This is a comprehensive project specifications document for the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut. The specifications detail technical requirements for construction of six Containerized Long Weapons Storage magazines, two Type G magazines, one Type H magazine with earth-covered concrete reinforced structures, a new Ordnance Operations building, a new Sentry/Truck Inspection building, and associated site work including demolition of 18 existing arch-type magazines and two buildings.
The specifications cover detailed technical requirements across multiple divisions including procurement, general requirements, concrete work, masonry, metals, thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, integrated automation, electrical systems, communications, electronic safety and security, earthwork, exterior improvements, utilities, and material processing equipment. Key construction elements include earth-covered magazine structures with specific blast protection requirements, specialized electrical systems with arc flash analysis and coordinated power system protection, sophisticated HVAC and control systems, comprehensive cybersecurity requirements for facility control systems, radon mitigation systems, chemical termite control, rigid inclusion foundation systems, concrete curbs and sidewalks, pavement markings, high-security chain-link fencing with barbed wire, landscape establishment with one-year maintenance and warranty periods, water utility distribution piping, and sanitary sewerage systems. Performance specifications mandate testing and inspection by certified laboratories, detailed submittals with government approval requirements for critical systems, adherence to applicable ASTM and industry standards, and comprehensive quality control procedures. The contract performance period spans 1,587 calendar days from award receipt with liquidated damages of $12,206.61 per calendar day of delay, and small business participation minimum of 20 percent is required.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Interior Design: Kimberly Miller Cybersecurity: Anthony Elg Crane: Gerald Staack
Specifications Final Design Submittal
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
This page left intentionally blank
NAVFAC ATLANTIC
WORK ORDER NO. 1667770
Specifications
P-1102 Weapons Magazine and Ordnance Operations Facility
Issue for Bid & Construction
PREPARED BY:
CH2M
5701 Cleveland Street Virginia Beach, VA 23462
Architectural: Pete Soukas, RA Mechanical: Chris Hill, PE
Civil: Josh Corum, PE Electrical: Kelley Bourassa, PE
Structural: Laura Presley, PE Fire Protection: Jeff McLaughlin, PE
Landscape Arch: Tamara Schlagbaum Telecom/Security: Rene Rubio
Interiors: Natalie Miller Cybersecurity: Anthony Elg
Crane: Gerald Staack Audio: Steven Yost
This page left intentionally blank
P-1102 Weapons Magazine & Ordnance Operations Facility eProjects WON: 1667770 Final Design Submission 23 June 2025
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 22 07/22 DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 25 02/20 QUALITY ASSURANCE FIELD INSPECTION
01 45 35 11/20 SPECIAL INSPECTIONS
01 45 36 06/23 SPECIAL INSPECTIONS - EARTH COVERED
MAGAZINES
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 78 30.00 22 01/23 GIS DATA DELIVERABLES
01 91 00.15 22 03/23 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 65 00 11/22 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 11/22 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 70 00 02/10, CHG 2: 08/20 MASS CONCRETE
PROJECT TABLE OF CONTENTS
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 23 05/20 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 39 55.00 20 11/24 NAVY STANDARD EARTH-COVERED MAGAZINE
DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
08 95 00 08/09 BLAST RESISTANCE
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18, CHG 2: 08/20 BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.23 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY MONITORING AND
CONTROL SYSTEM (UMCS)
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SAFETY AND
SECURITY INCLUDING CCTV, ACCESS
CONTROL SYSTEMS, AND INTRUSION
DETECTION SYSTEMS
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 00 05/21, CHG 1: 05/22 SF6/HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 13 23.00 40 11/14 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
31 23 06.00 02/21, CHG 1: 11/21 BLASTING - SURFACE
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 66 13 02/19 RIGID INCLUSIONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR
FLEXIBLE PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE AND SEPARATION
LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK) AND
GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP
RUNNING
41 22 13.15 11/22 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING TROLLEY
-- End of Project Table of Contents --
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 26 24 13
SWITCHBOARDS
08/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C12.1 (2014; Errata 2016) Electric Meters - Code for Electricity Metering
ASTM INTERNATIONAL (ASTM)
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
ASTM D1535 (2014; R 2018) Standard Practice for Specifying Color by the Munsell System
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
IEEE C57.12.28 (2014) Standard for Pad-Mounted Equipment
- Enclosure Integrity
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA PB 2.1 (2013) General Instructions for Proper Handling, Installation, Operation and Maintenance of Deadfront Distribution Switchboards Rated 600 V or Less
SECTION 26 24 13 Page 1
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA PB 2 (2011) Deadfront Distribution Switchboards
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 467 (2022) UL Standard for Safety Grounding and Bonding Equipment
UL 489 (2016; Rev 2019) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 891 (2019) UL Standard for Safety Switchboards
1.2 RELATED REQUIREMENTS
Section 26 08 00 APPARATUS INSPECTION AND TESTING applies to this section, with the additions and modifications specified herein.
