This document contains an inventory of facilities management systems and equipment at various U.S. military bases in the United Arab Emirates. It lists HVAC, electrical, fire protection, weight handling, and other building systems. Major systems include HVAC, lighting, fire alarms, generators, fuel storage, water systems, and communications equipment. Locations include facilities in Jebel Ali, Fujairah, and Sas Al Nahkl. The inventory includes quantities and manufacturers for most items.
This opportunity is a solicitation for base operations support services at U.S. Navy Compound Quay 9 in Jebel Ali, UAE. Services required include facilities management, utilities operation and maintenance, transportation, equipment operation, and general services. The period of performance is one base year with four optional years. Proposals are due by a specified date. The contract will be a fixed-price award-fee type and is set aside for small business. The soliciting agency is the Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Systems Descriptions HVAC and Refrigeration Systems - HVAC and Refrigeration Systems commence at, and includes the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an Preventive Maintenance (PM) Program for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, and all monitoring and control systems including the EMCS.
Interior and Exterior Lighting Systmes - Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc
Fire Protection Systems - Fire Protection Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the Fire Protection Systems; such as: AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices, Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), Wet Chemicals, monitoring and controls systems, etc.
| Compressed Air Systems - Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. |
| Generators - Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. |
| POL System Facilities and Distribution Systems - POL System Facilities and Distribution System commence at and include the utility isolation point of connection. The Contractor shall develop and implement a Preventive maintenance (PM) program for the POL System Facilities and Distribution System and all mechanically and electrically interlocked ancillary parts, equipment, and components of the POL System Facilities and Distribution System, such as: fuel tanks, pumps, piping, transfer switches, valves, monitoring and control systems, etc. |
| Backflow Prevention Devices - Backflow Prevention Devices commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) Program to maintain, inspect, test and certify, and make all necessary repairs to the Backflow Prevention Devices and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Backflow Prevention Devices, such as: bleeders, regulators, valves, etc |
| Weight Handling Equipment and Systems - Weight Handling Equipment and Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc. |
HVAC Jebel-Ali
| Old Bldg No. | Description | Make | Type | |
| Bldg No. | ||||
| 655R | Security | Window | ||
| 656R | MWR Storage | Split | ||
| Split | ||||
| 657R | MWR Life Cycle | Goodman | Central | |
| 658R | MWR Weight Room | Goodman | Central | |
| Foyer | Split | |||
| 659R | MWR Rec | Goodman | Central | |
| 660 | 2 | Warehouse | ||
| Supply Tent | Rheem | Split | ||
| Supply Tent | Rheem | Split | ||
| Supply Tent | Rheem | Split | ||
| Loading Dock | Ice Machine | |||
| Loading Dock | Ice Machine | |||
| 660A | Rest Room | Rheem | ||
| 661R | Driver Lounge | Window | ||
| Split | ||||
| Rheem | Split | |||
| 662 | Weapons Simulator & Lockers | Carrier | 10 ton package unit | |
| Carrier | 10 ton package unit | |||
| 663A | HazMat Facility | Carrier | Window | |
