N00024-13-R-4305_Conformed_Copy_through_Amendment_0012.pdf
PDF 2 MB Posted
- Attached to
- Amendment 0017 Federal contract opportunity
- Solicitation number
- N0002413R4305
About this file
Amendment 0012 Conformed Copy
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0017 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local t ime 19 Nov 2014
X
A X B X C X D
EX
X
G F 210 - 222
223 - 272 X H 273 - 278 michaella.easley@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO 1 278
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
(SEE SECTION L)
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MICHAELLA J. HARMON 202-781-3421
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 5 6 - 95
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
96 - 159 160 - 162
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
163 - 164
165 - 170 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 171 - 176 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 177 - 189 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
190 - 207
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
208 - 209
6. REQUISITION/PURCHASE NO.
N0002413NR63009
5. DATE ISSUED
22 May 2013
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00024-13-R-4305
Section A - Solicitation/Contract Form
SECTION B CLIN SUMMARY
ITEM DESCRIPTION
PMS
0100 PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN FY15-16
0105 AWARD FEE ONLY FOR ITEM 0100
0110 PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN FY16-17
0115 AWARD FEE ONLY FOR ITEM 0110
0120 PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN FY17-18
0125 AWARD FEE ONLY FOR ITEM 0120
FM/CORROSION CONTROL
FACILITY MAINTENANCE/CORROSION CONTROL FOR LCS
CLASS SHIPS IN FY15-16
0205 AWARD FEE ONLY FOR ITEM 0200
FACILITY MAINTENANCE/CORROSION CONTROL FOR LCS
CLASS SHIPS IN FY16-17
FACILITY MAINTENANCE/CORROSION CONTROL FOR LCS
CLASS SHIPS IN FY17-18
AESS
ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
IN FY15-16
0305 AWARD FEE ONLY FOR ITEM 0300
ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
IN FY16-17
0315 AWARD FEE ONLY FOR ITEM 0310
ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
IN FY17-18
0325 AWARD FEE ONLY FOR ITEM 0320
ISEA
0400 IN-SERVICE ENGINEERING AGENT IN FY15-16
0405 AWARD FEE ONLY FOR ITEM 0400
0410 IN-SERVICE ENGINEERING AGENT IN FY16-17
0415 AWARD FEE ONLY FOR ITEM 0410
0420 IN-SERVICE ENGINEERING AGENT IN FY17-18
0425 AWARD FEE ONLY FOR ITEM 0420
DATA/PIO/TRAVEL
0500 DATA REQUIREMENTS
0600 PROVISIONED ITEM ORDER
0700 TRAVEL/ODC
EXECUTIONPLANNING AND REPAIRS AND ALTS
1010 RESERVED
1015 RESERVED
1020 EXECUTION PLANNING FOR LCS 2 FY16 SRA(d)
1021 AWARD FEE ONLY FOR ITEM 1020
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS 2
FY16
1026 AWARD FEE ONLY FOR ITEM 1025
1030 EXECUTION PLANNING FOR LCS 3 FY16 SRA(d)
1031 AWARD FEE ONLY FOR ITEM 1030
1035 ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS 3
FY16
1036 AWARD FEE ONLY FOR ITEM 1035
1040 EXECUTION PLANNING FOR LCS 4 FY17 SRA(d)
1041 AWARD FEE ONLY FOR ITEM 1040
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS 4
FY17
1046 AWARD FEE ONLY FOR ITEM 1045
1050 EXECUTION PLANNING FOR LCS 1 FY18 DSRA
1051 AWARD FEE ONLY FOR ITEM 1050
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS 1
FY18
1056 AWARD FEE ONLY FOR ITEM 1055
1060 EXECUTION PLANNING FOR LCS 2 FY18 DSRA
1061 AWARD FEE ONLY FOR ITEM 1060
1070 EXECUTION PLANNING FOR LCS 5 FY18 SRA(d)
1071 AWARD FEE ONLY FOR ITEM 1070
1080 EXECUTION PLANNING FOR LCS 6 FY18 SRA(d)
1081 AWARD FEE ONLY FOR ITEM 1080
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS
TBD FY15-18
1146 AWARD FEE ONLY FOR ITEM 1145
1150 EXECUTION PLANNING FOR LCS TBD FY15-18
1151 AWARD FEE ONLY FOR ITEM 1150
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS
TBD FY15-18
1156 AWARD FEE ONLY FOR ITEM 1155
1160 EXECUTION PLANNING FOR LCS TBD FY15-18
1161 AWARD FEE ONLY FOR ITEM 1160
ACCOMPLISH REPAIRS AND ALT REQUIREMENTS FOR LCS
TBD FY15-18
1166 AWARD FEE ONLY FOR ITEM 1165
SHIP ASSESSMENT
2010 SHIP ASSESSMENT FOR LCS 1
2011 AWARD FEE ONLY FOR ITEM 2010
2020 SHIP ASSESSMENT FOR LCS 2
2021 AWARD FEE ONLY FOR ITEM 2020
2030 SHIP ASSESSMENT FOR LCS 3
2031 AWARD FEE ONLY FOR ITEM 2030
2040 SHIP ASSESSMENT FOR LCS 4
2041 AWARD FEE ONLY FOR ITEM 2040
2050 SHIP ASSESSMENT FOR LCS 5
2051 AWARD FEE ONLY FOR ITEM 2050
2060 SHIP ASSESSMENT FOR LCS 6
2061 AWARD FEE ONLY FOR ITEM 2060
2070 SHIP ASSESSMENT FOR LCS 7
2071 AWARD FEE ONLY FOR ITEM 2070
2080 SHIP ASSESSMENT FOR LCS 8
2081 AWARD FEE ONLY FOR ITEM 2080
2100 SHIP ASSESSMENT FOR LCS 10
2101 AWARD FEE ONLY FOR ITEM 2100
2120 SHIP ASSESSMENT FOR LCS 12
2121 AWARD FEE ONLY FOR ITEM 2120
2140 SHIP ASSESSMENT FOR LCS 14
2141 AWARD FEE ONLY FOR ITEM 2140
2160 SHIP ASSESSMENT FOR LCS 16
2161 AWARD FEE ONLY FOR ITEM 2160
2180 SHIP ASSESSMENT FOR LCS TBD
2181 AWARD FEE ONLY FOR ITEM 2180
2200 SHIP ASSESSMENT FOR LCS TBD
2201 AWARD FEE ONLY FOR ITEM 2200
2220 SHIP ASSESSMENT FOR LCS TBD
2221 AWARD FEE ONLY FOR ITEM 2220
CM/EM
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 1 IN FY15-18
3011 AWARD FEE ONLY FOR ITEM 3010
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 2 IN FY15-18
3021 AWARD FEE ONLY FOR ITEM 3020