1.3 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in
IEEE 100 .
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Switchboard Drawings
SD-03 Product Data
Switchboard
SD-06 Test Reports
Switchboard Design Tests
Switchboard Production Tests
Acceptance Checks and Tests
SD-10 Operation and Maintenance Data
Switchboard Operation and Maintenance, Data Package 5
SD-11 Closeout Submittals
SECTION 26 24 13 Page 2
Assembled Operation and Maintenance Manuals
Equipment Test Schedule
Service Entrance Available Fault Current Label
1.5 QUALITY ASSURANCE
1.5.1 Product Data
Include manufacturer's information on each submittal for each component, device and accessory provided with the switchboard including:
a. Circuit breaker type, interrupting rating, and trip devices, including available settings.
b. Manufacturer's instruction manuals and published time-current curves (in electronic format) of the main secondary breaker and largest secondary feeder device.
1.5.2 Switchboard Drawings
Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Identify circuit terminals on wiring diagrams and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Indicate on the drawings adequate clearance for operation, maintenance, and replacement of operating equipment devices. Include the nameplate data, size, and capacity on submittal. Also include applicable federal, military, industry, and technical society publication references on submittals.
Include the following:
a. One-line diagram including breakers, current transformers, meters, etc.
b. Outline drawings including front elevation, section views, footprint, and overall dimensions.
c. Bus configuration including dimensions and ampere ratings of bus bars.
d. Markings and NEMA nameplate data.
e. Circuit breaker type, interrupting rating, and trip devices, including available settings.
f. Wiring diagrams and elementary diagrams with terminals identified, and indicating prewired interconnections between items of equipment and the interconnection between the items.
g. Manufacturer's instruction manuals and published time-current curves (in electronic format) of the main secondary breaker and largest secondary feeder device. Use this information (designer of record) to provide breaker settings that ensures protection and coordination are achieved. For Navy installations, provide electronic format curves using SKM's Power Tools for Windows device library electronic format or EasyPower device library format depending on installation modeling software requirements.
SECTION 26 24 13 Page 3
1.5.3 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" or "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Provide equipment, materials, installation, and workmanship in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.5.4 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship, and:
a. Have been in satisfactory commercial or industrial use for 2 years prior to bid opening including applications of equipment and materials under similar circumstances and of similar size.
b. Have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period.
c. Where two or more items of the same class of equipment are required, provide products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.5.4.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.5.4.2 Material and Equipment Manufacturing Date
Products manufactured more than one year prior to date of delivery to site are not acceptable.
1.6 MAINTENANCE
1.6.1 Switchboard Operation and Maintenance Data
Submit Operation and Maintenance Manuals in accordance with Section
01 78 23 OPERATION AND MAINTENANCE DATA.
1.6.2 Assembled Operation and Maintenance Manuals
Assemble and securely bind manuals in durable, hard covered, water resistant binders. Assemble and index the manuals in the following order with a table of contents:
a. Manufacturer's O&M information required by the paragraph SD-10, OPERATION AND MAINTENANCE DATA.
b. Catalog data required by the paragraph SD-03, PRODUCT DATA.
SECTION 26 24 13 Page 4
c. Drawings required by the paragraph SD-02, SHOP DRAWINGS.
d. Prices for spare parts and supply list.
e. Information on metering.
f. Design test reports.
g. Production test reports.
1.7 WARRANTY
Provide equipment items that are supported by service organizations reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
PART 2 PRODUCTS
2.1 PRODUCT COORDINATION
Products and materials not considered to be switchboards and related accessories are specified in Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION, and Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
2.2 SWITCHBOARD
NEMA PB 2 and UL 891 .
