FINAL DESIGN_1667770dwg2of4Site.pdf
PDF 45 MB Posted
- Solicitation number
- N4008526R0004
About this file
This file is a comprehensive set of final design drawings for the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut. The drawings (sheets 2 of 4) include existing conditions plans, erosion and sediment control plans, demolition plans, and associated details spanning the 15.98-acre disturbed project area. The existing conditions plans document topographic survey data completed May 26, 2020 and updated August 15, 2022, including base control points, benchmark elevations, utility locations (sanitary sewer, storm sewer, water, natural gas, electric, and communications), and wetland delineations. The survey conforms to Connecticut topographic survey accuracy standards and references North American Datum (NAD) 1983 state plane coordinates and North American Vertical Datum (NAVD) 1988 elevations.
The erosion and sediment control plans provide initial and final configurations across five designated areas (A through E), identifying temporary sediment traps with specified storage volumes and dry/wet storage depths ranging from 153 to 412 cubic yards, temporary construction access roads, tree protection zones, geotextile silt fences, fiber rolls, outlet protection devices, and construction entrance details. The demolition plans identify removal of Building 524 (approximately 12,000 square feet on first floor, 5,500 on second floor, metal panel exterior on structural steel), Building 393 (approximately 800 square feet, single-story CMU construction), 18 existing arch-type magazines (A94-A111), associated pavement (4-8 inches concrete or asphalt with crushed stone base), utilities, transformer pads, riprap, and underground storage tanks. The plans indicate features to remain protected, including existing magazines A113-A114, fire hydrants, sanitary manholes, and portions of certain door trenches and drains. Construction is sequenced across three phases with site-specific erosion controls, dewatering measures, and permanent stabilization requirements via topsoiling and seeding in accordance with Connecticut Sediment & Erosion Control Guidelines. Demolition photographs document the existing conditions of buildings and magazines prior to construction.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SH
AR
K
BO
ULE
VA
RD
TRITON
AVENUE TRITON AVENUE
PERIMETER
R O
AD
SH
AR
K
BO
ULE
VA
RD
SH
AR
K
BO
ULE
VA
RD
TRITON
GENERAL SHEET NOTES
GRAPHIC SCALE
1. REFER TO SHEET C-001 FOR GENERAL NOTES, LEGEND, AND
ABBREVIATIONS.
2. VERTICAL CONTROL MUST BE BASED ON BASE CONTROL DISK
LOCATED ADJACENT TO TRITON AVENUE WITH COORDINATES
N 709,180.983, E 1,181,607.163, ELEVATION 41.80. TRAVERSE
FROM THIS POINT TO MULTIPLE LOCATIONS VISIBLE FROM
EACH PART OF THE CONSTRUCTION.
EX
IS
TI
NG
C O
ND
IT
IO
NS
P
LA
N
- O
VE
RA
LL
CI
VI
L
V-100
SURVEYOR'S NOTES
1. THIS MAP AND SURVEY HAVE BEEN PREPARED IN ACCORDANCE WITH THE
REGULATIONS OF CONNECTICUT STATE AGENCIES, SECTIONS 20-300B-A
THROUGH 20-300B-20, MINIMUM STANDARDS OF ACCURACY, CONTENT AND
CERTIFICATION FOR SURVEYS AND MAPS" IN THE STATE OF CONNECTICUT,
EFFECTIVE JUNE 21, 1996, AMENDED OCTOBER 26, 2018.
THE TYPE OF SURVEY PERFORMED AND THE MAPPED FEATURES DEPICTED
HEREON ARE THE ACCORDANCE WITH THE REQUIREMENTS OF A
TOPOGRAPHIC SURVEY, AND ARE INTENDED TO NOTE OR DEPICT THE
EXISTING IMPROVEMENTS INCLUDING STRUCTURES, CONCRETE SURFACES,
UTILITY POLES, CONCRETE WALLS, UNDERGROUND UTILITIES AND PARKING
AREAS.
THE CONTOUR INTERVAL IS ONE (1) FOOT.
THERE IS NO BOUNDARY DETERMINATION/OPINION.
THIS SURVEY CONFORMS TO TOPOGRAPHIC SURVEY ACCURACY CLASS T-2.
FIELD SURVEY WAS COMPLETED ON MAY 26, 2020, AND UPDATED ON AUGUST
15, 2022.
2. BEARINGS AND COORDINATES ARE REFERENCED TO THE NORTH AMERICAN
DATUM (NAD) OF 1983 PROJECTED ONTO THE CONNECTICUT STATE PLAN
COORDINATE SYSTEM HOLDING BASE CONTROL POINT 215 & 913 WITH THE
FOLLOWING PUBLISHED COORDINATES:
215 N 708,517.276, E 1,182,350.857 913 N 708,271.567, E 1,182,543.797
3. CONTOUR AND ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN
VERTICAL DATUM (NAVD) 1988 HOLDING BASE CONTROL 215 & 913 WITH THE
FOLLOWING PUBLISHED ELEVATIONS: 215=95.913 AND 913=77.677
4. REFERENCE IS MADE TO THE FOLLOWING MAPS:
A. "DEPARTMENT OF THE NAVY, NAVAL FACILITIES ENGINEERING COMMAND
MID-ATLANTIC NORTHEAST, NEW LONDON SUBMARINE BASE, P-848 MK-48
TORPEDO MAGAZINE, EXISTING FEATURES PLAN", SCALE 1"=30'
5. PARCEL IS IDENTIFIED AS TAX MAY 119, BLOCK 2120, LOT 1421 ON THE
LEDYARD ASSESSOR'S MAP.
6. PROPERTY IS LOCATED IN ZONE "X" AS DEPICTED ON FLOOD INSURANCE
RATE MAP (FIRM) PANEL 0364J, NEW LONDON COUNTY, CONNECTICUT, TOWN
OF GROTON, COMMUNITY NUMBER 090097, TOWN OF LEDYARD, COMMUNITY
NUMBER 090157, CITY OF NEW LONDON, COMMUNITY NUMBER 090100, TOWN
OF WATERFORD, COMMUNITY NUMBER 090107, MAP NUMBER 09011CO364J,
MAP REVISED AUGUST 5, 2013.
7. LIMIT OF INLAND WETLANDS AS FLAGGED BY DTC (MAY, 2011) FIELD LOCATED
BY THE LRC GROUP
8. THE SUBSURFACE UTILITIES DEPICTED HEREON CONFORM TO THE
FOLLOWING UTILITY QUALITY LEVELS, AD DEFINED BY THE AMERICAN
SOCIETY OF CIVIL ENGINEERS (ASCE) IN DOCUMENT CI/ASCE 38-02 TITLED
"STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA":
· SANITARY SEWER: QLC
· STORM SEWER: QLC
· WATER: QLC AND QLD
· NATURAL GAS: QLC AND QLD
· ELECTRIC: QLC AND QLD
· COMMUNICATIONS: QLC AND QLD
THE SUBSURFACE UTILITIES WERE COMPILED FROM PAROL EVIDENCE,
RECORD DRAWINGS, AND SURFICIAL EVIDENCE LOCATED DURING THE FIELD
SURVEY. THE SURVEYOR HAS NOT PHYSICALLY EXPOSED THE SUBSURFACE
UTILITIES, AND MAKES NO GUARANTEE THAT THE SUBSURFACE UTILITIES
DEPICTED HEREON COMPRISE ALL SUCH UTILITIES WITHIN THE SURVEYED
AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES
NOT WARRANT OR GUARANTEE THAT THE SUBSURFACE UTILITIES ARE IN THE
EXACT LOCATION DEPICTED, THOUGH THEY HAVE BEEN PLOTTED, IN
ACCORDANCE WITH THE STANDARD OF CARE, FROM INFORMATION
AVAILABLE. UTILIZE THE LOCAL UTILITY ONE CALL SYSTEM PRIOR TO
EXCAVATION FOR THE PURPOSE OF VERIFYING THE SUBSURFACE UTILITIES
IN THE AREA.
SURVEY LIMITS
SURVEY LIMITS
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
A1 EXISTING CONDITIONS PLAN - OVERALL
1" = 100'
MATCHLINE SEE ABOVE
MATCHLINE SEE BELOW
BASE CONTROL
MONUMENT FOUND
COORDINATES
N 709,670.311 E 1,181,715.482
ELEVATION 35.89
BASE CONTROL
MONUMENT FOUND
COORDINATES
N 708,913.493 E 1,180,648.055
ELEVATION 33.82
BASE CONTROL
DISK FOUND
COORDINATES
N 709,180.983 E 1,181,607.163
ELEVATION 41.80
BENCHMARK
NORTHERLY CORNER
OF CONCRETE PAD
COORDINATES
N 708,856.424 E 1,183,038.683
ELEVATION 90.57
BENCHMARK
WESTERLY CORNER
CONCRETE PAD
COORDINATES
N 708,524.546 E 1,182,725.038
ELEVATION 82.45
BENCHMARK
NW CORNER
OF CONCRETE
COORDINATES
N 708,570.181 E 1,182,566.014
ELEVATION 82.90
BENCHMARK
PUNCH EAST SCREW
COORDINATES
N 709,374.104 E 1,182,671.309
ELEVATION 124.29
BENCHMARK
CUT NAIL IN TREE
COORDINATES
N 709,877.143 E 1,182,410.172
ELEVATION 108.31
BENCHMARK
X CUT IN CONC
COORDINATES
N 708,925.934 E 1,181,176.094
ELEVATION 38.04
BENCHMARK
DRILL HOLE IN WALL
COORDINATES
N 709,656.648 E 1,181,021.144
ELEVATION 29.74
BENCHMARK
X EAST BOLT
COORDINATES
N 708,996.864 E 1,180,615.903
ELEVATION 36.31
BASE CONTROL
POINT 215
COORDINATES
N 708,517.276 E 1,182,350.857
ELEVATION 95.913
BASE CONTROL
POINT 913
COORDINATES
N 708,271.567 E 1,182,543.797
ELEVATION 77.677
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
PERIMETER
R O
AD
GENERAL SHEET NOTES
GRAPHIC SCALE
1. REFER TO SHEET C-001 FOR GENERAL NOTES, LEGEND, AND
ABBREVIATIONS.
