This is a technical specification section for board and block insulation work on the MQ-25 Aircraft Laydown Facilities project at Naval Station Norfolk, Virginia (FY 24 MCON Project P-222, eProject Work Order No. 1737012). The specification is dated 08/23 and covers Section 07 21 13 of the construction specifications.
The specification requires faced rigid cellular polyisocyanurate and polyurethane insulation complying with ASTM C1289 REV A, with Type I aluminum foil facing on both major surfaces and glass fiber reinforced core. Insulation must achieve a flame spread index of 75 or less and smoke developed index of 450 or less per ASTM E84, with compressive resistance at yield of not less than 15 psi per ASTM D1621 and water vapor permeance of not more than 0.5 perms per ASTM E96/E96M. R-values shall be as indicated on drawings. Recycled content requirements mandate minimum 9 percent for polyisocyanurate/polyurethane materials by weight. The specification also addresses concrete-faced insulated perimeter wall panels using extruded polystyrene board (ASTM C578, Type IV) with integral 5/16-inch latex-modified concrete facing, 2x4-foot board size with tongue-and-groove edges, and R-value of 5 per inch. Installation requirements include strict adherence to manufacturer instructions, proper handling and storage in dry conditions, installation continuity to avoid thermal bridges, appropriate clearances from heat-producing devices per NFPA codes, and protective coatings or boards for exposed exterior insulation. The contractor must provide three-year guarantees against ultraviolet light exposure failure and three-year manufacturer material warranties, with multiple submittals requiring government approval including shop drawings, product data, environmental data, and indoor air quality certifications.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 24 MCON Project P-222 eProject Work Order No: 1737012 MQ-25 Aircraft Laydown Facilities Naval Station, Norfolk, Virginia
SECTION 07 21 13
BOARD AND BLOCK INSULATION
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C518 (2021) Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM C578 (2023) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM C1289 (2023a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM D696 (2016) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D2842 (2019) Water Absorption of Rigid Cellular Plastics
ASTM D3833/D3833M (1996; R 2019) Standard Test Method for Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2024) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
SECTION 07 21 13 Page 1
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2021) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2020; TIA 23-1) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2024) National Fuel Gas Code
NFPA 70 (2023; ERTA 7 2023; TIA 23-15) National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Manufacturer's Standard Details ; G
SD-03 Product Data
Environmental Data for Materials ; G
Block or Board Insulation ; G
Vapor Retarder ; G
Pressure Sensitive Tape ; G
Protection Board or Coating ; G
Accessories including sealants; G
Recycled Content for Block or Board Insulation ; S
Concrete Faced Insulated Perimeter Wall Panels ; G
SD-07 Certificates
Indoor Air Quality For Block Or Board Insulation ; S
SD-08 Manufacturer's Instructions
Insulation Installation and Handling
Protection Board or Coating Installation
SECTION 07 21 13 Page 2
Adhesive
SD-11 Closeout Submittals
Draft Guarantee ; G
Final Guarantee ; G
Draft Warranty ; G
Final Warranty ; G
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details. Include verification of existing conditions.
1.4 PRODUCT DATA
Include environmental data for materials descriptions, recommendations for product shelf life, requirements for protection board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.5.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before and during installation.
1.6 SAFETY PRECAUTIONS
1.6.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by the National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) and in accordance with 29 CFR 1910.134 .
SECTION 07 21 13 Page 3
1.6.2 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
1.7 SPECIAL WARRANTIES
1.7.1 Guarantee
Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Beneficial Occupancy or Substantial Completion. Submit draft guarantee and final guarantee in accordance with Sections 01 78 00 CLOSEOUT SUBMITTALS and 01 78 23
OPERATION AND MAINTENANCE DATA.
1.7.2 Warranty
Provide manufacturer's material warranty for all system components for a period of three years from the date of Beneficial Occupancy or Substantial Completion. Submit draft warranty and final warranty in accordance with Sections 01 78 00 CLOSEOUT SUBMITTALS and 01 78 23 OPERATION AND
MAINTENANCE DATA.
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:
ASTM C1289 REV A
(1) Type I Aluminum Foil on both major surfaces. Class 1 - Class 2 - Glass fiber reinforced core.
2.1.1 Thermal Resistance
Provide R-values as indicated on the drawings.
2.1.2 Fire Protection Requirements
a. Flame spread index of 75 or less when tested in accordance with
ASTM E84.
b. Smoke developed index of 450 or less when tested in accordance with
ASTM E84.
c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.