2.2.1 Ratings
Provide equipment with the following ratings:
a. Voltage rating: as indicated.
b. Continuous current rating of the main bus: as indicated.
c. Short-circuit current rating: as indicated.
d. Where indicate, UL listed and labeled as service entrance equipment.
2.2.2 Construction
Provide the following:
a. Switchboard: consisting of one or more vertical sections bolted together to form a rigid assembly aligned as indicated.
b. All circuit breakers: front accessible.
c. Rear aligned switchboards: not to be used. Front accessible load connections.
d. Where indicated, "space for future" or "space" means to include a vertical bus provided behind a blank front cover. Where indicated, "provision for future" means full hardware provided to mount a breaker suitable for the location.
SECTION 26 24 13 Page 5
e. Completely factory engineered and assembled, including protective devices and equipment indicated with necessary interconnections, instrumentation, and control wiring.
2.2.2.1 Enclosure
Provide the following:
a. Enclosure: NEMA ICS 6 Type 1.
b. Enclosure: Front accessible only. Bolted together with removable bolt-on sides.
c. Base: includes any part of enclosure that is within 3 inches of concrete pad.
d. Paint color: ASTM D1535 light gray No. 61 or No. 49 over rust inhibitor.
e. Paint coating system: comply with IEEE C57.12.28 for galvanized steel.
2.2.2.2 Bus Bars
Provide the following:
a. Bus bars: copper with silver-plated contact surfaces.
(1) Phase bus bars: uninsulated.
(2) Neutral bus: rated 100 percent of the main bus continuous current rating.
b. Make bus connections and joints with hardened steel bolts.
c. Main-bus (through bus): rated at the full ampacity of the main throughout the switchboard.
d. Minimum one-quarter by 2 inch copper ground bus secured to each vertical section along the entire length of the switchboard.
2.2.2.3 Main Section
Provide the main section consisting of individually mounted molded-case or insulated-case circuit breakers for the main and branch devices as indicated. Provide metering..
2.2.2.4 Distribution Sections
Provide the distribution section (sw) consisting of molded-case circuit or insulated-case breakers as indicated.
2.2.3 Protective Device
Provide main and branch protective devices as indicated.
2.2.3.1 Molded-Case Circuit Breaker
Provide the following:
SECTION 26 24 13 Page 6
a. UL 489 . UL listed and labeled, standard rated branch breakers, low voltage molded-case or insulated-case circuit breaker, with a short-circuit current rating as indicated.
b. Breaker frame size: as indicated.
c. Series rated circuit breakers are unacceptable.
2.2.4 Electronic Trip Units
Equip breakers as indicated with a solid-state tripping system consisting of three current sensors and a microprocessor-based trip unit that provides true rms sensing adjustable time-current circuit protection.
Include the following:
a. Current sensors ampere rating: as indicated.
b. Trip unit ampere rating: as indicated, amperes.
c. Ground fault protection: as indicated and required by the NEC.
d. Electronic trip units: provide additional features as indicated:
(1) Electronic Breakers: include long delay pick-up and time settings, and LED indication of cause of circuit breaker trip.
(2) Main breakers: include short delay pick-up and time settings, instantaneous settings and ground fault settings as indicated and where required by code.
(3) Distribution breakers: include short delay pick-up and time settings, instantaneous settings, and ground fault settings as indicated.
(4) Main Breakers: include a digital display for phase and ground current.
(5) Main Breakers: include a digital display for watts, vars, VA, kWh, kvarh, and kVAh.
(6) For electronic trip units that are rated for or can be adjusted to 1,200 amperes or higher, provide arc energy reduction capability with an energy-reducing maintenance switch with local status indicator.
2.2.5 Metering
a. Section 26 27 14.00 20 Electrical Metering.
2.3 MANUFACTURER'S NAMEPLATE
Provide a nameplate on each item of equipment bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent is not acceptable. This nameplate and method of attachment may be the manufacturer's standard if it contains the required information.
SECTION 26 24 13 Page 7
2.4 FIELD FABRICATED NAMEPLATES
ASTM D709. Provide laminated plastic nameplates for each switchboard, equipment enclosure, relay, switch, and device; as specified in this section or as indicated on the drawings. Identify on each nameplate inscription the function and, when applicable, the position. Provide nameplates of melamine plastic, 0.125 inch thick, white with black center core. Provide matte finish surface. Provide square corners. Accurately align lettering and engrave into the core. Provide nameplates with minimum size of one by 2.5 inches. Provide lettering that is a minimum of
0.25 inch high normal block style.
