Attachment J-13

View the file

Other files

File Type Posted
N00024-13-R-4505_(Conformed_Copy_through_Amendment_0017).pdf PDF
N00024-13-R-4305_Amendment_0017_Summary_of_Changes.pdf PDF
Amendment_0016_Summary_of_Changes.pdf PDF
Conformed_Copy_through_Amendment_0016.pdf PDF
N00024-14-R-4305_Conformed_Copy_thorugh_Amendment_0015.pdf PDF
Amendment_0015_Summary_of_Changes.pdf PDF
N00024-13-R-4305_Amendment_0015_Bidders_Questions_Responses_(Enclosure_1)_rev1.pdf PDF
N00024-13-R-4305_Amendment_0014_Bidders_Questions_(Enclosure_1).pdf PDF
Amendment_0014_Summary_of_Changes.pdf PDF
LCS_SEC_Attachment_J-13_LCS_FM_CC_WI_Spec_897-11-002_Rev_2.pdf PDF
LCS_SEC_Attachment_S_2_Cost_Exhibits_L001_thru_L008_Rev_5.xlsx XLSX spreadsheet
LCS_SEC_Attachment_J-14_LCS_Planned_Maintenance_WI_Spec_897-11-001_Rev_2.pdf PDF
N00024-13-R-4305_Conformed_copy_through_Amendment_0014.pdf PDF
N00024-13-R-4305_Amendment_0013_Bidders_Questions_Responses_Enclosure_1.pdf PDF
Amendment_0013_Summary_of_Changes.pdf PDF
N00024-13-R-4305_Conformed_Copy_through_Amendment_0013.pdf PDF
Amendment_0012_Summary_of_Changes.pdf PDF
N00024-13-R-4305_Conformed_Copy_through_Amendment_0012.pdf PDF
N00024-13-R-4305_Amendment_0012_Response_to_Bidders_Questions.pdf PDF
LCS SEC Attachment J-14 LCS Planned Maintenance WI Spec 897-11-001.pdf PDF
LCS SEC Attachment S_2 Cost Exhibits L001 thru L008 Rev 4.xlsx XLSX spreadsheet
LCS SEC Attachment J_21 LCS PMS Equipment Guide List Rev 2.xlsx XLSX spreadsheet
N00024-13-R-4305_Exhibit A B C CDRL Pkg Rev 1.pdf PDF
Amendment 0011 Summary of Changes.pdf PDF
LCS SEC Attachment J_15 TAG-OUT SOP COMLCSRONONEINST 4700 1E.pdf PDF
LCS SEC Attachment J_3 FY15 Standard Work Items.pdf PDF
N00024-13-R-4305_Conformed Copy through Amendment 0011.pdf PDF
Amendment_0010.pdf PDF
Conformed_Copy_of_N00024-13-R-4305_through_Amendment_0009.pdf PDF
Amendment_0009_Summary_of_Changes.pdf PDF
N00024-13-R-1305_Amendment_0009_Bidders_Questions__(Enclosure_1).pdf PDF
Conformed_Copy_of_N00024-13-R-4305_through_Amendment_0008.pdf PDF
N00024-13-R-4305_Amendment_0008_Bidders_Questions_(Enclosure_1).pdf PDF
Amendment_0008_Summary_of_Changes.pdf PDF
LCS_SEC_Exhibits_A_B_C_CDRL_Pacakge_Rev_1.pdf PDF
N00024-13-R-4305_Amendment_0007_Bidders_Questions_(Enclosure_1).pdf PDF
Conformed_Copy_of_N00024-13-R-4305_through_Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Conformed_Copy_of_N00024-13-R-4305_through_Amendment_0006.pdf PDF
Amendment_0004.pdf PDF
Conformed_copy_of_N0002413R4305_through_Amendment_0001.pdf PDF
N00024-13-R-4305_Amendment_0002.zip ZIP file
N00024-13-R-4305_Amendment_0005.pdf PDF
N00024-13-R-4305_Amendment_0004_Bidders_Questions_(Enclosure_1).pdf PDF
Amendment_0001.pdf PDF
N00024-13-R-4305_Amendment_0001_Bidders_Questions_Reponses.pdf PDF
N00024-13-R-4305.zip ZIP file
N00024-13-R-4305_Amendment_0003.zip ZIP file
Conformend_Copy_of_N00024-13-R-4305_through_Amendment_0004.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 20130607

Facilities Maintenance Work Specification

Ship: LCS CLASS ITEM NO.897-11-002 COAR: N/A PCN: None

SWT FILE NO: CMP: N/A

REVISED: 20130607 PLANNER: N/A

1. SCOPE:

1.1. Title: Littoral Combat Ship Facilities Maintenance (FM) and Corrosion Control Planning and Execution; provide

1.2. Location of Work

1.2.1. Not Applicable

1.3. Identification

1.3.1. Not Applicable

2. REFERENCES

2.1. Contract N00024-12-G-4329/4330

2.2. NAVSEA S6480-A4-CAT-010: Authorized Chemical Cleaning Products and

Dispensing Systems Catalog

2.3. NAVSEA Standard Item: 009-32

2.4. S9086-VD-STM-010 to 030 (V1-V3) NSTM 631 Preservation of Ships.

2.5. S9086-VH-STM-010 NSTM 635 Thermal, Fire, and Acoustic Insulation.

3. REQUIREMENTS:

3.1. FM tasking is composed of three core elements: Housekeeping, Industrial Cleaning and Corrosion Control.

3.1.1. Utilize contractor developed Annual Cleaning Schedule to determine requirements for Housekeeping and Industrial Cleaning.

3.1.1.1. Annual Cleaning Schedule shall be approved by the

SUPERVISOR.

3.1.1.2. Annual Cleaning Schedule shall include list of spaces, space description, square footage, flooring type, cleaning level (1-

9) and periodicity.

Revised 20130607

3.1.2. Corrosion Control work items are planned by the Contractor based on requirements in CSMP and as found conditions on the vessel using 2.3 and 2.4 as guidance. Submit Condition Found Reports (CFR) as required.

3.1.2.1. Contractor shall, with concurrence of supervisor, perform corrosion control to resolve discrepancies found while performing maintenance. Any activity of this nature will be documented as follow-on work.

3.1.2.2. Corrosion Control to include insulation, lagging and coating system repairs using 2.3, 2.4, and 2.5 as guidance.

3.1.3. FM Planning will be conducted in contractor specified planning tool.

3.1.3.1. Contractor reporting requirements.

3.1.3.1.1. Provide required reports using 2.1 as required.

3.1.3.2.Daily progress reports are maintained to include housekeeping, industrial cleaning and corrosion control. Final work acceptance shall be by Supervisor or designated representative.

3.2. Tools, Parts and Equipment for FM.

3.2.1.Common material and equipment shall be procured with FM funding from commercial or government sources. The desire is that the industry team provides the best value in meeting the maintenance requirements.

Materials will be managed by the Contractor.

3.2.2. Only products listed in 2.2 and 2.3 shall be utilized. Substitutions shall be authorized by the Supervisor.

3.3. QA Surveillance for FM will be accomplished in accordance with the FM surveillance plan.

4.NOTES: None.

5.GOVERNMENT FURNISHED MATERIAL (GFM)

5.1. As required.

File details come from the government source that posted it. Updated .