KEYED NOTES
B A
C
KEYPLAN
SURVEY LIMITS
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
SURVEY LIMITS
SURVEY LIMITS
ADDITIONAL
TOPOGRAPHIC
INFORMATION FROM
GOVERNMENT
SUPPLIED GIS
INFORMATION
A1 EXISTING CONDITIONS PLAN - AREA A
1" = 30'
M
AT
CH
LI
NE
S
EE
B
EL
O
W
M
AT
CH
LI
NE
S
HE
ET
V -1
M
AT
CH
LI
NE
S
EE
A
BO
VE
BENCHMARK
PUNCH EAST SCREW
COORDINATES
N 709,374.104 E 1,182,671.309
ELEVATION 124.29
BENCHMARK
CUT NAIL IN TREE
COORDINATES
N 709,877.143 E 1,182,410.172
ELEVATION 108.31
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
EX
IS
TI
NG
C
ON
DI
TI
ON
S
PL
AN
AR
EA
A
CI
VI
L
V-101
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL NOTES, LEGEND, AND
ABBREVIATIONS.
KEYED NOTES
EX
IS
TI
NG
C O
ND
IT
IO
NS
P
LA
N
- A
RE
A
B
CI
VI
L
V-102
GRAPHIC SCALE
B A
C
KEYPLAN
SURVEY LIMITS
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
SURVEY LIMITS
SURVEY
LIMITS
ADDITIONAL
TOPOGRAPHIC
INFORMATION
FROM
GOVERNMENT
SUPPLIED GIS
INFORMATION
A1 EXISTING CONDITIONS PLAN - AREA B
1" = 30'
MATCHLINE SHEET V-103
M
AT
CH
LI
NE
S
EE
S
HE
ET
V -1
BENCHMARK
NORTHERLY CORNER
OF CONCRETE PAD
COORDINATES
N 708,856.424 E 1,183,038.683
ELEVATION 90.57
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
MATCHLINE SHEET V-102 GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL NOTES, LEGEND, AND
ABBREVIATIONS.
KEYED NOTES
GRAPHIC SCALE
B A
C
KEYPLAN
EX
IS
TI
NG
C O
ND
IT
IO
NS
P
LA
N
- A
RE
A
C
CI
VI
L
V-103
SURVEY LIMITS
A1 EXISTING CONDITIONS PLAN - AREA C
1" = 30'
ADDITIONAL TOPOGRAPHIC INFORMATION FROM
GOVERNMENT SUPPLIED GIS INFORMATION
BENCHMARK
NW CORNER
OF CONCRETE
COORDINATES
N 708,570.181 E 1,182,566.014
ELEVATION 82.90
BENCHMARK
WESTERLY CORNER
CONCRETE PAD
COORDINATES
N 708,524.546 E 1,182,725.038
ELEVATION 82.45
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
BASE CONTROL
POINT 215
COORDINATES
N 708,517.276 E 1,182,350.857
ELEVATION 95.913
BASE CONTROL
POINT 913
COORDINATES
N 708,271.567 E 1,182,543.797
ELEVATION 77.677
MAJOR CONTOUR
MINOR CONTOUR
BUILDING FOOTPRINT
SANITARY SEWER (GRAVITY)
WATER
ROOF DRAIN
CONCRETE PAVEMENT
ASPHALT PAVEMENT
EXISTING LEGEND
LEGEND
CONCRETE SIDEWALK
SAN
W
RD
CLEANOUT
DEMOLISH ASPHALT PAVEMENT
STORMWATER BEST MANAGEMENT
PRACTICE (BMP) FEATURE
GENERAL SHEET NOTES
1. DO NOT SCALE DIMENSIONS FOR CONSTRUCTION PURPOSES. USE
DIMENSIONED VALUES PROVIDED IN THE DRAWINGS AND
SPECIFICATIONS.
2. BASELINES AND STATIONING HAVE BEEN ESTABLISHED FOR
REFERENCE ONLY. VERIFY DIMENSIONS AND LOCATION OF
STRUCTURES.
3. PERFORM WORK IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE,
AND LOCAL LAWS AND ORDINANCES. PROTECT PUBLIC FROM
ONGOING CONSTRUCTION OPERATIONS.
4. INFORMATION REGARDING THE REPORTED PRESENCE, SIZE,
CHARACTER AND LOCATION OF EXISTING UNDERGROUND UTILITIES
HAS BEEN SHOWN ON THE DRAWINGS AND RECORDED AS SUCH IN
GOOD FAITH. THERE IS NO IMPLIED GUARANTEE OF THE ACCURACY
OF THE INFORMATION AND IT MUST BE CONSIDERED IN THIS LIGHT.
5. UNDERGROUND UTILITIES ARE SHOWN AT APPROXIMATE ELEVATIONS
AND LOCATIONS. EXACT LOCATIONS AND SIZES OF EXISTING UTILITIES
IN THE AREA OF CONSTRUCTION MUST BE VERIFIED IN THE FIELD WITH
A REPRESENTATIVE FROM THE UTILITY COMPANY OR PWD PRIOR TO
EXCAVATION.
6. CONFINE WORK TO THE LIMITS OF CONSTRUCTION SHOWN ON
DRAWINGS.
7. USE ONLY ESTABLISHED ROADWAYS AND OBSERVE APPLICABLE
WEIGHT RESTRICTIONS FOR VEHICLES AND/OR ROADWAYS.
8. SEQUENCE OF WORK MUST BE SELECTED TO MINIMIZE
INTERRUPTIONS TO TRAFFIC FLOW AND UTILITY SERVICE AND NEW
LONDON OPERATIONS, IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS.
9. CONDUCT EARTHMOVING ACTIVITIES IN A MANNER THAT WILL
PREVENT ACCELERATED EROSION AND RESULTING SEDIMENTATION,
IN ACCORDANCE WITH THE STORM WATER POLLUTION CONTROL PLAN
DEVELOPED FOR THIS SITE.
10. UNDER THIS CONTRACT, THE INTENT IS THAT EXCAVATED SOILS ARE
REUSED ON-SITE TO THE GREATEST EXTENT PRACTICABLE AND
ECONOMICALLY JUSTIFIED. IF REUSE IS NOT PRACTICAL OR
ECONOMICAL AND DISPOSAL ON THE GOVERNMENT INSTALLATION IS
NOT AVAILABLE, SOIL REMOVED FROM THE CONSTRUCTION SITE MUST
BE TAKEN OFFSITE.
11. CONTOUR INTERVAL IS 1-FOOT, 2-FOOT CONTOURS SHOWN FOR ROCK
CUTS AND EARTH COVER OVER MAGAZINES FOR CLARITY.
12. COORDINATE TEMPORARY STREET CLOSURES AND TRAFFIC CONTROL
SIGNAGE WITH THE INSTALLATION.
13. CONDUCT EARTHWORK UNDER THE SUPERVISION OF A REGISTERED
GEOTECHNICAL ENGINEER.
GEOTECHNICAL NOTES
1. A GEOTECHNICAL FIELD INVESTIGATION WAS CONDUCTED IN MAY 2020
AND JUNE 2022 BY TERRACON.
2. A GEOTECHNICAL DATA REPORT WAS PROVIDED TO JACOBS
ENGINEERING ON 01 SEPTEMBER 2022.
3. EIGHT (8) SOIL BORINGS WERE COMPLETED IN MAY 2020 AND AN
ADDITIONAL THIRTY-ONE (31) TEST BORINGS IN JUNE 2022. BORING
LOCATIONS ARE SHOWN ON SHEET BB101 AND BORING LOGS SHOWN ON
SHEETS BB301 TO BB308.
4. NINE (9) INFILTRATION TESTS WERE PERFORMED AND RATES RANGED
FROM 0 IN/HR TO 24 IN/HR.
UTILITY NOTES
1. LOCATION OF EXISTING WATER FACILITIES SHOWN ARE APPROXIMATE.
UTILITIES NOT SHOWN, OR NOT LOCATED WILL NOT BE CAUSE TO DENY
RESPONSIBILITY FOR PROTECTION AND/OR REPAIR OF DAMAGE
INCURRED DURING CONSTRUCTION. EXACT LOCATION MUST BE
VERIFIED IN THE FIELD.
2. WATER MAINS AND SANITARY PIPES REQUIRE A MINIMUM COVER OF 38".
3. WATER AND SANITARY SEWER LINES MUST HAVE A MINIMUM OF TEN (10)
FEET HORIZONTAL SEPARATION.
4. WATER AND STORM SEWER LINES MUST HAVE A MINIMUM OF FOUR (4)
FEET HORIZONTAL SEPARATION.
5. SANITARY AND STORM SEWER LINES MUST HAVE A MINIMUM OF
EIGHTEEN (18) INCH VERTICAL SEPARATION FROM THE WATER LINE.
