0100000 C General Information.pdf

PDF 108 KB Posted

Attached to
N62470-19-R-2010 BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVY COMPOUND QUAY 9, JEBEL ALI, U. A. E.
Solicitation number
N6247019R2010
Issued by

About this file

This document contains a performance work statement for base operations support services at the U.S. Navy Compound in Jebel Ali, United Arab Emirates. The contractor shall provide labor, supervision, management, materials, equipment and facilities to deliver services outlined in 18 annexes, including facility management, utilities, transportation, and environmental services. Specific locations include sites in Jebel Ali, Fujairah, Sas Al Nahkl, Al Minhad Air Base, and Tidmar Island in Oman. The Navy will use a performance-based acquisition approach with measurable performance standards and incentives. The solicitation number is N62470-19-R-2010 and the contract will be awarded by the Naval Facilities Engineering Command. The contractor must have knowledge of the local conditions and warrant that its technical proposal will meet or exceed the objectives in the performance work statement.

View the file

Other files

File Type Posted
N62470-19-R-2010 RFP Amend 0005.pdf PDF
N62470-19-R-2010 RFP AMend 0004.pdf PDF
0401000 J Force Protection Amendment 0004.pdf PDF
1700000 J Transportation Amendment 0004.pdf PDF
J-1502000-05 Facility Investment Inventory Amendment 0004.xlsx XLSX spreadsheet
J-0200000-07 ELINS Amendment 0004.xlsx XLSX spreadsheet
1503010 J Custodial Amendment 0004.pdf PDF
J-1502000-05 Facility Investment Inventory Amendment 0003.xlsx XLSX spreadsheet
1700000 J Transportation Amendment 0003.pdf PDF
0200000 J Management and Administration Amendment 0003.pdf PDF
N62470-19-R-2010 RFP Amend 00003.pdf PDF
1502000 J Facility Investment Amendment 0003.pdf PDF
Section F Deliverables Amendment 0003.xlsx XLSX spreadsheet
J-0200000-07 ELINS Amendment 0003x.xlsx XLSX spreadsheet
1602000 J Electrical Amendment 0003.pdf PDF
J- 1800000 Environmental Amendment 0002.pdf PDF
J- 1503020 Pest Control Amendment 0002.pdf PDF
0200000 J Management and Administration Amendment 0002.pdf PDF
J-1602000-05 Single Line Diagram Generator-Fed Facilities.pdf PDF
J-1502000-05 Facility Investment Inventory Amendment 0002.xlsx XLSX spreadsheet
J-0200000-07 ELINS Amendment 0002.xlsx XLSX spreadsheet
J-1602000-04 Layout Of Power Distribution From Generators.pdf PDF
J- 1602000 J Electrical Amendment 0002.pdf PDF
N62470-19-R-2010 RFP Amendment 0002.pdf PDF
Pre Proposal Conference Site Visit.pdf PDF
N62470-19-R-2010 Amendment 0001.pdf PDF
J-3 Section B Supplies or Services and Prices.pdf PDF
J-1501000-04 General Direct Condition Rating Guidance.xlsx XLSX spreadsheet
J-1503010-03.01 CUSTODIAL INVENTORY.xlsx XLSX spreadsheet
0401000 J Force Protection.pdf PDF
1700000 J Transportation.pdf PDF
1501000 J Facility Management.pdf PDF
N62470-19-R-2010 Jebel Ali BOS RFP.pdf PDF
J-1503060-02-Pavement Sweeping.pdf PDF
J-0200000-04 MAXIMO Data.xlsx XLSX spreadsheet
1503010 J Custodial.pdf PDF
J-1502000-03 Facility Inventory.xlsx XLSX spreadsheet
J-1502000-05 Facility Investment Inventory.xlsx XLSX spreadsheet
1800000 J Environmental.pdf PDF
_J-1 Past Performance Questionnaire.docx DOCX document
1604000 J Wastewater.pdf PDF
_J-2 Corporate Experience Project Data Sheet.docx DOCX document
1602000 J Electrical.pdf PDF
Section F Deliverables.xlsx XLSX spreadsheet
J-1502000-07 Floating Pier Instructions.docx DOCX document
J-1501000-03 Meter Group Descriptions Condition Rating.xlsx XLSX spreadsheet
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
1503060 J Pavement Clearance.pdf PDF
1502000 J Facility Investment.pdf PDF
1503030 J Integrated Solid Waste Management.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Acquisition of Additional Work

1.3 Background Information

1.4 Navy PBSA Approach

1.5 Standard Template

1.6 Related Information

1.7 Verification of Workload and Conditions

1.8 Contractor's Knowledge

1.9 Technical Proposal Certification

Spec Item Title Description

1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at various locations within United Arab Emirates (UAE) including the US Navy Compound, Shed 57, Quay 9, Jebel Ali, Fujairah Guard Coast Facility, Fujairah Sea Port, Sas Al Nahkl, and Al Minhad Air Base, and Tidmar Island, Oman, by means of a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff (Not Applicable) Annex 4 Public Safety

- 0401000 Force Protection Annex 5 Air Operations (Not Applicable) Annex 6 Port Operations (Not Applicable) Annex 7 Ordnance (Not Applicable) Annex 8 Range Operations (Not Applicable) Annex 9 Health Care Support (Not Applicable) Annex 10 Supply (Not Applicable) Annex 11 Personnel Support (Not Applicable) Annex 12 Morale, Welfare and Recreation Support (Not Applicable) Annex 13 Galley (Not Applicable) Annex 14 Unaccompanied Housing (Not Applicable) Annex 15 Facilities Support

- 1501000 Facility Management

- 1502000 Facility Investment

- 1503010 Custodial

- 1503020 Pest Control

- 1503030 Integrated Solid Waste Management

- 1503060 Pavement Clearance

Annex 16 Utilities

- 1602000 Electrical

- 1604000 Wastewater

Annex 17 Transportation Annex 18 Environmental

1.2 Acquisition of Additional

Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract.

Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.3 Background Information Jebel Ali is a port town, located 35 kilometers southwest of the city of Dubai in the United Arab Emirates (UAE). The port's construction began in the late 1970s along with Jebel Ali Village (built around 1977) which was used, initially, for the construction workers of the port. Jebel Ali is the world's largest man-made harbor and the biggest port in the Middle East.

1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.5 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized.

Specification Item 1 will always contain General Information.

Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements.

Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items.

Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.

1.6 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract.

Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.7 Verification of Workload

and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.

All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.

As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.8 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goa The Navy expects to receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.ls and objectives. The Navy's use of performance- based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.9 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.