This file is Amendment 0005 to solicitation N4008525R2639, issued by NAVFAC Mid-Atlantic on March 19, 2026, for construction services at Naval Station Norfolk, Virginia. The amendment extends the proposal due date from March 24, 2026 to March 31, 2026 at 2:00 PM ET, providing bidders additional time for subcontractor pricing and document review. The amendment incorporates an updated Wage Determination (VA20260160, effective January 30, 2026) for building construction in Norfolk County with prevailing wage rates for various trades including asbestos workers, boilermakers, electricians, elevator mechanics, ironworkers, plumbers, and numerous other construction classifications. The document includes extensive pre-proposal inquiry (PPI) responses addressing 153 distinct questions covering specifications, drawings, scope clarifications, constructability concerns, pricing, security requirements, and technical requirements across multiple discipline areas.

The amendment provides revised and new attachments including updated price proposal forms, revised drawing sets (Volumes I and II), specifications for total building commissioning, concrete pavement, gypsum board, fire alarm systems, insulation materials, expansion joint covers, and other technical documents. Key scope clarifications address FF&E procurement procedures, commissioning firm engagement through government design IDIQs rather than contractor subcontracting, utility cost charges, wage and hour requirements, cybersecurity and CUI documentation controls, citizenship requirements for secure area work, and material sourcing through U.S. suppliers only. The project involves construction of two buildings (LP-48A Annex and LP-48 Hangar) at Naval Station Norfolk with phased construction sequencing, including demolition, new structural work, mechanical/electrical/plumbing systems, security infrastructure, and specialized finishes. Multiple contract line items (CLINs) address base construction, energy storage systems, audiovisual systems, and furniture/fixtures/equipment procurement through separate best-value vendor selections.

View the file

Other files

File Type Posted
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Attachment F Small Business Participation Commitment.docx DOCX document
JA ML2650 25R2639 P222 ILDFA Redacted.pdf PDF
Solicitation Amendment N4008525R26390008 SF 30.pdf PDF
K3237099 LP-48 HazMat Report 3.5.26 - signed.pdf PDF
01 31 23.13 20.pdf PDF
Amendment 0007 Continuation Sheet.pdf PDF
Solicitation Amendment N4008525R26390007 SF 30.pdf PDF
REGISTER.pdf PDF
TABLE OF CONTENTS.pdf PDF
13 49 20.00 10.pdf PDF
Solicitation Amendment N4008525R26390006 SF 30.pdf PDF
P222_1737012_01 91 00.15 22.pdf PDF
Crane - LP48 1-DATA SHEET.pdf PDF
P222_1737012_Geotech Report.pdf PDF
P222_1737012_28 31 76.pdf PDF
Attachment H - Price Proposal Form_rev1.pdf PDF
P222_1737012_Drawings_volume II_Rev 001_SIGNED.pdf PDF
P222_1737012_04 20 00.pdf PDF
Amendment 0005 Continuation Sheet.pdf PDF
P222_1737012_32 13 13.06.pdf PDF
P222_1737012_09 29 00.pdf PDF
P222_1737012_07 60 00.pdf PDF
FY26 Naval Station Norfolk Utility Costs.pdf PDF
P222_1737012_07 21 13.pdf PDF
P222_1737012_REGISTER.pdf PDF
P222_1737012_Drawings_volume I_Rev 001_SIGNED.pdf PDF
P222_1737012_13 34 20.pdf PDF
Crane - LP48 2-DATA SHEET.pdf PDF
Solicitation Amendment N4008525R26390004 SF 30.pdf PDF
JA ML2623 25R2639 P222 ASSA Abloy Redacted.pdf PDF
JA ML2624 25R2639 P222 SRG RF Shielding Redacted.pdf PDF
26R2639 P222 Site Visit Log.pdf PDF
Solicitation Amendment N4008525R26390003 SF 30.pdf PDF
Solicitation Amendment N4008525R26390002 SF 30.pdf PDF
Solicitation Amendment N4008525R26390001 SF 30.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
1737012_dwg 02of02_P222.pdf PDF
Attachment M - P222 Site Visit Map.pdf PDF
1737012_spec 01of04_P222.pdf PDF
1737012_dwg 01of02_P222.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment H - Price Proposal Form.pdf PDF
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
1737012_spec 04of04_P222.pdf PDF
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment L - JA ML-26-01 P222 MQ25 Hangar Brand Name or Equal Finishes_Reda.pdf PDF
1737012_spec 03of04_P222.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 24 Mar 2026 31 Mar 2026

Section 00 21 16 - Instructions to Proposers

Miscellaneous text in this section has been added to:

Amendment 0005

This amendment is issued to incorporate the following:

1. Provide extension to proposal due date

2. Provide Updated Wage Determination

3. Provide attachments (attached separately)

4. Provide Pre-Proposal Inquiries

1. The proposal due date has been extended from 24 March 2026 to 31 March 2026 at 2pm ET.

2. Updated Wage Determination

"General Decision Number: VA20260160 01/30/2026

Superseded General Decision Number: VA20250160

State: Virginia

Construction Type: Building

County: Norfolk* County in Virginia.