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 3 IN FY15-18
3031 AWARD FEE ONLY FOR ITEM 3030
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 4 IN FY15-18
3041 AWARD FEE ONLY FOR ITEM 3040
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 5 IN FY15-18
3051 AWARD FEE ONLY FOR ITEM 3050
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 6 IN FY15-18
3061 AWARD FEE ONLY FOR ITEM 3060
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 7 IN FY15-18
3071 AWARD FEE ONLY FOR ITEM 3070
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 8 IN FY15-18
3081 AWARD FEE ONLY FOR ITEM 3080
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 10 IN FY15-18
3101 AWARD FEE ONLY FOR ITEM 3100
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 12 IN FY15-18
3121 AWARD FEE ONLY FOR ITEM 3120
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 14 IN FY15-18
3141 AWARD FEE ONLY FOR ITEM 3140
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS 16 IN FY15-18
3161 AWARD FEE ONLY FOR ITEM 3160
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS TBD IN FY15-18
3181 AWARD FEE ONLY FOR ITEM 3180
ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS TBD IN FY15-18
3201 AWARD FEE ONLY FOR ITEM 3200
3220 ACCOMPLISH NON-SCHEDULED CM/EM REPAIRS AND ALTS
REQUIREMENTS FOR LCS TBD IN FY15-18
3221 AWARD FEE ONLY FOR ITEM 3220
4000-4031 RESERVED
CLIN Summary Legend CLINs Description Numbering Concept 0100s PMS Base year (0100), Third digit represents option year 01X5 PMS Award fee for preceding CLIN 0200s FM Base year (0200), Third digit represents option year 0205 FM Award Fee for CLIN 0200 0300s AESS Base year 0300, Third digit represents contract year 03X5 AESS Award fee for preceding CLIN 0400s ISEA Base year 0400, Third digit represents option year 0500, 0600, 0700 Data, PIO, & Travel N/A
10X0s and 11X0s CNO Avails Second & Third digit represents the avail number, fourth digit:
0 = Planning, 5 = Execution 10XX CNO Avails Award Fee for preceding CLIN 2000s Ship Assessments Second and third digit represent the ship number 20X1 Ship Assessments Award fee for preceding CLIN 3000s CM/EM Second and third digit represent the ship number 30X1, 31X1, and 32X1 CM/EM Award fee for preceding CLIN 4000s RESERVED N/A
Note: CLINs 0130-0140, 0230-0240, 0330-0340, 0430-0440, 1010, 1015, 1065, 1075, and 1085-1140 have been deleted from this RFP. Please disregard any reference that may be made to these CLINs.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
CPIF
Lot
PURCHASE REQUEST NUMBER: N0002413NR63009
ACCOMPLISH PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN
FY15-16
SEE NOTE C, D, E & H
PLANNED MAINTENANCE LCS CLASS FY15-16
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
ACRN
ITEM NO SUPPLIES/SERVICES AMOUNT
OPTION PLANNED MAINTENANCE LCS CLASS FY15-16
AWARD FEE ONLY FOR ITEM 0100
SEE NOTE C & E
ACCOMPLISH PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN
FY16-17
SEE NOTES A, B, C, D & H
PLANNED MAINTENANCE LCS CLASS FY16-17
OPTION PLANNED MAINTENANCE LCS CLASS FY16-17
AWARD FEE ONLY FOR ITEM 0110
SEE NOTES A, B, C & E
ACCOMPLISH PLANNED MAINTENANCE FOR LCS CLASS SHIPS IN
FY17-18
SEE NOTES A, B, C, D & H
PLANNED MAINTENANCE LCS CLASS FY17-18
OPTION PLANNED MAINTENANCE LCS CLASS FY17-18
AWARD FEE ONLY FOR ITEM 0120
SEE NOTES A, B, C, & E
ACCOMPLISH FACILITY MAINTENANCE/CORROSION CONTROL FOR
LCS CLASS SHIPS IN FY15-16
SEE NOTE C, D, F & H
FM/CORROSION CONTROL LCS CLASS FY15-16
OPTION FM/CORROSION CONTROL LCS CLASS FY15-16
AWARD FEE ONLY FOR ITEM 0200
SEE NOTES A, B, C, & F
FM/CORROSION CONTROL LCS
CLASS FY16-17
FFP
OPTION ACCOMPLISH FACILITY MAINTENANCE/CORROSION CONTROL FOR LCS
CLASS SHIPS IN FY16-17
SEE NOTES A, B, C, D & H
FOB: Destination
NET AMT
FM/CORROSION CONTROL LCS
CLASS FY17-18
1 Lot
OPTION ACCOMPLISH FACILITY MAINTENANCE/CORROSION CONTROL FOR LCS
CLASS SHIPS IN FY17-18
SEE NOTES A, B, C, D & H
PROVIDE ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
(AESS) FOR LCS CLASS SHIPS HOMEPORTED OR VISITING SAN
DIEGO, CA IN FY 15-16
SEE NOTES C, D & F
ACCOMPLISH AESS FY15-16
OPTION ACCOMPLISH AESS FY15-16
AWARD FEE ONLY FOR ITEM 0300
PROVIDE ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
(AESS) FOR LCS CLASS SHIPS HOMEPORTED OR VISITING SAN
DIEGO, CA IN FY 16-17
SEE NOTES A, B, C, D & F
ACCOMPLISH AESS FY16-17
OPTION ACCOMPLISH AESS FY16-17
AWARD FEE ONLY FOR ITEM 0310
PROVIDE ADMINISTRATIVE AND ENGINEERING SUPPORT SERVICES
(AESS) FOR LCS CLASS SHIPS HOMEPORTED OR VISITING SAN
DIEGO, CA IN FY 17-18
ACCOMPLISH AESS FY17-18
OPTION ACCOMPLISH AESS FY17-18
AWARD FEE ONLY FOR ITEM 0320
Hours
SUPPORT IN-SERVICE ENGINEERING AGENT SERVICES FOR LCS
CLASS UNIQUE SYSTEMS IN FY15-16
SUPPORT ISEA LCS CLASS UNIQUE SYS
OPTION SUPPORT ISEA LCS CLASS UNIQUE SYS
AWARD FEE ONLY FOR ITEM 0300
SUPPORT IN-SERVICE ENGINEERING AGENT SERVICES FOR LCS
CLASS UNIQUE SYSTEMS IN FY16-17
AWARD FEE ONLY FOR ITEM 0400
SUPPORT IN-SERVICE ENGINEERING AGENT SERVICES FOR LCS
CLASS UNIQUE SYSTEMS IN FY17-18
AWARD FEE ONLY FOR ITEM 0420
DATA ITEMS
DATA ITEMS FOR ITEM 0100, 0200, 0300 AND (IF EXERCISED) OPTION
ITEM(S) 0110 - 0125, 0210 - 0225, 0310 - 0325, 0400 - 0425, 0600, 0700, 1020 -
(SEE EXHIBIT A, B & C CDRL(S) ATTACHED).