6. FOR UTILITY CONTACT INFORMATION, COORDINATE WITH CONTRACTING
OFFICER.
SURVEY NOTES
1. FIELD SURVEY WAS COMPLETED ON MAY 26, 2020 AND UPDATED ON
AUGUST 15, 2022.
2. BEARINGS AND COORDINATES ARE REFERENCED TO THE NORTH
AMERICAN DATUM (NAD) OF 1983 PROJECTED ONTO THE CONNECTICUT
STATE PLAN COORDINATE SYSTEM HOLDING BASE CONTROL POINTS 215
& 913 WITH THE FOLLOWING PUBLISHED COORDINATES:
215 N 708,517.276, E 1,182,350.857 913 N 708,271.567, E 1,182,543.797
3. CONTOURS AND ELEVATIONS ARE REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM (NAVD) 1988 HOLDING BASE CONTROL 215 &
913 WITH THE FOLLOWING PUBLISHED ELEVATIONS: 215=95.913 AND
913=77.677.
4. REFERENCE IS MADE TO THE FOLLOWING MAPS:
A. "DEPARTMENT OF THE NAVY, NAVAL FACILITIES ENGINEERING
COMMAND MID-ATLANTIC NORTHEAST, NEW LONDON NAVAL
SUBMARINE BASE, P-848 MK-48 TORPEDO MAGAZINE, EXISTING
FEATURES PLAT" SCALE 1"=30'.
5. PARCEL IS IDENTIFIED AS TAX MAP 119, BLOCK 2120, LOT 1431 ON THE
LEDYARD ASSESSOR'S MAP
DEMOLITION NOTES
1. COMPLY WITH PERTINENT PROVISIONS OF THE LATEST VERSION OF
U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH
REQUIREMENTS MANUAL, EM385-1-1.
2. DEMOLITION MUST BE IN ACCORDANCE WITH PROJECT DRAWINGS,
NOTES AND SPECIFICATIONS AS WELL AS FEDERAL, STATE AND LOCAL
REGULATIONS.
3. REFER TO THE SITE PLAN, UTILITY PLAN, OR PAVING PLAN FOR
LOCATION OF RELOCATED FACILITIES.
4. PROTECT EXISTING FEATURES TO REMAIN INCLUDING TREES, ROADS,
UTILITIES, PAVING AND SIMILAR ITEMS NOT IN THE CONTRACT WORK
LIMITS, WHICH IF DAMAGED MUST BE REPLACED IN KIND AT NO COST
TO THE GOVERNMENT.
5. REMOVE UTILITY LINES TO LIMITS SHOWN ON PLANS.
6. IF UNFORESEEN UTILITY LINES ARE ENCOUNTERED THAT ARE NOT
INDICATED ON UTILITY MAPS NOTIFY THE COR PRIOR TO FURTHER
WORK IN THE AREA.
7. RUBBISH AND DEBRIS MUST BE DISPOSED OF OFFSITE DAILY, UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER, TO AVOID
ACCUMULATION AT THE DEMOLITION SITE.
8. PROVIDE FENCING ALONG CONSTRUCTION SITE AT OPEN
EXCAVATIONS AND TUNNELS TO CONTROL ACCESS BY UNAUTHORIZED
PERSONS. PROVIDE SAFETY FENCE AS SPECIFIED.
9. CONSTRUCTION ON A SITE THAT HAS THE POSSIBILITY OF THE
EXISTENCE OF MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) /
UNEXPLODED ORDINANCE (UXO): IN THE EVENT MILITARY MUNITIONS,
AS DEFINED IN 40 CFR 260, ARE DISCOVERED OR UNCOVERED,
IMMEDIATELY STOP WORK IN THAT AREA AND IMMEDIATELY INFORM
THE CONTRACTING OFFICER.
DEBRIS REMOVAL NOTES
1. EXCESS MATERIALS ASSOCIATED WITH THE CONSTRUCTION OF THIS
PROJECT, MUST BE REMOVED FROM THE GOVERNMENT PROPERTY
UNLESS OTHERWISE AUTHORIZED BY THE CONTRACTING OFFICER.
LIMIT OF DISTURBANCE
SOIL TYPE DELINEATION LINE
GEOTEXTILE SILT FENCE (C1/C-501)
SUPER SILT FENCE (C3/C-502)
FIBER ROLL (C2/C-503)
TREE PROTECTION (A3/C-503)
TEMPORARY SEEDING, REFER TO
SPECIFICATION 32 92 19
PERMANENT SEEDING, REFER TO
SPECIFICATION 32 92 19
OUTLET PROTECTION (A3/C-502)
CONSTRUCTION ENTRANCE (A1/C-501)
GEOTEXTILE SILT FENCE (C1/C-501)
SUPER SILT FENCE (C4/C-502)
FIBER ROLL CHECK DAM (A1/C-502)
STONE CHECK DAM (C2/C-501)
FIBER ROLL INLET PROTECTION
(C1/C-502)
SILT FENCE INLET PROTECTION
(C2/C-502)
ROCK INLET PROTECTION (C3/C-502)
TEMPORARY EROSION CONTROL
BLANKET (A1/C-503)
CONCRETE WASHOUT STRUCTURE
(A4/C-501)
FILTER BAG (C1/C-503)
DUST CONTROL
TOPSOILING
TEMPORARY DIVERSION (A4/C-503)
TEMPORARY SEDIMENT TRAP
(C4/C-503)
Fd / BaA SOIL TYPE
UNDERGROUND ELECTRIC SECONDARYES
TP XX
TG XX
TOP OF PAVEMENT SPOT
ELEVATION
TOP OF GRADE SPOT ELEVATION
LIGHT POLE
SIGN POST
UNDERGROUND ELECTRIC PRIMARYE
STORM DRAINSD
33 FT UNOBSTRUCTED SPACE SETBACK
UNDER DRAIN (PERFORATED)UD UD
FOUNDATION DRAIN (PERFORATED)FD FD
CHAIN LINK FENCEX
TRANSFORMER
SANITARY MANHOLE
STORM INLET
POST INDICATOR VALVE
FIRE HYDRANT
SANITARY SEWER MANHOLE
TP
PS
OP
CE
SSF
SCD
FIP
STORM DRAIN
FIRE PROTECTION WATER SUPPLYF
TEE FITTING
11.25° ELBOW FITTING
45° ELBOW FITTING
22.5° ELBOW FITTING
REDUCER FITTING
G
EN
ER
AL
N O
TE
S
LE
G
EN
D
CI
VI
L
C-001
SF
LOD
33' AT
FCD
GSF
SIP
RIP
ECB
SSF
FR
FB
DC
TS
TO
FL
FH
E
N
CO
AC
MH
LM
PSI POUNDS PER SQUARE INCH
NTS NOT TO SCALE
MANHOLE
LINEAR FEET
FLOWLINE
FIRE HYDRANT
NORTH, NORTHING
CLEAN OUT
MAX MAXIMUM
PAVEMENT
ASPHALT CONCRETE
CONC CONCRETE
MIN MINIMUM
SST STAINLESS STEEL
RCP REINFORCED CONCRETE PIPE
SIM SIMILAR
TYP TYPICAL
ELEVATION
DIA, Ø DIAMETER
CL, C CENTERLINEL
STA STATION
APPROX APPROXIMATE
EXST EXISTING
PIV POST INDICATOR VALVE
BL BARREL
CI CAST IRON
ELECTRICAL
ELB ELBOW
FDC
F FLANGE
FIRE DEPARTMENT CONNECTION
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
PED
PE POLYETHYLENE
PEDESTRIAN
PVMNT
SD
VERT VERTICAL
ADA AMERICANS WITH DISABILITIES ACT
SANITARY SEWER
ABND
CMP CORRUGATED METAL PIPE
CONST CONSTRUCT
EAST, EASTING, ELECTRICAL
ELECT
EP EDGE OF PAVEMENT
FFE FINISHED FLOOR ELEVATION
G GAS
HC HEATING/COOLING
OVERHEAD
TC TOP OF CURB OR CASTING
TG TOP OF GRATE
W WATER
SIDEWALKSW
STND STANDARD
STRUCT STRUCTURAL
ABA
~ APPROXIMATELY
AND
ABANDONED
COORD COORDINATE
DEMO
CB CATCH BASIN
GB GRADE BREAK
BURIEDBUR
BM BENCH MARK
C.O., CO,
SPEC'D SPECIFIED
TOP OF CONCRETETOC
EQUIP EQUIPMENT
BMP BEST MANAGEMENT PRACTICE
IE INVERT ELEVATION
PLS PURE LIVE SEED
DI
TOP OF SLABTOS
TOW TOP OF WALL
POINT OF CURVATURE
STANDARD DETAIL / STORM DRAIN
DEMOLISH OR DEMOLITION
MUTCD MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
DUCTILE IRON/DROP INLET
W/ WITH
ELEV
FG FINISHED GRADE
HDPE HIGH DENSITY POLYETHYLENE
L LENGTH
LOD
LP LOW POINT
LT LEFT
PC
PCC POINT OF COMPOUND CURVE /
PVC POLYVINYL CHLORIDE OR
POINT OF VERTICAL CURVATURE
PT POINT OF TANGENCY
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
REQ'D REQUIRED
RT RIGHT
SF SECURITY FORCES
S, SS
CONTRACTING OFFICER
BC BOTTOM OF CURB
EOS EDGE OF SLAB/SIDEWALK
FOW FACE OF WALL
PORTLAND CEMENT CONCRETE
SOG SLAB ON GRADE
GOV GOVERNMENT OWNED VEHICLES
ABN ABANDON
ARCHITECTURAL BARRIERS ACT
A-T ANTI-TERRORISM
CCSD CONVENTIONAL CONSTRUCTION
STANDOFF DISTANCE
OH, OVH
ESC EROSION AND SEDIMENT CONTROL
UG UNDERGROUND
UST UNDERGROUND STORAGE TANK
DWG DRAWING
HP HIGH POINT
POV PRIVATELY OWNED VEHICLE
IN INCHES
DPW DIRECTORATE OF PUBLIC WORKS
GPS GLOBAL POSITIONING SYSTEM
STORMWATER MANAGEMENTSWM
BCSM BRASS CAP SURVEY MONUMENT
DOT DEPARTMENT OF TRANSPORTATION
CLSM CONTROLLED LOW STRENGTH MATERIAL
CWS CHILLED WATER SUPPLY
LOG LIP OF GUTTER
LIMIT OF DISTURBANCE
CWR CHILLED WATER RETURN
BLDG BUILDING
ABBREVIATIONS
INV INVERT
FT FEET
EROSION & SEDIMENT
CONTROL LEGEND
DEGREE OF CURVATURE
PI POINT OF INTERSECTION
R RADIUS
TD
PROPERTY LINE
EASEMENT LINE
INDEX CONTOUR
INTERMEDIATE CONTOUR
STONEWALL
TREE LINE
RETAINING WALL
FENCE
STREAM / EDGE OF WATER
LIMIT OF WETLANDS
STORM SEWER
SANITARY SEWER
WATER MAIN
ELECTRIC LINE
COMMUNICATIONS LINE
WETLAND FLAG
SIGN
BOLLARD
EXISTING SPOT GRADE
GUY WIRE
UTILITY POLE
WATER VALVE
HYDRANT
DRAINAGE MANHOLE
SANITARY MANHOLE
MANHOLE, UTILITY TYPE UNKNOWN
LAMP POST
ROOF LEADER
YARD DRAIN
MONITORING WELL
WOOD POST
DEPTH OF COVER (FT.)