2.1.3 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 15 pounds per square inch (psi) when measured according to
ASTM D1621.
SECTION 07 21 13 Page 4
b. Water Vapor Permeance: Not more than 0.5 Perms or less when measured according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
2.1.4 Recycled Materials
Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of this section. The minimum required recycled material contents (by weight, not volume) are:
Polyisocyanurate/Polyurethane: 9 percent
Phenolic Rigid Foam: 5 percent
Perlite Board: 23 percent post consumer paper
Provide data identifying percentage of recycled content for block or board insulation .
2.1.5 Indoor Air Quality
Provide certification of indoor air quality for block or board insulation .
2.1.6 Prohibited Materials
Do not provide materials containing asbestos.
2.2 VAPOR RETARDER AND DAMPPROOFING
2.2.1 Vapor Retarder under Floor Slab
The vapor retarder under the floor slab is specified in Section 03 30 00
CAST-IN-PLACE CONCRETE.
2.3 PRESSURE SENSITIVE TAPE
As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M .
2.4 PROTECTION BOARD OR COATING
As recommended by insulation manufacturer.
2.5 ACCESSORIES
2.5.1 Adhesive
As recommended by insulation manufacturer.
2.5.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation
SECTION 07 21 13 Page 5 manufacturer.
2.6 CONCRETE FACED INSULATED PERIMETER WALL PANELS
2.6.1 Extruded Polystyrene Board
Extruded polystyrene board, ASTM C578, Type IV, rigid, closed cell, with integral high density skin, with integral 5/16 inch thick latex-modified concrete facing.
a. Board Size: 2 x 4 feet x 2-5/16 inches thick.
b. Edges: Tongue-and-groove sides, square ends.
c. Thermal resistance: Long term aged R-value of 5 per inch, tested to
ASTM C518.
d. Foam compressive strength: Minimum 35 PSI, tested to ASTM D1621.
e. Compressive strength: Minimum 40 PSI, tested to ASTM D1621.
f. Water absorption: Maximum 0.7 percent by volume, tested ASTM D2842.
g. Water vapor permeance: 0.8, tested to ASTM E96/E96M.
h. Coefficient of lineal thermal Expansion: 3.5 x 10-5 inches per inch x degree F, tested to ASTM D696.
2.6.2 Accessories
Metal cap flashing: 24 gage galvanized steel J-channel; 2-1/4 inches wide, 4 inch long leg and 2-1/4 inch short leg; prefinished, color to be selected.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Prior to installation, ensure all areas that will be in contact with the insulation are dry and free of projections that could cause voids, compressed insulation, or punctured vapor retarders. For foundation perimeter or under slab applications, check that subsurface fill is flat, smooth, dry, and well tamped. Do not proceed with installation if moisture or other conditions are present and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Provide noncombustible blocking at all spaces between heat producing devices and the floors, ceilings and roofs through which they pass.
Provide in accordance with ICC IBC Section 2111.13 Fireplace Fireblocking and with the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless certified for installation surrounded by insulation: 3 inches from outside face of fixtures and
SECTION 07 21 13 Page 6 devices or as required by NFPA 70 and, if insulation is placed above fixture or device, 24 inches above fixture.
b. Vents and vent connectors used for venting products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .
c. Gas Fired Appliances: Clearances as required in NFPA 54 .
d. Oil Fired Appliances: Clearances as required in NFPA 31 .
Blocking is not required if chimneys or flues are certified in writing by the chimney or flue manufacturer for use in contact with specific insulating materials.
3.3 INSTALLATION
3.3.1 Insulation Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.
3.3.2 Electrical Wiring
Do not install insulation in a manner that would enclose electrical conductors, that are not installed in conduit, between two layers of insulation.
3.3.3 Cold Climate Requirement
Place insulation on the outside of pipes.
3.3.4 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.
3.3.5 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated and with the approved insulation submittal(s).
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Masonry Walls
Apply board directly to masonry with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Apply in parallel courses with joints breaking midway over course below. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Seal around cutouts with sealant. Install insulation in wall cavities so that it leaves at least a nominal one inch air space outside of the insulation to allow for cavity drainage.
SECTION 07 21 13 Page 7
3.4.2 Adhesive Attachment to Concrete and Masonry Walls
Apply adhesive to wall and completely cover wall with insulation.
a. As recommended by the insulation manufacturer.
b. Use only full back method for pieces of one square foot or less.
c. Butt all edges of insulation and seal edges with tape.