2.5 SOURCE QUALITY CONTROL
2.5.1 Equipment Test Schedule
The Government reserves the right to witness tests. Provide equipment test schedules for tests to be performed at the manufacturer's test facility. Submit required test schedule and location, and notify the Contracting Officer 30 calendar days before scheduled test date. Notify Contracting Officer 15 calendar days in advance of changes to scheduled date.
Provide the following as part of test equipment calibration:
a. Provide a calibration program which assures that all applicable test instruments are maintained within rated accuracy.
b. Accuracy: Traceable to the National Institute of Standards and Technology.
c. Instrument calibration frequency schedule: less than or equal to 12 months for both test floor instruments and leased specialty equipment.
d. Dated calibration labels: visible on all test equipment.
e. Calibrating standard: higher accuracy than that of the instrument tested.
f. Keep up-to-date records that indicate dates and test results of instruments calibrated or tested. For instruments calibrated by the manufacturer on a routine basis, in lieu of third party calibration, include the following:
(1) Maintain up-to-date instrument calibration instructions and procedures for each test instrument.
(2) Identify the third party/laboratory calibrated instrument to verify that calibrating standard is met.
2.5.2 Switchboard Design Tests
NEMA PB 2 and UL 891 .
2.5.2.1 Design Tests
Furnish documentation showing the results of design tests on a product of the same series and rating as that provided by this specification.
SECTION 26 24 13 Page 8
a. Short-circuit current test.
b. Enclosure tests.
c. Dielectric test.
2.5.3 Switchboard Production Tests
NEMA PB 2 and UL 891 . Furnish reports which include results of production tests performed on the actual equipment for this project. These tests include:
a. 60-hertz dielectric tests.
b. Mechanical operation tests.
c. Electrical operation and control wiring tests.
d. Ground fault sensing equipment test.
2.6 COORDINATED POWER SYSTEM PROTECTION
Provide a power system study as specified in Section 26 28 01.00 10
COORDINATED POWER SYSTEM PROTECTION.
2.7 ARC FLASH WARNING LABEL
Provide warning label for switchboards. Locate this self-adhesive warning label on the outside of the enclosure warning of potential electrical arc flash hazards and appropriate PPE required. Provide label format as indicated.
2.8 SERVICE ENTRANCE AVAILABLE FAULT CURRENT LABEL
Provide label on exterior of switchboards used as service equipment listing the maximum available fault current at that location. Include on the label the date that the fault calculation was performed and the contact information for the organization that completed the calculation.
Locate this self-adhesive warning label on the outside of the switchboard. Provide label format as indicated.
PART 3 EXECUTION
3.1 INSTALLATION
Conform to IEEE C2 , NFPA 70 , and to the requirements specified herein.
Provide new equipment and materials unless indicated or specified otherwise.
3.2 GROUNDING
NFPA 70 and IEEE C2 , except that grounds and grounding systems with a resistance to solid earth ground not exceeding 25 ohms.
3.2.1 Grounding Electrodes
Provide driven ground rods as specified in Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION and other applications sections of the specifications. Connect ground conductors to the upper end of the ground
SECTION 26 24 13 Page 9 rods by exothermic weld or compression connector. Provide compression connectors at equipment end of ground conductors. Connector in test wells shall be the reversable type.
3.2.2 Equipment Grounding
Provide bare copper cable not smaller than No. 4/0 AWG not less than 24 inches below grade connecting to the indicated ground rods. When work in addition to that indicated or specified is directed to obtain the specified ground resistance, the provision of the contract covering "Changes" applies.
3.2.3 Connections
Make joints in grounding conductors and loops by exothermic weld or compression connector. Install exothermic welds and compression connectors as specified in Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Do not use welds or exothermic welds on magazine reinforcement bars. See the drawings and other specification section for additional grounding and bonding requirements for the magazines.
3.2.4 Grounding and Bonding Equipment
UL 467 , except as indicated or specified otherwise.
3.3 INSTALLATION OF EQUIPMENT AND ASSEMBLIES
Install and connect equipment furnished under this section as indicated on project drawings, the approved shop drawings, and as specified herein.
3.3.1 Switchboard
ANSI/NEMA PB 2.1 .