CATCH BASIN
CURBLESS CATCH BASIN
DECIDUOUS TREE
CONIFEROUS TREE
BITUMINOUS CONCRETE SURFACE
CONCRETE SURFACE
GRAVEL SURFACE
RIP-RAP
LEGEND (CONT.)
DEMOLISH CONCRETE PAVEMENT
USFWS UNITED STATES FISH AND
WILDLIFE SERVICE
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
TST
CT-12
CRYSTAL LAKE RD
MILITARY HW
Y / SHARK BLVD
WAHOO AVE
TANG AVE
TRITON AVE
GRAPHIC SCALE
PROJECT AREA
CONTRACTOR
LAYDOWN AREA
GATE 7
COMMERCIAL
INSPECTION
GENERAL SHEET NOTES
1. AERIAL IMAGERY PROVIDED BY MICROSOFT CORPORATION.
2. EQUIPMENT AND MATERIAL STORAGE AREA IS DESIGNATED ON THIS
SHEET. SECURE EQUIPMENT AND STORED MATERIALS. NO COVERED
STORAGE IS AVAILABLE.
VI
CI
NI
TY
M
AP
H
AU
L
RO
UT
E
CI
VI
L
C-002
CONTRACTOR
HAUL ROUTE
A1 VICINITY MAP & HAUL ROUTE
1" = 100'
LOCATION OF ROCK
CRUSHING OPERATIONS
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
D E
F
G
H
I
J
B
A
C
K
CT-12
CRYSTAL LAKE RD
MILITARY HW
Y / SHARK BLVD
WAHOO AVE
TANG AVE
TRITON AVE
GRAPHIC SCALE
GENERAL SHEET NOTES
1. AERIAL IMAGERY PROVIDED BY MICROSOFT CORPORATION.V-101, CD101,C-101,
C-111, CS101, CG101,
CU101, ES101, TS101
V-102, CD102, C-102,
C-112, CS102, CG102,
CU102, ES102, TS102
C-100, C-104, C-110, C-114, ES104, TS104
C-100, C-110, TS106
C-100, C-105, C-110, C-115, ES105, TS105
TS107
TS108
TS109
TS110
V-103, CD103, C-103,
C-113, CS103, CG103,
CU103, ES103, TS103
O
VE
RA
LL
S
IT
E
KE
Y M
AP
CI
VI
L
C-003
A1 OVERALL SITE KEY MAP
1" = 100'
TS111
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
OFF-SITE AREAS
EROSION CONTROL SEQUENCE (CONT.)PROJECT DESCRIPTION
1. THE P-1102 NEW LONDON WEAPONS COMPOUND MAGAZINE
RECAPITALIZATION PROJECT WILL REPLACE 18 EXISTING MAGAZINES
WITH 6 CONTAINERIZED LONG WEAPONS STORAGE (CLWS), 2 TYPE G
MAGAZINES, 1 TYPE H MAGAZINE, REPLACE BUILDING 524 (ORDNANCE
OPERATIONS BUILDING), AND REPLACE BUILDING 393 (TRUCK
INSPECTION AND SENTRY BUILDING).
2. THE PROJECT IS LOCATED WITHIN THE EXISTING WEAPONS STORAGE
COMPOUND LOCATED AT THE NORTHERN END OF THE NAVAL
SUBMARINE BASE NEW LONDON ALONG TRITON DRIVE.
3. TOTAL DISTURBED AREA = 15.98 ACRES
GENERAL E & S NOTES
1. THE US GOVERNMENT IS THE OWNER OF RECORD ASSOCIATED WITH
THIS PROJECT.
2. THE GENERAL CONTRACTOR IS THE OPERATOR OF THE SITE AND
RESPONSIBLE FOR PROVIDING AND MAINTAINING EROSION AND
SEDIMENT CONTROL MEASURES DURING CONSTRUCTION
OPERATIONS.
3. PROVIDE SEDIMENT AND EROSION CONTROLS IN ACCORDANCE WITH
THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT
CONTROL, LATEST EDITION; AND THE CONTRACT DOCUMENTS.
4. KEEP A COPY OF THE GUIDELINES ON-SITE FOR REFERENCE DURING
CONSTRUCTION.
MONITORING & MAINTENANCE
1. E&S PLAN AND REVISIONS MUST IDENTIFY AN AGENT OR AGENTS WHO
HAVE THE RESPONSIBILITY AND AUTHORITY FOR THE IMPLEMENTATION,
OPERATION, MONITORING AND MAINTENANCE OF E&S MEASURES. SUCH
AGENT(S) MUST BE FAMILIAR WITH EACH CONTROL MEASURE USED
INCLUDING ITS LIMITATIONS, INSTALLATION, INSPECTION AND
MAINTENANCE. WHEN CONTROL MEASURES FAIL, OR ARE FOUND
INEFFECTIVE, SUCH AGENT(S) MUST COORDINATE PLAN REVISIONS
WITH A PROFESSIONAL EXPERIENCED IN EROSION AND SEDIMENT
CONTROL AND APPROVING AGENCY, WHEN THAT AGENCY’S APPROVAL
IS REQUIRED. SUCH AGENT(S) MUST HAVE THE ADDITIONAL
RESPONSIBILITY FOR ENSURING EROSION AND SEDIMENT CONTROLS
ARE INSTALLED AND MAINTAINED ACCORDING TO STATE OF
CONNECTICUT STANDARDS. INSPECT CONSTRUCTION SITE BEFORE
PREDICTED MAJOR STORMS. A MAJOR STORM IS DEFINED AS A STORM
PREDICTED BY THE NATIONAL OFFICE OF ATMOSPHERIC
ADMINISTRATION (NOAA) WEATHER SERVICE WITH WARNINGS OF
FLOODING, SEVERE THUNDERSTORMS OR SIMILARLY SEVERE WEATHER
CONDITIONS OR EFFECTS.
2. EACH MEASURE HAS INSPECTION REQUIREMENTS INCLUDED IN THE
MEASURE’S SECTION ENTITLED “MAINTENANCE”. MANY OF THE
MEASURES REQUIRE INSPECTIONS AT LEAST ONCE A WEEK AND WITHIN
24 HOURS OF THE END OF A STORM WITH A RAINFALL AMOUNT OF 0.5
INCH OR GREATER; SOME OTHERS REQUIRE DAILY INSPECTION. ONLY
THE PERMANENT MEASURES HAVE LESS FREQUENT INSPECTIONS.
MORE FREQUENT INSPECTIONS THAN THOSE IDENTIFIED IN THE
MEASURE MAY BE NECESSARY FOR SITES THAT ARE HEAVILY TRAVELED
AND BEFORE MAJOR STORMS.
BEST MANAGEMENT PRACTICES
1. CONSTRUCTION ENTRANCE - A STONE STABILIZED PAD SOMETIMES
ASSOCIATED WITH A MUD RACK, AUTOMOTIVE SPRAY, OR OTHER
MEASURES LOCATED AT POINT OF VEHICULAR INGRESS AND EGRESS
ON A CONSTRUCTION SITE USED TO REDUCE TRACKING OF SEDIMENT
OFF SITE ONTO PAVED SURFACES.
2. DEWATERING - THE REMOVAL OF WATER BY PUMPING, INFILTRATION,
OPEN AIR DRYING OR OTHER METHODS; DRAINAGE OF THE SOIL
PROFILE.
3. DIVERSION - A CHANNEL AND/OR SUPPORTING RIDGE, OR OTHER
MAN-MADE STRUCTURE CONSTRUCTED TO CHANGE THE DIRECTION OF
WATER FROM ONE AREA TO ANOTHER.