* INDEPENDENT CITY OF NORFOLK

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/02/2026 1 01/30/2026

ASBE0024-006 10/01/2024

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 40.77 20.17+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before

N4008525R26390005 and after the paid holiday.

BOIL0045-003 01/01/2025

Rates Fringes

BOILERMAKER......................$ 38.97 27.39

BRVA0008-001 05/01/2022

Rates Fringes

BRICKLAYER.......................$ 22.44 10.23

ELEC0080-010 06/01/2025

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 36.85 17.18%+7.80+a

a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

ELEV0052-005 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 52.06 38.435+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 06/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 40.99 18.05 Cranes under 90 tons........$ 39.99 18.05

IRON0028-006 05/01/2023

Rates Fringes

IRONWORKER, RIGGER...............$ 30.22 11%+14.24

IRON0028-007 05/01/2024

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 31.00 18.28

* PLUM0110-008 11/01/2025

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 36.92 18.25

PLUMBER..........................$ 36.92 18.25

SUVA2013-043 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 19.80 3.98

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 20.02 2.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 14.82 3.34

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12

LABORER: Pipelayer..............$ 12.40 1.86

LABORER: Common or General, Including Demolition.............$ 11.28 1.89

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.57 1.19

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 16.92 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 20.98 2.62

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

3. Provide attachments

The following attachments are included in this Amendment 0005 as supporting documents:

- Amendment 0005 Continuation Sheet

- Attachment H - Price Proposal Form_rev1

- Crane - LP48 #1-DATA SHEET

- Crane - LP48 #2-DATA SHEET

- FY26 Naval Station Norfolk Utility Costs

- P222_1737012_01 91 00.15 22

- P222_1737012_04 20 00

- P222_1737012_07 21 13

- P222_1737012_07 60 00

- P222_1737012_09 29 00

- P222_1737012_13 34 20

- P222_1737012_28 31 76

- P222_1737012_32 13 13.06

- P222_1737012_Drawings_volume I_Rev 001_SIGNED

- P222_1737012_Drawings_volume II_Rev 001_SIGNED

- P222_1737012_Geotech Report

- P222_1737012_REGISTER

4. Pre- proposal Inquiry Responses

PPI

Page Section Paragraph Question Response

Will FF&E and AV be included in a separate solicitation? If so, when can we expect the solicitation to be published?

FF&E, specification 12 00 01.00 20 details requirements. Design (Technology Refresh) of the FF&E and AV is included in Base Bid (FF&E) and CLIN 0003 (AV). Scope of work for these items are detailed in Spec Section 12 00 01.00 20 (FF&E) and 01 30

02.00 22 (AV).

Procurement of the FF&E and AV equipment requires Best Value Source Selection (BVD), of which the GC and their subs, are not eligible to bid on but the GC is entitled to 5% HAR for the respective CLINs

01 91 00.15

1.2 & 1.12 and 1.3 & 1.11

In Section 01 91 00.15, paragraphs 1.2 and 1.12 indicate that the Commissioning Provider (CxC) is employed by the Government. Paragraph

1.3 states that the Government has no direct contract authority with the Lead Commissioning Specialist and paragraph

1.11 states that the Commissioning Firm (including the CxC) must be a first-tier subcontractor. Please confirm that the Commission Firm, including the Lead Commissioning Specialist and the Commissioning Specialists for each discipline are employed by the Government.

01 91 00.15 22, Total Building Commissioning specification is to replace the current 01 91 00.15 Building Commissioning in its entirety via this Amendment. Please See Amendment 0005 Continuation Sheet and attachment "P222_1737012_01 91

00.15 22".

01 30 02.00

1.3.l

Section 01 30 02.00 22 paragraph 1.3.l states that the Government AV budget on the Bid Schedule/ Price Proposal Form for the AV Mod is $2,019,600. The Total of A/V CLINs 0004 and 0005 in Attachment H - Price Proposal Form is $139,850. Please confirm that Attachment H values are correct.

A revised Bid Schedule/ Price Proposal is provided via Amendment.

Please see Attachment H - Price Proposal Form_rev1

13 50

1.2

Section 13 50 00 Ignitable Liquid Drainage Floor Assembly (ILDFA) states in paragraph 1.2 that the Basis of Design manufacturer of the ILDFA is Safespill. To our knowledge, Safespill is the only manufacturer of this product and on other NAVFAC projects, the government has provided a Justification and Approval (J&A) authorizing and approving the use of Safespill as the sole source for the ILDFA. We request that NAVFAC provide a J&A for Safespill on this project as required by the FAR (Subpart 6.3) when only one responsible source will satisfy NAVFAC requirements.

J&A pending and scheduled to be in place prior to the award of this project

33 83

On Page 4 of Section 33 83 02 Steel Antenna Tower, a paragraph has been inserted after 3.1.k.

discussing Foundation Requirements. This paragraph states that a Geotechnical Investigation has been performed for this site and has been provided to the contractor for use and design of the foundation.

