Systems Descriptions HVAC and Refrigeration Systems - HVAC and Refrigeration Systems commence at, and includes the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an Preventive Maintenance (PM) Program for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, and all monitoring and control systems including the EMCS.
Interior and Exterior Lighting Systmes - Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc
Fire Protection Systems - Fire Protection Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the Fire Protection Systems; such as: AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices, Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), Wet Chemicals, monitoring and controls systems, etc.
| Compressed Air Systems - Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. |
| Generators - Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. |
| POL System Facilities and Distribution Systems - POL System Facilities and Distribution System commence at and include the utility isolation point of connection. The Contractor shall develop and implement a Preventive maintenance (PM) program for the POL System Facilities and Distribution System and all mechanically and electrically interlocked ancillary parts, equipment, and components of the POL System Facilities and Distribution System, such as: fuel tanks, pumps, piping, transfer switches, valves, monitoring and control systems, etc. |
| Backflow Prevention Devices - Backflow Prevention Devices commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) Program to maintain, inspect, test and certify, and make all necessary repairs to the Backflow Prevention Devices and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Backflow Prevention Devices, such as: bleeders, regulators, valves, etc |
| Weight Handling Equipment and Systems - Weight Handling Equipment and Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc. |
HVAC Jebel-Ali
| Old Bldg No. | Description | Make | Type |
| Bldg No. | | | | |
| 655R | | Security | | Window |
| 656R | | MWR Storage | | Split |
| | | | Split |
| 657R | | MWR Life Cycle | Goodman | Central |
| 658R | | MWR Weight Room | Goodman | Central |
| | Foyer | | Split |
| 659R | | MWR Rec | Goodman | Central |
| 660 | 2 | Warehouse | | |
| | Supply Tent | Rheem | Split |
| | Supply Tent | Rheem | Split |
| | Supply Tent | Rheem | Split |
| | Loading Dock | | Ice Machine |
| | Loading Dock | | Ice Machine |
| 660A | | Rest Room | Rheem | |
| 661R | | Driver Lounge | | Window |
| | | | Split |
| | | Rheem | Split |
| 662 | | Weapons Simulator & Lockers | Carrier | 10 ton package unit |
| | | Carrier | 10 ton package unit |
| 663A | | HazMat Facility | Carrier | Window |
| 664 | TFS | CTF 56.7 Supply Warehouse | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| 665R | 16 | Ablution Unit | Rheem | Split |
| | | Rheem | Split |
| | | Rheem | Split |
| 666R | 21 | TOC | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| 667R | 6R | CTF - 56 | Goodman | Split |
| | | Goodman | Split |
| 668R | 5R | CTF - 56 | Goodman | Split |
| | | Goodman | Split |
| 669R | 4 | CTF - 56 | Goodman | Split |
| | | Goodman | Split |
| 670R | 3 | CTF-53 | Rheem | Split |
| | Server Room | Goodman | Split |
| | | Goodman | Split |
| | | Rheem | Split |
| | | Rheem | Split |
| | PLE Office | Rheem | Split |
| | | Rheem | Split |
| 671R | 1 | CTF - 56 | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 672R | 8 | OIC | Goodman | Split |
| | | Goodman | Split |
| 673R | 17 | CENTCOM | Goodman | Split |
| | | Goodman | Split |
| 674R | 7 | CTF 53 | Goodman | Split |
| | NCIS | Carrier | Window |
| 675R | 2 | CTF 56 | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 676R | 19 | N6 | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 677R | 18 | NAVFAC | Rheem | Split |
| | | Rheem | Split |
| | | Rheem | Split |
| 678R | 13 | MDSU Boat Shop | Rheem | Split |
| | | Goodman | Split |
| | | Goodman | Split |
| 679R | 10 | CTF Office | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 680R | 11 | CTF 56 Supply | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 681R | 9 | CTF 56 Admin Office | Rheem | Split |
| | | Rheem | Split |
| | | Goodman | Split |
| 682R | 15 | PLE | Goodman | Split |
| | Side Office | Carrier | Window |
| 683R | 20 | CTF 53 Logistics | Carrier | Split |
| | | Carrier | Split |
| 684R | 14 | Classroom | Goodman | Split |
| | | Goodman | Split |
| | | Goodman | Split |
| | | Goodman | Split |
| 685R | 12 | Medical | Goodman | Split |
| | | Goodman | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| 687 | TFS | CTF 56.7 Multi-Purpose Warehouse | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| | | Trane | 10 ton package unit |
| 688 | | NEX Store | York | Condenser |
| | | Copeland | 3HP x 3 (Chill Display) |
| | | Carrier | 1.5 Ton (wall mounted FCU) |
