DRAFT Exhibit_A_DD1423_CDRLS.docx
DOCX document 181 KB Posted
- Attached to
- H-53 Depot Level Modifications IDIQ Federal contract opportunity
- Solicitation number
- N0001922R0044
About this file
This document provides details of an industry day for a forthcoming solicitation for depot level modifications to the H-53 helicopter under solicitation number N0001922R0044. The industry day will be a hybrid in-person and virtual event on December 7, 2021 to provide information to industry partners and collect written questions. Attendance is limited to 48 people in person on a first-come-first-served basis, with 1-on-1 virtual sessions also available. The solicitation will be a small business set-aside for a single-award IDIQ contract to perform non-recurring and recurring fabrication, assembly, prototyping, integration and installation efforts for engineering changes designated by PMA-261. Advanced questions on the draft solicitation are due by December 2, 2021. A draft RFP is expected in the second quarter of fiscal year 2022, with questions and answers to be provided approximately two weeks after the industry day.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, Contract Data Requirements List
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
TDP ____ TM ____ OTHER MGMT
D. SYSTEM/ITEM
H-53
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Certificate of Conformance
3. SUBTITLE
Installation Completion Report
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DI-MISC-81356A
5. CONTRACT REFERENCE
SOW Para 3.11
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
See Block 16
b. COPIES
16. REMARKS
Block 4: The Installation Completion Report informs the Government that the Task Order is technically complete, and documents any deviations from the associated Technical Directives.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 12 & 13: Submissions are required with each Aircraft delivery, documenting the aircraft modifications incorporated under the Task Order, and deviations from Task Order requirements as appropriate. Additional submissions are required if the data is revised by the Contractor. Subsequent submissions shall be delivered no later than seven working days after revision or Government request.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
DRAFT
FINAL
| Reg |
| Repro |
(See Block 16)
| 1 |
| 0 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT (IPMDAR)
3. SUBTITLE
IPMDAR / IMS
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MGMT-81861C
5. CONTRACT REFERENCE
SOW Para 3.13.1.1, 3.13.1.2, 3.13.1.3, 3.13.1.4
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
(See Block 16)
b. COPIES
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
16. REMARKS
Block4 “Authority” - The Contractor shall provide monthly IPMDARs per DID DI-MGMT-81861C except as modified and specified per the following:
A.) ‘1.2.1 Contract Performance Dataset (CPD)’: Contract Performance Dataset (CPD) is not applicable to this CDRL.
B.) ‘1.2.2 Schedule (Comprised of both the Native Schedule File and the Schedule Performance Dataset (SPD))’: Schedule Performance Dataset (SPD) is not applicable to this CDRL.
C.) ‘1.2.3 Performance Narrative Report (Comprised of both the Executive Summary and the Detailed Analysis Report)’: Only narrative analysis of data provided in the Schedule is applicable to this CDRL.
Schedule:
A.) ‘2.4.2.1 Reference’: The IMS shall have traceability to the Integrated Master Plan (IMP) and changes to the IMP affecting the schedule shall be documented in the monthly Detailed Analysis of the Performance Narrative Report.
B.) ‘2.4.2.20 Data Dictionary for Native Schedule File’: The first monthly analysis narrative submission for the Native Schedule shall include the ‘Schedule Assumptions’ and ‘Data Dictionary’. Any change, post-first submission, to the ‘Schedule Assumptions’ or ‘Data Dictionary’ requires re-submittal of the information with the affected IPMDAR deliverable.
C.) ‘2.4.2.21 Schedule Risk Assessment (SRA)’:
SRAs shall be conducted on a semiannual basis. Additionally, an SRA can be performed outside of routine scheduled occurrences, at the request of the Government, particularly when schedule is a significant concern for the Government due to operational requirements, funding limitations, or when scheduling is considered a major risk element to the acquisition effort.
Unless otherwise directed by the Government, the following shall apply:
Individual, vice ‘Global’, risk inputs (e.g. three-point estimates) and rationale shall be developed and applied to all tasks on the following paths:
| 1) | Primary critical path to the agreed-upon final major program milestone |
| 2) | Driving path to agreed-upon milestone(s) and near driving path(s) with less than or equal to 10 days of float or as directed by the Government. |
Remaining tasks’ risk inputs (e.g. three-point estimates) and rationale shall be individually or globally applied.
Risk/opportunity items that have the potential to impact schedule shall be evaluated as part of the SRA process and modeled as necessary.