| 664 | TFS | CTF 56.7 Supply Warehouse | Trane | 10 ton package unit |
| Trane | 10 ton package unit | |||
| Trane | 10 ton package unit | |||
| 665R | 16 | Ablution Unit | Rheem | Split |
| Rheem | Split | |||
| Rheem | Split | |||
| 666R | 21 | TOC | Carrier | Split |
| Carrier | Split | |||
| Carrier | Split | |||
| 667R | 6R | CTF - 56 | Goodman | Split |
| Goodman | Split | |||
| 668R | 5R | CTF - 56 | Goodman | Split |
| Goodman | Split | |||
| 669R | 4 | CTF - 56 | Goodman | Split |
| Goodman | Split | |||
| 670R | 3 | CTF-53 | Rheem | Split |
| Server Room | Goodman | Split | ||
| Goodman | Split | |||
| Rheem | Split | |||
| Rheem | Split | |||
| PLE Office | Rheem | Split | ||
| Rheem | Split | |||
| 671R | 1 | CTF - 56 | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 672R | 8 | OIC | Goodman | Split |
| Goodman | Split | |||
| 673R | 17 | CENTCOM | Goodman | Split |
| Goodman | Split | |||
| 674R | 7 | CTF 53 | Goodman | Split |
| NCIS | Carrier | Window | ||
| 675R | 2 | CTF 56 | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 676R | 19 | N6 | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 677R | 18 | NAVFAC | Rheem | Split |
| Rheem | Split | |||
| Rheem | Split | |||
| 678R | 13 | MDSU Boat Shop | Rheem | Split |
| Goodman | Split | |||
| Goodman | Split | |||
| 679R | 10 | CTF Office | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 680R | 11 | CTF 56 Supply | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 681R | 9 | CTF 56 Admin Office | Rheem | Split |
| Rheem | Split | |||
| Goodman | Split | |||
| 682R | 15 | PLE | Goodman | Split |
| Side Office | Carrier | Window | ||
| 683R | 20 | CTF 53 Logistics | Carrier | Split |
| Carrier | Split | |||
| 684R | 14 | Classroom | Goodman | Split |
| Goodman | Split | |||
| Goodman | Split | |||
| Goodman | Split | |||
| 685R | 12 | Medical | Goodman | Split |
| Goodman | Split | |||
| Carrier | Split | |||
| Carrier | Split | |||
| Carrier | Split | |||
| Carrier | Split | |||
| Carrier | Split | |||
| Carrier | Split | |||
| 687 | TFS | CTF 56.7 Multi-Purpose Warehouse | Trane | 10 ton package unit |
| Trane | 10 ton package unit | |||
| Trane | 10 ton package unit | |||
| Trane | 10 ton package unit | |||
| Trane | 10 ton package unit | |||
| 688 | NEX Store | York | Condenser | |
| Copeland | 3HP x 3 (Chill Display) | |||
| Carrier | 1.5 Ton (wall mounted FCU) | |||
| Carrier | 1.5 Ton (wall mounted FCU) | |||
| Carrier | 1.5 Ton (wall mounted FCU) | |||
| Carrier | 2 Ton (wall mounted FCU) | |||
| Carrier | 2 Ton (wall mounted FCU) | |||
| Carrier | 2 Ton (wall mounted FCU) | |||
| Carrier | 2 Ton (wall mounted FCU) | |||
| Carrier | 2 Ton (wall mounted FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | 2.5 Ton (ceiling cassette FCU) | |||
| Carrier | (Chill Open Display) | |||
| 697R | PWD Office | Carrier | Split | |
| Carrier | Split | |||
| Carrier | Split | |||
| 698R | Laundry Center | Carrier | Window | |
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| Carrier | Window | |||
| 699R | USO Ablution Unit | General | Split | |
| General | Split | |||
| General | Split | |||
| General | Split | |||
| General | Split | |||
| 702R | NEX Warehouse | 12Ton Central | ||
| 708R | CTG 56.7 Waterfront Operations | Rheem | Split | |
| 709R | CTG 56.7 Waterfront Operations | Carrier | Window | |
| 730A | Armory Container | LG | Window | |
| LG | Window | |||
| 730B | Weapons Cleaning | Split | ||
| Split | ||||
| Split | ||||
| T02 | RLB | NAVSUP | Carrier | 1T Split |
| Carrier | 1T Split | |||
| Carrier | 1T Split | |||
| Carrier | 1T Split | |||
| Carrier | 1T Split | |||
| T03 | RLB | NAVSUP | Carrier | 1T Split |
| Carrier | 1T Split | |||
| Carrier | 1T Split | |||