PROVISIONED ITEMS ORDER
PROVISIONED ITEMS ORDER (PIO) FOR ITEMS 0100, and 0200 (IF EXERCISED) OPTION ITEM(S) 0110-0125, 0210-0225, 1020-1166, and 3010-3221
SEE SECTION C
SEE NOTE H
OPTION TRAVEL/ODC
COST
PROVIDE TRAVEL IN SUPPORT OF ITEMS 0100, 0200, 0300, AND (IF
EXERCISED) OPTION ITEM(S) 0110-0125, 0210-0225, 0310-0325, 0400-425,
0700, AND 1020-3221
SEE SECTION C
SEE NOTE A, B, C, D & G
ESTIMATED COST
ITEM NO
RESERVED
ITEM NO
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS INDEPENDENCE (LCS 2)
FY16 DRY DOCKING CNO SCHEDULED AVAILABILITY
SEE NOTES A, B, C, D, E & H
EXECUTION PLANNING FOR LCS 2 FY16 SRA(d)
OPTION EXECUTION PLANNING FOR LCS 2 FY16 SRA(d)
AWARD FEE ONLY FOR ITEM 1020
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS INDEPENDENCE (LCS 2) FY16 DRY DOCKING CNO SCHEDULED
AVAILABILITY
ACCOMPLISH LCS 2 FY16 SRA(d)
OPTION ACCOMPLISH LCS 2 FY16 SRA(d)
AWARD FEE ONLY FOR ITEM 1025
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS FORT WORTH (LCS 3) FY16
DRY DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 3 FY16 SRA(d)
OPTION EXECUTION PLANNING FOR LCS 3 FY16 SRA(d)
AWARD FEE ONLY FOR ITEM 1030
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS FORT WORTH (LCS 3) FY16 DRY DOCKING CNO SCHEDULED
AVAILABILITY
ACCOMPLISH LCS 3 FY 16 SRA(d)
OPTION ACCOMPLISH LCS 3 FY 16 SRA(d)
AWARD FEE ONLY FOR ITEM 1035
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS CORONADO (LCS 4) FY17
DRY DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 4 FY17 SRA(d)
OPTION EXECUTION PLANNING FOR LCS 4 FY17 SRA(d)
AWARD FEE ONLY FOR ITEM 1040
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS CORONADO (LCS 4) FY17 DRY DOCKING CNO SCHEDULED
AVAILABILITY
ACCOMPLISH LCS 4 FY17 SRA(d)
OPTION ACCOMPLISH LCS 4 FY17 SRA(d)
AWARD FEE ONLY FOR ITEM 1045
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS FREEDOM (LCS 1) FY18 DRY
DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 1 FY18 DSRA
OPTION EXECUTION PLANNING FOR LCS 1 FY18 DSRA
AWARD FEE ONLY FOR ITEM 1050
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS FREEDOM (LCS 1) FY18 DRY DOCKING CNO SCHEDULED
AVAILABILITY
ACCOMPLISH LCS 1 FY18 DSRA
OPTION ACCOMPLISH LCS 1 FY18 DSRA
AWARD FEE ONLY FOR ITEM 1055
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS INDEPENDENCE (LCS 2)
FY18 DRY DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 2 FY18 DSRA
OPTION EXECUTION PLANNING FOR LCS 2 FY18 DSRA
AWARD FEE ONLY FOR ITEM 1060
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS MILWAUKEE (LCS 5) FY18
DRY DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 5 FY18 SRA(d)
OPTION EXECUTION PLANNING FOR LCS 5 FY18 SRA(d)
AWARD FEE ONLY FOR ITEM 1070
ALTERATION REQUIREMENTS FOR USS JACKSON (LCS 6) FY18 DRY
DOCKING CNO SCHEDULED AVAILABILITY
EXECUTION PLANNING FOR LCS 6 FY18 SRA(d)
OPTION EXECUTION PLANNING FOR LCS 6 FY18 SRA(d)
AWARD FEE ONLY FOR ITEM 1080
ALTERATION REQUIREMENTS FOR USS TBD (LCS TBD) FY15-18 CNO
SCHEDULED AVAILABILITY
EXECUTION PLANNING LCS TBD FY15-18
AWARD FEE ONLY FOR ITEM 1150
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS TBD (LCS TBD) FY15-18 CNO SCHEDULED AVAILABILITY
ACCOMPLISH LCS TBD FY15-18
OPTION ACCOMPLISH LCS TBD FY15-18
AWARD FEE ONLY FOR ITEM 1145
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS TBD (LCS TBD) FY15-18 CNO
SCHEDULED AVAILABILITY
OPTION EXECUTION PLANNING LCS TBD FY15-18
AWARD FEE ONLY FOR ITEM 1150
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS TBD (LCS TBD) FY15-18 CNO SCHEDULED AVAILABILITY
AWARD FEE ONLY FOR ITEM 1155
ACCOMPLISH THE EXECUTION PLANNING FOR THE REPAIR AND
ALTERATION REQUIREMENTS FOR USS TBD (LCS TBD) FY15-18 CNO
SCHEDULED AVAILABILITY
OPTION EXECUTION PLANNING LCS TBD FY15-18
AWARD FEE ONLY FOR ITEM 1160
ACCOMPLISH THE REPAIR AND ALTERATION REQUIREMENTS OF
USS TBD (LCS TBD) FY15-18 CNO SCHEDULED AVAILABILITY
AWARD FEE ONLY FOR ITEM 1165
ACCOMPLISH SHIP ASSESSMENTS FOR USS FREEDOM (LCS 1) IN
FY15-18
SHIP ASSESSMENTS
OPTION SHIP ASSESSMENTS
AWARD FEE ONLY FOR ITEM 2010
SEE NOTES A, B, C & F
ACCOMPLISH SHIP ASSESSMENTS FOR USS INDEPENDENCE (LCS 2)
IN FY15-18
AWARD FEE ONLY FOR ITEM 2020
ACCOMPLISH SHIP ASSESSMENTS FOR USS FORT WORTH (LCS 3) IN
FY15-18
AWARD FEE ONLY FOR ITEM 2030
SHIP ASSESSMENTS FOR USS CORONADO (LCS 4) IN FY15-18
AWARD FEE ONLY FOR ITEM 2040
ACCOMPLISH SHIP ASSESSMENTS FOR USS MILWAUKEE (LCS 5) IN
FY15-18
AWARD FEE ONLY FOR ITEM 2050
ACCOMPLISH SHIP ASSESSMENTS FOR USS JACKSON (LCS 6) IN
FY15-18
AWARD FEE ONLY FOR ITEM 2060
ACCOMPLISH SHIP ASSESSMENTS FOR USS DETROIT (LCS 7) IN
FY15-18
AWARD FEE ONLY FOR ITEM 2070
ACCOMPLISH SHIP ASSESSMENTS FOR USS MONTGOMERY (LCS 8)
IN FY15-18
AWARD FEE ONLY FOR ITEM 2080
ACCOMPLISH SHIP ASSESSMENTS FOR USS GABRIELLE GIFFORDS
(LCS 10) IN FY15-18
AWARD FEE ONLY FOR ITEM 2100
ACCOMPLISH SHIP ASSESSMENTS FOR USS OMAHAS(LCS 12) IN
FY15-18
AWARD FEE ONLY FOR ITEM 2120
ACCOMPLISH SHIP ASSESSMENTS FOR USS MANCHESTER (LCS 14)
