Attachment F - Small Business Participation Commitment.pdf

PDF 1 MB Posted

Attached to
Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation number
N4008526R0004
Issued by

About this file

This is a Small Business Participation Commitment Document (SBPCD) form for the Design-Bid-Build contract P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut (Contract Number N40085-26-R-0004). The form is a mandatory submission template that must be completed by all offerors—both large and small businesses—to provide supporting information for evaluation under Factor 5, Small Business Utilization and Participation. Only information provided on this specific form will be evaluated; alternative formats or offeror-created forms will not be considered.

The document requires offerors to identify their business size classification based on the applicable NAICS code and to indicate any qualifying socioeconomic categories, including HUBZone Small Business, Woman-Owned Small Business (WOSB), Economically Disadvantaged Woman-Owned Small Business (EDWOSB), Small Disadvantaged Business (SDB), Veteran-Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must provide a subcontracting breakdown showing total contract value and self-performed work, then detail their small business participation with dollar values and percentages. The contract establishes a minimum 20% small business participation requirement. If this threshold is not met, offerors must provide detailed justification. The form requires identification of subcontractors with firm written commitments (such as teaming agreements, joint venture agreements, or signed letters of commitment) including their business categories, products/services, and nature of commitment. If no subcontractors are identified or if the offeror does not intend to subcontract, detailed explanations are required. Small businesses intending to self-perform 100% of the work are exempt from providing subcontracting explanations.

View the file

Other files

File Type Posted
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040014 SF 30.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040010 SF 30.pdf PDF
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
1667770spc07.28.26_rev.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
P1102_Amend 0007_Drawings3of3.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
P-1102_Amend 0006_Drawings_rev.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
ATTACHMENT M - Permits Record of Decision (PROD).pdf PDF
N4008526R00040005 SF 30.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Amendment 0004 PPIs.pdf PDF
Attachment K - P1102 Site Visit Log.pdf PDF
Amendment 0002 PPIs.pdf PDF
N4008526R00040002 SF 30.pdf PDF
Attachment I - Site Visit Map.pdf PDF
N4008526R00040001 SF 30.pdf PDF
Solicitation - N4008526R0004.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
FINAL DESIGN_1667770dwg1of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeG.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeH.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
FINAL DESIGN_1667770dwg2of3Operations.pdf PDF
FINAL DESIGN_1667770dwg2of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg2of4Site.pdf PDF
FINAL DESIGN_1667770dwg3of4Site.pdf PDF
P-1102_1667770spc1of3.pdf.pdf PDF
P-1102_1667770spc3of3.pdf.pdf PDF
Attachment C - Construction Experience Project Data.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.pdf PDF
FINAL DESIGN_1667770dwg1of3Operations.pdf PDF
FINAL DESIGN_1667770dwg1of4Site.pdf PDF
FINAL DESIGN_1667770dwg4of4Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN BID BUILD P1102 WEAPONS MAGAZINE

NAVAL SUBMARINE BASE, NEW LONDON, CONNECTICUT

N40085-26-R-0004

ATTACHMENT F

SMALL BUSINESS PARTICIPATION

COMMITMENT DOCUMENT (SBPCD)

OFFEROR’S NAME

ADDRESS

N40085-26-R-0004 P1102 Weapons Magazine & Ordnance Operations Facility

New London, CT

Date Prepared

1. Instructions. The SBPCD includes the minimum level of commitment to subcontract with the SBs identified herein. This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form that will be evaluated to determine the offeror’s small business participation commitment. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to this form will not be evaluated. Round dollars to nearest whole dollar and percentages to the nearest tenth of a percent.

2. Offeror Information. Prime contractor size based on the NAICS Code identified in the solicitation (check one):

☐ Large Business (LB) ☐ Small Business (SB)

For offerors that identify as a SB, check all applicable socioeconomic categories that apply or check “None” if the offeror does not qualify under any of the socioeconomic categories:

☐ Historically Underutilized Business Zone Small Business (HUBZone SB) ☐Woman-Owned Small Business (WOSB) ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ☐ Small Disadvantaged Business (SDB) ☐ Veteran-Owned Small Business (VOSB) ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB) ☐ None

3. Subcontracting Breakdown.

a. Total contract value (TCV)(including options) $

b. Total value of the work to be self-performed by the prime offeror $

N40085-26-R-0004

4. Small Business Participation.

a.

Small Business Participation (Including Small Business prime offeror’s participation)

Business Category Dollar Value % of TCV Total Small Business (SB) (including all SB socio-economic categories and work self-performed as a SB) The minimum total small business subcontracting requirement for this contract is 20%. If this minimum small business participation requirement is not met, a detailed explanation is required below.

Small Disadvantaged Business (SDB) $ % Woman-Owned Small Business (WOSB) $ % Historically Underutilized Business Zone Small Business (HUBZone) $ % Veteran-Owned Small Business (VOSB) $ % Service-Disabled Veteran-Owned Small Business (SDVOSB) $ %

If the offeror has not proposed a minimum of 20% for small business participation, provide a detailed explanation:

b. To the greatest extent possible, the table below should identify SBs where firm commitments are in place, to support the minimum small business participation requirement identified in paragraph 4.a (above). Only add subcontractors with firm commitments to the table below, do NOT add subcontractor without firm commitments established. A SB commitment is a written agreement between a prime and small business to work together on this contract. This commitment in writing is considered the nature of commitment, which can include written teaming agreement, joint venture agreement, mentor-protégé agreement, written/signed letter of commitment from the small business, etc. This table can be expanded as needed.

Company Name Small Business Category(ies)*

Products/Services, including type & variety of work

Nature of Commitment

N40085-26-R-0004

*SB, WOSB, EDWOSB, SDB, HUBZone SB, VOSB, SDVOSB

5. Explanation/Rationale. If no subcontractors are identified in paragraph 4.b. above, provide detailed explanation for why subcontractors are not identified with firm commitments AND how your firm will be able to achieve the proposed small business participation.

6. If the offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation.

File details come from the government source that posted it. Updated .