3.4.3 Mechanical Attachment on Concrete and Masonry Walls
Cut insulation to cover walls. Apply adhesive to wall and set clip or other mechanical fastener in adhesive as recommended by manufacturer.
After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.
3.4.4 Protection Board or Coating Installation
Install protection board or coating in accordance with manufacturer's printed instructions. Install protection over all exterior exposed insulation and to one foot below grade.
3.5 INSTALLATION ON UNDERSIDE OF CONCRETE FLOOR SLAB
3.6 PERIMETER AND UNDER SLAB INSULATION
Install perimeter thermal insulation where heated spaces are adjacent to exterior walls, slab edges in slab-on-grade, or floating slab construction.
3.6.1 Manufacturer's Instructions
Layout insulation, tape edges, provide vapor retarder and other required accessories to protect against vermin, insects, and damage in accordance with manufacturer's printed instructions.
3.6.2 Insulation on Vertical Surfaces
Provide thermal insulation on exterior of foundation walls on grade beams below grade and on edges of slabs-on-grade. Fasten insulation with adhesive or mechanical fasteners.
3.6.3 Insulation Under Slab
Provide insulation horizontally under slab on grade for a distance of 2 feet from the edge of slab. Install insulation on top of vapor retarder and turn retarder up over the outside edge of insulation to top of slab.
3.6.4 Protection of Insulation
Protect insulation from damage during construction and back filling by application of protection board or a coating. Do not leave installed vertical insulation unprotected overnight. Protect installed insulation from weather, including rain and ultraviolet light, from mechanical abuse, compression, and dislocation. Install protection over entire exposed exterior insulation board.
SECTION 07 21 13 Page 8
3.7 ACCESS PANELS AND DOORS
Attach insulation to all access panels greater than one square foot and all access doors in insulated floors and ceilings. Use insulation with same R-Value as that for the floor or ceiling in which each panel occurs.
-- End of Section --
SECTION 07 21 13 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 07 21 13 Page 10
| 07 21 13 - BOARD AND BLOCK INSULATION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 MANUFACTURER'S DETAILS |
| 1.4 PRODUCT DATA |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Delivery |
| 1.5.2 Storage |
| 1.6 SAFETY PRECAUTIONS |
| 1.6.1 Respirators |
| 1.6.2 Other Safety Considerations |
| 1.7 SPECIAL WARRANTIES |
| 1.7.1 Guarantee |
| 1.7.2 Warranty |
| PART 2 PRODUCTS |
| 2.1 BLOCK OR BOARD INSULATION |
| 2.1.1 Thermal Resistance |
| 2.1.2 Fire Protection Requirements |
| 2.1.3 Other Material Properties |
| 2.1.4 Recycled Materials |
| 2.1.5 Indoor Air Quality |
| 2.1.6 Prohibited Materials |
| 2.2 VAPOR RETARDER AND DAMPPROOFING |
| 2.2.1 Vapor Retarder under Floor Slab |
| 2.3 PRESSURE SENSITIVE TAPE |
| 2.4 PROTECTION BOARD OR COATING |
| 2.5 ACCESSORIES |
| 2.5.1 Adhesive |
| 2.5.2 Mechanical Fasteners |
| 2.6 CONCRETE FACED INSULATED PERIMETER WALL PANELS |
| 2.6.1 Extruded Polystyrene Board |
| 2.6.2 Accessories |
| PART 3 EXECUTION |
| 3.1 EXISTING CONDITIONS |
| 3.2 PREPARATION |
| 3.2.1 Blocking Around Heat Producing Devices |
| 3.3 INSTALLATION |
| 3.3.1 Insulation Installation and Handling |
| 3.3.2 Electrical Wiring |
| 3.3.3 Cold Climate Requirement |
| 3.3.4 Continuity of Insulation |
| 3.3.5 Coordination |
| 3.4 INSTALLATION ON WALLS |
| 3.4.1 Installation on Masonry Walls |
| 3.4.2 Adhesive Attachment to Concrete and Masonry Walls |
| 3.4.3 Mechanical Attachment on Concrete and Masonry Walls |
| 3.4.4 Protection Board or Coating Installation |
| 3.5 INSTALLATION ON UNDERSIDE OF CONCRETE FLOOR SLAB |
| 3.6 PERIMETER AND UNDER SLAB INSULATION |
| 3.6.1 Manufacturer's Instructions |
| 3.6.2 Insulation on Vertical Surfaces |
| 3.6.3 Insulation Under Slab |
| 3.6.4 Protection of Insulation |
3.7 ACCESS PANELS AND DOORS