IN FY15-18
AWARD FEE ONLY FOR ITEM 2140
ACCOMPLISH SHIP ASSESSMENTS FOR USS TULSA (LCS 16) IN FY15-
AWARD FEE ONLY FOR ITEM 2160
ACCOMPLISH SHIP ASSESSMENTS FOR USS TBD (LCS TBD) IN FY15-
AWARD FEE ONLY FOR ITEM 2180
AWARD FEE ONLY FOR ITEM 2200
AWARD FEE ONLY FOR ITEM 2220
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS FREEDOM
(LCS 1) IN FY15-18
RPRS/ALTS FOR LCS 1 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 1 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3010
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS
INDEPENDENCE (LCS 2) IN FY15-18
RPRS/ALTS FOR LCS 2 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 2 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3020
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS FORT
WORTH (LCS 3) IN FY15-18
RPRS/ALTS FOR LCS 3 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 3 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3030
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS CORONADO
(LCS 4) IN FY15-18
RPRS/ALTS FOR LCS 4 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 4 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3040
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS MILWAUKEE
(LCS 5) IN FY15-18
RPRS/ALTS FOR LCS 5 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 5 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3050
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS JACKSON
(LCS 6) IN FY15-18
RPRS/ALTS FOR LCS 6 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 6 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3060
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS DETROIT
(LCS 7) IN FY15-18
RPRS/ALTS FOR LCS 7 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 7 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3070
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS
MONTGOMERY (LCS 8) IN FY15-18
RPRS/ALTS FOR LCS 8 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 8 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3080
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS GABRIELLE
GIFFORDS (LCS 10) IN FY15-18
RPRS/ALTS FOR LCS 10 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 10 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3100
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS OMAHA (LCS
12) IN FY15-18
RPRS/ALTS FOR LCS 12 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 12 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3120
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS
MANCHESTER (LCS 14) IN FY15-18
RPRS/ALTS FOR LCS 14 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 14 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3140
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS TULSA (LCS
16) IN FY15-18
RPRS/ALTS FOR LCS 16 BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS 16 BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3160
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS TBD (LCS
TBD) IN FY15-18
RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3180
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS TBD (LCS
RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAIL
OPTION RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAIL
AWARD FEE ONLY FOR ITEM 3200
ACCOMPLISH NON-SCHEDULED EMERGENT AND CONTINUOUS
MAINTENANCE REPAIRS AND ALTERATION REQUIREMENTS
BETWEEN CNO SCHEDULED AVAILABILITIES FOR USS TBD (LCS
RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAILS
OPTION RPRS/ALTS FOR LCS TBD BETWEEN CNO AVAILS
AWARD FEE ONLY FOR ITEM 3220
CLIN Number
CLIN Number RESERVED
CLIN Number RESERVED
SECTION B RESERVED CLINS
RESERVED CLINS TO ACCOMPLISH ASSESSMENTS (SEE NOTES A, B, C, D, F & G)
Reserved CLINs
USS FREEDOM (LCS 1) 2012 - 2019
USS INDEPENDENCE (LCS 2) 2022 - 2029
USS FORT WORTH (LCS 3) 2032 – 2039
USS CORONADO (LCS 4) 2042 - 2049
USS MILWAUKEE (LCS 5) 2052 - 2059
USS JACKSON (LCS 6) 2062 - 2069
USS DETROIT (LCS 7) 2072 - 2079
USS MONTGOMERY (LCS 8) 2082 - 2089
USS GABRIELLE GIFFORDS (LCS 10) 2102 - 2109
USS OMAHA (LCS 12) 2122 - 2129
USS MANCHESTER (LCS 14) 2142 - 2149
USS TUSLA (LCS 16) 2162 - 2169
USS TBD (LCS TBD) 2182 - 2189
USS TBD (LCS TBD) 2202 - 2209
USS TBD (LCS TBD) 2222 - 2229
RESERVED CLINS TO ACCOMPLISH NON-SCHEDULED REPAIR AND ALTERATION
REQUIREMENTS (SEE NOTES A, B, C, D, E & G)
Reserved CLINs
USS FREEDOM (LCS 1) 3012- 3019
USS INDEPENDENCE (LCS 2) 3022 - 3029
USS FORT WORTH (LCS 3) 3032 - 3039
USS CORONADO (LCS 4) 3042 - 3049
USS MILWAUKEE (LCS 5) 3052 - 3059
USS JACKSON (LCS 6) 3062 - 3069
USS DETROIT (LCS 7) 3072 - 3079
USS MONTGOMERY (LCS 8) 3082 - 3089
USS GABRIELLE GIFFORDS (LCS 10) 3102 - 3109
USS OMAHA (LCS 12) 3122 - 3129
USS MANCHESTER (LCS 14) 3142 – 3149
USS TUSLA (LCS 16) 3162 – 3169
USS TBD (LCS TBD) 3182 - 3189
USS TBD (LCS TBD) 3202 – 3209
USS TBD (LCS TBD) 3222 – 3229
NOTE A – EXERCISE OF OPTIONS
