This document comprises the final design specifications for the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London, Groton, Connecticut. The specifications cover Division 07 through Division 26 of the MasterFormat and detail comprehensive technical requirements for building systems, materials, installation procedures, and quality assurance testing across thermal and moisture protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, and integrated automation systems.
Key technical requirements include: fluid-applied membrane air barriers with minimum 0.072-inch polymer thickness for TPO roofing systems rated for 20-year warranties and Class A fire resistance; steel and aluminum doors with blast resistance capabilities and specialized hardware for vault and sound control applications; gypsum board, ceramic tile, and resilient flooring installations with indoor air quality certifications; acoustical ceilings and wall protection systems; comprehensive HVAC systems including split-system air conditioners, variable air volume terminal units, and dedicated outside air systems with energy recovery; electrical distribution requiring rigid steel conduit in magazines, pad-mounted switchgear rated 15.5 kV, surge protection devices, and specialized grounding systems for ordnance magazines with maximum 1-ohm bonded connection resistance and Faraday shield requirements; and integrated building automation with BACnet direct digital control, Niagara Framework supervisory gateways, and utility monitoring systems. All systems require government approval of shop drawings, product data, and test reports; ABAA-certified air barrier installers; RCI Registered Roof Observers during roofing installation; independent testing agency certification for fire suppression and electrical systems; and comprehensive performance verification testing including endurance testing, field quality control inspections, and operator training prior to final acceptance.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
Specifications:
For Commander, NAVFAC:
Date:
Submitted By: Date:
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Interior Design: Kimberly Miller Cybersecurity: Anthony Elg Crane: Gerald Staack
Specifications Final Design Submittal
Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.
This page left intentionally blank
NAVFAC ATLANTIC
WORK ORDER NO. 1667770
Specifications
P-1102 Weapons Magazine and Ordnance Operations Facility
Issue for Bid & Construction
PREPARED BY:
CH2M
5701 Cleveland Street Virginia Beach, VA 23462
Architectural: Pete Soukas, RA Mechanical: Chris Hill, PE
Civil: Josh Corum, PE Electrical: Kelley Bourassa, PE
Structural: Laura Presley, PE Fire Protection: Jeff McLaughlin, PE
Landscape Arch: Tamara Schlagbaum Telecom/Security: Rene Rubio
Interiors: Natalie Miller Cybersecurity: Anthony Elg
Crane: Gerald Staack Audio: Steven Yost
This page left intentionally blank
P-1102 Weapons Magazine & Ordnance Operations Facility eProjects WON: 1667770 Final Design Submission 23 June 2025
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 22 07/22 DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 25 02/20 QUALITY ASSURANCE FIELD INSPECTION
01 45 35 11/20 SPECIAL INSPECTIONS
01 45 36 06/23 SPECIAL INSPECTIONS - EARTH COVERED
MAGAZINES
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 78 30.00 22 01/23 GIS DATA DELIVERABLES
01 91 00.15 22 03/23 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 65 00 11/22 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 11/22 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 70 00 02/10, CHG 2: 08/20 MASS CONCRETE
PROJECT TABLE OF CONTENTS
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 54 23 05/20 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 39 55.00 20 11/24 NAVY STANDARD EARTH-COVERED MAGAZINE
DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
08 95 00 08/09 BLAST RESISTANCE
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18, CHG 2: 08/20 BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.23 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY MONITORING AND
CONTROL SYSTEM (UMCS)
25 05 11.28 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SAFETY AND
SECURITY INCLUDING CCTV, ACCESS
CONTROL SYSTEMS, AND INTRUSION
DETECTION SYSTEMS
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 00 05/21, CHG 1: 05/22 SF6/HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 13 23.00 40 11/14 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
31 23 06.00 02/21, CHG 1: 11/21 BLASTING - SURFACE
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 66 13 02/19 RIGID INCLUSIONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR
FLEXIBLE PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE AND SEPARATION
LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK) AND
GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP
RUNNING
41 22 13.15 11/22 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING TROLLEY
-- End of Project Table of Contents --
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS
05/17, CHG 2: 08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
ABAA QAP Quality Assurance Program
ASTM INTERNATIONAL (ASTM)
ASTM C836/C836M (2018; R 2022) Standard Specification for High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4541 (2017) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM D5590 (2000; R 2010; E 2012) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by Accelerated Four-Week Agar Plate Assay
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2022) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E283 (2019) Standard Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
SECTION 07 27 26 Page 1
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E2178 (2021a) Standard Test Method for Air Permeance of Building Materials
ASTM E2357 (2017) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1113 (2016) Architectural Coatings
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
1.2 RELATED REQUIREMENTS
Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM, Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, and other building enclosure sections to provide a complete building air barrier system. Submit all materials, components and assemblies of the air barrier system together as one complete submittal package.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications of Manufacturer; G
Qualifications of Installer; G
SD-02 Shop Drawings
Fluid-Applied Membrane Air Barrier; G
SD-03 Product Data
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Primers, Adhesives, and Mastics; G
SECTION 07 27 26 Page 2
Reinforcement; G
Safety Data Sheets; G
SD-06 Test Reports
Capillary Moisture Test; G
Field Peel Adhesion Test; G
Flame Propagation of Wall Assemblies; G
Flame Spread and Smoke Developed Index Ratings; G
Site Inspections Reports; G
SD-07 Certificates
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Indoor Air Quality for Fluid-Applied Air Barrier; S
Indoor Air Quality for Primer and Mastic; S
Indoor Air Quality for Adhesive and Sealant; S
SD-08 Manufacturer's Instructions
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Primers, Adhesives, and Mastics; G
1.4 MISCELLANEOUS REQUIREMENTS
For fluid-applied membrane air barriers provide the following:
1.4.1 Shop Drawings
Submit fluid-applied membrane air barrier shop drawings showing locations and extent of barrier assemblies, transition membranes, details of all typical conditions, intersections with other envelope assemblies and materials, and membrane counterflashings. Show details for bridging of gaps in construction, treatment of inside and outside corners, expansion joints, methods of attachment of materials covering the self-adhered barrier without compromising the barrier. Indicate how miscellaneous penetrations such as conduit, pipes, electric boxes, brick ties, and similar items will be sealed.
1.4.2 Product Data
Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety
SECTION 07 27 26 Page 3 requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products.
1.4.3 Test Reports
Submit test reports indicating that capillary moisture tests and field peel adhesion tests on all substrate materials have been performed and the changes made, if required, in order to achieve successful and lasting adhesion. Submit test reports for flame propagation of wall assemblies tested in accordance with NFPA 285 . Submit test reports for flame spread and smoke developed index ratings of barrier materials tested in accordance with ASTM E84.
1.4.4 Indoor Air Quality Certification
Submit required indoor air quality certifications in one submittal package.
Provide fluid-applied air barrier, primer, and mastic certified to meet California Department of Public Health (CDPH) Standard Method, UL 2818 GREENGUARD Gold, SCS Global Services Indoor Advantage Gold or VOC content requirements of Green Seal GS-11, California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings, or SCAQMD Rule 1113 .
Submit product data for indoor air quality for fluid-applied air barrier and indoor air quality for primer and mastic.
Provide adhesive and sealant certified to meet California Department of Public Health (CDPH) Standard Method, UL 2818 GREENGUARD Gold, SCS Global Services Indoor Advantage Gold or VOC content requirements of SCAQMD Rule 1168 . Submit product data for indoor air quality for adhesive and sealant.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage.
1.5.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Protect stored materials from direct sunlight.
1.6 CAPILLARY MOISTURE TEST
Perform a capillary moisture test by plastic sheet method in accordance with ASTM D4263 on the construction mockup and substrate materials.
