J-1503010-03.01 CUSTODIAL INVENTORY.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- N62470-19-R-2010 BASE OPERATIONS SUPPORT (BOS) SERVICES AT U. S. NAVY COMPOUND QUAY 9, JEBEL ALI, U. A. E.
- Solicitation number
- N6247019R2010
About this file
This document contains a custodial inventory attachment and related federal contract opportunity for base operations support services. The custodial inventory attachment lists building and facility details at various Navy locations in the United Arab Emirates, including Jebel Ali, Al Nakhl, Fujairah, and Al Minhad Air Base. It provides information on building types, areas, floor surfaces, and custodial requirements. The related federal contract opportunity is solicitation number N6247019R2010 for base operations support services at the U.S. Navy Compound in Jebel Ali, UAE. The opportunity is seeking these services from the Department of the Navy Naval Facilities Engineering Command. The document provides key details on the required products and services, location, and awarding agency.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 01 - JEBEL ALI
| Attachment J-1503010-03.01 | ||||||||||||||||||
| CUSTODIAL INVENTORY (JEBEL ALI) | ||||||||||||||||||
| Bldg | Type | Bldg Description | Area (SQM) | Floor Surface | Area | Sweep | Mop | Vaccuum | Trash | Showers | Sink | Toilet | Urinal | Mirror | Paper | Soap | ||
| 650 | 3 | Perm | Pass & ID | 163 | Porcelain Tiles | Entrance | D | D | ||||||||||
| 3 | 86 | Porcelain Tiles | Entrance Hall | D | D | |||||||||||||
| 3 | 61 | Porcelain Tiles | Corridor | D | D | |||||||||||||
| 3 | 30 | Vinyl | Pass Office | D | D | D | ||||||||||||
| 3 | 69 | Vinyl | Observation | W | W | |||||||||||||
| 3 | 10 | Vinyl | Observation | W | W | |||||||||||||
| 3 | 340 | Paver Bricks | Front Area | D | ||||||||||||||
| 3 | 8 | Anti Skid Ceramic Tiles | Male RR | D | D | D | 1 | 1 | 1 | 1 | 1 | |||||||
| 3 | 7 | Anti Skid Ceramic Tiles | Female RR | D | D | D | 1 | 1 | 1 | 1 | 1 | |||||||
| 3 | Anti Skid Ceramic Tiles | Rest Room | D | D | 1 | 1 | 1 | 1 | 1 | |||||||||
| 7 | Anti Skid Ceramic Tiles | Female | D | D | ||||||||||||||
| 18 | Anti Skid Ceramic Tiles | Male | D | D | ||||||||||||||
| 651 | 3 | Perm | Utility Building | 56 | Epoxy Paint | Pump Room | W | W | ||||||||||
| 178 | Epoxy Paint | Water Tanks | ||||||||||||||||
| 17 | Epoxy Paint | Server Room | W | W | ||||||||||||||
| 17 | Epoxy Paint | Telephone Ex | W | W | ||||||||||||||
| 29 | Epoxy Paint | Generator Room | W | |||||||||||||||
| 75 | Epoxy Paint | Transformer Room | W | W | ||||||||||||||
| 112 | Epoxy Paint | Fire Pump | W | W | ||||||||||||||
| 653 | 10 | Perm | Guard Station | 11 | Epoxy Paint | Guard Station | D | D | ||||||||||
| 3 | Anti Skid Ceramic Tiles | D | D | |||||||||||||||
| 3 | Anti Skid Ceramic Tiles | Rest Room | D | D | D | 1 | 1 | 1 | 1 | 1 | ||||||||
| 19 | Epoxy Paint | D | D | |||||||||||||||
| 19 | Epoxy Paint | D | D | |||||||||||||||
| 655R | Trailer | Portable Guard Shack | 11 | Vinyl | W | W | D | |||||||||||
| 657R | 20 | Trailer | MWR Cardio Room | 30 | Rubber | Cardio Room | D | D | ||||||||||