3.3.2 Meters and Instrument Transformers
ANSI C12.1 .
3.3.3 Field Applied Painting
Where field painting of enclosures is required to correct damage to the manufacturer's factory applied coatings, provide manufacturer's recommended coatings and apply in accordance with manufacturer's instructions.
3.3.4 Galvanizing Repair
Repair damage to galvanized coatings using ASTM A780/A780M , zinc rich paint, for galvanizing damaged by handling, transporting, cutting, welding, or bolting. Do not heat surfaces that repair paint has been applied to.
3.3.5 Field Fabricated Nameplate Mounting
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
SECTION 26 24 13 Page 10
3.4 FOUNDATION FOR EQUIPMENT AND ASSEMBLIES
3.4.1 Interior Location
For floor mounted switchboards, mount switchboard on concrete slab as follows:
a. Unless otherwise indicated, provide the slab with dimensions at least 3-1/2 inches thick.
b. Install slab such that the top of the concrete slab is approximately 4 inches above the finished grade.
c. Provide edges above grade 1/2 inch chamfer.
d. Provide slab of adequate size to project at least 8 inches beyond the equipment.
e. Provide conduit turnups and cable entrance space required by the equipment to be mounted.
f. Seal voids around conduit openings in slab with water- and oil-resistant caulking or sealant.
g. Cut off and bush conduits 3 inches above slab surface.
h. Provide concrete work as specified in Section 03 30 00 CAST-IN-PLACE
CONCRETE.
3.5 FIELD QUALITY CONTROL
3.5.1 Performance of Acceptance Checks and Tests
Perform in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.
3.5.1.1 Switchboard Assemblies
a. Visual and Mechanical Inspection
(1) Compare equipment nameplate data with specifications and approved shop drawings.
(2) Inspect physical, electrical, and mechanical condition.
(3) Verify appropriate anchorage, required area clearances, and correct alignment.
(4) Clean switchboard and verify shipping bracing, loose parts, and documentation shipped inside cubicles have been removed.
(5) Inspect all doors, panels, and sections for paint, dents, scratches, fit, and missing hardware.
(6) Verify that circuit breaker sizes and types correspond to approved shop drawings as well as to the circuit breaker’s address for microprocessor-communication packages.
SECTION 26 24 13 Page 11
(7) Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey.
(8) Confirm correct operation and sequencing of electrical and mechanical interlock systems.
(9) Confirm correct application of manufacturer's recommended lubricants.
(10) Inspect insulators for evidence of physical damage or contaminated surfaces.
(11) Verify correct barrier installation and operation.
(12) Exercise all active components.
(13) Inspect all mechanical indicating devices for correct operation.
(14) Verify that filters are in place and vents are clear.
(15) Test operation, alignment, and penetration of instrument transformer withdrawal disconnects.
(16) Inspect control power transformers.
b. Electrical Tests
(1) Perform insulation-resistance tests on each bus section.
(2) Perform dielectric withstand voltage tests.
(3) Perform insulation-resistance test on control wiring; Do not perform this test on wiring connected to solid-state components.
(4) Perform control wiring performance test.
(5) Perform primary current injection tests on the entire current circuit in each section of assembly.
3.5.1.2 Circuit Breakers
Low Voltage Molded Case with Solid State Trips
a. Visual and Mechanical Inspection
(1) Compare nameplate data with specifications and approved shop drawings.
(2) Inspect circuit breaker for correct mounting.
(3) Operate circuit breaker to ensure smooth operation.
(4) Inspect case for cracks or other defects.
(5) Inspect all bolted electrical connections for high resistance using low resistance ohmmeter, verifying tightness of accessible bolted connections and/or cable connections by calibrated
SECTION 26 24 13 Page 12 torque-wrench method, or performing thermographic survey.
(6) Inspect mechanism contacts and arc chutes in unsealed units.
b. Electrical Tests
(1) Perform contact-resistance tests.
(2) Perform insulation-resistance tests.
(3) Perform Breaker adjustments for final settings in accordance with Government provided settings.
(4) Perform long-time delay time-current characteristic tests
(5) If applicable, Determine short-time pickup and delay by primary current injection.
(6) If applicable, Determine ground-fault pickup and time delay by primary current injection.
(7) If applicable, Determine instantaneous pickup current by primary injection.
(8) If applicable, Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, and anti-pump function.