| | | Carrier | 1.5 Ton (wall mounted FCU) |
| | | Carrier | 1.5 Ton (wall mounted FCU) |
| | | Carrier | 2 Ton (wall mounted FCU) |
| | | Carrier | 2 Ton (wall mounted FCU) |
| | | Carrier | 2 Ton (wall mounted FCU) |
| | | Carrier | 2 Ton (wall mounted FCU) |
| | | Carrier | 2 Ton (wall mounted FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | 2.5 Ton (ceiling cassette FCU) |
| | | Carrier | (Chill Open Display) |
| 697R | | PWD Office | Carrier | Split |
| | | Carrier | Split |
| | | Carrier | Split |
| 698R | | Laundry Center | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| | | Carrier | Window |
| 699R | | USO Ablution Unit | General | Split |
| | | General | Split |
| | | General | Split |
| | | General | Split |
| | | General | Split |
| 702R | | NEX Warehouse | | 12Ton Central |
| 708R | | CTG 56.7 Waterfront Operations | Rheem | Split |
| 709R | | CTG 56.7 Waterfront Operations | Carrier | Window |
| 730A | | Armory Container | LG | Window |
| | | LG | Window |
| 730B | | Weapons Cleaning | | Split |
| | | | Split |
| | | | Split |
| T02 | RLB | NAVSUP | Carrier | 1T Split |
| | | Carrier | 1T Split |
| | | Carrier | 1T Split |
| | | Carrier | 1T Split |
| | | Carrier | 1T Split |
| T03 | RLB | NAVSUP | Carrier | 1T Split |
| | | Carrier | 1T Split |
| | | Carrier | 1T Split |
| T04 | RLB | Military Working Dog Kennel | Daikon | 2T Split |
| | | Daikon | 2T Split |
| T05 | RLB | Oasis Ablution Unit (Male) | Carrier | 3T Split |
| | | Carrier | 3T Split |
| | | Carrier | 3T Split |
| T06 | RLB | Oasis Ablution Unit (Female) | Carrier | 1.5T Split |
| | | Carrier | 3T Split |
| T07 | RLB | Social Worker | Carrier | 1.5T Split |
| T08 | RLB | Guard Stand (Dispatch-Buses) | Carrier | 1.5T Split |
| T09 | Tent | Tent near Finger Pier | Carrier | 3T Package Unit |
| T10 | Tent | Tent near Finger Pier | Carrier | 3T Package Unit |
| T12R | TFS | Boat simulator | Carrier | 12.5Ton Central |
| | | Carrier | 12.5Ton Central |
| T12-A | PEB | Server Room | Carrier | 2Ton Split |
| T12A | | | Carrier | 2Ton Split |
| T13 | RSL | Ballistic shack | Carrier | 1.5Ton Central |
| T14R | RLB | Guard Shack near Gate 2 | Carrier | 1.5Ton Central |
| T15R | RSL | Small Army Armory | Carrier | 1.5Ton Central |
| T16 | RLB | Guard Stand near BOSC | Carrier | 1.5Ton Central |
| T18 | RLB | DJ Booth | Carrier | 1.5 Window |
| T19R | RSL | Ballistic shack | Carrier | 1.5 Window |
| T20 | RLB | Shore Battle Space (SBS) | Carrier | 2 Ton Split |
| T20 | | | Carrier | 2 Ton Split |
| T20 | | | Carrier | 2 Ton Split |
| T24 | RLB | Shuttle Waiting Room | Carrier | 2 Ton Split |
| | | Carrier | 2 Ton Split |
| T13 | Guard Stand (outside ECP) | Portable Cooling |
| T14 | Guard Stand (ECP near tower) | Portable Cooling |
| T15 | Guard Stand (BOS Housekeeping) | Portable Cooling |
| T16 | Guard Stand (DJ Booth in USO area) | Portable Cooling |
| T17 | Guard Stand (Husbanding) | Portable Cooling |
| Installation | Portable Cooling |
| Installation | Portable Cooling |
HVAC SAS AL Nahkl
| FACILITY NO | AREA DESCRIPTION | AC TYPE | MAKE | CAPACITY | QTY |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A2 | MWR - Transient Rm | Split | General | 2.5 ton | 1 |
| A2 | MWR - Transient Rm | Split | General | 2.5 ton | 1 |
| A3 | MWR - Male Toilet | Split | General | 1.5 ton | 1 |
| A4 | MWR - Female Toilet | Split | General | 2.5 ton | 1 |
| A4 | MWR - Female Toilet | Split | General | 3 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Office | Split | General | 2 ton | 1 |
| B2 | DFAC - Stockroom | Split | Midea | 2.5 ton | 1 |
| B3 | DFAC - Male Toilet | Split | General | 2 ton | 1 |
| B4 | DFAC - Female Toilet | Split | General | 2 ton | 1 |
| E1 | Office - Admin | Split | Super General | 2 ton | 1 |
| E1 | Office - Linguist | Split | General | 2 ton | 1 |
| E1 | Office - CRE | Split | Super General | 2 ton | 1 |
| E1 | Office - Sgt Mjr | Split | General | 2 ton | 1 |
| E1 | Office - XO | Split | General | 2.5 ton | 1 |
| E1 | Office - CO | Split | Panasonic | 1.5 ton | 1 |
| E1 | Office - Conference | Split | General | 2.5 ton | 1 |
| E1 | Office - Conference | Split | Midea | 2.5 ton | 1 |
| E1 | Office - Hallway | Split | General | 3 ton | 1 |
| E1 | WH - JOC Server | Split | Royal Cool | 2 ton | 1 |
| E1 | WH - JOC Server | Split | Royal Cool | 2 ton | 1 |
| E1 | WH - JOC Server | Split | Midea | 2.5 ton | 1 |
| E1 | WH - J6 | Split | Super General | 2 ton | 1 |
| E1 | WH - J6 | Split | Midea | 2.5 ton | 1 |
| E1 | WH - J8 | Split | Super General | 2 ton | 1 |
| E1 | WH - J4 | Split | Super General | 2 ton | 1 |
| E1 | WH - JOC | Split | General | 3 ton | 1 |
| E1 | WH - JOC | Split | General | 3 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC New | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC New | Split | General | 2.5 ton | 1 |
