This document is a Summary of Changes for utilities cost projections at Naval Station Norfolk comparing fiscal year 2025 and fiscal year 2026 government furnished (GF) amounts per unit.

The utilities analysis covers two locations within Naval Station Norfolk: Craney Island and Norfolk proper. At Craney Island, electricity costs are projected to increase 12% from $198.97 to $223.43 per megawatt-hour due to increased electric purchase costs, while water costs show a significant 202% increase from $10.39 to $31.42 per thousand gallons. Sewer costs are expected to decrease 72% from $87.44 to $24.54 per thousand gallons, and OWWO (Oily Waste Water Overboard) costs increase slightly by 3%. At the Norfolk location, electricity increases 8% to $123.12 per megawatt-hour, water costs rise 31% to $20.20 per thousand gallons due to increased purchase and operating costs, natural gas increases 5% to $6.70 per million British thermal units, and steam rises 5% to $37.53 per million British thermal units. OWWO costs decrease 21% to $117.75 per thousand gallons reflecting increased units processed with fixed operating costs, and sewer costs decline 14% to $19.19 per thousand gallons. All GF amounts represent estimated actual or produced costs per unit plus applicable cost recovery and may vary during the fiscal year based on actual purchased or produced unit costs.

View the file

Other files

File Type Posted
Attachment G Individual Small Business Subcontracting Plan.docx DOCX document
Attachment F Small Business Participation Commitment.docx DOCX document
JA ML2650 25R2639 P222 ILDFA Redacted.pdf PDF
Solicitation Amendment N4008525R26390008 SF 30.pdf PDF
K3237099 LP-48 HazMat Report 3.5.26 - signed.pdf PDF
01 31 23.13 20.pdf PDF
Amendment 0007 Continuation Sheet.pdf PDF
Solicitation Amendment N4008525R26390007 SF 30.pdf PDF
REGISTER.pdf PDF
TABLE OF CONTENTS.pdf PDF
13 49 20.00 10.pdf PDF
Solicitation Amendment N4008525R26390006 SF 30.pdf PDF
P222_1737012_01 91 00.15 22.pdf PDF
Crane - LP48 1-DATA SHEET.pdf PDF
P222_1737012_Geotech Report.pdf PDF
P222_1737012_28 31 76.pdf PDF
Attachment H - Price Proposal Form_rev1.pdf PDF
P222_1737012_Drawings_volume II_Rev 001_SIGNED.pdf PDF
Solicitation Amendment N4008525R26390005 SF 30.pdf PDF
P222_1737012_04 20 00.pdf PDF
Amendment 0005 Continuation Sheet.pdf PDF
P222_1737012_32 13 13.06.pdf PDF
P222_1737012_09 29 00.pdf PDF
P222_1737012_07 60 00.pdf PDF
P222_1737012_07 21 13.pdf PDF
P222_1737012_REGISTER.pdf PDF
P222_1737012_Drawings_volume I_Rev 001_SIGNED.pdf PDF
P222_1737012_13 34 20.pdf PDF
Crane - LP48 2-DATA SHEET.pdf PDF
Solicitation Amendment N4008525R26390004 SF 30.pdf PDF
JA ML2623 25R2639 P222 ASSA Abloy Redacted.pdf PDF
JA ML2624 25R2639 P222 SRG RF Shielding Redacted.pdf PDF
26R2639 P222 Site Visit Log.pdf PDF
Solicitation Amendment N4008525R26390003 SF 30.pdf PDF
Solicitation Amendment N4008525R26390002 SF 30.pdf PDF
Solicitation Amendment N4008525R26390001 SF 30.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
1737012_dwg 02of02_P222.pdf PDF
Attachment M - P222 Site Visit Map.pdf PDF
1737012_spec 01of04_P222.pdf PDF
1737012_dwg 01of02_P222.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment H - Price Proposal Form.pdf PDF
Attachment E- Historical Small Business Utilization.docx DOCX document
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
1737012_spec 04of04_P222.pdf PDF
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment L - JA ML-26-01 P222 MQ25 Hangar Brand Name or Equal Finishes_Reda.pdf PDF
1737012_spec 03of04_P222.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

UNCLASSIFIED

Summary of Changes Naval Station Norfolk

Delta %FY26 GF 1FY25 GF 1UTILITIES

CRANEY ISLAND

+ 12% 2$ 223.43$ 198.97 Electricity (MWH)

+ 202% 3$ 31.42 $ 10.39 Water (KGAL)

+ 3%$ 131.96 $ 128.25 OWWO (KGAL)

- 72% 3$ 24.54 $ 87.44 Sewer (KGAL)

NORFOLK

+ 8%$ 123.12$ 114.02 Electricity (MWH)

+ 31% 4$ 20.20 $ 15.47 Water (KGAL)

+ 5%$ 6.70 $ 6.37 Natural Gas (MBTU)

- 21% 5$ 117.75 $ 149.87 OWWO (KGAL)

- 14% $ 19.19 $ 22.19 Sewer (KGAL)

+ 5%$ 37.53 $ 35.81 Steam (MBTU)

1 GF amount represents the ESTIMATED actual or produced cost per unit plus applicable cost recovery.

This amount may change during year based upon actual purchased or produced unit costs and cost recovery.

2 Increase in electric purchase cost 3 Small commodities change in units for same fixed costs 4 Increase in water purchase and operating costs 5 Increase units processed with fixed operating costs

File details come from the government source that posted it. Updated .