3.5.1.3 Current Transformers
a. Visual and Mechanical Inspection
(1) Compare equipment nameplate data with specifications and approved shop drawings.
(2) Inspect physical and mechanical condition.
(3) Verify correct connection.
(4) Verify that adequate clearances exist between primary and secondary circuit.
(5) Inspect all bolted electrical connections for high resistance using low-resistance ohmmeter, verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method, or performing thermographic survey.
(6) Verify that all required grounding and shorting connections provide good contact.
b. Electrical Tests
(1) Perform resistance measurements through all bolted connections with low-resistance ohmmeter, if applicable.
(2) Perform insulation-resistance tests.
(3) Perform polarity tests.
SECTION 26 24 13 Page 13
(4) Perform ratio-verification tests.
3.5.1.4 Metering and Instrumentation
a. Visual and Mechanical Inspection
(1) Compare equipment nameplate data with specifications and approved shop drawings.
(2) Inspect physical and mechanical condition.
(3) Verify tightness of electrical connections.
b. Electrical Tests
(1) Determine accuracy of meters at 25, 50, 75, and 100 percent of full scale.
(2) Calibrate watthour meters according to manufacturer's published data.
(3) Verify all instrument multipliers.
(4) Electrically confirm that current transformer and voltage transformer secondary circuits are intact.
3.5.1.5 Grounding System
a. Visual and Mechanical Inspection
(1) Inspect ground system for compliance with contract plans and specifications.
b. Electrical Tests
(1) IEEE 81 . Perform ground-impedance measurements utilizing the fall-of-potential method. On systems consisting of interconnected ground rods, perform tests after interconnections are complete.
On systems consisting of a single ground rod perform tests before any wire is connected. Take measurements in normally dry weather, not less than 48 hours after rainfall. Use a portable ground resistance tester in accordance with manufacturer's instructions to test each ground or group of grounds. Use an instrument equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the ground rod or grounding systems under test.
(2) Submit the measured ground resistance of each ground rod and grounding system, indicating the location of the rod and grounding system. Include the test method and test setup (i.e., pin location) used to determine ground resistance and soil conditions at the time the measurements were made.
3.5.2 Follow-Up Verification
Upon completion of acceptance checks, settings, and tests, show by demonstration in service that circuits and devices are in good operating condition and properly performing the intended function. Trip circuit
SECTION 26 24 13 Page 14 breakers by operation of each protective device. Test each item to perform its function not less than three times. As an exception to requirements stated elsewhere in the contract, provide the Contracting Officer five working days advance notice of the dates and times for checks, settings, and tests.
-- End of Section --
SECTION 26 24 13 Page 15
SECTION 26 24 13 Page 16
SECTION 26 27 14.00 20
ELECTRICITY METERING
02/21, CHG 1: 05/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C12.1 (2014; Errata 2016) Electric Meters - Code for Electricity Metering
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - IP (2019; Errata 1 2019; Errata 2-6 2020;
Addenda BY-CP 2020; Addenda AF-DB 2020;
Addenda A-G 2020; Addenda F-Y 2021;
Errata 7-8 2021; Interpretation 1-6 2021;
Addenda AS-BF 2022) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 90.1 - SI (2019; Errata 1-4 2020; Addenda BY-CP 2020; Addenda AF-DB 2020; Addenda A-G 2020; Addenda F-Y 2021; Errata 5-7 2021;
Interpretation 1-4 2020; Interpretation 5-8 2021; Addenda AU-BF 2020) Energy Standard for Buildings Except Low-Rise Residential Buildings
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C37.90.1 (2013) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
IEEE C57.13 (2016) Standard Requirements for Instrument Transformers
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C12.7 (2014) Requirements for Watthour Meter Sockets
SECTION 26 27 14.00 20 Page 1
ANSI C12.18 (2006; R 2016) Protocol Specification for ANSI Type 2 Optical Port
ANSI C12.20 (2015; E 2018) Electricity Meters - 0.1, 0.2, and 0.5 Accuracy Classes
NEMA C12.19 (2021) Utility Industry End Device Data Tables
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2023) National Electrical Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES, the CONTRACT CLAUSES and DD Form 1423:
Technical data packages consisting of technical data and computer software (meaning technical data which relates to computer software) which are specifically identified in this project and which may be defined/required in other specifications must be delivered strictly in accordance with the CONTRACT CLAUSES and in accordance with the Contract Data Requirements List, DD Form 1423. Data delivered must be identified by reference to the particular specification paragraph against which it is furnished. All submittals not specified as technical data packages are considered 'shop drawings' under the Federal Acquisition Regulation Supplement (FARS) and must contain no proprietary information and be delivered with unrestricted rights.