| 658R | 21 | Trailer | MWR Weight Room | 35 | Rubber | Weight Room | D | D | ||||||||||
| 659R | 22 | Trailer | Rec Room | 35 | Carpet | Lounge | W | 3W | ||||||||||
| 660 | 2 | Perm | Warehouse | 422 | Concrete | Loading Dock | 2W | |||||||||||
| 14 | Epoxy Paint | Office | W | W | ||||||||||||||
| 10 | Epoxy Paint | Office | W | W | ||||||||||||||
| 3 | Anti Skid Ceramic Tiles | Rest Room | W | W | 1 | 1 | 1 | 1 | 1 | |||||||||
| 660A | Restroom Male | 12 | Porcelain Tiles | D | D | D | 2 | 4 | 2 | 2 | 2 | 1 | ||||||
| Restroom Female | 12 | Porcelain Tiles | D | D | D | 2 | 2 | 2 | 2 | 1 | ||||||||
| 661R | Trailer | Driver Lounge | 10 | Linoleum | D | D | D | |||||||||||
| 662 | TFS | Weapons Simulator | 256 | Pavers | 2M | 3W | ||||||||||||
| 663 | Shade | HazMat Shelter | 256 | Pavers | 2M | 3W | ||||||||||||
| 664 | TFS | Boat Maintenance | 405 | Pavers | 2M | D | ||||||||||||
| 665R | 16 | Trailer | Ablution Unit | 33 | Porcelain Tiles | Male Locker | D | D | D | |||||||||
| 33 | Porcelain Tiles | Male Rest Room | 2D | 2D | 2D | 5 | 5 | 5 | 5 | 5 | 3 | 3 | ||||||
| 19 | Porcelain Tiles | Locker | D | D | D | |||||||||||||
| 19 | Porcelain Tiles | Female Rest Room | 2D | 2D | 2D | 3 | 3 | 3 | 3 | 3 | 3 | |||||||
| 666R | 21 | Trailer | TOC | 82 | Carpet | W | D | |||||||||||
| 667R | 6 | Trailer | CTF - 56 | 41 | Carpet | W | 3W | |||||||||||
| 668R | 5 | Trailer | CTF - 56 | 41 | Carpet | W | 3W | |||||||||||
| 669R | 4 | Trailer | CTF - 56 | 41 | Vinyl | W | 3W | |||||||||||
| 670R | 3 | Trailer | CTF - 56 | 31 | Carpet | W | 3W | |||||||||||
| 10 | Carpet | W | 3W | |||||||||||||||
| 671R | 1 | Trailer | CTF - 56 | 17 | Carpet | Conference Room | W | 3W | ||||||||||
| 14 | Carpet | CO Office | W | 3W | ||||||||||||||
| 10 | Carpet | XO Office | W | 3W | ||||||||||||||
| 672R | 8 | Trailer | OIC | 21 | Carpet | Conference Room | W | 3W | ||||||||||
| 20 | Carpet | Office | W | 3W | ||||||||||||||
| 673R | 17 | Trailer | CENTCOM | 41 | carpet | Conference Room | W | 3W | ||||||||||
| 674R | 7 | Trailer | CTF 53 | 20 | Carpet | Office | W | 3W | ||||||||||
| 14 | Carpet | NCIS Office | W | 3W | ||||||||||||||
| 675R | 2 | Trailer | CTF 56 | 21 | Carpet | Office | W | 3W | ||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 676R | 19 | Trailer | Office | 15 | Carpet | Office | W | 3W | ||||||||||
| 16 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 677R | 18 | Trailer | NAVFAC | 10 | Carpet | Office | W | 3W | ||||||||||
| 21 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 678R | 13 | Trailer | Divers | 31 | Carpet | MSDU Divers | W | 3W | ||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 679R | 10 | Trailer | CTF Office | 15 | Carpet | Office | W | 3W | ||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 6 | Carpet | Office | W | 3W | ||||||||||||||
| 680R | 11 | Trailer | CTF 56 Supply | 21 | Carpet | Office | W | 3W | ||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 681R | 9 | Trailer | CTF 56 Admin Office | 21 | Carpet | Office | W | 3W | ||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 682R | 15 | Trailer | CTF 53 Embark | 20 | Carpet | Office | W | 3W | ||||||||||
| 14 | Carpet | Mail Room | W | 3W | ||||||||||||||