By written notice to the Contractor, the Contracting Officer may exercise, if at all, any of the Option Items identified in Section B and require the Contractor to provide, within the performance period specified in Section F, the work described in Section C for such Option (s) at the estimated cost and fee set forth in Section B prior to Option exercise. The Option(s) may be exercised after the Contractor’s receipt of the Specification Work Package in accordance with the procedures stated in Section C, but in any event, the Option(s) shall be exercised, if at all, within the time frames listed in FAR clause 52.217-7 in Section I of this contract. Contract Line Items will be priced prior to Option exercise.
NOTE B – GOVERNMENT RIGHT TO NOT EXERCISE FUTURE OPTIONS
Whether to exercise an option is solely within the Government's discretion. However, part of the Government's decision to exercise an option or options may be based on how well, in the Government's determination, the Contractor has been performing the contract. The Government reserves the right to not exercise future option(s) if, among other reasons:
Contractor’s Management & Technical Award Fee-based Performance Rating scores are evaluated as:
“Yellow” for any availability within the first year of contract performance
“Green” for any availability within the second year of contract performance
“Purple” for any availability within the third year of contract performance
Contractor’s Cost Performance:
Final Cost, excluding growth reservation, exceeds Target Cost by more than 8%, within the first year of contract performance
Final Cost, excluding growth reservation, exceeds Target Cost by more than 6%, within the second year of contract performance
Final Cost, excluding growth reservation, exceeds Target Cost by more than 4%, within the third year of contract performance
Contractor’s Schedule Performance:
In first year of contract performance, up to 2 missed major milestones and the possibility of impacting the contract completion date
In second year of contract performance, Ship Delivery on schedule, but integration of Ship’s Force, Ship Intermediate Maintenance Activity (SIMA) and Alteration Installation Team (AIT) work packages had impact to major milestones and/or incorporation of authorized changes had impact to minor milestones
In third year of contract performance, all contractual dates met, but integration of Ship’s Force, Regional Maintenance Center (RMC), and AIT work packages had impact to minor milestones and/or incorporation of authorized changes after the 25% point had impact to minor milestones
NOTE C – PLACE OF PERFORMANCE
All work under this contract is to be performed as follows:
CNO Scheduled availability work will be performed at the Contractor's facility at the assigned homeport in San Diego, CA unless otherwise stipulated in the work package.
For continuous maintenance periods including emergent type work and interim availabilities, work may be performed OCONUS, at the Contractor's or Government facility within the ship's homeport in San Diego, CA, or as determined by the ACO.
Administrative And Engineering Support Services (AESS) functions may be performed at the Contractor's facility, at various Government activities, or onboard vessels, in accordance with specification work items.
For Planned Maintenance (PM), Facilities Maintenance (FM) including Corrosion Control, In-Service Engineering Agent (ISEA) and Ship Assessments, work may be performed at either the Contractor's or Government facility within the ship's homeport in San Diego, CA, or as determined by the ACO.
Travel will include CONUS and OCONUS for Fly-Away Teams.
NOTE D – COST OF MONEY FOR FACILITIES CAPITAL
The Cost of Money for Facilities Capital is not a fee-bearing cost under this contract. However, such amount is included in the Total Estimated Cost for purpose of the “LIMITATION OF COST” clause of this contract.
NOTE E – INSTRUCTIONS FOR PROPOSING FEE FOR EXECUTION PLANNING AND REPAIR AND
ALTERATION REQUIREMENTS, PLANNED MAINTENANCE (CLINs 0100 - 0125)
Offerors shall propose a fee of nine percent (9.0%) of the proposed CLIN/Sub-CLIN cost, which includes four percent (4.0%) award fee and five percent (5.0%) incentive fee, as stated in the clause “DETERMINATION OF FEE” (note that the overall proposed fee of 9.0% is not the same as the maximum overall fee of 11.0%, the difference being 2% between the target cost incentive fee of 4.00% and the maximum cost incentive fee of 6.0%).
The Government will NOT permit the “tiering” of profit or fee on any subcontract. The Government will NOT permit any “profit-on-profit” or “fee-on-fee” on any subcontract. The only exception to this requirement is a subcontractor awarded a fixed price contract in a competitive environment where cost and pricing data was not available. Subcontractors shall propose fee of no more than 9.0%.
