Revised 20130607
Facilities Maintenance Work Specification
Ship: LCS CLASS ITEM NO.897-11-002 COAR: N/A PCN: None
SWT FILE NO: CMP: N/A
REVISED: 20130607 PLANNER: N/A
1. SCOPE:
1.1. Title: Littoral Combat Ship Facilities Maintenance (FM) and Corrosion Control Planning and Execution; provide
1.2. Location of Work
1.2.1. Not Applicable
1.3. Identification
1.3.1. Not Applicable
2. REFERENCES
2.1. Contract N00024-12-G-4329/4330
2.2. NAVSEA S6480-A4-CAT-010: Authorized Chemical Cleaning Products and
Dispensing Systems Catalog
2.3. NAVSEA Standard Item: 009-32
2.4. S9086-VD-STM-010 to 030 (V1-V3) NSTM 631 Preservation of Ships.
2.5. S9086-VH-STM-010 NSTM 635 Thermal, Fire, and Acoustic Insulation.
3. REQUIREMENTS:
3.1. FM tasking is composed of three core elements: Housekeeping, Industrial Cleaning and Corrosion Control.
3.1.1. Utilize contractor developed Annual Cleaning Schedule to determine requirements for Housekeeping and Industrial Cleaning.
3.1.1.1. Annual Cleaning Schedule shall be approved by the
SUPERVISOR.
3.1.1.2. Annual Cleaning Schedule shall include list of spaces, space description, square footage, flooring type, cleaning level (1-
9) and periodicity.
Revised 20130607
3.1.2. Corrosion Control work items are planned by the Contractor based on requirements in CSMP and as found conditions on the vessel using 2.3 and 2.4 as guidance. Submit Condition Found Reports (CFR) as required.
3.1.2.1. Contractor shall, with concurrence of supervisor, perform corrosion control to resolve discrepancies found while performing maintenance. Any activity of this nature will be documented as follow-on work.
3.1.2.2. Corrosion Control to include insulation, lagging and coating system repairs using 2.3, 2.4, and 2.5 as guidance.
3.1.3. FM Planning will be conducted in contractor specified planning tool.
3.1.3.1. Contractor reporting requirements.
3.1.3.1.1. Provide required reports using 2.1 as required.
3.1.3.2.Daily progress reports are maintained to include housekeeping, industrial cleaning and corrosion control. Final work acceptance shall be by Supervisor or designated representative.
3.2. Tools, Parts and Equipment for FM.
3.2.1.Common material and equipment shall be procured with FM funding from commercial or government sources. The desire is that the industry team provides the best value in meeting the maintenance requirements.
Materials will be managed by the Contractor.
3.2.2. Only products listed in 2.2 and 2.3 shall be utilized. Substitutions shall be authorized by the Supervisor.
3.3. QA Surveillance for FM will be accomplished in accordance with the FM surveillance plan.
4.NOTES: None.