| 683R | 20 | Trailer | CTF 53 Logistics | Carpet | W | 3W | ||||||||||||
| Carpet | W | 3W | ||||||||||||||||
| 684R | 14 | Trailer | Classroom | 84 | Carpet | Conference Room | W | 3W | ||||||||||
| 685R | 12 | Trailer | Medical | 18 | Vinyl | Medical | W | D | ||||||||||
| 20 | Vinyl | Medical | W | D | ||||||||||||||
| 3 | Porcelain Tiles | Rest Room | D | D | D | 1 | 1 | 1 | 1 | |||||||||
| 686R | 19 | Trailer | Army | 15 | Carpet | Office | W | 3W | ||||||||||
| 6 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 10 | Carpet | Office | W | 3W | ||||||||||||||
| 687 | TFS | CTG 56.7 Multi Use | 605 | Pavers | 2M | 3W | ||||||||||||
| 697R | Trailer | PWD Office | 24 | Linoleum | Conference Room | W | W | |||||||||||
| 10 | Linoleum | Office | W | W | ||||||||||||||
| 2 | Linoleum | Pantry | W | W | ||||||||||||||
| 5 | Linoleum | Rest Room | W | W | 1 | 1 | 1 | 1 | ||||||||||
| 699R | Trailer | USO Ablution Unit | 24 | Linoleum | Male Rest Room | 2D | 2D | 2D | 6 | 12 | 6 | 2 | 2 | 2 | ||||
| 10 | Linoleum | Female Rest Room | 2D | 2D | 2D | 6 | 10 | 6 | 2 | 2 | ||||||||
| 708R | CTG 56.7 Waterfront Ops | 3 | Linoleum | W | W | D | ||||||||||||
| 709R | CTG 56.7 Waterfront Ops | 3 | Linoleum | W | W | D | ||||||||||||
| 720 | Trailer | HazWaste Facility | 517 | Cement | W | W | 2W | |||||||||||
| 730B | Trailer | Weapons Cleaning | 9 | Linoleum | W | W | 3W | |||||||||||
| T01 | Tent | FLS | 120 | Pavers | W | 3W | ||||||||||||
| T02 | RLB | NAVSUP | 42 | Carpet | W | W | 3W | |||||||||||
| T03 | RLB | NAVSUP | 21 | Carpet | W | W | 3W | |||||||||||
| T04 | RLB | Dog Kennel | 14 | Linoleum | W | W | 3W | |||||||||||
| T05 | RLB | Oasis Ablution Unit | 64 | Linoleoun | Male Rest Room | 2D | 2D | 2D | 9 | 12 | 13 | 9 | 6 | 6 | see J-1503010-06 during ship visits | |||
| T06 | RLB | Oasis Ablution Unit | 25 | Linoleoun | Female Rest Room | 2D | 2D | 2D | 6 | 6 | 6 | 4 | 3 | see J-1503010-06 during ship visits | ||||
| T07 | RLB | Social Worker | 9 | Carpet | W | W | 2W | |||||||||||
| T08 | RLB | Portable Guard Shack near Gate 1 | 9 | |||||||||||||||
| T12 | TFS | Boat Simulator | 243.25 | Pavers/concrete | Training | W | M | 2W | ||||||||||
| T12/B | PEB | Server inside Boat Sim | 22.75 | Linoleoun | Server | 2W | W | W | 2W | |||||||||
| T13 | RLB | Ballistic shack | 8 | Chequer | Guard room | 2W | W | 2W | ||||||||||
| T14 | RLB | Guard Shack near Gate 2 | 9 | Vinyl | Guard room | W | W | 2W | ||||||||||
| T15 | RSL | Small Army Armory | 9 | Vinyl | Armory | W | W | 2W | ||||||||||
| T16 | RLB | Guard shack near BOSC | 9 | Chequer | W | W | 2W | |||||||||||
| T19 | RLB | Ballistic shack | 8 | Chequer | Guard room | W | W | 2W | ||||||||||
| T20 | RLB | Shore Battle Space | 60 | Chequer | Office | W | W | 2W | ||||||||||
| T24 | RLB | Shuttle waiting station | 14.4 | Vinyl | Guard room | W | W | 2W |
&"Times New Roman,Bold"Attachment J-1503010-03 Custodial Inventory
Tab 02 - SAS AL NAKHL
| Attachment J-1503010-03 | ||||||||||||||||||||
| CUSTODIAL INVENTORY (SAS AL NAKHL) | ||||||||||||||||||||
| Bldg-Room | Qty | Type | Description | Area (SQM) | Floor Surface | Area | Sweep | Mop | Vaccuum | Trash | Showers | Sink | Toilet | Urinal | Mirror | Paper | Soap | Sewer Box | Washer | Dryer |