SD-02 Shop Drawings
Installation Drawings; G
SD-03 Product Data
Electricity Meters; G
The most recent meter product data must be submitted as a Technical Data Package and must be licensed to the project site.
Any software must be submitted on CD-ROM and 3 hard copies of the software user manual must be submitted for each piece of software provided.
Current Transformer; G
Potential Transformer; G
External Communications Devices; G
Configuration Software; G
The most recent version of the configuration software for each type (manufacturer and model) must be submitted as a Technical Data Package and must be licensed to the project site. Software must be submitted on CD-ROM and 2 hard copies of the software user
SECTION 26 27 14.00 20 Page 2 manual must be submitted for each piece of software provided.
SD-06 Test Reports
Acceptance Checks and Tests; G
System Functional Verification; G
Building Meter Installation Sheet, per Building; G
Meter Configuration Template; G
Contractor must fill in the meter configuration template and submit to the Activity for concurrence.
Meter Configuration Report; G
The meter configuration report must be submitted as a Technical Data Package.
SD-10 Operation and Maintenance Data
Electricity Meters and Accessories, Data Package 5; G
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein.
SD-11 Closeout Submittals
System Functional Verification; G
1.3 QUALITY ASSURANCE
1.3.1 Installation Drawings
Drawings must be provided in hard-copy and pdf electronic format, and must include but not be limited to the following:
a. Wiring diagrams with terminals identified of applicable kilowatt advanced meter, current transformers, potential transformers, protocol modules, communications interfaces, Ethernet connections, .
For each typical meter installation, provide a diagram.
b. One-line diagram, including meters, switch(es), current transformers, potential transformers, protocol modules, communications interfaces, Ethernet connections, and fuses. For each typical meter installation, provide a diagram. Provide one-line diagram to the local Public Works department.
1.3.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products must have been in satisfactory commercial or industrial use for one year prior to bid opening. The one-year period must include applications of equipment and materials under similar circumstances and of similar size. The product, or an earlier release of the product, must have been on sale on the commercial market through advertisements, manufacturers catalogs, or brochures during the
SECTION 26 27 14.00 20 Page 3 prior one-year period. Where two or more items of the same class of equipment are required, these items must be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.3.3 Material and Equipment Manufacturing Data
Products manufactured more than 1 year prior to date of delivery to site must not be used, unless specified otherwise.
1.4 MAINTENANCE
1.4.1 Additions to Operation and Maintenance Data
In addition to requirements of Data Package 5, include the following on the actual electricity meters and accessories provided:
a. A condensed description of how the system operates
b. Block diagram indicating major assemblies
c. Troubleshooting information
d. Preventive maintenance
e. Prices for spare parts and supply list
1.5 WARRANTY
The equipment items and software must be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment and software on a regular and emergency basis during the warranty period of the contract.
1.6 SYSTEM DESCRIPTION
1.6.1 System Requirements
Electricity metering, consisting of meters and associated equipment, will be used to record the electricity consumption and other values as described in the requirements that follow and as shown on the drawings.
Communication system requirements are contained in a separate specification section as identified in paragraph COMMUNICATIONS INTERFACES.
1.6.2 Selection Criteria
Metering components and software are part of a system that includes the physical meter, data recorder function and communications method. Every building site identified must include sufficient metering components to measure the electrical parameters identified and to store and communicate the values as required.
Contractor must verify that the electricity meter installed on any building site is compatible with the base-wide metering system with respect to the types of meters selected and the method used to program the meters for initial use. Software and meter programming tools are necessary to set up the meters described by this specification. New software tools different from the meter programming methods currently used by base
SECTION 26 27 14.00 20 Page 4 personnel will require an Authority to Operate (ATO) by Command Information Office at the Enterprise level.