| E1 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E1 | Rooftop | Package | Petra | 50 ton | 1 |
| E1 | Rooftop | Package | Petra | 50 ton | 1 |
| E2 | Office - CRF CDR | Split | Sanyo | 2 ton | 1 |
| E2 | Office - CRF IFC | Split | Sanyo | 2 ton | 1 |
| E2 | Office - CRF IFC Annex | Split | Super General | 2 ton | 1 |
| E2 | Office - Conference | Split | Royal Cool | 2 ton | 1 |
| E2 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E2 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Hallway | Split | Super General | 2 ton | 1 |
| E2 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E2 | TBD | Split | Sanyo | 1.5 ton | 1 |
| E2 | Rooftop | Package | Petra | 50 ton | 1 |
| E2 | Rooftop | Package | Petra | 50 ton | 1 |
| E3 | Office - Armory Office | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 9 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - SPT Main Office | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | General | 2 ton | 1 |
| E3 | Office - CON CEN | Split | Sanyo | 2.5 ton | 1 |
| E3 | Office - CON CEN | Split | Sanyo | 2.5 ton | 1 |
| E3 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| E3 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E3 | Rooftop | Package | Petra | 50 ton | 1 |
| E3 | Rooftop | Package | Petra | 50 ton | 1 |
| E4 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Rm 8 | Split | General | 2 ton | 1 |
| E4 | Office - Rm 9 | Split | General | 2 ton | 1 |
| E4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Conference | Split | General | 3 ton | 1 |
| E4 | Office - Armory | Split | Sanyo | 2.5 ton | 1 |
| E4 | Office - Armory | Split | Sanyo | 2.5 ton | 1 |
| E4 | Office - Hallway | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E4 | Rooftop | Package | Petra | 50 ton | 1 |
| E4 | Rooftop | Package | Petra | 50 ton | 1 |
| D3 | Office - Sleeping Rm | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Medical | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Stock Rm | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D3 | Office - Comm Rm | Split | General | 3 ton | 1 |
| D3 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| D3 | Office - Comm Rm-Hallway | Split | Sanyo | 2.5 ton | 1 |
| D3 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| D3 | Rooftop | Package | Petra | 50 ton | 1 |
| D3 | Rooftop | Package | Petra | 50 ton | 1 |
| D4 | Office - Sleeping Rm | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Medical | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Stock Rm | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D4 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D4 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| D4 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| D4 | Rooftop | Package | Petra | 50 ton | 1 |
| D4 | Rooftop | Package | Petra | 50 ton | 1 |
| T11 | New Laundry Rm1 | Split | Midea | 2.5 ton | 1 |
| T12 | Male Common Latrine1 | Split | Midea | 2.5 ton | 1 |
| T13 | New Laundry Rm2 | Split | Midea | 2.5 ton | 1 |
| T14 | Male Common Latrine2 | Split | Midea | 2.5 ton | 1 |
| T15 | Female Common Latrine | Split | Midea | 2.5 ton | 1 |
| G | CO's Rm | Split | General | 2.5 ton | 1 |
| G | Sgt Mjr's Rm | Split | Supra | 2 ton | 1 |
| G | XO's Rm | Split | Sanyo | 2 ton | 1 |
| G | Common Toilet | Split | General | 2 ton | 1 |
| G | Dental/Kitchen | Split | Super General | 2 ton | 1 |
| G | Medical Supply Rm | Split | General | 2 ton | 1 |
| G | Medical Clinic | Split | General | 2 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| CHU 116 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 116 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 117 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 117 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 118 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 118 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 119 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 119 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 120 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 120 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 121 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 121 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 122 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 122 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 123 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 123 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 124 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 124 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 125 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 125 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 126 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 126 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 127 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 