D.) ‘2.4.3.2 Resources’: The Native Schedule deliverables shall include all resource loaded information utilized by the Contractor’s business system(s) practices. The ‘Data Dictionary’ will define applicable fields and the ‘Schedule Assumptions’ will describe when the resource loaded information is utilized and updated.
Block 12 “Date of First Submission” – Incremental Delivery instructions:
‘1.8.1 Monthly Submissions Requirement’: The IPMDAR authoritative data consisting of the Schedule (Native Schedule File and Performance Narrative (Executive Summary and Detailed Analysis) shall be submitted no later than 16 business days after the end of the first full accounting period following Authorization to Proceed (ATP).
Block 13 “Date of Subsequent Submissions” - instructions:
‘1.8.1 Monthly Submission Requirement’: IPMDAR authoritative data consisting of the Schedule (Native Schedule File and Performance Narrative (Executive Summary and Detailed Analysis) shall be submitted no later than 16 business days after the close of the contractor’s monthly accounting period.
Block 14 “Distribution” - instructions:
A.) If an individual Task Order is greater than $20M (Cost-Type only), IPMDAR files must be electronically submitted to the OUSD Acquisition Data and Analytics (ADA) EVM-Central Repository (EVM-CR) on the ADA website at https://www.acq.osd.mil/asda/ae/ada/ipm/index.html.
B.) This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to CH-53K Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
EVM-CR
| 1 |
| 0 |
| PMA-261 (see Block 16) |
| 1 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
TDP ____ TM ____ OTHER MISC
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contractor Work Breakdown Structure (CWBS)
3. SUBTITLE
CWBS
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MGMT-81334D
5. CONTRACT REFERENCE
SOW Para 3.13.1.4
6. REQUIRING OFFICE
NAVAIR Cost and Schedule Analysis
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ (See Blk 16)
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
8. APP CODE
A
| N/A (See Blk 16) |
| 11. AS OF DATE |
See Blk 16
13. DATE OF SUBSEQUENT SUBMISSION
(See Blk 16)
b. COPIES
16. REMARKS
Block 4: Supplemental Instructions for Completion of CWBS
Block 8: The Government will have 30 days for review and acceptance/rejection of each submission. The Contractor shall have 30 days to resubmit. No advance draft is required.
Block 9: No Distribution Statement Required. Distribution statements governed by DoDI 5230.24 “Distribution Statements on Technical Documents” do not apply to financial data including Software Resource Data Reports (SRDRs).
Block 10-13: Initial submission is required within ninety (90) days after contract award. Provide updates to previously approved CWBS, as required.
1. Part I INDEX. Provide a matrix identifying the contract line item and SOW to the WBS elements.
2. Part II CWBS Dictionary. The Dictionary shall provide a definition of every CWBS element and contractor task essential to fulfill the WBS element description. The task definitions shall include summary identification of the functional/organizational resources to be applied.
a) The elements shall be in the same order as the Part I INDEX.
b) The WBS element number shall preceded the WBS element title.
3. The CWBS shall be prepared and developed in accordance with the DI-MGMT-81334D (or most recently approved version) and using the latest version of MIL-STD-881. The contractor may use its own WBS element numbering scheme as long as the WBS is compliant with the latest version of the MIL-STD-881. The DID, DI-MGMT-81334D is available from the Defense Cost and Resource Center (DCARC) website at https://cade.osd.mil.
Block 14: This deliverable shall be submitted as an electronic Microsoft Excel file. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
(See Block 16)
PMA-261
| 1 |
AIR-4.2.3
| 1 |
15. TOTAL
| 2 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Performance and Cost Report
3. SUBTITLE
Performance and Cost Report
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-FNCL-80912A
5. CONTRACT REFERENCE
SOW Para 3.13.1.5
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MONTHLY
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
MONTHLY
b. COPIES
16. REMARKS
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
(See Block 16)
| 1 |
| 0 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Meeting Minutes
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-ADMIN-81250C
5. CONTRACT REFERENCE
SOW Para 3.13.2, 3.13.3, 3.13.4
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
13. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 12: Initial delivery shall be the Post Award Conference agenda to be delivered no later than ten (10) business days after contract award.
Block 13: PMR Agendas shall be delivered NLT 10 business days prior to the event. PMR minutes shall be delivered within 5 business days of the end of the event.