PART 2 PRODUCTS
2.1 ELECTRICITY METERS AND ACCESSORIES
Provide meter(s) and connect the meter(s) to the existing AMI DAS and BAS. The contractor must use the existing government laptop computers to configure the meter using existing software loaded on the computer. The contractor will not be allowed to modify any software or add any additional software to the computer. Alternatively, the government will configure the meter(s), which must be compatible with the existing system, using existing software. Contractor must insure that the meter(s) will transmit the specified data to the DAS. Contact local Public Works department and confirm the EIG Shark 270 revenue meter is the meter to be used at each of the two building services.
2.1.1 Physical and Common Requirements
a. Provide metering system components that meet the current requirements at this facility. Provide Meter configuration template.
b. Meter must have NEMA 3R enclosure for surface mounting with bottom or rear penetrations.
c. Surge withstand capability must conform to IEEE C37.90.1 .
d. Use #12 SIS (XHHW, or equivalent) wiring with ring lugs for all meter connections. Color code and mark the conductors as follows:
(1) Red - Phase A CT - C1
(2) Orange - Phase B CT - C2
(3) Brown - Phase C CT - C3
(4) Gray with white stripe - neutral current return - C0
(5) Black - Phase A voltage - V1
(6) Yellow - Phase B voltage - V2
(7) Blue - Phase C voltage - V3
(8) White - Neutral voltage
2.1.2 Potential Transformer Requirements
a. Meter must be capable of connection to the service voltage phases and magnitude being monitored. If the meter is not rated for the service voltage, provide suitable potential transformers to send an acceptable voltage to the meter.
b. Provide one fuse per phase, Class RK type, to protect the voltage input to the meter. Size fuses as recommended by the meter manufacturer. Fusing must either be inside the secondary compartment of the transformer or inside the same enclosure as the CT shorting device.
c. Potential transformers will be used to convert 480 volt inputs to 120 volts for the locations shown on the metering schedule. Potential transformers must be rated indoor or outdoor, as required for the specific application. Voltage rating must provide 120 volts, wye-connected, 3 phase, 4 wire, 60 Hz, insulation class, 600 volts.
Potential transformers BIL must be 10 kV and must have an accuracy class of 0.3 at burdens w, x, and y. Thermal rating must be 500 VA.
SECTION 26 27 14.00 20 Page 5
2.1.3 Current Transformer Requirements
a. Current transformer must be installed with a rating as shown in the schedule.
b. Current transformers must have an Accuracy Class of 0.15 (with a maximum error of plus/minus 0.3 percent at 5.0 amperes) when operating within the specified rating factor.
c. Current transformers must be solid-core, bracket-mounted for new installations using ring-tongue lugs for electrical connections.
Current transformers must be accessible and the associated wiring must be installed in an organized and neat workmanship arrangement.
Current transformers that are retrofitted onto existing switchgear busbar can be a busbar split-core design.
d. Current transformers must have:
(1) Insulation Class: All 600 volt and below current transformers must be rated 10 KV BIL.
(2) Frequency: Nominal 60 Hz.
(3) Burden: Burden class must be selected for the load.
(4) Phase Angle Range: 0 to 60 degrees.
e. Meter must accept current input from standard instrument transformers (5A secondary current transformers).
f. Current inputs must have a continuous rating in accordance with
IEEE C57.13 .
g. Provide one single-ratio current transformer for each phase per power transformer with characteristics required for the installation.
2.1.4 Meter Requirements
Meter must be compatible with and must meet the specific requirements of the facility. Incompatible product is not acceptable. All meters must meet NAVFAC Cyber Security Requirements.
Electricity meters must include the following features:
a. Meter must comply with ANSI C12.1 , NEMA C12.19 , and ANSI C12.20 and must match existing AMI meter system at the installation and be the newest version with ATO.
b. Meter sockets must comply with ANSI C12.7 .
c. Provide socket-mounted or panel mounted meters.
d. Meter must be a Class 20, transformer rated design.
e. Meter must be rated for use at temperature from minus 40 degrees Centigrade to plus 70 degrees Centigrade.
f. The meters must have an electronic demand recording register and must
SECTION 26 27 14.00 20 Page 6 be secondary reading as indicated. The register must be used to indicate maximum kilowatt demand as well as cumulative or continuously cumulative demand. Demand must be measured on a block-interval basis and must be capable of a 5 to 60 minute interval and initially set to a 15-minute interval. It must have provisions to be programmed to calculate demand on a rolling interval basis. Meter readings must be true RMS.
g. The meter electronic register must be of modular design with non-volatile data storage.