Perform test after curing period as recommended by the air barrier manufacturer. Record mode of failure and area which failed in accordance with ASTM D4263. Once the air barrier material manufacturer has established a minimum adhesion or moisture level for the product on the particular substrate, indicate on the inspection report whether this requirement has been met. Where the manufacturer has not declared a
SECTION 07 27 26 Page 4 minimum adhesion or moisture value for their product and substrate combination, the inspector must record actual values.
1.7 FIELD PEEL ADHESION TEST
Perform a field peel adhesion test on a construction mockup. Test the applied product for adhesion in accordance with manufacturer's recommendations. Perform test after curing period recommended by the manufacturer. Record mode of failure and area which failed in accordance with ASTM D4541. When the manufacturer has established a minimum adhesion level for the product on the particular substrate, the inspection report must indicate whether this requirement has been met. Where the manufacturer has not declared a minimum adhesion value for their product/substrate combination, the inspector must record actual values.
1.8 AIR BARRIER TESTING
Perform air barrier testing in accordance with Section 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM.
1.9 QUALITY ASSURANCE
1.9.1 Qualifications of Manufacturer
Submit documentation verifying that manufacturer of fluid-applied membrane air barrier is currently accredited by the Air Barrier Association of America ( ABAA Accreditation https://www.airbarrier.org/ ).
1.9.2 Qualifications of Installer
Submit documentation verifying that installers of the fluid-applied membrane air barrier are currently certified in accordance with the ABAA QAP Quality Assurance Program ( https://www.airbarrier.org/qap/ ).
1.10 PRECONSTRUCTION MEETING
Conduct a preconstruction meeting a minimum of two weeks prior to commencing work specified in this Section. Agenda must include, at a minimum, construction and testing of construction mock up, sequence of construction, coordination with substrate preparation, materials approved for use, compatibility of materials, coordination with installation of adjacent and covering materials, and details of construction. Attendance is required by representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the fluid-applied membrane air barrier.
1.11 ENVIRONMENTAL CONDITIONS
1.11.1 Temperature
Install fluid-applied membrane air barrier within the range of ambient and substrate temperatures as recommended in writing by the fluid-applied membrane air barrier manufacturer. Do not apply fluid-applied membrane air barrier to a damp or wet substrate. Do not apply during inclement weather or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent.
SECTION 07 27 26 Page 5
1.11.2 Exposure to Weather
Protect fluid-applied membrane air barrier products from direct exposure to rain, snow, sunlight, mist, and other extreme weather conditions.
Replace, at no additional cost to the government, barrier products that have been exposed to ultraviolet (sun)light longer than allowed by manufacturer's written requirements.
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE AIR BARRIER
Provide a fluid-applied, vapor permeable, air barrier. This barrier must exhibit no visible water leakage when tested in accordance with ASTM E331 and must perform as a liquid water drainage plane with thru-wall flashing to discharge incidental condensation and water penetration to the exterior of the building enclosure. Provide products suitable for use within temperature ranges specified by manufacturer for the location of the project.
Comply with Indoor Air Quality Certification requirements for waterproofing membrane.
2.1.1 Physical Properties
a. Air Permeance ( ASTM E2178): less than 0.004 CFM per sf at 1.57 psf.
b. Air Leakage ( ASTM E2357, ASTM E283): Less than 0.04 CFM per sf at
1.57 psf at one inch.
c. Water Vapor Permeance (Vapor Permeable Membrane) ( ASTM E96/E96M, desiccant method A): 10.0 perms.
d. Tensile Strength ( ASTM D412): Not less than 138 psi.
e. Elongation ( ASTM D412): Not less than 300 percent.
f. Low temperature Flexibility and Crack Bridging ( ASTM C836/C836M):
Pass at minus 15 degrees F.
g. Solids by Volume: minimum 50 percent.
h. Flame propagation of wall assemblies ( NFPA 285 ): Pass
i. Surface Burning Characteristics ( ASTM E84):
(1) Flame Spread Index Rating not higher than 25.