| T04 | RLB | Military Working Dog Kennel | Daikon | 2T Split |
| Daikon | 2T Split | |||
| T05 | RLB | Oasis Ablution Unit (Male) | Carrier | 3T Split |
| Carrier | 3T Split | |||
| Carrier | 3T Split | |||
| T06 | RLB | Oasis Ablution Unit (Female) | Carrier | 1.5T Split |
| Carrier | 3T Split | |||
| T07 | RLB | Social Worker | Carrier | 1.5T Split |
| T08 | RLB | Guard Stand (Dispatch-Buses) | Carrier | 1.5T Split |
| T09 | Tent | Tent near Finger Pier | Carrier | 3T Package Unit |
| T10 | Tent | Tent near Finger Pier | Carrier | 3T Package Unit |
| T12R | TFS | Boat simulator | Carrier | 12.5Ton Central |
| Carrier | 12.5Ton Central | |||
| T12-A | PEB | Server Room | Carrier | 2Ton Split |
| T12A | Carrier | 2Ton Split | ||
| T13 | RSL | Ballistic shack | Carrier | 1.5Ton Central |
| T14R | RLB | Guard Shack near Gate 2 | Carrier | 1.5Ton Central |
| T15R | RSL | Small Army Armory | Carrier | 1.5Ton Central |
| T16 | RLB | Guard Stand near BOSC | Carrier | 1.5Ton Central |
| T18 | RLB | DJ Booth | Carrier | 1.5 Window |
| T19R | RSL | Ballistic shack | Carrier | 1.5 Window |
| T20 | RLB | Shore Battle Space (SBS) | Carrier | 2 Ton Split |
| T20 | Carrier | 2 Ton Split | ||
| T20 | Carrier | 2 Ton Split | ||
| T24 | RLB | Shuttle Waiting Room | Carrier | 2 Ton Split |
| Carrier | 2 Ton Split |
| T13 | Guard Stand (outside ECP) | Portable Cooling |
| T14 | Guard Stand (ECP near tower) | Portable Cooling |
| T15 | Guard Stand (BOS Housekeeping) | Portable Cooling |
| T16 | Guard Stand (DJ Booth in USO area) | Portable Cooling |
| T17 | Guard Stand (Husbanding) | Portable Cooling |
| Installation | Portable Cooling | |
| Installation | Portable Cooling |
HVAC SAS AL Nahkl
| FACILITY NO | AREA DESCRIPTION | AC TYPE | MAKE | CAPACITY | QTY |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A1 | MWR- Lounge | Split | General | 2.5 ton | 1 |
| A2 | MWR - Transient Rm | Split | General | 2.5 ton | 1 |
| A2 | MWR - Transient Rm | Split | General | 2.5 ton | 1 |
| A3 | MWR - Male Toilet | Split | General | 1.5 ton | 1 |
| A4 | MWR - Female Toilet | Split | General | 2.5 ton | 1 |
| A4 | MWR - Female Toilet | Split | General | 3 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B1 | DFAC - Dining | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Kitchen | Split | General | 2.5 ton | 1 |
| B2 | DFAC - Office | Split | General | 2 ton | 1 |
| B2 | DFAC - Stockroom | Split | Midea | 2.5 ton | 1 |
| B3 | DFAC - Male Toilet | Split | General | 2 ton | 1 |
| B4 | DFAC - Female Toilet | Split | General | 2 ton | 1 |
| E1 | Office - Admin | Split | Super General | 2 ton | 1 |
| E1 | Office - Linguist | Split | General | 2 ton | 1 |
| E1 | Office - CRE | Split | Super General | 2 ton | 1 |
| E1 | Office - Sgt Mjr | Split | General | 2 ton | 1 |
| E1 | Office - XO | Split | General | 2.5 ton | 1 |
| E1 | Office - CO | Split | Panasonic | 1.5 ton | 1 |
| E1 | Office - Conference | Split | General | 2.5 ton | 1 |
| E1 | Office - Conference | Split | Midea | 2.5 ton | 1 |
| E1 | Office - Hallway | Split | General | 3 ton | 1 |
| E1 | WH - JOC Server | Split | Royal Cool | 2 ton | 1 |
| E1 | WH - JOC Server | Split | Royal Cool | 2 ton | 1 |
| E1 | WH - JOC Server | Split | Midea | 2.5 ton | 1 |
| E1 | WH - J6 | Split | Super General | 2 ton | 1 |
| E1 | WH - J6 | Split | Midea | 2.5 ton | 1 |
| E1 | WH - J8 | Split | Super General | 2 ton | 1 |
| E1 | WH - J4 | Split | Super General | 2 ton | 1 |
| E1 | WH - JOC | Split | General | 3 ton | 1 |
| E1 | WH - JOC | Split | General | 3 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC New | Split | General | 2.5 ton | 1 |
| E1 | WH - JOC New | Split | General | 2.5 ton | 1 |