127 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 128 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 128 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 129 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 129 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 130 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 130 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 131 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 131 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 132 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 132 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 133 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 133 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 134 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 134 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 135 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 135 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 136 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 136 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 137 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 137 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 138 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 138 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 139 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 139 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 140 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 140 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 141 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 141 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 142 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 142 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 143 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 143 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 144 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 144 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 145 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 145 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 146 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 146 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 147 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 147 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 148 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 148 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 149 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 149 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 150 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 150 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 151 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 151 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 152 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 152 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 153 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 153 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
HVAC Fujairah
| HVAC and Refrigeration System Inventory | | | | |
| Main Facility | | | | |
| FACILITY CODE | UNIT REF. | QTY | MAKE |
| CHIILER UNIT | CHIILER - 50 Ton | 2 | YORK Model - YSAA0110HA |
| PUMP | CHILLED WATER PUMP | 3 | |
1 FACILITY COD-1 DX UNIT DIRECT EXPANSION 1 MITSUBISHI
| 1 | FACILITY COD-2 | PACKAGE UNIT | | 2 | SKM |
| 2 | FACILITY COD-2 | EXTRACT FANS | | 4 | SYSTEM AIR |
| 3 | FACILITY COD-2 | DX UNIT | DIRECT EXPANSION | 7 | MITSUBISHI |
| 3 | FACILITY COD-2 | FCU | FAN COIL UNIT | 1 | MITSUBISHI |
| 1 | FACILITY COD-3 | AHU | AIR HANDLING UNIT | 4 | EUROCLIMA |
| 2 | FACILITY COD-3 | EXTRACT FANS | | 11 | SYSTEMAIR |
| 3 | FACILITY COD-3 | FAHU | FRESH AIR HANDLING UNIT | 1 | EUROCLIMA |
| 4 | FACILITY COD-3 | FACU | FAN COIL UNIT | 10 | EUROCLIMA |
| 5 | FACILITY COD-3 | DX UNIT | DIRECT EXPANSION | 1 | MITSUBISHI |
| 6 | FACILITY COD-3 | CHILLED WATER | | | |
| 1 | FACILITY COD-4 | PACKAGE UNIT | | 5 | SKM |
| 2 | FACILITY COD-4 | KEF | | 4 | SYSTEMAIR |
| 3 | FACILITY COD-4 | MAF | MOTORIZED AIR FRESH | 2 | SYSTEMAIR |
| 4 | FACILITY COD-4 | EXTRACT FAN | | 4 | SYSTEMAIR |
| 1 | FACILITY COD-5 | FAHU-Fresh Air U | FRESH AIR HANDLING UNIT | 1 | SKM |
| 2 | FACILITY COD-5 | FCU S | | 48 | SYSTEMAIR |
| 1 | FACILITY COD-6 | FAHU-Fresh Air U | FRESH AIR HANDLING UNIT | 1 | SKM |
| 2 | FACILITY COD-6 | EXTRACT FAN | | 2 | SYSTEMAIR |
| 3 | FACILITY COD-6 | FCU S | | 36 | SYSTEMAIR |
| 1 | FACILITY COD-7 | FCU S | FAN COIL UNIT | 4 | SYSTEMAIR |
| 2 | FACILITY COD-7 | EXTRACT FAN | | 2 | SYSTEMAIR |
| 3 | FACILITY COD-3 | FRESH AIR UNIT | FRESH AIR HANDLING UNIT | 1 | SYSTEMAIR |
1 FACILITY COD-8 DX UNIT DIRECT EXPANSION 2 SYSTEMAIR
| 1 | FACILITY COD-11 | DX UNIT | DIRECT EXPANSION | 2 | SYSTEMAIR |