(2) Smoke Developed Index Rating not higher than 200.
j. Resistance to Mold, Mildew and Fungal Growth ( ASTM D5590): 0, No growth.
2.2 PRIMERS, ADHESIVES, AND MASTICS
Provide primers, adhesives, mastics, sealants and other accessories as recommended by manufacturer of fluid-applied membrane air barrier for a complete installation.
SECTION 07 27 26 Page 6
Comply with Indoor Air Quality Certification requirements.
2.3 TRANSITION MEMBRANE
Provide as specified in Section 07 27 19.01 SELF-ADHERING AIR BARRIERS.
2.4 SHEET METAL FLASHING
Provide as specified in Section 07 60 00 FLASHING AND SHEET METAL.
2.5 JOINT SEALANTS
Provide as specified in Section 07 92 00 JOINT SEALANTS.
2.6 REINFORCEMENT
Provide fiberglass mesh tape, or fluid-applied air barrier manufacturer's approved comparable equal product, reinforcement at seams, edges, projections and penetrations. Reinforce all joints exceeding1/4 inch with fiberglass mesh.
PART 3 EXECUTION
3.1 EXAMINATION
Before installing fluid-applied membrane air barrier, examine substrates, areas, and conditions under which fluid-applied membrane air barrier assemblies will be applied, with installer present, for compliance with requirements. Ensure the following conditions are met:
a. Surfaces are sound, dry, even, and free of oil, grease, dirt, excess mortar or other contaminants detrimental to the adhesion of the membranes.
b. Concrete and masonry surfaces are cured and dry, smooth without large voids, spalled areas or sharp protrusions. Do not proceed with installation until after minimum concrete curing period recommended by fluid-applied membrane air barrier manufacturer.
c. Fill voids, gaps and spalled areas in substrate to provide an even plane. Strike masonry joints full flush.
d. Verify substrate is visibly dry and free of moisture. Test for capillary moisture by plastic sheet method in accordance with ASTM D4263 and take suitable measures until substrate passes moisture test.
e. Verify sealants used in substrates, and in joints between substrates, are compatible with fluid-applied membrane air barrier.
3.2 PREPARATION
Clean, prepare, and treat substrate in accordance with manufacturer's written instructions. Ensure clean, dust-free, and dry substrate for fluid-applied membrane air barrier application.
a. Remove dust, dirt and other contaminants from joints and cracks before coating surfaces.
SECTION 07 27 26 Page 7
b. Prepare, treat, and seal vertical and horizontal surfaces at terminations and penetrations through fluid-applied membrane air barrier.
c. At changes in substrate plane, provide transition material (bead of sealant, mastic, extruded silicone sealant, membrane counterflashing or other material recommended by manufacturer) under transition membrane to eliminate all sharp 90 degree inside corners and to make a smooth transition from one plane to another.
d. Provide mechanically fastened non-corrosive metal sheet to span gaps in substrate plane and to make a smooth transition from one plane to the other. Continuously support membrane with substrate.
e. For exterior sheathing substrates, ensure that exterior sheathing is stabilized, with corners and edges fastened with appropriate screws.
Treat all joints in accordance with the air barrier manufacturer's instructions prior to application of air barrier material. Allow sufficient time for joint treatments to fully cure before application of transition membranes and fluid-applied membrane air barrier.
f. For concrete and masonry substrates, fill all voids and holes, particularly in mortar joints, with non-shrinking grout.
g. Mask off and cover adjacent surfaces to protect from spillage and overspray.
3.3 INSTALLATION
3.3.1 Installation of Transition Membrane
Install transittion membrane materials in accordance with the details on the drawings, Section 07 27 19.01 SELF-ADHERING AIR BARRIERS, and the following:
a. Install transition membrane at all required locations prior to installation of the fluid-applied membrane air barrier.
b. Verify transition membrane is fully adhered to substrate and that its surface is clean, dry and wrinkle free prior to installation of the fluid-applied membrane air barrier.
c. Verify transition membrane completely covers all transition areas and will provide continuity of the finished fluid-applied membrane air barrier without gaps or cracks.