NOTE F – INSTRUCTIONS FOR PROPOSING FEE FOR ADMINISTRATIVE AND ENGINEERING
SUPPORT SERVICES (AESS) (CLINs 0300 through 0325), FACILITY MAINTENANCE (CLIN 0200 ONLY), IN-SERVICE ENGINEERING AGENT (ISEA) (CLINs 0400 through 0425), AND SHIP ASSESSMENT (CLINs 2010 through 2221)
Offerors shall propose a fee of nine percent (9.0%) of the proposed CLIN/Sub-CLIN cost, which includes five percent(5.0%) award fee and four percent (4.0%) incentive fee, as stated in the clause “DETERMINATION OF FEE” (note that the overall proposed fee of nine percent (9.0%) is not the same as the maximum overall fee of eleven percent (11.0%), the difference being two point zero percent (2.0%) between the target cost incentive fee of four percent (4.0%) and the maximum cost incentive fee of six percent (6.0%). The Government will NOT permit the “tiering” of profit or fee on any subcontract. The Government will NOT permit any “profit-on-profit” or “fee-on-fee” on any subcontract. The only exception to this requirement is a subcontractor awarded a fixed price contract in a competitive environment where cost and pricing data was not available. Subcontractors shall propose fee of no more than 9.0%.
NOTE G – TRAVEL COSTS
Travel costs are non fee-bearing costs under this contract. 1The Contractor shall obtain prior written approval by the ACO per trip occurrence. Travel shall be funded under CLIN 0700. All estimated and incurred travel costs shall be in accordance with FAR 31.205-46.
1 This is applicable to the Prime contractor and all subcontractors.
NOTE H – INSTRUCTIONS FOR PROPOSING FEE FOR PROVISIONED ITEM ORDERS
For ordering material in support of CLINs 0100-0220, 0600, 1020-1166, and 3010-3221, see Section C Provisioned Items Order (PIO) (NAVSEA) (NOV 1996). The fixed fee in any orders placed in this section shall be no greater than (TBD%)* of the total estimated cost for ordering materials.
*Fee percentage to be negotiated by the ordering officer upon placement of the order, however shall be no more than a maximum of 6%.
B-1 - DETERMINATION OF FEE
(Applicable to all CLINs except for 0210-0220, 0500, 0600, and 0700)
FEE DEFINED:
Fee payable under this contract shall be evaluated in two (2) Phases. Phase I will evaluate incentive and award fees.
Phase II will evaluate Small Business Contracting performance. The award fee evaluation will be based on the Contractor’s performance in the areas of Management and Technical.
The incentive fee evaluation for Execution Planning, Repair and Alteration Requirements, and Planned Maintenance (NOTE E) will be determined based on the Contractor’s performance in the areas of Schedule and Cost. The maximum fee payable under this contract (including both the incentive and award fees) shall not exceed eleven percent (11.0%) and the minimum fee payable shall be zero percent (0.0%). Fee will be split between incentive fee and award fee as follows: Incentive Fee maximum is seven percent (7.0%) broken down as 6.0% maximum for cost and one percent (1.0%) for schedule. Award Fee maximum is four percent (4.0%). There will be no roll-over of any unearned fees.
The incentive fee evaluation for Administrative And Engineering Support Services (AESS) and Ship Assessment , Facilities Maintenance (FM) (CLIN 0200 only), and In-Service Engineering Agent (ISEA) (NOTE F) will be determined based on the Contractor’s performance in the area of Cost. The maximum fee payable under this contract (including both the incentive and award fees) shall not exceed eleven percent (11.0%) and the minimum fee payable shall be zero percent (0.0%). For AESS, Ship Assessment, Facilities Maintenance (CLIN 0200 and 0205 only), and In-Service Engineering Agent the maximum fee will be split between incentive fee and award fee as follows: Incentive Fee maximum for the cost incentive is six percent (6.0%) Award Fee maximum is five percent (5.0%). There will be no roll-over of any unearned fees.
PHASE I: AWARD AND INCENTIVE FEE
AWARD FEE:
The Contractor may earn an Award Fee for performance in the Management and Technical areas as determined by the Fee Determining Official (FDO). The Government's purpose in granting an award fee is to encourage and reward superior Contractor effort directed toward performance in the Management and Technical areas of this contract. The specifics for evaluation are set forth in the following paragraphs:
A. Award Fee Evaluation Period: An Award Fee Evaluation Period shall be established on a semi-annual basis, tentatively every six months beginning at contract award.
B. In the event of discontinuance of the work, the Award Fee otherwise payable shall be determined in accordance with the clause of the Special Contract Requirements entitled "AWARD FEE DETERMINATION
IN EVENT OF TERMINATION OR DISCONTINUANCE."
C. Award Fee Process: The Contractor’s performance will be evaluated in two categories: Management and Technical. Specific Award Fee Pool values will be made available by the ACO after award and/or exercise of option(s), provided that, in accordance with DFARS 216.405-2(1), in any annual contract period, a minimum of 40% of the potential Award Fee available for the full contract year shall be allocated to the award fee pool for the final evaluation period, defined as the last evaluation period within each one-year period.
1. Scope of Work Evaluated:
a. The Award Fee Evaluation will include AESS (CLINs 0300 – 0325), Ship Assessment
(CLINs 2010 - 2221), Facility Maintenance (FM) including corrosion control (CLIN 0200 and 0205 Only), and In-Service Engineering Agent (CLINs 0400 – 0425) requirements.
b. It will also include execution planning, repair and alteration (CLINs 1020 - 1166 and 3010 - 3221) and Planned Maintenance (CLIN 0100 - 0125) work completed within the Award Fee Evaluation Period.
i. Execution, planning, repair and alteration CLINS will be considered completed sixty
(60) days following completion of the work for each specific CLIN.
2. Evaluation Categories and Factors: The Contractor's performance during each Award Fee Evaluation Period will be evaluated in the following areas:
a. Management (60%)
b. Technical Performance (40%)
The Contractor will be notified of changes in the evaluation categories and factors as well as any adjustments to the weighing of categories, if any, prior to commencement of each evaluation period.
Unsatisfactory performance under an award fee criterion may result in an increased weight for that factor in subsequent evaluation periods.