| Other Facilities | | | | | |
| F03 | | | | 1 | |
| F06 | | | | 1 | |
| Facility Control System HVAC and Refrigeration System - Main Facility | | | |
| | QTY | MAKE |
| Facility Control System | 1 | Johnson Controls - Metasys |
Interior-Exterior Lighting
| JEBEL-ALI | | | |
| Facility Type | ITEM | DESCRIPTION | QTY |
| Administrative Trailers | FANS | Vortice | 40 |
| exterior lights | 20w LED | 26 |
| Emergency lights | Battery operated | 26 |
| office spaces | 4X18W fluorescent light fixtures | 8 |
| office spaces | fluorescent light fixtures | 32 |
| office spaces | recessed 40wLED | 298 |
| ITEM | DESCRIPTION | QTY |
| MWR-GYM | FANS | Vortice | 0 |
| exterior lights | 20w LED | 5 |
| Emergency lights | Battery operated | 8 |
| Gym AREA | recessed 40wLED | 72 |
| ITEM | DESCRIPTION | QTY |
| NEX | FANS | Vortice | 6 |
| exterior lights | 20w LED | 4 |
| Emergency lights | battery operated | 12 |
| NEX STORE | recessed 40wLED | 65 |
| NEX STORE | ceiling mounted 40w LED | 15 |
| ITEM | DESCRIPTION | QTY |
| USO | FANS | Vortice | 2 |
| exterior lights | 20w | 8 |
| Emergency lights | Battery operated | 4 |
| office spaces | Recessed 4X18W fluorescent light fixtures | 50 |
| office spaces | 18W fluorescent light fixtures | 200 |
| office spaces | 1x26w recessed down lights | 22 |
| office spaces | spotlights | 16 |
| office spaces | Ceiling mounted 40w LED | 15 |
| ITEM | DESCRIPTION | QTY |
| Ablution Units | FANS | GREENHECK Centrifugal Fan CSP B110 | 36 |
| exterior lights | Led 50w | 6 |
| exterior lights | Fluorescent 2x18w | 4 |
| Emergency lights | Fluorescent light 2x36 IP66 with battery backup | 7 |
| Hallway | Ceiling mounted IP65 2X36 W fluorescent light fixtures | 12 |
| Hallway | 36w fluorescent light fixtures | 24 |
| Cubicals | 1x26w down lights | 54 |
| Cubicals | Spotlights | 54 |
| ITEM | DESCRIPTION | QTY |
| Tension Fabric Structures | exterior lights | 20w LED | 5 |
| Emergency lights | With battery back up | 8 |
| High bay lights | High bay 150w LED | 22 |
| high bay lights | High bay metal halide | 20 |
| ITEM | DESCRIPTION | QTY |
| Armory - HAZWASTE | Explosion proof lights | IP65 Twin 1200mm fluorescent lamp 2x36w explosion proof | 56 |
| | all lights are photodcell operated | |
| ITEM | DESCRIPTION | QTY |
| Laundry | FANS | Vortice | 40 |
| Emergency lights | BACKUP BATTERY | 4 |
| office spaces | 2X36W fluorescent light fixtures | 34 |
| office spaces | 36W fluorescent light | 64 |
| ITEM | DESCRIPTION | QTY |
| Street Lights | SINGLE ARM | CREE-XSP SERIES 400W LED LIGHTS | 48 |
| Double arm | 2x250W Explosion proof metal halide | 24 |
| Rubber Power cable protectors(RUBBER | heavy traffic(10000lb) for 120mm diam cable | 26 |
| Rubber Power cable protectors(RUBBER | pedestrian for 120mm diam cable | 130 |
| Rubber Power cable protectors(RUBBER | heavy traffic(10000lb) for 70mm diam five channels | 120 |
| Rubber Power cable protectors(RUBBER | pedestrian traffic for 70mm diam five channels | 160 |
| ITEM | DESCRIPTION | QTY |
| Guard Shacks | ballistic resistant guard shack | LED exterior light 40w | 8 |
| ballistic resistant guard shack | LED ceiling mounted 40W | 4 |
| ballistic resistant guard shack | emergency lights | 2 |
| normal guard shack | 1x18w fluorescent fixture | 7 |
| normal guard shack | 18w fluorescent light | 7 |
| normal guard shack | external fluorescent lights 1x60w | 5 |
| normal guard shack | LED external lights 50w | 8 |
| SAS AL NAHKL | | | |
| Facility Type/Use | ITEM | DESCRIPTION | QTY |
| MWR | WATER HEATER | ARITSON SUPERG R 50V | 2 |
| WATER HEATER | Atlantic 863033 Horizontal | 3 |
| FANS | KDK ventalation fan 15WHA | 13 |
| exterior light fixture | 2X32W Waterproof light fixture fluorescent | 3 |
| exterior lights | 32w fluorescent | 6 |
| main room light fixtures | 4X18W fluorescent light fixtures | 16 |
| main room lights | 18w fluorescent | 64 |
| Bathroom light fixtures | 18w fluorescent light waterproof fixtures | 16 |
| Bathroom lights | 18w fluorescent lights | 16 |
| Big bathroom light fixtures | 1x32w fluorescent light fixture | 7 |
| Big bathroom lights | 32w fluorescent lights | 7 |
| Bedroom light fixtures | 4X18W fluorescent light fixtures | 12 |
| Bedroom ligths | 18w fluorescent lights | 48 |
| ITEM | DESCRIPTION | QTY |
| Galley | Exterior light fixture | 2x32w waterproof fluorescent light fixture | 4 |
| exterior lights | 32w fluorescent lights | 8 |
| Interior light fixture | 4x18w fluorescent light fixture | 70 |
| Interior lights | 18w fluorescent lights | 280 |
| Interior light fixture bathroom | 1x18w waterproof fluoerscent light fixture | 5 |
| Interior lights bathroom | 18w fluorescent lights | 5 |
| Receptacles | Double gang UAE receptacle 23Amp | 40 |
| WATER HEATERS | ARITSON SUPERG R 50V | 2 |
| Fans | KDK ventalation fan 15WHA | 5 |
| Exhaust fans | Industrial exhaust fans 40A motors | 8 |
| ITEM | DESCRIPTION | QTY |
| E2-E3-E4-D1-D2 Warehouses | Exterior light fixture | 10W E27 90-260V bulb | 45 |
| Interior elec. Room light fix | 2X32W fluorescent light fixture | 10 |
| Interior elec. Room light | 32w fluorescent lights | 20 |
| Office light fixtures | 4x18w fluorescent light fixture | 230 |
| Office light fixtures | 2X32W fluorescent light fixture | 56 |
| Office lights | 32w fluorescent lights | 112 |
| Office lights | 18w fluorescent lights | 920 |
| Bathroom light fixtures | 2x18w Fluorescent light fixture | 20 |
| Bathroom lights | 18w fluorescent lights | 40 |
| Bathroom Light fixtures | 2X32W fluorescent light fixture | 16 |
| Bathroom lights | 32w fluorescent lights | 32 |
| Bathroom Light fixtures | 1X18w fluorescent light fixture | 20 |
| Fans | KDK Ventalation fan 15WHA | 25 |
| High bay lights fluor. Fixture | 2X32W fluorescent light fixture | 400 |
| High bay lights fluor. | 32w fluorescent lights | 800 |
| High bay lights Fixture | metal halide light fixtures | 85 |
| High bay lights | Metal Halide lights | 85 |
| ITEM | DESCRIPTION | QTY |
| E1 Warehouse | Light fixtures | 2x32w fluorescent light fixture | 35 |
| Light fixtures | 4x18w fluoercent llight fixture | 60 |
| Lights | 32w fluorescent light | 70 |
| Lights | 18w fluorescent light | 240 |
| ITEM | DESCRIPTION | QTY |
| CO/Medical | Exterior light fixture | 4x18w fluorescent light fixture | 5 |
| exterior lights | 18w fluorescent lights | 20 |
| Exterior light parking fixtures | 2X32W waterproof fluorescent light fixture | 6 |
| Exterior light parking fixtures | 32w fluorescent lights | 12 |
| Bathroom light fixtures | 2X32W fluorescent light fixture | 2 |
| Bathroom light fixtures | 2X18W fuorescent light fixture | 3 |
| Bathroom light fixtures | 1X18W fuorescent light fixture | 1 |
| Bathroom lights | 32w fluorescent lights | 8 |
| Bathroom lights | 18w fluorescent lights | 7 |
| Office light fixtures | 4x18w fluorescent light fixture | 24 |
| Office lights | 18w fluorescent lights | 96 |
| ITEM | DESCRIPTION | QTY |
| Berthing | Twin Tube lights | 40w | 380 |
| Ceiling round lights | 40w | 76 |
| Exhaust fans | 40W | 152 |
| external lights | 20W | 76 |
| bulk head lights | 40W | 76 |
| FUJAIRAH | | | |
| Facility Type/Use | ITEM | DESCRIPTION | QTY (Approximate) |
| F1K | 2x28W ,SURFACE ,TS FLUORESCENT TUBE BATTEN FITTING , HF ELECTRONIC BALLAST | |
| Fujairah Main Building | F1W | 2x28W, TS LINEAR FLUORESCENT LAMP, SURFACE, LIGHT FITTING TO IP54, SLIM-DEPTH GRP BODY, WHITE ENAMELLED STEEL REFLECTOR AS GEAR TRAY, UV-STABILIZED CLEAR ACRYLIC STIPPLED DIFFUSER OF SMOOTH EXTERIOR FINISH, FASTENED WITH STAINLESS STEEL CLIPS, MAGNETIC BALLAST. | 31 |
| F1K | 2x28, SURFACE, T5 FLOURESCENT TUBE BATTEN FITTING, HF ELECTRONIC BALLAST | 2 |
| F1X | 2x28W, SURFACE, TS FLUORESCENT TUBE LIGHT FITTING WITH DIFFUSER, ELECTRONIC BALLAST AND EXPLOSION PROOF TO Ex(d) T6 ZONE1 STANDARDS | 34 |
| F2X | 2x54W, SURFACE, T5 FLUORESCENT TUBE LIGHT FITTING WITH DIFFUSER, ELECTRONIC BALLAST AND EXPLOSION PROOF TO Ex(d) T6 ZONE1 STANDARDS. | 25 |
| C3B | 4x14W FULLY-RECESSED, T5 FL. TUBE LIGHT FITTING WITH POLISHED REFLECTOR AND PRISMATIC DIFFUSER. HF ELECTRONIC BALLAST. | 29 |
| C3N | 4x14W, FULLY-RECESSED | 34 |
| T3D | 4x14W, T5 LINEAR FLUORESCENT LAMP, FULLY-RECESSED LIGHT FITTING WITH HIGHLY SPECULAR ANODIZED ALUMINIUM MIRROR LOUVERS, ALUMINIUM BACK REFLECTOR, EPOXY COATED SHEET STEEL BODY, HF ELECTRONIC BALLAST. | 73 |
| T3B | 4x14W, TS LINEAR FLUORESCENT LAMP, FULLY·RECESSED LIGHT FITTING WJTH PRISMATIC DIFFUSER, ALUMINIUM BACK REFLECTOR, EPOXY COATED SHEET STEEL BODY, HF ELECTRONIC BALLAST. | 23 |
| D4N | 1x28W, T5 UNEAR FLUORESCENTLAMP, WALL•MOUNTED MIRROR UGHT TO !P54. WHITE POWDER COATED SHEET STEEL BODY, HIGH GRADE ANODIZED ALUMINIUM REFLECTOR, ONE PIECE INJUCTION MOULDED NON-AGEING ACRYLIC PRISMATIC DIFFUSER OF BEVELLED EDGES FITTED WITH INTERNAL SNAP•ON SPRING CUPS, HF ELECTRONIC BALLAST. | 24 |
| A4N | 1x14W, T5 LINEAR FLUORESCENT LAMP MIRROR LIGHT WITH DIFFUSER, IP54, HF ELECTRONIC BALLAST. | 8 |
| CS2 | 2x18W, COMPACT FLUORESCENT LAMP, SURFACE FITTING, HF ELECTRONIC BALLAST. | 14 |
| PS4 | 2x18W, COMPACT FLUORESCENT LAMP, FULLY RECESSED DOWN LIGHT, HF ELECTRONIC BALLAST | 69 |
| PS4c | 2x1+L155:AY1558W, COMPACT FLUORESCENT LAMP, FULLY RECESSED DOWNUGHTER, LOW DIAMETER LESS THAN 200mm0, CAST ALUMINIUM HOUSING, POST-ANODIZED, HIGH GRADE ALUMlNJUM REFLECTOR OF WIDE BEAM CHARACTERISTICS, FREZNEL LENS AND CAST ALUMINIUM CHROME FINISH BEZEL RING, HF ELECTRONIC BALLAST. | 9 |
| CL4c | 2x26W, RECESSED, COMPACT FL TUBE LIGHT FITTING WITH CAST ALUMINfUM BODY, DECORATIVE CIRCULAR DIFFUSER. HF ELECTRONIC BALLAST . | 109 |
| PW1 | 1x18W, COMPACT FLUORESCENT LAMP, FULLY RECESSED DOWN LIGHT TO lP54, CAST ALUM!NlUM HOUSING, POST ANODIZED HIGH GRADE ALUMINIUM REFLECTOR, CAST-ALUMINIUM WH!TE POWDER-COATED BEZEL RING, SLIGHTLY FROSTED GLASS DISC ATTACHMENT FLUSH WITH CEILING, HF ELECTRONIC BALLAST. | 50 |
| PW2 | 2x.18W | 37 |
| H21 | 1x70W, METAL HALIDE LAMP, DECORATNE WALL BRACKET TO IP 55, CAST ALUMINIUM BODY, HIGH GRADE REFLECTOR/REFRACTOR OPTICS, TRANSPARENT GLASS DIFFUSER. | 7 |
| H22 | 1x70 METAL HALIDE LAMP, IP5 5, METAL CLAD WALL MOUNTED LIGHT WITH POLISHED REFLECTOR AND GLASS COVER. | 3 |
| HL2 | 1x400W, METAL HAUDE LAMP, IP55, ALUMINIUM BODY, FLOOD LIGHT PROJECTOR WITH POLISHED REFLECTOR OF WIDE ANGLE DISTRIBUTION, HINGED TOUGH GLASS DIFFUSER, ADJUSTABLE MOUNTING BRACKET AND ANTI-GLARE LOUVERS. (AIMING TO BE DONE AS PER SITE REQUIREMENTS.) | 4 |
| M1 | 1x14W, T5 LINEAR FLOURESCENT LAMP< WALL_MOUNTED MIRROR LIGHT< HF ELECTRONIC BALLAST | 1 |
| E1 | 1X8W,FLOURESCENT TUBE EMERGENCY LIGHT,SURFACE TYPE, 3 HOUR DURATION,SELF CONTAINED NON-MAINTAINED WITH LED INDICATION,ELECTRONIC BALLAST | 19 |
| E1r | 1X8W,FLOURESCENT TUBE EMERGENCY LIGHT, RECESSED TYPE, 3 HOUR DURATION,SELF CONTAINED NON-MAINTAINED WITH LED INDICATION,ELECTRONIC BALLAST | 72 |
| E2 | EMERGENCY EXIT LIGHT,WALL MOUNTED,8W,LINEAR FL.LAMP, LED INDICATION AND ESCAPE ROUTE SIGN ELECTRONIC BALLAST | 13 |
| E5 | 1X8W,FLOURESCENT TUBE EMERGENCY LIGHT, 3 HOUR DURATION,SELF CONTAINED NON-MAINTAINED WITH LED INDICATION, EXPLOSION PROOF TO Ex(d) T6 ZONE 1 STANDARDS | 6 |
| E6 | 2 NO.7W NOMINAL (7x1W) HIGH POWER LED LAMP FLOODLIGHT HEADS WALL MOUNTED EMERGENCY LIGHT, 3 HOUR DURATION, SELF CONTAINED NON MAINTAINED WITH LED INDICATION. POWDER COATED SHEET STEEL ENCLOSURE. EXPLOSION PROOF TO Ex(d) T6 ZONE1 STANDARDS. | 6 |
WHE
| Building | Location | Description | Manufacturer | Type/Model | SN | Manuf. Date | Capacity | Travel Distance | Working Ht | Span of Bridge | Wire Rope Chain | Power Supply | Quantity |
| Boat Maintenance Facility | Fujairah | Overhead Crane | SWF Krantechnik | NB04L6CFP230BTIS/Electric Powered Single Girder Top Runing Overhead Travelling Crane | 11954807 | 2017 | 2.5 T | 15.0 m | 8.0 m | 7.85 m | 6 mm, 4 Falls | 3 Phase 50 Hz | 1 |
Lightning-Grounding System
| Fujairah | | |
| Location | Lighting Arrestor System | Remarks |
| Main Building - Rooftop | 1 | Runs along perimeter of rooftop. Consistss of 25x3mm solid copper tape mesh on roof, air terminals, down conductors bonded tostell column/structrual steel elements of building and earth pits at ground level. |
| Jebel-Ali | | | |
| Location | Lighting Arrestor System | Remarks | Qty |
| Armory/HAZWASTE | Lightning Arrestors | Copper Arrestors | 72 |
| Armory/HAZWASTE | Grounding Pits | Copper Rods - 3 meters long | 78 |
| Street Lights | Light Distribution Panel | Copper Rods | 72 |
| Street Lights | Grounding Pits | Copper Rods | 73 |
| Installation Wide | Additional Grounding Pits | Copper Rods | 26 |
Fire Prot. & Extinguishers
| JEBEL-ALI | | | | | | | |
| Building No. | Smoke Detectors | Pull Stations | Bell Alarm | Fire Alarm Panel | Fire Extinguisher | Fire Alarm Panels | |
| TFS Facilities (662,664,687, 731) | 27 | 5 | 4 | | 8 | Location | Fire Alarm Panel Description |
| 662, 663A, 666R, 664, 687, 688, 730B, T02 | | | | 8 | | 666 | Zener ZCP-108 * Zone Panel |
| T02, T03, T05, T06, T07 | 8 | | | | 5 | 730B | HST Model HP201 Stand Alone |
| 663A | 2 | | 1 | | | 665-TO5-TO6 | PFC-6030 Stand Alone |
| 688 | 12 | 2 | 1 | | 1 | 664, 687 | Gent Vigilon Compact |
| 698R | 6 | 2 | | | 1 | 662 | ZCP-104 Stand Alone |
| 663 | | | | | 1 | | |
| Trailer Area | | | | | 30 | | |
| Armory Compound | | | | | 10 | | |
| Finger Pier | | | | | 1 | | |
| MWR Facilities (4) (near Driver's Trailer) | | | | | 4 | | |
| T01 | | | | | 1 | | |
| T04 | | | | | 1 | | |
| T12 - T24 | | | | | 9 | | |
| FUJAIRAH | | | | | | | | | | |
| Boat Maintenance Facility | Smoke Detectors | Heat Detectors | Pull Station | Ceiling Sprinker | Ceiling Sprinkler w/ Flasher | Sprinkler - Wall Mounted | Sprinkler - Upright | Extinguisher - Powder | Extinguisher - CO2 | Hose Cabinet |
| GR. FL. | 32 | 0 | 5 | 9 | 5 | 14 | 98 | 5 | 5 | 3 |
| 1ST FL. | 29 | 0 | 2 | 18 | 10 | 2 | 104 | 2 | 2 | 2 |
| 2ND FL. | 30 | 0 | 2 | 11 | 26 | 2 | 129 | 3 | 3 | 2 |
| TOTAL | 91 | 0 | 9 | 38 | 41 | 18 | 331 | 10 | 10 | 7 |
| Sas Al Nahkl | |
| Location | Smoke Detectors |
| All CHU Facilities | 76 |
VTE
| Location | Building | Manufacturer | Model | Description | Quantity |
| Fujairah | Main Facility | Thysenkrupp | | 13 passenger, 1000 Kg. | 1 |
Overhead Doors
| Location | Building | Description | Quantity | Door Description |
| Jebel-Ali | 662 | TFS | 1 | Standard Big Top tent Disappearing Door |
| Jebel-Ali | 664 | TFS | 2 | Standard Big Top tent Disappearing Door |
| Jebel-Ali | 687 | TFS | 2 | Standard Big Top tent Disappearing Door |
| Jebel-Ali | 702 | TFS | 1 | Standard Big Top tent Disappearing Door |
| AL Minhad | 27 | HANGAR | 3 | Motor Driven metal roll-up door |
| Fujairah | Boat Maintenance Facility | BOAT MMAINTENANCE | 2 | Acessa (7 m x 5m x 42 m Insulated Panel) |
| Fujairah | EOD | EOD | 1 | Acessa (4 m x 4m x 42 m Insulated Panel) |
| Fujairah | General Storage | | 1 | |
| Sas Al Nahkl | Clamshell | Warehouse | 1 | |
Compressed Air Systems
| Location | Building | Location | Description | Quantity |
| Fujairah | Main Facility | Boat Maintenance Area | Compressed Air System | 1 |
| Location | Building | Equipment Description | Capacity | Motor |
| Fujairah | Main Facility | Electric Direct Drive Screw Type | 90m3/h @ 7bar. | 400vac/3p/50hz 11KW IP 54 Class F Insulation, Automatic Control |
Generators
| Location | Generator Type | Model | Size | Quantity | Remarks |
| Sas Al Nahkl | Cummins | C700D5 | 500 kVA | 2 | US Government Operated |
| Sas Al Nahkl | MEP | 806B | 60 kW | 1 | US Government Operated |
| Sas Al Nahkl | MEP | 802A | 5 kW | 1 | US Government Operated |
| Sas Al Nahkl | Atlas Copco | 8972 8225 46 | 35 kW | 2 | US Government Operated |
POL Systems
| Location | Building/Area | Equipment Description | Manufacturer | Model | Capacity | Quantity |
| Fujairah | Waterfront | Diesel Tank | | | 2000 Gal - Double Wall | 1 |
| Fujairah | Waterfront | Pump | Fill-Rite | Series 800C FR701VG | 20GPM | 1 |
Floating Pier
| Location | Building/Area | Equipment Description | Quantity |
| Jebel-Ali | Waterfront | Floating Concrete Pier , Chain System | 1 |
| Fujairah | Waterfront | Floating Concrete Pier , Bungee Cord System | 1 |
Water Tank and Pump
| Location | Building | Description | Quantity | Tank Capacity | Pump Capacity |
| Sas Al Nakhl | H | Water Tanks - Polycon Insulated | 4 | 6000 Gal. | |
| Sas Al Nakhl | H | Pump for Water Tanks | 2 | | 40A 3-Phase |
| Jebel Ali | 698 | Water Tanks | 5 | 5000 Gal | |
| Jebel Ali | 698 | Pump for Water Tanks | 2 | | |
| Jebel Ali | T05/T06 | Water Tank | 1 | 5000 Gal | |
| Jebel Ali | T05/T06 | Pump for Water Tank | 1 | 5000 Gal | |
| Fujairah | Waterfront | Water Tank - Boat Maintenance - PVC | 1 | 5000 Gal | |
Emergency Eyewash Stations
| Location | Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | | | | Permanent | 2 |
| | | | Portable | 3 |
| Fujairah | Main Facility | | | Permanent | 1 |
| Fujairah | Main Facility | | | Portable | 4 |
Mass Notification
| Location | Building | Description | Quantity | Sytem Controller | Zone Call Station | No. Speakers | Local Operating Console | Ceiling Mtd Speakers | Celing Mtd. Speakers w/ Flash | Fire Speakers w/ Flash | Public Address Panel | LED Text Signs |
| Fujairah | Main Facility | Big Voice | 1 | Unknown | | | 4 | 45 | 40 | 22 | 1 | 6 |
| Jebel-Ali | Installation | Big Voice | 1 | Inter M ECS 6216 (Emergency Combination System) | RM 6024 (System Remote MIC Station) | 38 | | | | | | |
UPS
| Location | Building | Manufacturer | Model | UPS Model | Battery Model | No. Batteries | Backup Power Time Rating |
| Fujairah | Main Facility | APC Schneider | MGE Galaxy 5500 | G55TUPSM40h-kVA, 442V | NiCD 63ah | 317 | 30 minutes |
Solar Hot Water Panels
| Location | Building | Description | Quantity |
| Fujairah | Main Facility - Rooftop | Solar Hot Water System | 1 |
| Fujairah | Main Facility - Rooftop | Solar Hot Water Panels | 36 |
| Fujairah | Main Facility - Rooftop | Tanks | 2 |
Grease Trap
| Location | Building | Description | Capacity | Quantity |
| Sas Al Nakhl | B-B2 | Kitchen Grease Trap | (40x40x47inch) 45cu.ft. | 2 |
Exhaust Hood and Duct
| Location | Building | Description | Size | Quantity |
| Sas Al Nakhl | B-B2 | Kitchen Exhaust Hood | 3.6x2.8x5 meters | 1 |
| | Supply Duct - Kitchen Hood | 8' diam. by 10 meters | 1 |
| | Exhaust Duct - Kitchen Hood | 14' diam. By 11 meters | 1 |
| Hood - Baking Area | 1.2 x 1.2 x 5 meters | 1 |
| Exhaust Duct- Baking Area | 11' diam. by 6 meters | 1 |
Roofing - Gutters
| Location | Roof Type | Roof Size | Gutters | Downspouts |
| Al Minhad | Corrugated sandwich metal sheet with polyurethane insulating | 37000 SF | 980 LF | 570 LF |
Locksmith
| Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | Simplex | EE100 | Cipher Locks | 24 |
| Sas Al Nahkl | Simplex | EE101 | Cipher Locks | 6 |
| Sas Al Nahkl | | | Keyed Locks | TBD |
| Fujairah | TBD | TBD | Cipher Locks | 2 |
Laundry Equipment
| Location | Building | Manufacturer(s) | Model (s) | Description | Quantity |
| Sas Al Nahkl | CHU | SPEEDQUEEN/ Whirlpool/ Frigidaire | LWN311SP301NW22/AW0E9912/FLAY17GGAV8 | Washer Units | 13 |
| Sas Al Nahkl | CHU | SPEEDQUEEN/ Whirlpool/ Frigidaire | LES17AWF3022/AZB9780/MKR63GWTWB0 | Dryer Units | 19 |
| Fujairah | Main Facility | Maytag | 3LMVWC315FWO | Washer Units | 10 |
| Fujairah | Main Facility | Electrolux | EDC2086PDW | Dryer Units | 16 |
Ice Machines
| Location | Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | | BREMA | VM 900A | 50hz 3000W-220/240V | 2 |