3.3.2 Installation of Flashing
Counterflash upper edge of thru-wall flashing and fluid-applied air barrier. Counter flashing and thru-wall flashing are specified in Section
07 60 00 FLASHING AND SHEET METAL.
3.3.3 Installation of Fluid-Applied Membrane Air Barrier
Install materials in accordance with manufacturer's recommendations and the following:
a. Apply fluid-applied membrane air barrier in single or dual coat application by spray or roller. Apply fluid-applied membrane air
SECTION 07 27 26 Page 8 barrier within manufacturer's recommended temperature range for application.
b. Apply fluid-applied membrane air barrier in manner and at rate and wet film thickness recommended by manufacturer to yield a finished dry film thickness of not less than 40 mils or as otherwise required by the manufacturer for the application substrate material and surface roughness..
c. Apply fluid-applied membrane air barrier around all penetrations ensuring a complete and continuous air barrier. Lap fluid-applied membrane air barrier a minimum of 3 inch over transition membrane to seal leading edge.
d. Seal membrane terminations, heads of mechanical fasteners, masonry tie fasteners, around penetrations, HVAC assemblies, plumbing and electrical assemblies, doors, windows, louvers, and other assemblies penetrating the fluid-applied membrane air barrier with a termination sealant recommended by the fluid-applied membrane air barrier manufacturer.
e. Notify the Contracting Officer and Testing Agency upon completion of fluid-applied membrane air barrier installation. Air barrier materials and assemblies must remain exposed until tested and inspected by the ABAA.
f. Do not allow materials to come in contact with chemically incompatible materials.
3.3.4 Installation of Reinforcement
Install reinforcement at projections, corners, joints, and penetrations where applicable.
3.4 FIELD QUALITY CONTROL
3.4.1 Site Inspections and Testing
Provide site inspections and testing in accordance with ABAA protocol to verify conformance with the manufacturer's instructions, the ABAA QAP Quality Assurance Program ( https://www.airbarrier.org/qap/ ), Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM and this section.
a. Conduct inspections and testing at 5, 50, and 95 percent completion of this scope of work. Forward written inspection reports to the Contracting Officer within five working days of the inspection and test being performed.
b. If the inspections reveal any defects, promptly remove and replace defective work at no additional expense to the Government.
3.5 PROTECTION AND CLEANING
3.5.1 Protection
Protect fluid-applied membrane air barrier assemblies from damage during application and remainder of construction in accordance with manufacturer's written instructions.
SECTION 07 27 26 Page 9
Coordinate installation, testing, and inspection procedures to ensure exposure period does not exceed that recommended by the product manufacturer. Remove and replace, at no additional cost to the government, membrane products that exceed manufacturer's allowed exposure limits.
3.5.2 Cleaning of Adjacent Surfaces
Clean excess product from adjacent construction using cleaning agents and procedures as recommended in writing by the manufacturer of each type of affected construction and as acceptable to same.
3.6 CLEANUP OF SPILLS
Conduct cleanup of uncured product spillage in accordance with manufacturer's written safe handling instructions.