4. GEOTEXTILE - FABRIC OR SYNTHETIC MATERIAL PLACED (1) BETWEEN
THE SOIL AND A PIPE, GABION, STONE, OR RETAINING WALL TO
ENHANCE WATER MOVEMENT AND/OR RETARD SOIL MOVEMENT, (2) AS
A BLANKET OR MAT TO ADD REINFORCEMENT AND/OR SEPARATION (3)
TO PROVIDE AN ABOVE GROUND SEDIMENT BARRIER.
5. GEOTEXTILE SILT FENCE - A TEMPORARY SEDIMENT BARRIER
CONSISTING OF A GEOTEXTILE FABRIC PULLED TAUT AND ATTACHED TO
SUPPORTING POSTS AND ENTRENCHED.
6. INLET PROTECTION - A TEMPORARY SEDIMENT BARRIER CONSISTING OF
GEOTEXTILE FABRIC AND STONE PLACED AROUND STORM WATER
CATCH BASINS.
7. OUTLET PROTECTION - STRUCTURALLY LINED APRONS OR OTHER
ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED BETWEEN THE
OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS AND A STABLE
DOWNSTREAM CHANNEL.
8. PERMANENT STABILIZATION - ESTABLISHMENT OF PERMANENT STAND
OF GRASS AND/OR LEGUMES BY SEEDING AND MULCHING EXPOSED
SOILS WITH A SEED MIXTURE FOR LONG TERM STABILIZATION ON
DISTURBED OR ERODIBLE SOILS THAT HAVE BEEN BROUGHT TO FINAL
GRADE, OR WHERE SUSPENSION OF WORK IS EXPECTED TO EXCEED 1
YEAR, AND WHERE SLOPES GRADIENTS ARE NO STEEPER THAN 2H:1V.
FOR SLOPES STEEPER THAN 2H:1V, USE SLOPE STABILIZATION
MEASURES FROM THE STABILIZATION STRUCTURES FUNCTIONAL
GROUP.
9. TEMPORARY STABILIZATION - ESTABLISHMENT OF TEMPORARY STAND
OF GRASS AND/OR LEGUMES BY SEEDING AND MULCHING SOILS THAT
WILL BE EXPOSED FOR A PERIOD GREATER THAN 1 MONTH BUT LESS
THAN 12 MONTHS. WITHIN THE FIRST 7 DAYS OF SUSPENDING WORK ON
A GRADING OPERATION THAT EXPOSES ERODIBLE SOILS WHERE SUCH
SUSPENSION IS EXPECTED TO LAST FOR 1 TO 12 MONTHS. SUCH AREAS
INCLUDE SOIL STOCKPILES, BORROW PITS, ROAD BANKS AND OTHER
DISTURBED OR UNSTABLE AREAS. NOT FOR USE ON AREAS THAT ARE
LEFT DORMANT FOR MORE THAN 1 YEAR. USE PERMANENT VEGETATIVE
MEASURES IN THOSE SITUATIONS.
SOILS
THERE ARE MULTIPLE SOIL TYPES FOUND AT THE SITE. THE SOILS ARE
IDENTIFIED ON THE EROSION AND SEDIMENT CONTROL PLAN. THESE SOILS
ARE LISTED BELOW:
73C - CHARLTON-CHATFIELD COMPLEX, 0 TO 15 % SLOPES, VERY ROCKY
PROPERTIES AND QUALITIES
HYDROLOGIC SOIL GROUP: B
75E - HOLLIS-CHATFIELD-ROCK OUTCROP COMPLEX, 3 TO 15 % SLOPES
PROPERTIES AND QUALITIES
HYDROLOGIC SOIL GROUP: D
306 - UDORTHENTS-URBAN LAND COMPLEX
PROPERTIES AND QUALITIES
HYDROLOGIC SOIL GROUP: B
EXISTING CONDITIONS
1. THE UNDEVELOPED PORTIONS OF NAVAL SUBMARINE BASE NEW
LONDON ARE WOODED. THE CLEAR ZONE AROUND THE SECURITY
FENCE IS MOWED GRASS. INSIDE THE SECURITY FENCE IS PRIMARILY
DEVELOPED WITH EXISTING STRUCTURES, PAVEMENT, AND SOME
GRAVEL.
2. WETLANDS ARE LOCATED WITHIN THE PROJECT SITE LOCATED ON THE
EAST SIDE OF THE WEAPONS STORAGE COMPOUND. THE WETLANDS
WERE DELINEATED AND CAPTURED ON THE TOPOGRAPHIC FIELD
SURVEY. ENCROACHMENT INTO THE WETLAND AREA REQUIRED FOR
CONSTRUCTION OF THE CLWS MAGAZINES WILL REQUIRE A WETLAND
ALTERATION PERMIT. A CONNECTICUT GENERAL CONSTRUCTION
PERMIT WILL BE REQUIRED FOR DISTURBANCE OF 1 ACRE OR MORE.
ADJACENT PROPERTY
1. THE PROJECT SITE AND DISTURBANCE IS LOCATED WITHIN THE SECURE
PERIMETER OF NAVAL SUBMARINE BASE NEW LONDON.
MANAGEMENT STATEGIES
1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS
CAN BEGIN AND END AS QUICKLY AS POSSIBLE.
2. AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLEARLY MARKED
BY SIGNS, FLAGS, ETC.
MATERIALS
1. EROSION & SEDIMENT CONTROL MATERIALS MUST MEET THE
REQUIREMENTS OF THE CONNECTICUT GUIDELINES FOR SOIL EROSION
AND SEDIMENT CONTROL, LATEST EDITION.
1. PROVIDE REQUIRED PERMITS AND EROSION AND SEDIMENT CONTROL
ASSOCIATED WITH OFF-SITE BORROW OR SPOIL AREAS.
ER
O
SI
O
N
SE
DI
M
EN
T
CO
NT
RO
L
- G
EN
ER
AL
N
O
TE
S
CI
VI
L
C-004
EROSION CONTROL SEQUENCE (CONT.)
PHASE 1C
1. DEMOLISH BUILDING 524 INCLUDING UTILITY SERVICE LINES,
PAVEMENTS, AND STRUCTURAL SLABS.
2. PERFORM GRADING IN AREAS OF PAVEMENT AND STRUCTURAL SLAB
DEMOLITION. ESTABLISH SUB-GRADE FOR TOPSOIL AREAS.
3. PLACE TOPSOIL WHERE REQUIRED.
4. FINE GRADE, RAKE, SEED, AND MULCH DISTURBED AREAS FOR FINAL
STABILIZATION.
EROSION CONTROL SEQUENCE
PHASE 1A
1. FLAG LIMITS OF CONSTRUCTION NECESSARY TO FACILITATE THE
PRE-CONSTRUCTION MEETING.
2. HOLD PRE-CONSTRUCTION MEETING ONSITE WITH CONTRACTING
OFFICER. (REMEMBER TO CALL BEFORE YOU DIG 1-800-922-4455).
3. FLAG REMAINDER OF THE LIMITS OF CONSTRUCTION AND TREE
PROTECTION ZONES.
4. PROVIDE CONSTRUCTION ENTRANCE AND TEMPORARY CONSTRUCTION
ACCESS AND SECURITY FENCING TO ENSURE A SECURE PERIMETER
AROUND EXISTING MAGAZINES TO REMAIN IN PLACE DURING PHASE 1
OPERATIONS.
5. PROVIDE PERIMETER EROSION AND SEDIMENT CONTROLS AND TREE
PROTECTION DEVICES IN ACCORDANCE WITH THE E&S PLAN.
6. CUT TREES WITHIN THE DEFINED CLEARING LIMITS AND REMOVE CUT
WOOD. CHIP BRUSH AND SLASH, STOCKPILE CHIPS FOR FUTURE USE OR
REMOVE OFF SITE.
7. STRIP AND STOCKPILE TOPSOIL THAT IS WITHIN THE FOOTPRINT OF THE
OPERATIONS BUILDING. REFERENCE STOCKPILE MANAGEMENT FOR
EROSION AND SEDIMENT CONTROLS.
8. PERFORM EXCAVATION FOR OPERATIONS BUILDING. MAKE CUTS AND
FILLS REQUIRED. ESTABLISH THE SUB-GRADE FOR THE TOPSOIL AREAS,
PARKING AND ROADWAY, AND STRUCTURE. MINIMIZE AREA AROUND
FOOTPRINT OF BUILDING REQUIRED FOR CONSTRUCTION ACTIVITIES.
9. BEGIN CONSTRUCTION OF OPERATIONS BUILDING.
10. PROVIDE SANITARY SEWERS, DRAINAGE SYSTEMS AND UTILITIES TO
WITHIN 5 FEET OF THE BUILDING OR AS OTHERWISE MODIFIED BY THE
CONTRACTING OFFICER TO ADJUST FOR UNFORESEEN SITE
CONDITIONS.
11. PREPARE SUB-BASE, SLOPES, PARKING AREAS, SHOULDER AREAS,
ACCESS ROADS AND OTHER AREA OF DISTURBANCE FOR FINAL
GRADING.
12. PROVIDE AGGREGATE BASE COURSE IN PARKING AND ROADWAY
AREAS.
13. PLACE TOPSOIL WHERE REQUIRED. COMPLETE LANDSCAPE PLANTINGS.
14. FINE GRADE, RAKE, SEED AND MULCH TO WITHIN 2 FEET OF PAVEMENT
EDGE.