3. Award Fee Evaluation Board (AFEB): The Contractor's performance for Award Fee Evaluation Periods will be conducted by an AFEB consisting of five voting members but not more than eight:
• Chairperson (Regional Maintenance Center (RMC) Code 100 or designated representative)
• Administrative Contracting Officer (RMC Code 400 or designated representative)
• Procuring Contracting Officer (SEA 0243 or designated Representative )
• Type Commander (TYCOM) Representative
• PMS 505A Representative
• RMC Code 300 (Waterfront Ops)
• LCSRON N43
• Recorder (RMC Representative, Non-voting)
4. Fee Determining Official (FDO): The FDO, PMS 505 Ship Program Manager or Deputy Program Manager, shall make determinations of the award fee due to the Contractor based upon the performance evaluation conducted by the AFEB established pursuant to paragraph 2 above.
5. Award Fee Determination and Reclama Procedures:
a. Within sixty (60) working days after the end of each evaluation period under the contract, the Contractor shall furnish to the AFEB such information as may be reasonably required, including a statement of cost incurred, to assist the AFEB in evaluating the Contractor’s performance during that evaluation period.
b. Within ninety (90) calendar days after the end of each evaluation period under the contract, the AFEB shall meet to assess and derive an evaluated Award Fee earned for that period as determined by reports submitted by the contractor as well as Government agents.
c. Within three (3) working days after the AFEB meeting, the AFEB shall prepare the performance evaluation letter and present it to the FDO. A copy will be provided to the Contractor upon transmittal to the FDO.
d. Within five (5) working days from receipt of the copy of the performance evaluation letter, the Contractor may submit to the FDO any comments with respect thereto. In support of his comments, the Contractor may furnish a written description of his performance during the period under consideration.
This description shall clearly identify specific evaluation categories, factors and elements, and the Contractor's own rating thereof.
e. Within five (5) working days from the receipt of the Contractor evaluation comments, the FDO shall provide the Administrative Contracting Officer (ACO) a final performance evaluation and determination of the award fee.
f. Within five (5) working days from receipt of the final determination, the ACO shall notify the Contractor in writing of that final determination and issue a unilateral modification to the contract to provide for the award fee.
6. Finality of Fee Determining Official's Determination: Determinations of the FDO with respect to the amount of the award fee to be paid to the Contractor are unilateral decisions made solely at the discretion of the Government.
7. Award Fee Computation:
a. Within sixty (60) working days after the end of each Award Fee Evaluation Period under the contract, the Contractor shall furnish to the AFEB such information as may be reasonably required, including a statement of cost incurred, to assist the AFEB in evaluating the Contractor’s performance during that evaluation period.
b. The AFEB may use any information, Contractor deliverables, or other materials available to evaluate the Contractor in the categories of Management and Technical, as illustrated herein. The categories will have appropriate weights assigned, which were established, prior to start of the Award Fee Evaluation Period.
c. The AFEB shall determine through the use of information, Contractor deliverables, or other materials, specific adjective grade to be assigned for each category as follows:
(i) Dark Blue (Exceptional)
(ii) Purple (Very Good)
(iii) Green (Satisfactory)
(iv) Yellow (Marginal)
(v) Red (Unsatisfactory)
d. The AFEB shall determine and assign a numerical score within each adjective category.
e. A weighted average will be computed by multiplying the numerical score assigned within each adjective category by the weight assigned to the specific overall category. The weighted average for each of the two categories will be summed to derive a numerical Performance Rating which will represent the overall rating for award fee calculation.
f. The actual amount of award fee will be calculated in accordance with the Performance Rating section below, in addition to the Management and Technical charts that follow.
(i) Performance Ratings: The following performance ratings are derived from Table 16-1 under
FAR 16.401:
Adjective Rating
Numerical Score
Description
DARK BLUE
(Excellent)
100-91 Contractor has exceeded almost all of the significant award-fee criteria and has met overall cost, schedule, and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award-fee evaluation period.
Adjective Rating
Numerical Score
Description
PURPLE
(Very Good)
90-76 Contractor has exceeded many of the significant award-fee criteria and has met overall cost, schedule, and technical performance requirements of the contract in the
GREEN
(Good)
75-51 Contractor has exceeded some of the significant award-fee criteria and has met overall cost, schedule, and technical performance requirements of the contract in the
YELLOW
(Satisfactory)
No Greater than 50
Contractor has met overall cost, schedule, and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award-fee evaluation period.
RED
(Unsatisfactory)
49-0 Contractor has failed to meet overall cost, schedule, and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award-fee evaluation period.
(ii) Award Fee Determination: For numerical scores 71-100, the Award Fee earned by the contractor for each evaluation period shall be calculated as follows:
Award Fee = Numerical score (expressed as a percentage with a maximum of 100%) X Award Fee Pool for that period
For numerical scores 50-70, the award fee earned by the contractor will be 50% of the Award Fee Pool for that period.
Note: A performance rating of 49 or below is deemed unsatisfactory. The contractor is not entitled to any award fee for a rating of 50 or below.
MANAGEMENT (60%)
DARK BLUE PURPLE GREEN YELLOW RED
100-91 90-76 75-51 No Greater than 50 49-0
CONTRACTOR'S
MANAGEMENT
SYSTEM
CONTRACTOR'
S
MANAGEMENT
SYSTEM
CONTRACTOR'S
MANAGEMENT
SYSTEM
CONTRACTOR'S
MANAGEMENT
SYSTEM
CONTRACTOR'S
MANAGEMENT
SYSTEM
Management System
Effectiveness
Management System
Effectiveness
Management System
Effectiveness
Management System
Effectiveness
Management System
Effectiveness
Contractor’s management system demonstrates a policy of total corporate commitment from the deck plate
Contractor’s management system actively engages in continuous process improvements
Contractor’s management system delivers effective planning and production actions that result in on time completion. The
Management has not demonstrated effective planning and production actions resulting in adverse impact to cost and/or schedule.
Management system does not work effectively, requiring Govt. intervention to prevent avoidable incidents such as violations of quality supervision up through upper management. It is evident that the management is effective in development and implementation of process improvements as seen through products such as execution planning and production efforts. The proactive management approach facilitates a totally coordinated and integrated production effort across the full spectrum of government and contractor entities.