-- End of Section --
SECTION 07 27 26 Page 10
SECTION 07 54 23
THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
05/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI/SPRI ES-1 (2003) Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.24 (2014) Roofing - Safety Requirements of Low-Sloped Roofs
ASTM INTERNATIONAL (ASTM)
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4434/D4434M (2015) Standard Specification for Poly(Vinyl Chloride) Sheet Roofing
ASTM D6754/D6754M (2010) Standard Specification for Ketone Ethylene Ester Based Sheet Roofing
ASTM D6878/D6878M (2017) Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing
ASTM E108 (2011) Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2022) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
SECTION 07 54 23 Page 1
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA 3619 (2004) Quality Control Guidelines for Application of Polymer-modified Bitumen Roofing
NRCA 3740 (2005) The NRCA Waterproofing Manual
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI RD-1 (2014) Performance Standard for Retrofit Drains
UNDERWRITERS LABORATORIES (UL)
UL 790 (2004; Reprint Jul 2014) Standard Test Methods for Fire Tests of Roof Coverings
1.2 SUMMARY
Adhered thermoplastic-polyolefin (TPO) roof membrane system applied over TPO membrane roofing manufacturer-accepted substrate. Incorporate air barrier in the roof assembly as specified in Section 07 22 00 ROOF AND
DECK INSULATION.
1.3 ASSEMBLY REQUIREMENTS
Provide roofing membrane sheet widths consistent with membrane attachment methods and wind uplift requirements, and as large as practical. In order to minimize joints and 3-way overlaps, prefabricated sheets are not accepted. Provide membrane which is free of defects and foreign material. Coordinate flashing work to permit continuous roof-surfacing operations. Install insulation and weatherproofed planned sections on the same day.
1.3.1 Fire Resistance
Complete roof system assembly:
a. Class A rated in accordance with ASTM E108, FM 4470 , or UL 790 ; and
b. Be listed as Class I roof deck construction in FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
1.3.2 Wind Uplift Resistance
Provide a complete roof system assembly that is rated and installed to resist wind loads indicated and validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated systems, except as approved by the Contracting Officer. Submit Engineering calculations, signed, sealed, and dated by a Registered Engineer validating the wind resistance per ASCE 7, and ANSI/SPRI ES-1 of non-rated roof system. Base wind uplift measurements on a design wind speed of as indicated on the drawings and in accordance with ASCE 7 and other applicable building code requirements.
SECTION 07 54 23 Page 2
1.3.3 Solar Reflectance Index (SRI)
SRI measures the roof's ability to reject solar heat, defined such that a standard black (reflectance 0.05, emittance 0.90) is 0 and a standard white (reflectance 0.80, emittance 0.90) is 100. Use roofing materials having minimum appropriate SRI for more than 75 percent of roof surface (low slope (less than 2:12) SRI greater than 78; high slope (greater than 2:12) SRI greater than 29).
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G
Roof Plan; G
SD-03 Product Data
TPO Roofing Membrane; G
Recycled Content for TPO; S
Bonding Adhesive
Flashing
Membrane Fasteners and Plates
Roof Insulation
Pre-Manufactured Accessories
Information Card
SD-05 Design Data
Wind Uplift Resistance; G
SD-07 Certificates
Qualification of Manufacturer
Qualifications of Applicator
Qualification of Engineer of Record
Wind Uplift Resistance
Fire Resistance classification
Minimum Polymer Thickness
SECTION 07 54 23 Page 3
Sample Warranty; G
SD-08 Manufacturer's Instructions
Application Method; G
Membrane Flashing; G
Perimeter Attachment
Auxiliary Fasteners
Pre-Manufactured Accessories
Cold Weather; G
SD-11 Closeout Submittals
Warranty; G
Information Card; G
Instructions to Government Personnel; G
1.5 QUALITY ASSURANCE
1.5.1 Qualification of Manufacturer
Polyvinyl-Chloride sheet roofing system manufacturer must have a minimum of 10 years experience in manufacturing TPO roofing products.
1.5.2 Qualifications of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the TPO sheet roofing system manufacturer and have a minimum of five years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. Supply the names, locations and client contact information of five projects, within the previous three years, of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project.
1.5.3 Qualification of Engineer of Record
Engineer of Record must be currently licensed within the jurisdiction of the project.
1.5.4 Conformance and Compatibility
Provide an entire roofing and flashing system that is in accordance with specified and indicated requirements, including fire and wind resistance.
1.5.5 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
SECTION 07 54 23 Page 4
a. Drawings, including roof plan, specifications and submittals related to the roof work.