Please provide this Geotechnical Investigation.

The Geotechnical Report provided via this Amendment.

Please see attachment "P222_1737012_Geot ech Report"

01 57

1.5.1.1.5.3

Please confirm that the cost of establishing the water treatment system as described in Spec Section 01 57 19 paragraph

1.5.1.1.5.3 is to be included in CLIN 0001A and not in CLIN 0001E which describes a Unit Price for treatment of contaminated water.

Confirmed.

Permitting, design, and establishment of the water treatment system as described in Spec Section 01 57 19 paragraph 1.5.1.1.5.3 is to be included in CLIN 0001A. It is the responsibility of the contractor to utilize means and methods that minimize the volume of dewatering needed to complete construction of this project.

VOL 2

AE411

Dtl: A3

Please provide a specification for the 3- Tiered, wall mounted, adjustable, open grated steel storager shelving indicated by Keynote 13 on Sheet AE411

Bid per construction documents.

28 31

1.6.1

Drawing FA-001 calls for Fire Alarm Circuits to be Class B, Spec 28 31 76 _

1.6.1 indicates Class A.

Please confirm if Fire Alarm circuits can be Class B.

Please see revision in Amendment 0005 Continuation Sheet and attachment "P222_1737012_28 31 76"

28 31

2.19

Paragraph 2.19 in Specification Section 28 31 76 indiactes that the mass notification transceiver must …. meet all the requirements of paragraph, RADIO

TRANSMITTER AND

INTERFACE PANELS.

Please provide this paragraph as we are unable to locate it in the Bid Documents.

Please see revision in Amendment 0005 Continuation Sheet and attachment "P222_1737012_28 31 76"

Solicitat ion

Basis for Award Factor 1

The size and complexity requirements of the project may prevent adequate competition for this contract. To allow the evaluation of more recent experience and promote more competition we request the Government allow construction projects that are 75% complete, with interim

Bid per construction

CPARS, to fulfill the corporate experience requirement.

01 32 00.20

1.10.1.10.1-d

Cost Loaded Network Analysis Schedule, specification 01 32 17.00 20 - 1.10.1.10.1-d states that the cost loaded schedule for commissioning, testing, and closeout WBS sections may not be less than 10 percent of the total costs for procurement and construction activities.

Please confirm this is not less than 10% of the costs of the equipment to be commissioned and not the entire contract value.

The specification reads “The value of commissioning, testing, and closeout WBS section may not be less than 10 percent of the total costs for procurement and construction activities.” , reads as plural “activities.” and does not say equipment. The intent is for the FOW for the mechanical system commissioning as a whole WBS section, and not just the specific equipment.

Sheet

IN602

Finish Legend

The Finish Legend indicates that AF2 Access Floor is based on "Tate DirectPERF 32%" Airflow Panels. While these panels may be used in the heavy duty CCN3000, heavy equipment cannot be rolled over these airflow panels. Per the manufacturer, the only airflow panel that will match the load performance of a CCN3000 panel is the HD GrateAire. Please confirm that the design intent is for the airflow panel to match the load performance of the solid access panels and that HD GrateAire panels should be the BoD for the AF2 Access Floor.

Confirming, yes, perforated panels are not recommended to be rolled over. Many facilities will still install them and restrict all equipment moves to the hot aisle where the solid panels are.

07 11

Advise damproofing is not applicable on this project;

if it is applicable to the project, advise specific product / assembly and location where this is required.

Delete Specification 07 11 13. Please see Amendment 0005 Continuation Sheet.

07 21

Clarify with specific basis of design product / assembly what insulation is required on LP48 and LP48A foundation walls as there are contradictions between the bid documents: A1 & A3 / AE505 (LP48A) calls for

XPS, B1 / AE511 (LP48)

calls for concrete faced insulation panel, and Specification 07 21 13 -

2.1 calls for poly-iso.

Concrete face insulation panel is added to 07 21 13 and references to XPS are removed from the drawings. Please see Amendment 0005 Continuation Sheet and attachment "P222_1737012_07 21 13".

07 92

Clarify with specific basis of design product / assembly what Building Expansion Joint (BES) is required for large joints between the existing and new structure on LP-48 and provide revised details to reflect the requirement as specification section for expansion joint do not exist, specification section 07 92 00 Joint Sealants do not have a performance specification for expansion joints, details

C1/AE513, A1/AE514,

C4/AE514, A2/AE517,

A3/AE518, A3/AE519,

A1, A3, A4/AE520 depict air barrier membranes / sheets freely draping without direct adherence to solid substrate, which does not appear to be an appropriate application / method, call for Bellow Type, which appears to be an applicable term for expansion fittings for pipings and not building expansion joint, and call out / imply that the covers for the expansion joints are air barrier product, which does not appear to be correct designation.