Contractor management (deck plate & above) is proactive, continually implementing process improvements and enhancing customer relations. Upper management is actively involved in management of the availability, efficiently coordinating all production efforts.
throughout the organization as evidenced by products such as execution planning and production efforts.
Management fosters a cooperative customer service program that anticipates and identifies the needs of Ship’s Force and other Government activities (subs, AIT, SIMA and Ship’s force).
Contractor integrates ship’s work, training and habitability requirements into the overall production plan, maximizing efficiencies and maintaining schedule and cost.
The Contractor is effective in coordinating all production work/efforts (subs, AIT, Government Activities and Ship’s Force).
management system is effective in utilizing lessons learned to identify and preclude adverse incidents that place personnel at risk, damage government property, impact schedule, cost or quality.
Management is responsive to availability fluctuation and incorporates ship’s force and other government activity requirements. The contractor manages schedules and tracks all availability activities, identifying problems and coordinating resolutions while maintaining schedule.
Govt. intervention is required to prevent adverse incidents that place personnel at risk, damage government property, impact schedule, cost or quality. Contractor failed to successfully incorporate lessons learned, which resulted in repetitive adverse conditions.
Customers are not satisfied with the results of management’s decisions. All production efforts are not effectively coordinated.
and safety requirements.
Systems do not provide adequate response to changes in work scope, operational or crew training requirements, and have major impact to schedule or cost.
Customers are dissatisfied with many processes.
Subcontractors and all other production efforts (AIT, SIMA and ship’s force) are not coordinated.
Contractor fails to preclude avoidable incidents such as fire, flooding or serious personal injury. (Examples include but are not limited to tag out violations, failure to maintain fire watches or docking incidents. Safety violations are of extreme importance).
Contractor management provided timely notification of excess funds by the 50-60% point in the avail.
provided timely notification of excess funds by the 60-75% point in the avail.
provided notification of excess funds by the 75-90% point in the avail.
provided notification of excess funds by end of the avail.
provided no notification of excess funds.
management Contractor management Contractor management
Contractor management ensured average turnaround time for pricing growth was within 3 days and settled cost to proposed cost ratio was 95% or greater.
turnaround time for pricing growth was within 5 days and settled cost to proposed cost ratio was 90% or greater.
turnaround time for pricing growth was within 10 days and settled cost to proposed cost ratio was 90% or greater.
allowed average pricing growth to exceed 10 days.
allowed average pricing growth to exceed 15 days.
ensured EAC/BAC ratio remained within + or – 5% for the last 25% of the provided final EAC/BAC Ratio by the end of the management did not provide final EAC/BAC Ratio until after the end of the avail.
management poorly implemented and or communicated projections based on their cost control management system.
management did not implement or communicate projections based on their cost control system.
integrated ship’s force, RMC, and AIT work packages with NO impact to any milestones. Highly effective communication, coordination and information sharing between Alteration Installation Teams (AITs), OEMs, government agencies, Planning Yard (PY), Prime contractor, each original building yard (MMC and Austal), and its significant subcontractors.
force, RMC, and AIT work packages with NO impact to major milestones and minimal impact to minor milestones.
Effective communication, coordination and information sharing between Alteration Installation Teams (AITs), OEMs, government agencies, Planning Yard (PY), Prime contractor, each original building yard (MMC and Austal), and its force, RMC, and AIT work packages with NO impact to major milestones.
Routine communication, coordination and information sharing between Alteration Installation Teams (AITs), OEMs, government agencies, Planning Yard (PY), Prime contractor, each original building yard (MMC and Austal), and its
Coordination plan is not sufficient, or planned schedules were impacted.
Manages to communication, coordination and information sharing between Alteration Installation Teams (AITs), OEMs, government agencies, Planning Yard (PY), Prime contractor, each original building yard (MMC and Austal), and its
No coordination plan existed. Does not manage to communication, coordination and information sharing between Alteration Installation Teams (AITs), OEMs, government agencies, Planning Yard (PY), Prime contractor, each original building yard (MMC and Austal), and its
All Change Order Pricing Agreements (COPA)s submitted provided detailed estimates with
Cost proposals provided details facilitating negotiation, including subcontractor supporting
Contractor complied with cost or pricing data submission requirements of
FAR 52-512-21
without additional detail supporting
No trade or subcontractor breakdown submitted with pricing.
Justification provided for costs were inadequate.
trade and subcontractor breakdowns.
documents and complied with cost or pricing data submission requirements of
FAR 52.512-21.
negotiations.
Production schedule was submitted IAW NAVSEA Std Item 009-60 with significant issues highlighted and updated accurately as they occurred.
Scheduling system established and submitted IAW NAVSEA Std Item 009-60 with no discrepancies.
established and submitted IAW NAVSEA Std Item 009-60 with minor discrepancies.
Planned activities supported contract milestones.
not sufficient to integrate planned activities from multiple maintenance providers. Progress updates were inaccurate or late.
No scheduling system maintained, and or no progress updates provided.
In assessing the Contractor’s management, evaluators will consider, among other things, facts applicable to technical, schedule, and cost subfactors.
management, evaluators will consider, among other things, facts applicable to management, evaluators will consider, among other things, facts applicable to management, evaluators will consider, among other things, facts applicable to management, evaluators will consider, among other things, facts applicable to
The Contractor utilized the DoD Supply System to the fullest extent possible while considering the cost and schedule goals.
Over time, did the number of Demand Only Transactions reduce? The Contractor helped the Navy’s endeavor to maximize the use of the DoD Supply System and reduce Total Ownership Cost (TOC).
The Contractor utilized the DoD Supply System for 90% of material while achieving cost and schedule goals.
Over time, did the number of Demand Only Transactions reduce? The Contractor helped the Navy’s endeavor to maximize the use of the DoD Supply System and reduce Total Ownership Cost (TOC).
The Contractor utilized the DoD Supply System for 80% of material while achieving cost and schedule goals.
Over time, the number of Demand Only Transactions remains the same?
The material received had some minor issues but were resolved
The Contractor utilized the DoD Supply…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .