1502000 J Facility Investment Amendment 0003.pdf
PDF 32 KB Posted
- Attached to
- N62470-19-R-2010 BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVY COMPOUND QUAY 9, JEBEL ALI, U. A. E.
- Solicitation number
- N6247019R2010
About this file
This document contains technical specifications and standards for facility maintenance services at various Navy bases in the United Arab Emirates. It outlines definitions and acronyms, references technical documents, and provides inventories of facilities, historical workloads, investments, and temperature standards. Attachment J-1502000-03 lists facility properties, while Attachment J-1502000-05 inventories facility systems and equipment. Attachment J-1502000-04 details annual historical levels of emergency, urgent, routine, and project work at each base location. The related solicitation seeks proposals for base operations support services at Navy Compound Quay 9 in Jebel Ali, UAE, to be awarded on a best-value basis by the Naval Facilities Engineering Command. It specifies maintenance and management of facilities and installed equipment.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J-1502000-01 Definitions and Acronyms
J-1502000-02 References and Technical Documents
J-1502000-03 Facility Inventory
J-1502000-04 Historical Service Order and Project Order Workloads
J-1502000-05 Facility Investment Inventory
J-1502000-06 Temperature Setting for HVAC and Refrigeration Systems
J-1502000-07 Floating Pier Inventory and Instructions
Attachment J-1502000-01 Definitions and Acronyms
Definition Description Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes
(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Maintenance, Preventive
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
Management Information Systems- Maintenance
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.
The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.
Replacement is performed when the equipment has reached the end of its useful life;
when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
Weight Handling Equipment (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.
Acronym Title ACO Administrative Contracting Officer BPVC Boiler and Pressure Vessel Code BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CMMS Computerized Maintenance Management System COR Condition of Readiness DBH Diameter at Breast Height DoD Department of Defense DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials
GPWS Guide Performance Work Statements HCA Head Contracting Agency HVAC Heating, Ventilation, and Air Conditioning ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity IFLOLS Improved Fresnel Lens Optical Landing System IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MSDS Material Safety Data Sheets NFPA National Fire Protection Association NAVFAC Naval Facilities Engineering Command NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PRCSP Permit Required Confined Space Program PWS Performance Work Statement Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment SC Security Clearances SCADA Supervisory Control And Data Acquisition SM Semimonthly SOP Standard Operating Procedures SPAR Senior Performance Assessment Representative SRM Sustainment, Restoration and Modernization TE Technical Evaluation UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VIQ Variation in Quantity WBS Work Breakdown Structure
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
Reference Title UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and
Unfired Pressure Vessels NAVFAC P-307 Management of Weight Handling Equipment
ATTACHMENT J-1502000-03
FACILITY PROPERTY INVENTORY
Reference MS Excel file “J-1502000-03 Facility Inventory.xlsx”
ATTACHMENT J-1502000-04
Annual Historical Service Order Workload
Service Order Type Jebel-Ali Al Minhad
Sas Sl Nakhl
Fujairah
Emergency 24 2 12 20 Urgent 5 2 2 2 Routine 100 20 200 100
Project Work Type Jebel-Ali Al Minhad
Sas Sl Nakhl
Fujairah
Project Work Level 1 10 1 10 8
NOTE: The data represents an annual estimated quantity of Service Orders and Project Orders at each location and is meant for information only. The estimated quantity of service orders is the total estimated quantity referenced above plus or minus the Inventory Data Quantity Variation percentage stated in Annex 0200000. Labor Categories may vary significantly.
ATTACHMENT J-1502000-05
FACILITY INVESTMENT SYSTEM AND EQUIPMENT INVENTORY
Reference MS Excel file “J-1502000-05 Facility Investment Inventory.xlsx”
ATTACHMENTJ-1502000-06
TEMPERATURE STANDARDS
Area Summer Season Winter Season
Dry bulb (°F) Dry bulb (°C) Dry bulb (°F) Dry bulb (°C)
Living & Admin. Areas (Inactive Employment)
78 26 68 20
Working Areas (Active Employment)
78 26 68 20
Storage Areas 78 26 40 4
Computer Areas 70 21 68 20
Training Areas 75 24 68 20
REFRIGERATION SYSTEMS
Type Degrees
°F °C Frozen Meat 0 to -5 -18 to -20
Fresh Meat 30 to 34 -1 to 1
Ice Storage 28 to 30 -2 to -1
Dairy Products 32 to 34 0 to 1
Ice Cream 0 to -5 -18 to -20
Beer 35 to 39 2 to 4
Fruits and Vegetables 36 to 42 2 to 6
Chill Room 35 to 39 2 to 4