Specification for bellows expansion joint cover system are added to section 07 60 00 in this Amendment (attachment "P222_1737012_07 60 00"). Application shown is within industry standards.

Coordinate with product manufacturer / installer and air barrier consultant as required.

The “air barrier” annotation is applicable to the bellow type building expansion joint cover because of the locations where metal flanges occur in the wall assembly. The flanges are sandwiched between the insulated metal panels, sealant, and air barrier materials, making them a component of the air barrier system at those locations.

Attachment H

CLIN 0010 Option 9 includes removal and disposal of buried below grade asbestos containing

Removal of the buried steam line is included in the base bid; see Civil demolition pipe insulation (insulation on pipe up to 24 inches in diameter). Clarify if pipe must be removed as part of this unit rate, or just the insulation on the pipe -general bid notes item k does not specify.

drawings. CLIN only applies if asbestos containing pipe insulation is identified when the steam line is uncovered. Means and methods are up to the contractor.

Attachment H

Clarify if CLIN 0010 Option 9 includes all excavation and backfill related to the asbestos containing pipe insulation removal. If required, please clarify depth of pipe. General bid notes item k does not specify.

Removal of the buried steam line is included in the base bid; see Civil demolition drawings. CLIN only applies if asbestos containing pipe insulation is identified when the steam line is uncovered. Means and methods are up to the contractor.

Attachment H

Clarify if FF&E design shall be included as a cost within the bid, or if this cost is not required and by others. If required to be by Contractor, please clarify which CLIN the design shall be included.

CLIN 0003 identifies an AV design services cost.

No FF&E design services cost CLIN is identified.

Design is not identified as part of the scope of the Government Estimated Price in CLIN 0006 or CLIN 0007. Bid notes for ESS, FF&E and A/V

(LINE ITEMS 0002 -

0007) item B is unclear if the design is by the Contractor.

The design/BVD of the FF&E is part of the construction contract. It is detailed in specification section 12 00 01.00 20.

09 96

Note O on IN602 states that various parts of the catwalk are to be coated in HPC2, but the structural drawings state that the external catwalk / antennea platform located above the hangar roof are to be coated in hot-dipped galvinized coating. Please confirm that the catwalk / antenna platform is to be hot-dipped galvinized coating and the extent of

Extents of HPC2 as indicated on IN602 is in reference to the Hangar itself.

HPC2 is located within the hangar itself.

IN101C

(Drawin g set 2/2)

Per keynote 36 & the legend, white HPC1 forms a ring around the hangar, and this is located on top of the ILDFA flooring.

Please confirm that the HPC1 in this area is to be painted on top of the

ILDFA.

Confirming, HPC1, FS1, and FS2 are applied on top of ILDFA (aluminum substrate).

IN601

(Drawin g set 2/2)

Please confirm that within the hangar, the ring of flooring outside of the ILDFA, is to be RF3, and that the resinous flooring does not go under the

ILDFA.

Correct. RF3 applies to floor area outside of

ILDFA.

misc.

Due to there being 2 drawing sets, please confirm how we should dilineate between the first set and the second set when we are asking PPIs.

For example, A-001 shows up in voluyme 1 & volume 2 and is not designated between the two sets.

The 2 drawing sets are to be delineated by building (vol 1 is building LP-48A and vol 2 is LP-48 as depicted in the drawing title blocks).

Due Date

Please provide a 3 week bid extension to allow for PPI response integration and subcontractor pricing efforts.

Please see Amendment 0005; the proposal due date has been extended to 31 March 2026 at 2pm

ET.

Factor 1

For project relevancy, Scope and Complexity is defined as; New construction of a multi-story steel framed building with concrete masonry walls. Question

- Will projects that are steel framed without masonry walls be considered? Or do all 5 submitted projects have to have both steel frame and masonry walls?

Bid per factor 1 criteria.

41 22 13.15

1.3.1.2

The bridge crane specification describes two different types of classified area, a “general purpose hazardous area”

Class I, Division 2, Group C/D hazardous area for the entire ARS Work Center and a “Class I, Division 2, Group C/D hazardous area”. Which one applies to this project?

including Crane. See Volume 1, EH101.

10 51

Lockers

Part 2 Products

The Finish Legend on Sheet IN502 indicates the Scranton, Duralife Two Tier Z-Locker as the Basis of Design. The Scranton Duralife locker only comes in standard double tier design and is not available in a Z-Locker configuration. The Scranton Tufftec locker does come in a Z-Tier, however it is not Fire Rated as required by NFPA 286 in Section 10 51 13 paragraph 2.2.1.

Please clarify the type and configuration of the lockers required.

Z-Tier will be adjusted to 2-high stacked design to maintain

NFPA 286

performance. Please see sheet IN602 in revised drawings attachment "P222_1737012_Draw ings_volume II_Rev

001_SIGNED".

08 34

3.3

The specification for the Sound Control Door Assemblies requires third party testing in accordance with ASTM E336. Please confirm that this testing is only required for the STC 50 rated doors and that it is not required at STC 30 or STC 45 door assemblies

Bid per construction

09 29

3.1

The specification for the Gypsum Board requires third party testing of sound rated assemblies in accordance with ASTM E336. Please confirm the extent of the STC rated partitions to be tested as virtually every drywall partition has an STC rating which varies between 45 and 60.

This has been revised via this Amendment;

please see Amendment 0005 Continuation sheet and attachment "P222_1737012_09 29 00".

Attach ment H

CLIN

0001C

Please confirm that the Unit Price per VLF associated with Foundation Piling in CLIN 0001C is only applicable to the Precast Concrete Piles. If a Unit Price for Concrete Filled Steel Piles (Micropiles) is

A revised Bid Schedule/ Price Proposal is provided via Amendment.

Please see Attachment H - Price Proposal Form_rev1 required, please provide an additional CLIN.

AE602

AE603

The Annex Building Door Frame Details J3 & H3 and J7 & H7 indicate "Perimeter Kerf w/Seal where indicated". Please confirm that Kerf is only required when the associated Hardware Set includes a Gasket Seal.

Confirmed.

SF521

Sheet SF571 describes modifications to the two

(2) existing bridge cranes in the Hangar. In order to price this work, bidders require the Hoist manufacturer, model and serial number for each hoist.. Note 8 on Sheet SF521 refers to Specification 41 22 13.55.

Please provide this Specification.

Revise SF521 Note 8 to refer to Specification 41 22

13.15. Hoist

manufacturer and serial numbers not available. Please see revised drawings via this Amendment "P222_1737012_Draw ings_volume II_Rev

001_SIGNED"

32 13 13.06

2.3.4

The Concrete Pavement specification indicates the use of a paver-finisher machine. To increase subcontractor participation in pricing concrete pavement work and logistical limitations of the work areas, please confirm that alternate placement methods (eg.

truss screed placement) are acceptable in lieu of a paver-finisher, provided that alternate methods produce a comparable outcome.”

Please see revision in Amendment 0005 Continuation Sheet and attachment "P222_1737012_32 13 13.06"

013217.

00 20

1.9.2

Confirm the project scheduler needs to be on site full time and they are not allowed to have any other responsibilities.

Confirmed, bid as shown.

289 of 1234 13526 1.7

Clarify if the project SSHO is allowed to have additional responsibilities

- Section 01 45 00 1.6.1.1 references that the QC manager is to serve as the Level two site safety and health officer (SSHO) but

Confirmed - Dedicated SSHO, QCM and Superintendent.

Neither of them can serve as one of the others.

further states the only duties and responsibilities of the QC manager are to manage and implement the QC program on this Contract. With the complexity of this project please confirm a dedicated SSHO and a dedicated QC manager are required full time onsite.

403 of 1234 15000 3.2.2.b

Provide the utility service rates that will be charged.

Please see attachment "FY26 Naval Station Norfolk Utility Costs" in this Amendment.

19100.1

1.11

Confirm the Commissioning firm is by the Owner - Section 1.11 states to employ the services of a commissioning firm and all commissioning specialists required to perform work for the project and section 1.2 and 1.12 states the Commissioning Provider (CxC) is and entity hired by the Government.

Yes, that is correct the CxA responsibilities are outlined in 01 91

00.15 22, Total Building Commissioning issued via this Amendment.

General RFP

After attending the site visit and due to the phasing and complexity of the project - we respectfully request an extension of 3 weeks to adequately price the project.

Please see Amendment 0005; the proposal due date has been extended to 31 March 2026 at 2pm

ET.

General RFP

Will another site visit for subcontractors be allowed

No, bid per construction documents.

96723.1

1.3.5.5

Please consider removing both SSPC QP8 and SSPC SQ1 certification requirements for the fuel resistive resinous flooring 5 coat system installers.

This certification is outdated and the BOD does not require the certification for their product. Will a portfolio of qualified projects and references from manufacturers suffice for qualifications, product manufacturers do not require the SSPC QP8 or SSPC QS1 certification.

11 99000 1.6.3

Please consider removing the SSPC QP1 Certification requirements for subs performing surface prep and coating application under Specification 099000.

Will a portfolio of qualified projects and references from manufacturers suffice for qualifications?

Bid per construction documents.

11 99000 1.6.3

If the specified SSPC QP1 Certified painters are not available, will equivalent industry certifications be accepted?

No, bid per construction documents.

IN602 Vol 2

Confirm all HPC coatings and subcontractor requirements (HPC1-3) fall under Specification 099600 and not 099000 Paints and Coatings.

Specification 09 96 00 covers HPC coatings and epoxy resin floor striping. Floor striping for ILDFA sounds in specification 13. 50 00, Section 2.12.

IN601 Vol 1, IN602, Vol 2

99000 1.6.3

Please clarify which painted metal surfaces fall under Specification 099000, specifically Paragraph 1.6.3, which requires the contractor to be SSPC QP1 certified.

Our interpretation is that this requirement applies to finishes PT6 and PT7 when applied to metal, but confirmation is requested.

This appears to be a very limited scope for an SSPC QP1 certification requirement.

Painted steel surfaces include: Doors and frames, metal stringers and handrails, exposed ceilings, exposed columns (except those with HPC coatings), bid per construction documents.

IN602 Vol 2

For new steel to receive HPC coatings, are they to be field applied or shop applied?

Field-applied, bid per construction documents.

11100 1.2

The contract specifications indicate that the building(s) will be occupied during performance of the work.

However, the civil drawings identify construction phasing as

This has been revised via this Amendment;

please see Amendment 0005 Continuation sheet and attachments "P222_1737012_Draw ings_volume I_Rev 001_SIGNED" and

Phase 1 (all work shown in Volume 1) and Phase 2 (all work shown in Volume 2), with no indication of occupied versus unoccupied areas within either phase.

1. Please confirm LP48 and LP48A will not be occupied during construction and this specification reference is intended for neighboring buildings. If either of them are to be occupied, clarify when and provide a scope / extent of areas that will be made available to the Contractor (by floor / admin vs hanger / percent of hanger etc.) and any operational constraints that must be maintained during construction.

"P222_1737012_Draw ings_volume II_Rev

001_SIGNED".

IN602 Vol 2

Painted exposed steel structures (HPC3) is this refereeing to primary steel only or are we to paint primary and secondary steel HPC3?

Finish applies to both primary and secondary steel that are not specified to be shop-coated.

IN602 & IN601, Vol 2

Please clarify which rooms are to receive finishes HPC1 and HPC3.

These finishes are not identified on finish schedule IN601. Many rooms with exposed metals are instead shown to receive PT6 and PT7 (epoxy coating). Since these finishes originate from two separate specifications with differing requirements, please confirm the correct finish designation for each applicable room.

Hangar H001 -reference Vol. II sheets IN101C, IN101D and general notes on IN602 for applications. HPC and FS finishes are captured in specification 09 96 00.

CU101 Vol 1 and 2

Confirm the Contractor is not responsible for any site utility charges/installation fees from the gas company.

See Note 1 on CU101

Non concur, the contractor is responsible for all utility charges/installation fees from gas company. See attachment "FY26

Naval Station Norfolk Utility Costs" in this Amendment.

IN601, Vol 2

In the Finish Remarks, #2, it reads "Provide (SSM2) Solid Surface Counters With Integral Sinks And A (PL2) Angled Apron."

Please confirm the integral sink is required, and not a clipped in porcelain sink, which is typical.

Military projects prefer solid surface integral sinks in restrooms. This applies to both LP48 and LP48A. Provide integral solid surface sinks where noted in drawings.

Security Plans Vol 1 and 2

For the CAGs - are these to be provided by the Contractor and if so, how many will be required.

CAGs will be provided by the Government

Vol 2 122413

Please provide the locations of the RWS1 Roller Window Shades.

All windows in second floor offices and conference rooms at the building perimeter.

C-001

Construction Phasing - This section talks to Phase 1 (vol 1) having two site phases. Confirm the Tower Site and Power check pad pavement can be concurrent with the construction of LP-48A.

The GBSAA Tower and Power Check Pad scopes are concurrent with the construction of LP-48A.

C-003

Security Plan vol 1

Confirm there is only one Secure laydown area and one ACP -- each security plan references it. Will either need to be relocated / moved between phases?

Provide location of the ACP as it is not indicated on the plans.

There is only one Secure Laydown Area, shown on C-003. It will not be relocated/moved between phases. The laydown area is accessed via the two entrances indicated on C-003. The LP-48A and LP-48 sites behind the flightline fence may be accessed via existing gate directly west of the LP-48A site (shown at the westmost keynote 16, Vol 1, CD101) and the existing gate directly north of the under-construction P-1027 hangar. Bid as shown, base access, laydown requirements and additional base access gates will be discussed at Preconstruction Kick-Off meeting with the award-winning contractor.

General General

Confirm the P48A, Tower and airfield repairs are considered one project site and do not require additional safety / QC / Superintendent.

Confirmed. Bid per construction documents.

M-801, Vol 1

DDC

System

Per note #1 within the Backflow Preventor Heated Enclosure Monitoring Schedule, can you please provide where this heated enclosure is located on drawing CP102? Also, please provide and show how the enclosure is being heated?

And does this heat source need to be tied into the base wide BAS/DDC system?

Please see Vol 1:

CS101 - keynote 17, CU101 - keynote 5, ES401 - keynote 11, and spec section 33 11 00 para 2.1.4., M-801

BACKFLOW

PREVENTER

HEATED

ENCLOSURE

MONITORING

SCHEDULE

FX002 + P-501, Vol 1

Plumbi ng & Fire Protecti on

Per drawing P-501, detail C1, shows a 8" combination domestic water and fire protection service. Drawing FX002, detail shows a separate 6" fire protection service.

Please confirm what is correct scope of work for both of these systems?

Water service to LP48A is supplied by a single 8" water line.

The water service splits inside the building to domestic water and sprinkler.

See Civil sheet CU101. See attachment "P222_1737012_Draw ings_volume I_Rev 001_SIGNED" and "P222_1737012_Draw ings_volume II_Rev

001_SIGNED"

SF521 Vol 2

Please provide the manufacturer and model of the existing overhead bridge cranes that are being modified.

See attachments "Crane - LP48 #1- DATA SHEET" and "Crane - LP48 #2-

DATA SHEET"

SF521 Vol 2

Please provide the manufacturer and model of the existing vertical lift fabric door that is being modified.

Bid per construction documents; also, please see J&A for VLFD that was provided in Amendment 0003.

CS101 Vol 1

133420 Prefabri cated Steel

Section 133420 calls for a 6'-0" x 7'-0" floor plan and looks to be a guard booth with Cashier Window.

We could not find a

The prefabricated steel building is located at the GBDAA tower site. See Amendment 0005 Continuation

Buildin g contractor provided guard booth on drawings, only, the (2) guard shacks to be provided by government and installed by contractor shown at keynote 1 on CS101 Vol 1. Please confirm if these guard shacks are as specified in Section 133420 Prefabricated Steel Building?

Sheet and attachment "P222_1737012_13 34 20"

B3/ES402, Vol 1

133420 Prefabri cated Steel Buildin

Please confirm whether the prefab building located at the GBDAA Tower found in Sheet B3/ES402, Vol 1 is that as specified in Section 133420 Prefabricated Steel Building? Section 133420 calls for a 6'-0" x 7'-0" and the prefab building located at the GBDAA Tower is 10' x 15'. To properly price, please provide elevations and section cuts for this prefab structure.

The prefabricated steel building is located at the GBDAA tower site. See Amendment 0005 Continuation Sheet and attachment "P222_1737012_13 34 20"

AE401 V1, AE401 V2 102813

Please provide the specifications for the following specialty items:

Paper Towel Dispenser (B1), Semi-Recessed Trash Receptacle (B2), Soap Dispenser (C1), and Toilet Paper Holder (G1).

Bid per Construction Documents

122200 and 102123.

Please confirm if Specification 102123.16 Cubicle Track and Hardware and Specification 122200 Curtains and Draperies are referring to the same items.

The correct specification for these items is 10 21 23.16.

Spec section 12 22 00 is removed - See Amendment 0005 Continuation Sheet.

Vol 1

CU101

PF101B

CU101 - note 1 calls for 2.5" gas line - PF101B calls for a 2" Natural Gas line - please clarify and update documents

Please see attachment "P222_1737012_Draw ings_volume I_Rev

001_SIGNED"

Vol 1 and 2 TA001

Please clarify who is responsible for the TV Mounts for the AV system. (Contractor or TBD AV Contractor)

The Best Value Vendor AV contractor is responsible for the TV mounts.

Vol 1 and 2

TA101

A /101B

Who is responsible for the IP Video encoder and decoder and the IP Switch located within the telecom rack with fiber link -- is this by the (Contractor or TBD AV Contractor)

AV electronics, to include the AV encoders, decoders and IP switch are provided by the TBD AV contractor.

Connectivity between these devices will utilize horizontal cabling on each floor under the Contractor's base telecom scope.

The telecom drawings account for this cabling. The TA700 series drawings utilize dashed signal lines and keynotes to indicate which connections utilize the telecom cabling vs.

dedicated AV cabling (solid lines). The fiber link between AV IP switches is base telecom scope.

Vol 1 and 2 TA001

Please clarify who is responsible for the Rack Cabinets and components for the AV system.

(Contractor or TBD AV Contractor)

When referred to as "telecom rack" in the TA drawings, this indicates the rack is to be provided under the Contractors base telecom scope. The AV system is to occupy a small portion of the rack space; see telecom drawings for elevation/details. The AV credenza rack in Conf Rm 218 is a dedicated AV rack and to be provided by the TBD AV contractor.

Vol 1 and 2 TA001

Please clarify who is responsible for the cable for the AV system (Contractor or TBD AV Contractor)

The TBD AV contractor is responsible for all "solid line" cables/connections shown in the TA700 series diagrams. In instances where base telecom cabling is used for connectivity between AV devices, these signal lines appear as dashed and there is a keynote indicating such. Note, the telecom cable counts shown in the telecom drawings already account for these cables to be used for AV. What is shown in the TA700 series sheets is not in addition, but rather to shown the utilization of these cables where applicable to understand AV connectivity and signal flow.

RFP / Bid Form

Option on bid form are valid for 360 after award- RFP states 364 CD -please clarify

The RFP states "365".

Please see attached revised bid schedule (Attachment H - Price Proposal Form_rev1)

Bid Form

Confirm the Contractor is not responsible for the Design of the ESS system -- only the HAR under CLIN 2 - Confirm CLIN 2 is for P222 complete (includes both LP48A and

LP48)

Correct - Contractor is only responsible for the infrastructure

Vol 1

AE112

B

Note 25 and 26 call that Privacy Curtain is FF & E.

Confirm this is the scope of work included in specification section 102123.16

Privacy curtains tagged with Keynote 25 and 26 on Vol. I AE112B are not FFE.

They are finish C2 and are part of the contractors scope as per IN102B, in addition to the associated track and hardware. You are correct, the specification for this item is 10 21 23.16.

Spec section 12 22 00 to be removed - See Amendment 0005 Continuation Sheet.

Vol 1 and 2

IF101A

thru

IF102B

These sheets call out Lockers (Keynote1) Fire Extinguishers (General note B), VDU1 / VDU3 (General Note F) as FF and E --Please confirm these are to be included in the FF & E Package (not

These items are to be included in this bid -

CFCI

Keynote 1 on both Vol 1 and Vol II sheet IF101A notes Lockers indicated as CFCI (Contractor in base contract) or to be included in the bid.

Furnished/Installed) -these are not called out as FFE. Lockers noted with CFCI are part of the contractors base scope. Other storage lockers (such as S18 noted on Vol I sheet IF102B), which are items not bolted to the structure, are noted on the Furniture Schedule IF-001 and are FF&E since not affixed to the building. There is a third type of "locker" indicated with a GF-tag. These "lockers" are GFGI (Government furnished) and are not part of the Contractors scope.

Fire extinguishers (not cabinets or brackets -extinguishers only) are part of FF&E.

General Contractor is to provide the cabinets and brackets for each type indicated.

VDU1 / VDU3

(General Note F - both Volumes) notes these items are part of Construction and are therefore part of the Contractors scope.

Provide as part of base contract.

Vol 1 and 2

IF101A

thru

IF102B

Advise if the Fire Extinguisher cabinets (General Note B) are to be included in the FF & E package (not in the base contract) or to be included in the bid.

These items are to be included in this bid -

CFCI

Fire extinguisher cabinets and brackets are included in the base contract and provided by the General Contractor.

Vol 2

ED111

C

Note 5 calls for hanger door equipment to be replaced - or refurbished by hanger door manufacture - clarify

Refer to Vol 2, SF521 for scope of work requirements scope - what is the existing manufacture - is it just the motors to be replaced or additional items. Provide a specification

120001.

00 20 Furnitur e Fixtures and Equipm ent

(FF&E)

Package

1.3

Section 120001.00 20 (1.3) defines what is considered FF&E. Please confirm Is signage is to be included in the FF&E interior Design effort scope.

Signage is part of the base contract, not FF&E as it is adhered to the building.

Vol 1: AE512, AE513, AE514 and Vol 2:

AE506, AE507 and

AE508

134920.

00 10

RFI

Shieldin

The RF Shielding Detail Drawings Vol 1: AE512, AE513, AE514 and Vol 2:

AE506, AE507 and AE508 refer to a shielded panel system. Is the intent to use modular RF shielding, as opposed to a wall finish such as foil?

Bid per construction documents. The RF shielding is under a J&A for SRG Shielding Resources Group that was in Amendment 0003.

134920.

00 10

RFI

Specification 134920.00 10 refers to SELDS testing throughout, which only applies to welded shielding. Is any portion of the RF shielding to be welded?

Bid per construction documents. The RF shielding is under a J&A for SRG Shielding Resources Group that was in Amendment 0003.

RFI

How will the RF performance be verified?

Is the shielding contractor to test the RF shielding per IEEE299 and at what frequency(ies)?

Bid per construction documents. The RF shielding is under a J&A for SRG Shielding Resources Group that was in Amendment 0003.

Vol 2 EP131

Confirm the CDL Platform is GFGI and the Contractor only owns the CDL Power Terminal Box and conduits / power switch / CDL Fiber patch panel.

The CDL Platform is GFCI. The structural framing of Platform to catwalk is CFCI. See amendment.

Vol 2 CD101

General Note 3 states 12" thick layer of cement treated aggregate is existing under existing pavement surfaces -- Geotech references 18" What should be assumed.

Additionally, is this condition located under

LP-48.

Bid per CTA is 12" thick.

Vol 2

PD100

B

Per drawing PD100B, please confirm there will be no plumbing work required within this drawing.

No plumbing work required on PD100B

Vol 2 P-501

Per detail A4, Gas Fired Water Heater -DWH-1, please indicate where the venting associated with the water heater is shown on the Mechanical Drawings.

The intent is to replace the existing domestic water heater in the same location and use the existing water heater flue vent

Vol 2 P-001

Per drawing P-001, General Note #40, since this scope of work is not shown on the drawings, please provide quantities for each item, so we can provide accurate pricing or provide a bid form allowance for this scope of work

For bidding, include patching 200 linear feet of existing pipe insulation and repair/replace 20 existing pipe supports.

Vol 2 230130.

Regarding specification

230130.41 (HVAC

System Cleaning), please provide…