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, and roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representative to roof manufacturer;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control( NRCA 3619) plan for the roof system installation;
f. Safety requirements.
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, mechanical and electrical work, other trades interfacing with the roof work, designated safety personnel trained to enforce and copy with ASSE/SAFE A10.24 , and a representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.6 DETAIL DRAWINGS
Submit roof plan depicting wind loads and boundaries of enhanced perimeter and corner attachments of roof system components, as applicable. Provide drawings that reflect the project roof plan of each roof level and conditions indicated. Submit bids with approved detail drawings and specifications approved and furnished by the TPO membrane manufacturer.
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Delivery
Deliver materials in the manufacturer's original, unopened containers and rolls with labels intact and legible. Mark and remove wet or damaged materials from the site. Where materials are covered by a referenced specification number, the container must bear the specification number, type, class, and shelf life expiration date where applicable. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.7.2 Storage
Protect materials against moisture absorption and contamination or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms or pallets one level high in dry locations with adequate ventilation, such as an enclosed building or
SECTION 07 54 23 Page 5 closed trailer. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work is finished and dry. Maintain roll materials at temperatures above 50 degrees F for 24 hours immediately before application. Do not store materials outdoors unless approved by the Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof. Provide sufficient ventilation to prevent condensation. Do not store more materials on roof than can be installed the same day and remove unused materials at end of each days work. Distribute materials temporarily stored on roof to stay within live load limits of the roof construction.
a. Maintain a minimum distance of 35 foot for all stored flammable materials, including materials covered with shrink wraps, craft paper or tarps from all torch/welding applications.
b. Immediately remove wet, contaminated or otherwise damaged or unsuitable materials from the site. Damaged materials may be marked by the Contracting Officer.
1.7.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment to prevent damage to materials or applied roofing.
1.8 ENVIRONMENTAL REQUIREMENTS
Do not install roofing system when air temperature is below 40 degrees F, during any form of precipitation, including fog, or when there is ice, frost, moisture, or any other visible dampness on the roof deck. Follow manufacturer's printed instructions for Cold Weather Installation.
1.9 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counterflashing in accordance with NRCA 3740, are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials.
1.10 WARRANTY
Provide roof system material and workmanship warranties. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness, and has a minimum duration of 20 years. Submit sample certificate.
1.10.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20-year, no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, and accessories necessary for a watertight roof system construction. Provide warranty directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:
SECTION 07 54 23 Page 6
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, the time frame established in UFGS Section 01 78 02.00 50 as set by the Priority Code of the notification, emergency temporary repairs performed by others does not void the warranty.
1.10.2 Roofing System Installer Warranty
The roof system installer must warrant for a minimum period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.10.3 Continuance of Warranty
Repair or replacement work that becomes necessary within the warranty period must be approved, as required, and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the manufacturer warranty for the remainder of the manufacturer warranty period.
PART 2 PRODUCTS
2.1 MATERIALS
Coordinate with other specification sections related to the roof work.
Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.1.1 TPO Roof Membrane
Provide a minimum polymer thickness 0.072 inch reinforced TPO as specified herein. Provide TPO system capable of obtaining 20 year warranties and as listed in the applicable wind uplift and fire rating classification listings.
Submit Data as required by Section 07 22 00 ROOF AND DECK INSULATION together with requirements of this section. Provide data that includes written acceptance by the roof membrane manufacturer of the insulation and
SECTION 07 54 23 Page 7 other products and accessories to be provided by and warranted under the full system guarantee of the roof membrane manufacturer.
a. Coordinate with other specification sections related to the roof work. Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Provide materials free of defects and suitable for the service and climatic conditions of the installation.