15. UPON SUBSTANTIAL COMPLETION OF THE BUILDING, COMPLETE THE
BALANCE OF SITE WORK AND STABILIZATION OF REMAINING DISTURBED
AREAS. PROVIDE FIRST COURSE OF PAVING. CONVERT TEMPORARY
SEDIMENT TRAP 1 TO PERMANENT STORM WATER FACILITY C. MAINTAIN
TREATMENT CHAMBERS OFFLINE UNTIL FINAL SITE STABILIZATION.
16. WHEN WORK AND SITE STABILIZATION HAS BEEN COMPLETED, SWEEP
PAVED AREAS FOR FINAL COURSE OF PAVING. INSPECT DRAINAGE
SYSTEM AND CLEAN AS NEEDED.
PHASE 1B
1. REROUTE AND DEMOLISH EXISTING UTILITIES NECESSARY TO
CONSTRUCT TYPE H MAGAZINE. INSTALL TEMPORARY SEDIMENT TRAP
2.
2. STRIP AND STOCKPILE TOPSOIL THAT IS WITHIN THE FOOTPRINT OF
TYPE H MAGAZINE. REFERENCE STOCKPILE MANAGEMENT FOR
EROSION AND SEDIMENT CONTROLS.
3. PERFORM EXCAVATION FOR TYPE H MAGAZINE. MAKE CUTS AND FILLS
REQUIRED. ESTABLISH SUB-GRADE FOR TOPSOIL AREAS, APRON, AND
STRUCTURE. MINIMIZE AREA AROUND FOOTPRINT OF BUILDING
REQUIRED FOR CONSTRUCTION ACTIVITIES.
4. BEGIN CONSTRUCTION OF TYPE H MAGAZINE.
5. PROVIDE DRAINAGE SYSTEMS AND UTILITIES TO WITHIN 5 FEET OF THE
BUILDING OR AS OTHERWISE MODIFIED BY THE CONTRACTING OFFICER
TO ADJUST FOR UNFORESEEN SITE CONDITIONS.
6. PREPARE SUB-BASE, SLOPES, PAVEMENT AREAS AND OTHER AREAS OF
DISTURBANCE FOR FINAL GRADING.
7. PROVIDE AGGREGATE BASE COURSE IN APRON AREA.
8. PLACE TOPSOIL WHERE REQUIRED.
9. FINE GRADE, RAKE, SEED AND MULCH TO WITHIN 2 FEET OF CURBING.
10. UPON SUBSTANTIAL COMPLETION OF THE BUILDING, COMPLETE THE
BALANCE OF SITE WORK AND STABILIZATION OF DISTURBED AREAS.
CONVERT TEMPORARY SEDIMENT TRAP 2 TO PERMANENT STORM
WATER FACILITY B. MAINTAIN TREATMENT CHAMBER OFFLINE UNTIL
FINAL SITE STABILIZATION.
11. WHEN WORK AND SITE STABILIZATION HAS BEEN COMPLETED, INSPECT
THE DRAINAGE SYSTEM AND CLEAN, AS NEEDED.
12. PROVIDE CONCRETE PAVEMENT.
PHASE 2
1. MAINTAIN CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION
ACCESS, AND SECURITY FENCING TO ENSURE A SECURE PERIMETER
AROUND EXISTING MAGAZINES TO REMAIN IN PLACE DURING PHASE 2
OPERATIONS.
2. DEMOLISH PAVEMENT WEST OF EXST-002 (A113) NECESSARY TO INSTALL
TEMPORARY SEDIMENT TRAP 4.
3. DEMOLISH EXISTING MAGAZINES A94, A95, A96, AND A97 INCLUDING
ASSOCIATED PAVEMENTS AND UTILITIES.
4. STRIP AND STOCKPILE TOPSOIL NEAR MAGAZINES A94, A95, A96, AND
A97. REFERENCE STOCKPILE MANAGEMENT FOR EROSION AND
SEDIMENT CONTROLS.
5. PERFORM ROCK BLASTING AND EXCAVATION NEAR MAGAZINES A94, A95,
A96, AND A97. DEMOLISH PAVEMENT AND REROUTE EXISTING UTILITIES
IN AREA OF SENTRY BUILDING.
6. BEGIN CONSTRUCTION OF TYPE G MAGAZINES AND SENTRY BUILDING.
7. PROVIDE DRAINAGE SYSTEMS AND UTILITIES TO WITHIN 5 FEET OF
BUILDING OR AS OTHERWISE MODIFIED BY THE CONTRACTING OFFICER
TO ADJUST FOR UNFORESEEN SITE CONDITIONS.
8. PREPARE SUB-BASE, SLOPES, PAVEMENT AREAS AND AREAS OF
DISTURBANCE FOR FINAL GRADING.
9. PROVIDE AGGREGATE BASE COURSE IN APRON AREA.
10. PLACE TOPSOIL WHERE REQUIRED.
11. FINE GRADE, RAKE, SEED AND MULCH TO WITHIN 2 FEET OF CURBING.
12. UPON SUBSTANTIAL COMPLETION OF THE BUILDING, COMPLETE THE
BALANCE OF SITE WORK AND STABILIZATION OF DISTURBED AREAS.
13. WHEN WORK AND SITE STABILIZATION HAS BEEN COMPLETED, INSPECT
DRAINAGE SYSTEM AND CLEAN, AS NEEDED.
14. PROVIDE CONCRETE PAVEMENT.
PHASE 3
1. MAINTAIN CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION
ACCESS, AND SECURITY FENCING TO ENSURE A SECURE PERIMETER
AROUND EXISTING MAGAZINES TO REMAIN IN PLACE DURING PHASE 3
OPERATIONS.
2. INSTALL TEMPORARY SEDIMENT TRAP 5.
3. DEMOLISH EXISTING MAGAZINES A100 - A109 INCLUDING ASSOCIATED
PAVEMENTS AND UTILITIES.
4. STRIP AND STOCKPILE TOPSOIL NEAR MAGAZINES A100 - A109.
REFERENCE STOCKPILE MANAGEMENT FOR EROSION AND SEDIMENT
CONTROLS.
5. PERFORM EXCAVATION NEAR MAGAZINES A100 - A109.
6. BEGIN CONSTRUCTION OF SIX (6) CLWS MAGAZINES.
7. PROVIDE DRAINAGE SYSTEMS AND UTILITIES TO WITHIN 5 FEET OF
BUILDING OR AS OTHERWISE MODIFIED BY THE CONTRACTING OFFICER
TO ADJUST FOR UNFORESEEN SITE CONDITIONS.
8. PREPARE SUB-BASE, SLOPES, PAVEMENT AREAS, AND AREAS OF
DISTURBANCE FOR FINAL GRADING.
9. PROVIDE AGGREGATE BASE COURSE IN APRON AREA.
10. PLACE TOPSOIL WHERE REQUIRED.
11. FINE GRADE, RAKE, SEED AND MULCH TO WITHIN 2 FEET OF CURBING.
12. UPON SUBSTANTIAL COMPLETION OF THE BUILDING, COMPLETE THE
BALANCE OF SITE WORK AND STABILIZATION OF DISTURBED AREAS.
13. WHEN WORK AND SITE STABILIZATION HAS BEEN COMPLETED, INSPECT
DRAINAGE SYSTEM AND CLEAN, AS NEEDED.
14. PROVIDE CONCRETE PAVEMENT.
15. DEMOLISH EXISTING BUILDING 393 INCLUDING ASSOCIATED UTILITIES.
PERMANENTLY STABILIZE AREA FOR FINAL INSPECTION.
16. AFTER SITE IS STABILIZED AND AFTER FINAL INSPECTION AND
APPROVAL BY AUTHORITY HAVING JURISDICTION, REMOVE TEMPORARY
EROSION AND SEDIMENT CONTROLS (E.G. GEOTEXTILE SILT FENCES) .
CONNECT UNDERGROUND STORM WATER CHAMBERS TO STORM
SEWER.
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
PHASE 1A (CONTINUED)
17. PROVIDE FINAL COURSE OF PAVEMENT.
18. DEMOLISH EXISTING MAGAZINES A98, A99, A110, AND A111 INCLUDING
ASSOCIATED PAVEMENTS AND UTILITIES. INSTALL TEMPORARY
SEDIMENT TRAPS 1 AND 3.
19. STRIP AND STOCKPILE TOPSOIL NEAR MAGAZINES A98, A99, A110, AND
A111. REFERENCE STOCKPILE MANAGEMENT FOR EROSION AND
SEDIMENT CONTROLS.
20. PERFORM ROCK BLASTING AND EXCAVATION FOR OPERATIONS
BUILDING AND AREA NEAR MAGAZINES A98, A99, A110, AND A111.
21. PROVIDE TEMPORARY SEEDING ON AREA OF DEMOLISHED MAGAZINES
A98, A99, A110, AND A111 TO REMAIN INACTIVE UNTIL CONSTRUCTION OF
CLWS MAGAZINES.
22. STRIP AND STOCKPILE TOPSOIL THAT IS WITHIN THE FOOTPRINT OF
STORM WATER MANAGEMENT AREAS A, B, AND C. REFERENCE
STOCKPILE MANAGEMENT FOR EROSION AND SEDIMENT CONTROLS.
23. BEGIN CONSTRUCTION OF STORM WATER MANAGEMENT AREA A.
24. DO NOT CONNECT STORM WATER CHAMBER SYSTEM TO STORM SEWER
TO PREVENT SEDIMENT LOADING DURING CONSTRUCTION ACTIVITIES.