| E1 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E1 | Rooftop | Package | Petra | 50 ton | 1 |
| E1 | Rooftop | Package | Petra | 50 ton | 1 |
| E2 | Office - CRF CDR | Split | Sanyo | 2 ton | 1 |
| E2 | Office - CRF IFC | Split | Sanyo | 2 ton | 1 |
| E2 | Office - CRF IFC Annex | Split | Super General | 2 ton | 1 |
| E2 | Office - Conference | Split | Royal Cool | 2 ton | 1 |
| E2 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E2 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Weapons | Split | Sanyo | 2.5 ton | 1 |
| E2 | Office - Hallway | Split | Super General | 2 ton | 1 |
| E2 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E2 | TBD | Split | Sanyo | 1.5 ton | 1 |
| E2 | Rooftop | Package | Petra | 50 ton | 1 |
| E2 | Rooftop | Package | Petra | 50 ton | 1 |
| E3 | Office - Armory Office | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 9 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - SPT Main Office | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E3 | Office - Rm 5 | Split | General | 2 ton | 1 |
| E3 | Office - CON CEN | Split | Sanyo | 2.5 ton | 1 |
| E3 | Office - CON CEN | Split | Sanyo | 2.5 ton | 1 |
| E3 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| E3 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E3 | Rooftop | Package | Petra | 50 ton | 1 |
| E3 | Rooftop | Package | Petra | 50 ton | 1 |
| E4 | Office - Rm 5 | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Rm 8 | Split | General | 2 ton | 1 |
| E4 | Office - Rm 9 | Split | General | 2 ton | 1 |
| E4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| E4 | Office - Conference | Split | General | 3 ton | 1 |
| E4 | Office - Armory | Split | Sanyo | 2.5 ton | 1 |
| E4 | Office - Armory | Split | Sanyo | 2.5 ton | 1 |
| E4 | Office - Hallway | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | WH - Office New | Split | General | 2.5 ton | 1 |
| E4 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| E4 | Rooftop | Package | Petra | 50 ton | 1 |
| E4 | Rooftop | Package | Petra | 50 ton | 1 |
| D3 | Office - Sleeping Rm | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Medical | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Stock Rm | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D3 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D3 | Office - Comm Rm | Split | General | 3 ton | 1 |
| D3 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| D3 | Office - Comm Rm-Hallway | Split | Sanyo | 2.5 ton | 1 |
| D3 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| D3 | Rooftop | Package | Petra | 50 ton | 1 |
| D3 | Rooftop | Package | Petra | 50 ton | 1 |
| D4 | Office - Sleeping Rm | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Medical | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Stock Rm | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Conference | Split | Sanyo | 2 ton | 1 |
| D4 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D4 | Office - Comm Rm | Split | Sanyo | 2.5 ton | 1 |
| D4 | Office - Hallway | Split | Sanyo | 2.5 ton | 1 |
| D4 | Electrical Room | Split | Sanyo | 1.5 ton | 1 |
| D4 | Rooftop | Package | Petra | 50 ton | 1 |
| D4 | Rooftop | Package | Petra | 50 ton | 1 |
| T11 | New Laundry Rm1 | Split | Midea | 2.5 ton | 1 |
| T12 | Male Common Latrine1 | Split | Midea | 2.5 ton | 1 |
| T13 | New Laundry Rm2 | Split | Midea | 2.5 ton | 1 |
| T14 | Male Common Latrine2 | Split | Midea | 2.5 ton | 1 |
| T15 | Female Common Latrine | Split | Midea | 2.5 ton | 1 |
| G | CO's Rm | Split | General | 2.5 ton | 1 |
| G | Sgt Mjr's Rm | Split | Supra | 2 ton | 1 |
| G | XO's Rm | Split | Sanyo | 2 ton | 1 |
| G | Common Toilet | Split | General | 2 ton | 1 |
| G | Dental/Kitchen | Split | Super General | 2 ton | 1 |