Provide warranted roof system in which all components are sourced from the TPO roof membrane manufacturer, including but not limited to all insulation, coverboards, accessories, adhesives and edge metal.
b. For each roof, furnish a typewritten information card for facility records and a card laminated in plastic and framed for interior display at roof access point, or a photoengraved 0.032 inch thick aluminum card for exterior display. Provide card that is 8 1/2 by 11 inches minimum. On the information card identify facility name and number; location; contract number; approximate roof area; detailed roof system description, including deck type, membrane, number of plies, method of application, manufacturer, insulation and cover board system and thickness; presence of tapered insulation for primary drainage, presence of vapor retarder; date of completion; installing Contractor identification and contact information; membrane manufacturer warranty expiration, warranty reference number, and contact information. Install card at roof top or access location as directed by the Contracting Officer and provide a paper copy to the Contracting Officer.
2.1.2 Energy and Cool Roof Performance
Install a roof system that meets an overall performance as specified on the drawings or by insulation specified in other sections. The roofing system will need to meet the criteria for Cool Roof Products.
2.1.3 Bonding Adhesive
Provide TPO membrane manufacturer's recommended adhesive, as supplied by roof membrane manufacturer, and recommended by the manufacturer's printed data for bonding of TPO membrane materials to acceptable insulation, wood, metal, concrete or other acceptable substrate materials. Do not use bonding adhesive to bond membrane materials to each other.
2.1.4 Water Cutoff Mastic/Water Block
As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.5 Membrane Flashing
Provide membrane flashing, including self-adhering membrane flashing, perimeter flashing, flashing around roof penetrations and prefabricated pipe seals, of a minimum polymer thickness 0.072 inch reinforced TPO for 20 year warranties, and utilized as recommended and supplied by the roof membrane manufacturer or minimum 0.072 inch thick reinforced TPO roof membrane and flashings for 20 year warranties. Submit certification from TPO membrane manufacturer that the proposed TPO membrane roofing product meets the minimum polymer thickness specified.
SECTION 07 54 23 Page 8
2.1.6 Membrane Fasteners and Plates
Coated, corrosion-resistant fasteners as recommended and supplied by the TPO roof membrane manufacturer and meeting the requirements of FM 4470 and FM RoofNav (www. roofnav.com) or FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified. Fasteners and plates to be supplied and warranted for the substrate type(s) by TPO membrane manufacturer and recommended by TPO membrane manufacturer's printed data.
2.1.6.1 Stress Plates, Bar or Rail for Fasteners
Utilize corrosion-resistant stress plates as recommended by the roof membrane manufacturer's printed instructions and meeting the requirements of FM 4470 . Stress plates to be supplied by TPO roof membrane manufacturer. Form stress plates to prevent dishing or cupping.
Manufacturer-supplied anchoring bar or rails may be utilized for high wind conditions.
2.1.6.2 Auxiliary Fasteners
Provide corrosion resistant screws, nails, or anchors suitable for intended attachment purpose and be recommended and supplied for use by the TPO roof membrane manufacturer.
2.1.7 Pre-manufactured Accessories
Provide pre-manufactured accessories shall be manufacturer's standard for intended purpose, must comply with applicable specification section, be compatible with the membrane roof system and approved for use and supplied by the TPO roof membrane manufacturer. Provide pre-fabricated curbs of 16 gauge G90 galvanized with minimum 4 inch flange for attachment to roof nailers. Provide curbs of minimum height of 10 inches above the finished roof membrane surface.
2.1.8 TPO Walk Tread
Scrim reinforced 0.096 inch thickness TPO membrane with a textured surface, compatible with and supplied by manufacturer of the TPO roof membrane.
2.1.9 Roof Insulation
Provide insulation system and facer material compatible with membrane application specified and be approved and supplied by the TPO membrane roof manufacturer and as specified in Section 07 22 00 ROOF AND DECK
INSULATION.
2.1.10 Wood Products
As specified in Section 06 10 00 ROUGH CARPENTRY, except that fire retardant treated materials must not be in contact with TPO membrane or TPO accessory products, unless approved by the membrane manufacturer and the Contracting Officer.
2.2 REINFORCED,…