Enclosure_(4)_Blank_Engineering_Action_Chit.pdf

PDF 100 KB Posted

Attached to
H-53 Depot Level Modifications IDIQ Federal contract opportunity
Solicitation number
N0001922R0044
Issued by
Department of the Navy Naval Air Systems Command

About this file

This notice provides information for an industry day regarding a forthcoming solicitation for an indefinite-delivery/indefinite-quantity contract to support depot-level modifications for the H-53 helicopter program managed by PMA-261. The industry day will include both in-person and virtual components on December 7, 2021. Interested parties must RSVP by December 2 to obtain attendance limits and logistics details. The industry day will review requirements for non-recurring and recurring efforts including prototyping, integration, and installation of engineering changes. The subsequent solicitation is expected in the second quarter of fiscal year 2022 and will be a small business set-aside resulting in a single-award IDIQ. Questions are due by December 2 for response approximately two weeks after the industry day.

View the file

Other files for this federal contract opportunity

Other files attached to H-53 Depot Level Modifications IDIQ, newest first.
File Type Posted
N0001922R0044 Q_A RFP Amendment 3.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
Attachment_L6_Section B CLINs and Prices_2ndDraft.docx DOCX document
DRAFT Exhibit_A_DD1423_CDRLS_2ndDraft.docx DOCX document
Attachment_1_SOW_DEPOTMODIDIQCOMP_2ndDraft.docx DOCX document
Enclosure (1) H53 Depot Mod FY Schedule and Locations_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(3)_GfpAttachmentTemplate_2ndDraft.pdf PDF
Attachment_L2_Corporate Experience Table T1_T2_2ndDraft.xlsx XLSX spreadsheet
Attachment_L3_Contract Reference Experience Tables_2ndDraft.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
Attachment_L7_Proposed_Additional_GFP_Requirements_2ndDraft.xlsx XLSX spreadsheet
Summary of Changes_2ndDraft.docx DOCX document
Attachment_L8_Offeror_Information_Table_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(4)_Blank_Engineering_Action_Chit_2ndDraft.pdf PDF
Draft N001922R0044_2ndDraft.docx DOCX document
Enclosure_(5)_Over_and_Above_Work_Request_2ndDraft.docx DOCX document
Attachment_4_N00019-22-R-0044_BID_DD254_signed_2ndDraft.pdf PDF
Attachment_L1_TechLibraryContents_2ndDraft.xlsx XLSX spreadsheet
Attachment_L9_Business_System_Status_2ndDraft.xlsx XLSX spreadsheet
N0001922R0044 IndustryDay 2 Brief.pptx PPTX presentation
Attachment_L5_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Enclosure (2) SOW_TD Alignment.xlsx XLSX spreadsheet
Draft N0001922R0044_4-20-22.docx DOCX document
Attachment_L5_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L1_TechLibraryContents.xlsx XLSX spreadsheet
DRAFT Exhibit_A_DD1423_CDRLS.docx DOCX document
Attachment_L2_Corporate Experience Table T1_T2.xlsx XLSX spreadsheet
Enclosure (1) H53 Depot Mod FY Schedule and Locations.xlsx XLSX spreadsheet
Enclosure (3)_GfpAttachment.pdf PDF
Attachment_4_N00019-22-R-0044_BID_DD254_signed.pdf PDF
Attachment_L7_Proposed_Additional_GFP_Requirements.xlsx XLSX spreadsheet
Attachment_L8_Offeror_Information_Table.xlsx XLSX spreadsheet
Attachment_L3_Contract Reference Experience Tables.xlsx XLSX spreadsheet
Attachment_3_ Labor Categories_ Rates.xlsx XLSX spreadsheet
Attachment_1_SOW_DEPOTMODIDIQCOMP.docx DOCX document
Enclosure_(6)_TechLibraryContents.xlsx XLSX spreadsheet
Enclosure_(5)_Over_and_Above_Work_Request.docx DOCX document
QA N0001922R0044 Form.xlsx XLSX spreadsheet
Attachment L6_Section B CLINs and Prices.docx DOCX document
N0001922R0044 Industry Day QA.xlsx XLSX spreadsheet
Draft Section B_NTC (1).xlsx XLSX spreadsheet
CUI_STATEMENT OF WORK_DEPOTCOMP_DRAFT FOR INDUSTRY DAY 24 Nov 21 (1).docx DOCX document
DRAFT DD1423 CDRLS_11.16.2021 (v2)_NTC.docx DOCX document
Draft N0001922R0044.docx DOCX document
Enclosure (X) H53 Depot Mod FY Schedule and Locations 24 Nov 21.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TD TITLE (AFC, AYC, DCC, PPC, AVC ETC.)

TD

NUMBER BUNO ORIGINATOR ENGINEER

Phone # or contact info:

DRAWING NUMBER FIGURE SHEET PARAGRAPH ITEM

PAGE ZONE

PART NUMBER

INITIATOR DISCREPANCY DESCRIPTION

INITIATOR SUGGESTED CORRECTION

ENGINEERING OR LOGISTICS DIRECTION AUTHOR:

ENGINEERING ACTION CHIT (EAC) EAC

NUMBER Revised Form REQUEST FOR ENGINEERING OR LOGISTICS ACTION

This form replaces electronic copy EAC to enable electronic tracking and transfer, type information where appropriate

INSTRUCTIONS

INITIATOR: fill in the appropriate information and pass to the H-53 IST mod manager.

MOD MANAGER: assigns number, logs EAC as open and transfers to engineering or logistics dept for tasking.

ENGINEERING OR LOGISTICS DEPT: assigns EAC for tasking, ensures completed EAC is returned to mod manager

COG ENGINEER OR LOGISTICIAN: Provides direction, notes concurrence, answer date, author; returns direction to mod manager MOD MANAGER: logs EAC as complete and returns direction to initiator

TD STAGE (check box)

Engineering or logistics direction author must ensure solution concurrence with logistics and / or engineering counterpart to complete EAC.

Date:

Prototype Validation Verification Retrofit

EAC Form

File details come from the government source that posted it. Updated .