US

DEPARTMENT OF THE INTERIOR "SECRETARY OF THE INTERIOR'S STANDARDS FOR THE

TREATMENT OF HISTORIC PROPERTIES." HISTORIC ITEMS INDICATED OR SPECIFIED TO BE

SALVAGED FOR REINSTALLATION OR TO REMAIN IN PLACE MUST BE PROTECTED DURING

CONSTRUCTION.

19. WHEN ATTACHING FASTENERS, BLOCKING, OR ACCESSORIES TO EXISTING HISTORIC

BRICK OR STONE, PLACE FASTENERS IN MORTAR JOINTS. EXCEPTION: LIGHTNING

PROTECTION.

20. SYSTEMS AND THEIR ASSOCIATED CONDUIT MUST NOT PENETRATE HISTORIC FEATURES

OF THE BUILDING (WINDOW AND DOOR SURROUNDS, STAIRWELLS, WOOD BASE, CRANE

RAILS, ETC.). MAXIMIZE THE PLACEMENT OF CONDUIT IN SECONDARY SPACES WHERE

PRACTICABLE.

21. PRIOR TO INSTALLING FIRE PROTECTION PIPING, MECHANICAL DUCTWORK, PIPING,

ELECTRICAL CONDUIT, AND OTHER ASSOCIATED SYSTEM ELEMENTS, SUBMIT

COORDINATION DRAWINGS AND OBTAIN APPROVAL BY THE CONTRACTING OFFICER AND

THE PWD ME CULTURAL RESOURCES MANAGER. REFER TO SPECIFICATION SECTION 01

30 10.00 22 COORDINATION PROCEDURES AND COORDINATION DRAWINGS (PWD ME).

22. PROVIDE LIGHTNING PROTECTION SYSTEM TYPICAL. SEE ELECTRICAL SHEETS FOR

INFORMATION.

23. ACCESS TO THE INTERIOR OF BUILDING 60 MUST BE VIA EXISTING OPENINGS IN

EXTERIOR FACADE. UNDER NO CIRCUMSTANCES WILL NEW TEMPORARY OPENINGS BE

ENTERTAINED AND MUST NOT BE INCLUDED AS BASIS OF BID.

24. CONTRACTOR MUST PROVIDE PAVEMENT AND ASSOCIATED SELECT SUB BASE FOR

AREAS BEYOND THOSE IDENTIFIED ON THE CONTRACT DOCUMENTS THAT ARE IMPACTED

AS A RESULT OF THE CONTRACTORS MEANS AND METHODS AS REQUIRED TO PERFORM

THE CONTRACT SCOPE OF WORK.

L

GENERAL CONSTRUCTION NOTES

GENERAL MASONRY CLEANING/REPAIR/REPOINTING NOTES

1. BUILDING 60 AND ITS MASONRY ARE HISTORIC. COMPLY WITH SPECIFICATION SECTION 04 01

00.91 22 RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).

2. PROTECT MASONRY AND STRUCTURE THROUGHOUT PROJECT. USE THE GENTLEST MEANS

TO PERFORM THE WORK.

3. ENGAGE THE SERVICES OF A HISTORIC MASONRY CONSULTANT TO DETERMINE THE

CONDITION OF THE EXISTING MASONRY AND MATERIALS AND TO RECOMMEND CLEANING

AND RESTORATION PROCEDURES. REFER TO SPECIFICATION SECTION 04 01 00.91 22

RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES (PWD ME).

4. PREPARE A MOCK-UP FOR MASONRY REPAIR/RESTORATION WORK. REVIEW WITH

CONTRACTING OFFICER AND PWD-ME CULTURAL RESOURCES MANAGER.

BUILDING CODE:

UNIFIED FACILITIES CRITERIA (UFC) 1-200-01 (26 FEB. 2024)

UNIFIED FACILITIES CRITERIA (UFC) 1-200-02 (01 JUNE 2022)

UNIFIED FACILITIES CRITERIA (UFC) 3-101-01 (08 JAN. 2024)

UNIFIED FACILITIES CRITERIA (UFC) 3-110-03 (01 MAY 2012)

ACCESSIBILITY CODE:

UNIFORM ACCESSIBILITY STANDARDS (UFAS)

ARCHITECTURAL BARRIERS ACT (ABA)

AMERICANS WITH DISABILITIES ACT (ADA)

ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAAG)

MECHANICAL CODE:

INTERNATIONAL MECHANICAL CODE (IMC) 2021

ELECTRICAL CODE:

NFPA 70, NATIONAL ELECTRIC CODE

PLUMBING CODE:

INTERNATIONAL PLUMBING CODE (IPC) 2021

FIRE PREVENTION & LIFE SAFETY CODE:

SEE SHEET G-100.

CODE SUMMARY

GENERAL REMOVALS NOTES

1. COORDINATE REMOVAL OF DEBRIS WITH THE CONTRACTING OFFICER TO MINIMIZE DISRUPTION OF

BASE ACTIVITIES. COORDINATE WITH WASTE MANAGEMENT PLAN.

2. ITEMS DEPICTED FOR REMOVAL OR DEMOLITION ARE SHOWN FOR INFORMATIONAL PURPOSES.

THESE DRAWINGS DO NOT INDICATE EACH AND EVERY ITEM TO BE REMOVED OR DEMOLISHED.

(EX: VALVE, HANGER, FASTENER, ETC.) VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH

REMOVALS OR DEMOLITION.

3. WHERE MATERIALS THAT ARE SUSPECTED TO CONTAIN HAZARDOUS MATERIALS ARE

ENCOUNTERED, IMMEDIATELY STOP THAT WORK AND REPORT THE CONDITION TO THE

CONTRACTING OFFICER. SEE HAZARDOUS MATERIALS NOTES AND HAZARDOUS MATERIALS

REMOVALS PLANS.

4. REMOVALS KEYNOTES INDICATED ON "AD" SHEETS ARE REPRESENTATIVE OF GENERAL ITEMS TO BE REMOVED AND ARE NOT INTENDED TO IDENTIFY EACH ITEM ON EVERY WALL, FLOOR, CEILING, OR

ELEVATION. VERIFY IN FIELD COMPLETE WORK ASSOCIATED WITH REMOVALS.

5. BUILDING 60 IS A HISTORIC FACILITY AND IS A CONTRIBUTING RESOURCE TO THE PORTSMOUTH NAVAL SHIPYARD HISTORIC DISTRICT. REMOVE ITEMS IN SUCH A MANNER THAT THE HISTORIC STRUCTURE (e.g. MORTAR JOINTS, GRANITE, BRICK, WOOD WINDOW AND DOOR TRIM, ETC.) TO

REMAIN IS NOT DAMAGED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ANY ITEMS

DAMAGED BY THE CONTRACTOR MUST BE REPAIRED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL

COST TO THE GOVERNMENT. SUBMIT A WORK PLAN TO ADDRESS REPAIRS TO DAMAGED ITEMS.

PWD MAINE CULTURAL RESOURCES MANAGER MUST REVIEW AND APPROVE THE CONTRACTOR'S

QUALITY CONTROL PLAN PRIOR TO COMMENCING REPAIR WORK.

6. HISTORIC ITEMS INDICATED ARE TO BE SALVAGED FOR REINSTALLATION OR ARE TO REMAIN IN PLACE (e.g. WOOD TRIM, METAL DOOR, PAINTED SIGNAGE, WINDOWS, AND STRUCTURAL ELEMENTS, ETC). PROTECT HISTORIC ITEMS DURING DEMOLITION AND CONSTRUCTION. ITEMS TO BE STORED FOR REINSTALLATION OR TURNED OVER TO GOVERNMENT MUST BE STORED ON SITE IN SAFE AND

SECURE LOCATION.

7. COORDINATE GENERAL BUILDING REMOVAL CONSTRUCTION SEQUENCE WITH HAZARDOUS

MATERIALS REMOVALS.

8. PATCH ANCHORAGE LOCATIONS AT REMOVED ITEMS. CUT FLUSH TO FLOOR/WALLS ANY EQUIPMENT

ATTACHMENT/ANCHORAGE AS TO PROVIDE THE REQUIRED FLOOR/WALL FINISH.

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:4

:0

P

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

G-004B

B

R

E P

A

IR

S

A B

B R

E V

IA

T

IO

N

S

L E

G E

N D

A

N D

G E

N E

R A

L P

R O

J E

C T

N O

T E

S

V

O L U

M E

RSH

JMR

MJD

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

G -0

B

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

0/

R

S H

Sheets
AE102 - FIRST FLOOR PART PLAN - WEST
AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST
AE131 - TYPICAL SIGNAGE DETAILS
AE202 - EXTERIOR ELEVATIONS 1
AE804 - SECOND FLOOR FF&E PLAN (OPTION 1)
G-004A - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 1
G-004B - ABBREVIATIONS, LEGEND, AND GENERAL PROJECT NOTES - VOLUME 2
Q-601 - EQUIPMENT SCHEDULE (OPTION 2)