| 116-153 | 38X2 | RLB | Double Room (38x2) | 820.8 | Vinyl | Dormitory | ||||||||||||||
| 116-153 | 38X2 | RLB | Toilets | 383.04 | Vinyl | Toilets | Y | Y | ||||||||||||
| 116-153 | 38X2 | RLB | Hallways | 383.04 | Chequer plate | External | 3W | 1W | 3W | Y | Y | |||||||||
| A-A1 | 1 | RLB | MWR | 147 | Carpet | Lounge | 1W | 3W | ||||||||||||
| A-A2 | 1 | RLB | MWR | 68.25 | Vinyl | Transient Bedroom | D | D | D | D | ||||||||||
| A-A3 | 1 | RLB | MWR | 32.4 | Vinyl | Shower/Laundry | D | D | D | D | 4 | 4 | 4 | Y | Y | 5 | 5 | |||
| A-A4 | 1 | RLB | MWR | 39.6 | Vinyl | Toilet/Laundry | 3W | 3W | 1W | 3W | 3 | 3 | 2 | 4 | Y | Y | ||||
| B-B1 | 1 | RLB | Dining Facility | 312.8 | Vinyl | Dining Room | 2D | 3D | 1W | 3W | ||||||||||
| B-B4 | 1 | RLB | Dining Facility | 43.2 | Vinyl | Male Toilet | D | D | 1W | D | 7 | 4 | 3 | 7 | Y | Y | ||||
| B-B3 | 1 | RLB | Dining Facility | 18 | Vinyl | Female Toilet | D | D | 1W | D | 3 | 2 | 3 | Y | Y | |||||
| E1 | 1 | PERM | Warehouses E1 offices | 375 | Vinyl | Common Areas and offices | 3W | 3W | 1W | 3W | ||||||||||
| E2 to E4; D3 to D4 | 5 | PERM | Warehouses (office Area Hallways+Rooms) | 1050 | Vinyl | Common Areas and offices | 3W | 3W | 1W | 3W | ||||||||||
| E1 to E4; D3 to D4 | 6 | PERM | Warehouses | 4230 | Concrete | Warehouse Areas | 3W | 3W | 1W | 3W | ||||||||||
| T11 | 1 | RLB | Toilet | 36 | Vinyl | Male Shower | 2D | 2D | 1W | D | 9 | 8 | 4 | Y | Y | Y | ||||
| T12 | 1 | RLB | Toilet | 36 | Vinyl | Male Shower | 2D | 2D | 1W | D | 9 | 8 | 4 | Y | Y | Y | ||||
| T16 | 1 | RLB | Laundry Room | 36 | Vinyl | Laundry | D | D | 1W | D | 4 | Y | 8 | 8 | ||||||
| T17 | 1 | RLB | Toilet | 36 | Vinyl | Male Shower | 2D | 2D | 1W | D | 9 | 8 | 4 | Y | Y | Y | ||||
| T18 | 1 | RLB | Laundry Room | 36 | Vinyl | Laundry | D | D | 1W | D | 4 | Y | 8 | 8 | ||||||
| E1 to E4; D3 to D4 | 6 | PERM | Toilets (Warehouses) | 72.9 | Porcelain Tile | Office Toilet | D | D | 1W | D | 3 | 3 | 2 | Y | Y | Y | ||||
| G | 1 | PERM | Medical (Toilet) | 10.8 | Vinyl | Toilets | 1W | 1W | 1W | D | 1 | 1 | 2 | 1 | 1 | Y | Y | Y | ||
| G | 1 | PERM | Commanding Officers Toilet | 10.8 | Vinyl | Toilets | 1W | 1W | 1W | 2W | 1 | 1 | 1 | 1 | Y | Y | Y | |||
| H | 3 | PERM | Common Areas and Laundries | 881.78 | Porcelain Tile | 3W | 3W | |||||||||||||
| H | 6 | PERM | Stairs | 193.2 | Porcelain Tile | 3W | 3W | |||||||||||||
| H | 10 | PERM | Toilets | 306.44 | Porcelain Tile | Toilets | D | D | D | 24 | 28 | 30 | 28 | Y | Y | |||||
| K | 1 | TFS | Clamshell | 902 | Interlock metal deck | Maintenance | W | W | 3W |
Custodial Inventory
Tab 03 - FUJAIRAH
| Attachment J-1503010-03 | ||||||||||||||||||
| CUSTODIAL INVENTORY (FUJAIRAH, Building 25 - Three Storey) | ||||||||||||||||||
| Bldg. Floor | Room | Type | Bldg Description | Area (SQM) | Floor Surface | Area | Sweep | Mop | Vaccuum | Trash | Showers | Sink | Toilet | Urinal | Mirror | Paper | Soap | Powerwash |
| Gr.Fl | 1 | Perm | Ready Room | 59.3 | Porcelain Tiles | 3W | 1W | W | ||||||||||
| 2 | Perm | General Storage | 172 | Epoxy Paint on Cement | W | M | M | W | ||||||||||