25. PLACE TOPSOIL WHERE REQUIRED. FINE GRADE, RAKE, SEED AND
MULCH.
C
E
E
E
E
E
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
DLOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
DLO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYED NOTES
1. STORMWATER MANAGEMENT AREA
2. DELINEATED WETLAND AREA
3. EXISTING MAGAZINES
4. SOIL DELINEATION
5. TEMPORARY SEDIMENT TRAP
IN
IT
IA
L
ER
O
SI
O
N
AN
D
SE
DI
M
EN
T
CO
NT
RO
L
PL
AN
O
VE
RA
LL
CI
VI
L
C-100
D E
B A
C
KEYPLAN
A114
A113
1. REFER TO C-004 FOR EROSION & SEDIMENT CONTROL NOTES AND
SEQUENCE OF EROSION CONTROL CONSTRUCTION.
2. REFER TO SHEET C-001 FOR LEGEND AND ADDITIONAL NOTES.
3. COMPLY WITH THE CONNECTICUT SEDIMENT & EROSION CONTROL
GUIDELINES, LATEST EDITION, FOR EROSION AND SEDIMENT CONTROL
MEASURES UTILIZED.
4. REFER TO SHEET C-501 TO C-503 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
5. COORDINATE WITH USFWS REGARDING SITE CLEARING RESTRICTIONS
RELATED TO THE NORTHERN LONG-EARED BAT. LIMIT TREE CLEARING
TO DESIGNATED SEASONS REQUIRED BY USFWS.
B524
B393
TRITON AVENUE
A1 INITIAL EROSION AND SEDIMENT CONTROL PLAN - OVERALL
1" = 100'
A99 A110
A111A98
A94
A95
A96
A97
A100 A109
A101 A108
A102 A107
A103 A106
A104 A105
SSF
FCD
MATCHLINE SEE ABOVE
MATCHLINE SEE BELOW
MILITARY HWY/
SHARK BLVD
CONSTRUCTION PHASE 1A
CONSTRUCTION PHASE 1A
CONSTRUCTION PHASE 1A
CONSTRUCTION PHASE 1A
CONSTRUCTION PHASE 1B
CONSTRUTION PHASE 1A
CONSTRUCTION PHASE 1B
CONSTRUCTION PHASE 1C
CONSTRUCTION PHASE 2
CONSTRUCTION PHASE 3
CONSTRUCTION PHASE 1A
CONSTRUCTION PHASE 1A
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
5 5
C
E
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
PERIMETER
R O
AD
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYED NOTESM
AT
CH
LI
NE
S
HE
ET
C -1
IN
IT
IA
L
ER
O
SI
O
N
AN
D
SE
DI
M
EN
T
CO
NT
RO
L
PL
AN
AR
EA
A
CI
VI
L
C-101
D E
B A
C
KEYPLAN
1. REFER TO C-004 FOR EROSION & SEDIMENT CONTROL NOTES AND
SEQUENCE OF EROSION CONTROL CONSTRUCTION.
2. REFER TO SHEET C-001 FOR LEGEND AND ADDITIONAL NOTES.
3. COMPLY WITH THE CONNECTICUT SEDIMENT & EROSION CONTROL
GUIDELINES, LATEST EDITION, FOR EROSION AND SEDIMENT CONTROL
MEASURES UTILIZED.
4. REFER TO SHEETS C-501 TO C-503 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
5. COORDINATE WITH USFWS REGARDING SITE CLEARING RESTRICTIONS
RELATED TO THE NORTHERN LONG-EARED BAT. LIMIT TREE CLEARING
TO DESIGNATED SEASONS REQUIRED BY USFWS.
1. LIMIT OF DISTURBANCE
2. PROVIDE DUST CONTROL DURING DEMOLITION OF BUILDING 524
3. SOIL DELINEATION
4. CONCRETE WASHOUT STRUCTURE
5. TEMPORARY SEDIMENT TRAP #1
6. TEMPORARY DIVERSION DITCH, REFER TO A4/C-503
7. TEMPORARY SEDIMENT TRAP LIMITS OF DRAINAGE AREA
GSF
FCD
GSF
FCD
CE
B524
GSF
A1 INITIAL EROSION AND SEDIMENT CONTROL PLAN - AREA A
1" = 30'
M
AT
CH
LI
NE
S
EE
B
EL
O
W
M
AT
CH
LI
NE
S
EE
A
BO
VE
TPTP
DC
FCD
FCD
FCD
FCD SCD
TP
FCD
N 709,192.87 E 1,182,485.26
N 709,180.60 E 1,182,498.82
N 709,217.89 E 1,182,517.47
N 709,337.35 E 1,182,494.05
N 709,344.06 E 1,182,508.93
N 709,349.71 E 1,182,540.08
N 709,358.59 E 1,182,580.98
N 709,363.50 E 1,182,610.95
N 709,368.17 E 1,182,625.36
N 709,378.48 E 1,182,640.69
N 709,445.01 E 1,182,603.19
N 709,415.36 E 1,182,616.35
N 709,411.85 E 1,182,622.63
N 709,421.03 E 1,182,519.83
N 709,632.02 E 1,182,481.38
N 709,728.99 E 1,182,427.39
N 709,779.04 E 1,182,441.41
N 709,800.41 E 1,182,478.78
N 709,821.47 E 1,182,412.58
N 709,809.49 E 1,182,403.18N 709,873.03
E 1,182,309.54
N 709,916.46 E 1,182,344.24
N 709,930.06 E 1,182,316.52
N 709,957.80 E 1,182,336.97
N 709,986.50 E 1,182,364.28
N 709,979.16 E 1,182,390.04
N 709,944.47 E 1,182,379.65
N 709,945.78 E 1,182,396.44
N 709,950.72 E 1,182,414.24
N 709,968.13 E 1,182,448.45
N 709,952.26 E 1,182,352.81
N 709,983.91 E 1,182,472.93
N 710,009.15 E 1,182,495.92
N 710,002.59 E 1,182,507.95
N 709,977.80 E 1,182,502.85 N 709,936.05 E 1,182,474.78
N 709,877.19 E 1,182,494.59
N 709,856.05 E 1,182,517.04
N 709,852.46 E 1,182,536.82
N 709,838.27 E 1,182,584.33
N 709,818.69 E 1,182,616.40
N 709,797.43 E 1,182,635.09
N 709,689.76 E 1,182,686.40
N 709,645.70 E 1,182,697.51
N 709,593.86 E 1,182,697.81
N 709,438.40 E 1,182,760.10
N 709,376.82 E 1,182,771.84
N 709,232.68 E 1,182,769.09
N 709,301.42
E 1,182,767.45 FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
54.00'
24.00'
SEDIMENT TRAP #1
DRAINAGE AREA = 2.45 AC
REQ'D STOR. VOL. = 328 CY
REQ'D WET VOL. = 164 CY
REQ'D DRY VOL. = 164 CY
DEPTH WET STOR. = 3'
DEPTH DRY STOR. = 3'
TP
TST
N 709,821.42 E 1,182,439.52
LOD
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LOD LOD LOD LOD LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
E
E
GENERAL SHEET NOTES
KEYED NOTES
IN
IT
IA
L
ER
O
SI
O
N
AN
D
SE
DI
M
EN
T
CO
NT
RO
L
PL
AN
AR
EA
B
CI
VI
L
C-102
GRAPHIC SCALE
D E
B A
C
KEYPLAN
1. LIMIT OF DISTURBANCE
2. DELINEATED WETLAND AREAS
3. EXISTING MAGAZINES
4. SOIL DELINEATION
5. PROVIDE DUST CONTROL DURING DEMOLITION OF EXISTING MAGAZINES.
PROVIDE TEMPORARY SEEDING ON DISTURBED AREAS IF
CONSTRUCTION OF MAGAZINES IS DELAYED FOR MORE THAN 30 DAYS.
6. CONCRETE WASHOUT STRUCTURE
7. TEMPORARY GRAVEL CONSTRUCTION ACCESS, APPROXIMATELY 320' IN
LENGTH, REFER TO A1/C-501 FOR SECTION AND WIDTH
8. PROVIDE TEMPORARY DIVERSION DITCH TO DIVERT BASE FLOW
AROUND MAGAZINE AND ROCK EXCAVATION WORK AREA, REFER TO
DETAIL A4/C-503
9. TEMPORARY SEDIMENT TRAP LIMITS OF DRAINAGE AREA
1. REFER TO C-004 FOR EROSION & SEDIMENT CONTROL NOTES AND
SEQUENCE OF EROSION CONTROL CONSTRUCTION.
2. REFER TO SHEET C-001 FOR LEGEND AND ADDITIONAL NOTES.
3. COMPLY WITH THE CONNECTICUT SEDIMENT & EROSION CONTROL
GUIDELINES, LATEST EDITION, FOR EROSION AND SEDIMENT CONTROL
MEASURES UTILIZED.
4. REFER TO SHEETS C-501 TO C-503 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
5. COORDINATE WITH USFWS REGARDING SITE CLEARING RESTRICTIONS
RELATED TO THE NORTHERN LONG-EARED BAT. LIMIT TREE CLEARING
TO DESIGNATED SEASONS REQUIRED BY USFWS.
SSF
TP
SSF
A113
A1 INITIAL EROSION AND SEDIMENT CONTROL PLAN - AREA B
1" = 30'
MATCHLINE SHEET C-103
M
AT
CH
LI
NE
S
EE
S
HE
ET
C -1
A99 A110
A111A98
A94
A95
A96
A97
A100 A109
A101 A108
A102 A107
A103 A106
TP
TP
TP
TP
TP
TP
TP
FCD
DC TS
DC TS
DC TS DC TS
5 5
7 TP
12.00'
SCD
SCD
SCD
SCD
SCD
8TD
N 709,039.70 E 1,182,698.86
N 709,014.82 E 1,182,704.55 N 708,972.59
E 1,182,748.18
N 709,099.50 E 1,182,860.22
N 709,100.11 E 1,182,909.55
N 709,019.53 E 1,182,990.01
N 709,054.33 E 1,183,024.77
N 709,053.62 E 1,183,109.59 N 708,880.75
E 1,183,293.84
N 708,830.98 E 1,183,295.58
N 708,732.94 E 1,183,200.75
N 708,720.38 E 1,183,156.99
N 708,664.61 E 1,183,104.75
N 708,638.05 E 1,183,086.93
N 708,600.02 E 1,183,052.80
N 708,582.04 E 1,183,048.43
N 708,555.21 E 1,183,050.04
N 708,530.80 E 1,183,031.70 N 708,517.63
E 1,183,018.83
N 708,508.34 E 1,182,985.62
N 708,505.82 E 1,182,966.94
N 708,489.45 E 1,182,940.66
TP
N 708,977.20 E 1,182,621.97
N 708,953.42 E 1,182,639.56
N 708,925.39 E 1,182,634.44
N 708,886.73 E 1,182,597.27
N 708,878.66 E 1,182,576.29
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
TST
50.00'
25.00'
SEDIMENT TRAP #2
DRAINAGE AREA = 2.02 AC
REQ'D STOR. VOL. = 271CY
REQ'D WET VOL. = 136CY
REQ'D DRY VOL. = 136 CY
DEPTH WET STOR. = 3'
DEPTH DRY STOR. = 3'
TD TD
GSF
TD
TD
TD
GSF
GSF
N 708,467.62 E 1,182,921.10
LOD
LOD
LOD
LODLOD
E
LO
D
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LOD
LODLO
D
LOD
LOD
LO
D
LOD
LO
D
GENERAL SHEET NOTES
KEYED NOTES
GRAPHIC SCALE
D E
B A
C
KEYPLAN
IN
IT
IA
L
ER
O
SI
O
N
AN
D
SE
DI
M
EN
T
CO
NT
RO
L
PL
AN
AR
EA
C
CI
VI
L
C-103
1. LIMIT OF DISTURBANCE
2. SOIL DELINEATION
3. DELINEATED WETLAND AREA
4. EXISTING MAGAZINES
5. PROVIDE DUST CONTROL DURING DEMOLITION OF EXISTING MAGAZINES.
PROVIDE TEMPORARY SEEDING ON DISTURBED AREAS IF
CONSTRUCTION OF MAGAZINES IS DELAYED FOR MORE THAN 30 DAYS.
6. TEMPORARY GRAVEL CONSTRUCTION ACCESS, APPROXIMATELY 320' IN
LENGTH, REFER TO D1/CS504
7. TEMPORARY SEDIMENT TRAP LIMITS OF DRAINAGE AREA
1. REFER TO C-004 FOR EROSION & SEDIMENT CONTROL NOTES AND
SEQUENCE OF EROSION CONTROL CONSTRUCTION.
2. REFER TO SHEET C-001 FOR LEGEND AND ADDITIONAL NOTES.
3. COMPLY WITH THE CONNECTICUT SEDIMENT & EROSION CONTROL
GUIDELINES, LATEST EDITION, FOR EROSION AND SEDIMENT CONTROL
MEASURES UTILIZED.
4. REFER TO SHEET C-501 TO C-503 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
5. COORDINATE WITH USFWS REGARDING SITE CLEARING RESTRICTIONS
RELATED TO THE NORTHERN LONG-EARED BAT. LIMIT TREE CLEARING
TO DESIGNATED SEASONS REQUIRED BY USFWS.
SSF
SCD
RIP
FIP
FIP
SIP
A114
A113
B393
A1 INITIAL EROSION AND SEDIMENT CONTROL PLAN - AREA C
1" = 30'
MATCHLINE SHEET C-102
FIP
A104 A105
FIP
RIP
RIP
SSF
SCD
SCD
SSF
SSF
GSF
FIP
RIP
TP
SSF
DC TS
M
AT
CH
LI
NE
S
EE
B
EL
O
W
M
AT
CH
LI
NE
S
EE
A
BO
VE
SSF
SSF
N 708,408.61 E 1,182,886.25
N 708,356.98 E 1,182,860.81
N 708,282.05 E 1,182,932.07
N 708,250.48 E 1,182,933.62
N 708,183.85 E 1,182,960.43
N 708,105.35 E 1,182,950.75
N 708,127.18 E 1,182,888.40
N 708,139.37 E 1,182,858.12
N 708,183.25 E 1,182,807.31
N 708,231.55 E 1,182,546.77
N 708,239.24 E 1,182,502.26
N 708,251.46 E 1,182,479.53
N 708,344.31 E 1,182,385.17
N 708,452.04 E 1,182,365.30
N 708,455.81 E 1,182,340.99
N 708,468.74 E 1,182,323.84
N 708,492.26 E 1,182,337.46
N 708,522.49 E 1,182,357.18
N 708,570.60 E 1,182,323.91
N 708,636.52 E 1,182,329.22
N 708,653.58 E 1,182,340.15
N 708,707.82 E 1,182,308.83
N 708,296.61 E 1,182,915.41
N 708,265.60 E 1,182,934.39
N 708,115.17 E 1,182,911.39
N 708,209.14 E 1,182,755.86
N 708,874.81 E 1,182,482.73
FAX: 571.218.1600
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
MI
D-
AT
LA
NT
IC
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V A
NA
VA
L
SU
BM
AR
IN
E
BA
SE
N
EW
L O
ND
O
N G
RO
TO
N, C
O
NN
EC
TI
CU
T
P-
W
EA
PO
NS
M
AG
AZ
IN
E
OR
DN
AN
CE
O
PE
RA
TIO
NS
FA
CI
LIT
Y
SI
TE
SMS/CWJ
JWJ
HPN
1667770
APPROVED BY LCDR PETE
FOVARGUE NAVFAC FEAD
DIRECTOR - NLON, VIA EMAIL
6/3/2025
TST
TST TST
TD
61.00'
31.00'
SEDIMENT TRAP #3
DRAINAGE AREA = 3.07 AC
REQ'D STOR. VOL. = 412 CY
REQ'D WET VOL. = 206 CY
REQ'D DRY VOL. = 206 CY
DEPTH WET STOR. = 3'
DEPTH DRY STOR. = 3'
SEDIMENT TRAP #5
DRAINAGE AREA = 1.14 AC
REQ'D STOR. VOL. = 153 CY
REQ'D WET VOL. = 77 CY
REQ'D DRY VOL. = 77 CY
DEPTH WET STOR. = 3'
DEPTH DRY STOR. = 3'
SEDIMENT TRAP #4
DRAINAGE AREA = 2.23 AC
REQ'D STOR. VOL. = 300 CY
REQ'D WET VOL. = 150 CY
REQ'D DRY VOL. = 150 CY
DEPTH WET STOR. = 3'
DEPTH DRY STOR. = 3'
50.00'
25.00'
19.00'
37.00'
TD
TD
GSF
TD TS
N 708,313.99 E 1,182,903.81
N 708,441.48 E 1,182,913.01
N 708,405.52 E 1,182,873.00
GSF
SSF
GSF
N 708,544.98 E 1,182,3338.29
AVENUE TRITON AVENUE
E
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
E
GENERAL SHEET NOTES
KEYED NOTES
GRAPHIC SCALE
D E
B A
C
KEYPLAN
IN
IT
IA
L
ER
O
SI
O
N
AN
D
SE
DI
M
EN
T
CO
NT
RO
L
PL
AN
AR
EA
D
CI
VI
L
C-104
1. LIMIT OF DISTURBANCE
2. SOIL DELINEATION
3. PROVIDE PERIMETER CONTROLS ALONG DOWNSTREAM SIDE OF
TRENCHING OPERATIONS. PROVIDE GEOTEXTILE SILT FENCE IN
NON-PAVED AREAS AND ANCHORED FIBER ROLL IN PAVED AREAS,
REFER TO C1/C-501 AND C2/C-503.
1. REFER TO C-004 FOR EROSION & SEDIMENT CONTROL NOTES AND
SEQUENCE OF EROSION CONTROL CONSTRUCTION.
2. REFER TO SHEET C-001 FOR LEGEND AND ADDITIONAL NOTES.
3. COMPLY WITH THE CONNECTICUT SEDIMENT & EROSION CONTROL
GUIDELINES, LATEST EDITION, FOR EROSION AND SEDIMENT CONTROL
MEASURES UTILIZED.
4. REFER TO SHEET C-501 TO C-503 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
5. SECURE AREAS FROM VEHICULAR TRAFFIC AND PEDESTRIAN ACCESS.
PROVIDE TRAFFIC AND PEDESTRIAN CONTROL.
6. INSTALL EROSION AND SEDIMENT CONTROLS AND TREE PROTECTION
DEVICES IN ACCORDANCE WITH E&SC PLAN.
7. SAW CUT PAVEMENT OR CONCRETE AS INDICATED ON DRAWINGS.
8. EXCAVATE TRENCH AND STOCKPILE SUITABLE MATERIALS. USE
DEWATERING MEASURES AS NEEDED. REMOVE UNSUITABLE
MATERIALS TO A SECURED…