| G | Medical Supply Rm | Split | General | 2 ton | 1 |
| G | Medical Clinic | Split | General | 2 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| K | CLAMSHELL - Maintenance Tent | Package | Carrier | 15 ton | 1 |
| CHU 116 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 116 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 117 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 117 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 118 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 118 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 119 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 119 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 120 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 120 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 121 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 121 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 122 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 122 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 123 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 123 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 124 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 124 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 125 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 125 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 126 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 126 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 127 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 127 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 128 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 128 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 129 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 129 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 130 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 130 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 131 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 131 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 132 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 132 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 133 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 133 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 134 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 134 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 135 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 135 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 136 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 136 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 137 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 137 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 138 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 138 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 139 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 139 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 140 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 140 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 141 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 141 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 142 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 142 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 143 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 143 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 144 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 144 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 145 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 145 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 146 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 146 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 147 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 147 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 148 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 148 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 149 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 149 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 150 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 150 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 151 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 151 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 152 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 152 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
| CHU 153 | CHU - Room 1 | Split | Toshiba | 1.5 ton | 1 |
| CHU 153 | CHU - Room 2 | Split | Toshiba | 1.5 ton | 1 |
HVAC Fujairah
| HVAC and Refrigeration System Inventory | ||||
| Main Facility | ||||
| FACILITY CODE | UNIT REF. | QTY | MAKE |
1 FACILITY COD-1 DX UNIT DIRECT EXPANSION 1 MITSUBISHI
| 1 | FACILITY COD-2 | PACKAGE UNIT | 2 | SKM | |
| 2 | FACILITY COD-2 | EXTRACT FANS | 4 | SYSTEM AIR | |
| 3 | FACILITY COD-2 | DX UNIT | DIRECT EXPANSION | 7 | MITSUBISHI |
| 3 | FACILITY COD-2 | FCU | FAN COIL UNIT | 1 | MITSUBISHI |
| 1 | FACILITY COD-3 | AHU | AIR HANDLING UNIT | 4 | EUROCLIMA |
| 2 | FACILITY COD-3 | EXTRACT FANS | 11 | SYSTEMAIR | |
| 3 | FACILITY COD-3 | FAHU | FRESH AIR HANDLING UNIT | 1 | EUROCLIMA |
| 4 | FACILITY COD-3 | FACU | FAN COIL UNIT | 10 | EUROCLIMA |
| 5 | FACILITY COD-3 | DX UNIT | DIRECT EXPANSION | 1 | MITSUBISHI |
| 6 | FACILITY COD-3 | CHILLED WATER |
| 1 | FACILITY COD-4 | PACKAGE UNIT | 5 | SKM | |
| 2 | FACILITY COD-4 | KEF | 4 | SYSTEMAIR | |
| 3 | FACILITY COD-4 | MAF | MOTORIZED AIR FRESH | 2 | SYSTEMAIR |
| 4 | FACILITY COD-4 | EXTRACT FAN | 4 | SYSTEMAIR |
| 1 | FACILITY COD-5 | FAHU-Fresh Air U | FRESH AIR HANDLING UNIT | 1 | SKM |
| 2 | FACILITY COD-5 | FCU S | 48 | SYSTEMAIR |
| 1 | FACILITY COD-6 | FAHU-Fresh Air U | FRESH AIR HANDLING UNIT | 1 | SKM |
| 2 | FACILITY COD-6 | EXTRACT FAN | 2 | SYSTEMAIR | |
| 3 | FACILITY COD-6 | FCU S | 36 | SYSTEMAIR |
| 1 | FACILITY COD-7 | FCU S | FAN COIL UNIT | 4 | SYSTEMAIR |
| 2 | FACILITY COD-7 | EXTRACT FAN | 2 | SYSTEMAIR | |
| 3 | FACILITY COD-3 | FRESH AIR UNIT | FRESH AIR HANDLING UNIT | 1 | SYSTEMAIR |
1 FACILITY COD-8 DX UNIT DIRECT EXPANSION 2 SYSTEMAIR
| 1 | FACILITY COD-11 | DX UNIT | DIRECT EXPANSION | 2 | SYSTEMAIR |
| Other Facilities | |||||
| F03 | 1 | ||||
| F06 | 1 |
| Facility Control System HVAC and Refrigeration System - Main Facility | |||
| QTY | MAKE | ||
| Facility Control System | 1 | Johnson Controls - Metasys |
WHE
| Building | Location | Description | Quantity |
| Boat Maintenance Facility | Fujairah | Overhead Crane | 1 |
Fire Prot. & Extinguishers
| JEBEL-ALI | |||||
| Building No. | Smoke Detectors | Pull Stations | Bell Alarm | Fire Alarm Panel | Fire Extinguisher |
| TFS Facilities (662,664,687, 731) | 27 | 5 | 4 | 8 | |
| 662, 663A, 666R, 664, 687, 688, 730B, T02 | 8 | ||||
| T02, T03, T05, T06, T07 | 8 | 5 | |||
| 663A | 2 | 1 | |||
| 688 | 12 | 2 | 1 | 1 | |
| 698R | 6 | 2 | 1 | ||
| 663 | 1 | ||||
| Trailer Area | 30 | ||||
| Armory Compound | 10 | ||||
| Finger Pier | 1 | ||||
| MWR Facilities (4) (near Driver's Trailer) | 4 | ||||
| T01 | 1 | ||||
| T04 | 1 | ||||
| T12 - T24 | 9 |
| FUJAIRAH | ||||||||||
| Boat Maintenance Facility | Smoke Detectors | Heat Detectors | Pull Station | Ceiling Sprinker | Ceiling Sprinkler w/ Flasher | Sprinkler - Wall Mounted | Sprinkler - Upright | Extinguisher - Powder | Extinguisher - CO2 | Hose Cabinet |