| 3 | Perm | Workshop 1 | 17.1 | Epoxy Paint on Cement | W | M | M | W | ||||||||||
| 4 | Perm | Workshop 2 | 20.45 | Epoxy Paint on Cement | W | M | M | W | ||||||||||
| 5 | Perm | Compressor room | 22.96 | Epoxy Paint on Cement | W | M | M | |||||||||||
| 6 | Perm | Ablution female | 17.65 | Porcelain Tiles | 2D | D | D | 0 | 3 | 3 | 0 | 1 | 3 | 2 | ||||
| 7 | Perm | Ablution Male | 17.67 | Porcelain Tiles | 2D | D | D | 0 | 4 | 3 | 0 | 1 | 2 | |||||
| 8 | Perm | Boat Maintenace Facility | 234.53 | Epoxy Paint on Cement | W | D | M | |||||||||||
| 9 | Perm | Staircase 1 | 19.2 | Marble | 3W | 1W | ||||||||||||
| 10 | Perm | Corridor1 | 142.34 | Marble | 3W | 1W | ||||||||||||
| 11 | Perm | Shop storage | 11.25 | Epoxy Paint on Cement | W | M | M | |||||||||||
| 12 | Perm | Workshop 3 | 19.78 | Epoxy Paint on Cement | W | M | M | W | ||||||||||
| 13 | Perm | Office | 8 | Porcelain Tiles | 3W | 1W | 3W | |||||||||||
| 14 | Perm | Electr. Room | 25 | Porcelain Tiles | W | 1W | ||||||||||||
| 15 | Perm | Dining Café | 76 | Porcelain Tiles | 2D | 2D | 2D | |||||||||||
| 16 | Perm | Kitchen | 21.18 | Porcelain Tiles | 2D | 2D | 2D | |||||||||||
| 17 | Perm | Mechanical room | 30.13 | Epoxy Paint on Cement | W | M | M | |||||||||||
| 18 | Perm | Dive Storage | 23.6 | Epoxy Paint on Cement | W | M | M | |||||||||||
| 19 | Perm | Dive chamber | 23.54 | Epoxy Paint on Cement | W | M | M | D | ||||||||||
| 20 | Perm | Medical | 24.56 | Porcelain Tiles | D | 2W | D | 1 | ||||||||||
| 21 | Perm | Exam Room | 11.75 | Porcelain Tiles | D | 2W | D | 1 | ||||||||||
| 22 | Perm | Comunication Room | 11.4 | Porcelain Tiles | W | W | ||||||||||||
| 23 | Perm | Staircase 2 | 20.7 | Marble | 2W | W | ||||||||||||
| 24 | Perm | Dive Lockers | 74.5 | Epoxy Paint on Cement | W | W | 2W | 2 | ||||||||||
| 25 | Perm | Laundry | 30.26 | Porcelain Tiles | D | 2W | D | |||||||||||
| 26 | Perm | Armory | 34.5 | Carpet | W | W | W | |||||||||||
| 1st Fl | 27 | Perm | Office | 13.3 | Concrete | 3W | W | 3W | ||||||||||
| 28 | Perm | Office | 13.3 | Epoxy Paint | 3W | W | 3W | |||||||||||
| 29 | Perm | Office | 13.2 | Epoxy Paint | 3W | W | 3W | |||||||||||
| 30 | Perm | Corridor2 | 141 | Pocellain (Float floor) | 3W | W | ||||||||||||
| 31 | Perm | Conference Room | 38.22 | Anti Skid Ceramic Tiles | 2W | W | W | |||||||||||
| 32 | Perm | Mechanical Room | 21.82 | Epoxy Paint on Cement | 2M | M | ||||||||||||
| 33 | Perm | Office | 10.38 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 34 | Perm | Office | 33.88 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 35 | Perm | Ablution Female | 37.43 | Porcelain Tiles | 2D | 2D | D | 3 | 6 | 4 | 1 | 4 | 3 | |||||
| 36 | Perm | Ablution Male | 37.94 | Porcelain Tiles | 2D | 2D | D | 3 | 6 | 5 | 4 | 2 | 5 | 3 | ||||
| 37 | Perm | abl disab | 8.34 | Porcelain Tiles | W | W | D | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 38 | Perm | Electr. Room 3 | 7.84 | Porcelain Tiles | 3W | W | ||||||||||||
| 39 | Perm | Office | 7.84 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 40 | Perm | Corridor 3 | 78.4 | Marble | 3W | W | ||||||||||||
| 41 | Perm | Office | 11.82 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 42 | Perm | Open Office | 118.48 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 43 | Perm | Corridor 4 | 43.16 | Marble | 3W | W | ||||||||||||
| 44 | Perm | Starcase 3 | 19.2 | Marble | 3W | W | ||||||||||||
| 45 | Perm | Starcase 4 | 20.7 | Marble | 3W | W | ||||||||||||
| 46 | Perm | Communication room | 7.92 | Porcelain Tiles | 3W | W | ||||||||||||
| 47 | Perm | Ablution Female | 13.8 | Porcelain Tiles | 2D | 2D | D | 2 | 3 | 2 | 0 | 1 | 2 | 2 | ||||
| 48 | Perm | Lockers Female | 21.9 | Porcelain Tiles | 2D | 2D | D | |||||||||||
| 49 | Perm | Ablution Officers | 19.78 | Porcelain Tiles | 2D | 2D | D | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 50 | Perm | Ablution Male | 8.8 | Porcelain Tiles | 2D | 2D | D | 2 | 3 | 2 | 2 | 1 | 2 | 2 | ||||
| 51 | Perm | Lockers Male | 30.68 | Porcelain Tiles | 2D | 2D | D | |||||||||||
| 52 | Perm | MWR Fitness | 144.26 | Rubber Mat | 3W | 3W | D | |||||||||||
| 2nd.Fl | 53 | Perm | Berthing 1 | 122 | Porcelain Tiles | 3W | W | 3W | ||||||||||
| 54 | Perm | Berthing 2 | 21.3 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 55 | Perm | Berthing 3 | 31.86 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 56 | Perm | Berthing 4 | 85.48 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 57 | Perm | Berthing 5 | 88.8 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 58 | Perm | Berthing 6 | 49.15 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 59 | Perm | Berthing 7 | 122.14 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 60 | Perm | Berthing 8 | 128.4 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 61 | Perm | Berthing 9 | 146.5 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 62 | Perm | Storage | 17.24 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 63 | Perm | Room | 23.855 | Porcelain Tiles | 3W | W | 3W | |||||||||||
| 64 | Perm | Staircase 5 | 19.2 | Marble | 3W | W | ||||||||||||
| 65 | Perm | Staircase 6 | 20.7 | Marble | 3W | W | ||||||||||||
| 66 | Perm | Ablution Female | 45.37 | Porcelain Tiles | 2D | 2D | D | 5 | 9 | 4 | 0 | 7 | 4 | 4 | ||||
| 67 | Perm | Ablution Male | 71.25 | Porcelain Tiles | 2D | 2D | D | 8 | 9 | 9 | 0 | 7 | 9 | 4 | ||||
| 68 | Perm | Ablution disabled | 8.34 | Porcelain Tiles | 2D | 2D | D | 1 | 1 | 1 | 0 | 1 | 1 | 1 | ||||
| 69 | Perm | Corridor 5 | 138.23 | Marble | 3W | W | ||||||||||||
| 70 | Perm | Gear Store | 23 | Porcelain Tiles | W | W | W | |||||||||||
| 71 | Perm | Communication room 3 | 7.92 | Porcelain Tiles | W | W | ||||||||||||
| 72 | Perm | Elevator | 7.7 | Porcelain Tiles | D | W | ||||||||||||
| F03 | RLB | Guard Stand | 7.4 | checker plate | 3W | W | 3W | |||||||||||
| F06 | RSL | Armory | 6.3 | Vinyl | 3W | W | 3W |
Custodial Inventory
Tab 04 - AL MINHAD
| Attachment J-1503010-03 |
| CUSTODIAL INVENTORY (AL MINHAD AIR BASE) |
| Bldg 27: Only building perimeter services (includes weed removal and debris) and sweeping twice a month (2M). |
| Bldg 27: Ceiling Tile cleaning twice a year (2Y) required at Minhad. |
Custodial Inventory
File details come from the government source that posted it. Updated .