| GR. FL. | 32 | 0 | 5 | 9 | 5 | 14 | 98 | 5 | 5 | 3 |
| 1ST FL. | 29 | 0 | 2 | 18 | 10 | 2 | 104 | 2 | 2 | 2 |
| 2ND FL. | 30 | 0 | 2 | 11 | 26 | 2 | 129 | 3 | 3 | 2 |
| TOTAL | 91 | 0 | 9 | 38 | 41 | 18 | 331 | 10 | 10 | 7 |
VTE
| Location | Building | Manufacturer | Model | Description | Quantity |
| Fujairah | Thysenkrupp | 13 passenger, 1000 Kg. | 1 |
Overhead Doors
| Location | Building | Description | Quantity |
| Jebel-Ali | 662 | TFS | 1 |
| Jebel-Ali | 664 | TFS | 2 |
| Jebel-Ali | 687 | TFS | 2 |
| Jebel-Ali | 702 | TFS | 1 |
| AL Minhad | 27 | HANGAR | 3 |
| Fujairah | Boat Maintenance Facility | BOAT MMAINTENANCE | 2 |
| Fujairah | EOD | EOD | 1 |
| Fujairah | General Storage | 1 |
Compressed Air Systems
| Location | Building | Location | Description | Quantity |
| Fujairah | Main Facility | Boat Maintenance Area | Compressed Air System | 1 |
Generators
| Location | Generator Type | Model | Size | Quantity | Remarks |
| Sas Al Nahkl | Cummins | C700D5 | 500 kVA | 2 | US Government Operated |
| Sas Al Nahkl | MEP | 806B | 60 kW | 1 | US Government Operated |
| Sas Al Nahkl | MEP | 802A | 5 kW | 1 | US Government Operated |
| Sas Al Nahkl | Atlas Copco | 8972 8225 46 | 35 kW | 2 | US Government Operated |
POL Systems
| Location | Building/Area | Equipment Description | Manufacturer | Model | Capacity | Quantity |
| Fujairah | Waterfront | Diesel Tank | 1 | |||
| Fujairah | Waterfront | Pump | Fill-Rite | Series 800C FR701VG | 20GPM | 1 |
Floating Pier
| Location | Building/Area | Equipment Description | Quantity |
| Jebel-Ali | Waterfront | Floating Concrete Pier , Chain System | 1 |
| Fujairah | Waterfront | Floating Concrete Pier , Bungee Cord System | 1 |
Water Tank and Pump
| Location | Building | Description | Quantity |
| Sas Al Nakhl | H | Water Tanks | 4 |
| Sas Al Nakhl | H | Pump for Water Tanks | 2 |
| Jebel Ali | 698 | Water Tanks | 5 |
| Jebel Ali | 698 | Pump for Water Tanks | 2 |
| Jebel Ali | T05/T06 | Water Tank | 1 |
| Jebel Ali | T05/T06 | Pump for Water Tank | 1 |
| Fujairah | Waterfront | Water Tank - Boat Maintenance | 1 |
Emergency Eyewash Stations
| Location | Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | |||||
| Fujairah | Main Facility | Permanent | 1 | ||
| Fujairah | Main Facility | Portable | 2 |
Mass Notification
| Location | Building | Description | Quantity |
| Fujairah | Main Facility | Big Voice | 1 |
| Jebel-Ali | Installation | Big Voice | 1 |
UPS
| Location | Building | Manufacturer | Model | Quantity |
| Fujairah | Main Facility | APC Schneider | MGE Galaxy 5500 | 1 |
Solar Hot Water Panels
| Location | Building | Description | Quantity |
| Fujairah | Main Facility - Rooftop | Solar Hot Water System | 1 |
| Fujairah | Main Facility - Rooftop | Solar Hot Water Panels | 36 |
| Fujairah | Main Facility - Rooftop | Tanks | 2 |
Grease Trap
| Location | Building | Description | Quantity |
| Sas Al Nakhl | B-B2 | Kitchen Grease Trap | 2 |
Exhaust Hood and Duct
| Location | Building | Description | Quantity |
| Sas Al Nakhl | B-B2 | Kitchen Exhaust Hood and Duct System | 2 |
Locksmith
| Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | Simplex | EE100 | Cipher Locks | 24 |
| Sas Al Nahkl | Simplex | EE101 | Cipher Locks | 6 |
| Sas Al Nahkl | Keyed Locks | TBD | ||
| Fujairah | TBD | TBD | Cipher Locks | 2 |
Laundry Equipment
| Location | Building | Manufacturer | Model | Description | Quantity |
| Sas Al Nahkl | CHU | Washer Units | 13 | ||
| Sas Al Nahkl | CHU | Dryer Units | 19 | ||
| Fujairah | Main Facility | Washer Units | 16 | ||
| Fujairah | Main Facility | Dryer Units | 8 |
Ice Machines
| Location | Building | Manufacturer | Model | Description | Quantity |
| Jebel-Ali | 2 | ||||
| Fujairah | 2 |