IPT meeting minutes shall be submitted by the close of the business day one day prior to the next weekly meeting via email. The day of the week to be determined by joint agreement between the government and the Contractor.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
(See Block 16)
| 1 |
| 0 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
TRANSITION PLAN PHASE-IN
3. SUBTITLE
Phase-In Transition Plan
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-SESS-82299
5. CONTRACT REFERENCE
SOW Para 3.13.6.1.1
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
One/R
12. DATE OF FIRST SUBMISSION
10 DAC
14. DISTRIBUTION
8. APP CODE
A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 7: Government has ten (10) business days after submission to review and provide comments or actions. Contractor shall have five (5) business days to update and resubmit final report.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 13: Updates/subsequent submissions in support of individual Task Orders as appropriate or required by the Task Order.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
| (See Block 16) |
| 1 |
| 1 |
| 0 |
| 15. TOTAL |
| 1 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Government Furnished Property Inventory Report
3. SUBTITLE
GFP Inventory Report
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MGMT-81947B
5. CONTRACT REFERENCE
SOW Para 3.13.6.1.1, 7.5.1.2
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
Yearly
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
8. APP CODE
A
| D (See Block 16) |
| 11. AS OF DATE |
(See Block 16)
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 4: Format in accordance to Enclosure (3) to the SOW.
Block 7: Government has ten (10) business days after submission to review and provide comments or actions. Contractor shall have five (5) business days to update and resubmit final report.
Contractor phase-in inventory shall be conducted within 30 days of contract award and a physical inventory of all GFP must be delivered yearly. Results of the GFP inventory shall be uploaded IAW Defense Procurement and Acquisition Policy (DPAP) located at website http://www.acq.ord/dpap
This will include technical data or computer software provided to the contractor as specified in this contract.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 11 & 13: Submit initial inventory report within five (5) days of completion of the Phase-In Transition inventory, and subsequent inventory reports on the anniversary of the initial inventory report.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
| (See Block 16) |
| 1 |
| 1 |
| 0 |
| 15. TOTAL |
| 1 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
TRANSITION PLAN PHASE-OUT
3. SUBTITLE
Phase-Out Transition Plan
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MGMT-81945
5. CONTRACT REFERENCE
SOW Para 3.13.6.2
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
One
12. DATE OF FIRST SUBMISSION
60 DAC
14. DISTRIBUTION
8. APP CODE
A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A
b. COPIES
16. REMARKS
Block 7: Government has ten (10) business days after submission to review and provide comments or actions. Contractor shall have five (5) business days to update and resubmit final report.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
| (See Block 16) |
| 1 |
| 1 |
| 0 |
| 15. TOTAL |
| 1 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
Program Management Report
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW Para 3.13.7.4
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
45 DAC
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 11 and 13: Contractor shall deliver the monthly Program Management Report on the 15th of each month, summarizing the previous month’s activities.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
(See Block 16)
| 1 |
| 0 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A00A
2. TITLE OF DATA ITEM
Quality Assurance Program Plan
3. SUBTITLE
Quality Assurance Program Plan & Contractor Flight and Ground Operations Procedures
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-QCIC-81794A
5. CONTRACT REFERENCE
SOW Para 3.13.8
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
8. APP CODE
A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 4: The Quality Assurance Program Plan and Contractor’s Flight and Ground Operations Procedures are separate deliverables. Revision/update/subsequent submission of one does not require redelivery of the other.
Contractor format is acceptable for the Quality Assurance Program Plan.
Contractor’s Flight and Ground Operations Procedures shall be prepared in accordance with DCMA INST 8210.1C and NAVAIRINST 3710.1G.
Block 7: For both the Quality Assurance Program Plan and the Contractor’s Flight and Ground Operations Procedures, the Government has ten (10) business days after submission to review and provide comments or actions. Contractor shall have five (5) business days to update and resubmit final report.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 13: Required in the event the approved deliverable is revised for any reason.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
| (See Block 16) |
| 1 |
| 1 |
| 0 |
| 15. TOTAL |
| 1 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| (1 Data Item) | |
| Form Approved |
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
TBD
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
N0001922R0044
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM
Technical Report
3. SUBTITLE
Program Progress and Status Report, Draft Engineering Action Chits, & VAL/VER Report
4. AUTHORITY (Data Acquisition Document No.)17. PRICE GROUP
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Para 3.13.9, 4.1
6. REQUIRING OFFICE
PMA-261
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
See Block 16
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
8. APP CODE
N/A
| D (See Block 16) |
| 11. AS OF DATE |
N/A
13. DATE OF SUBSEQUENT SUBMISSION
b. COPIES
16. REMARKS
Block 4: Contractor format acceptable for the Weekly Status Report and VAL/VER Report Engineering Action Chits shall be submitted in accordance with the Enclosure (4) to the SOW.
Block 10, 12, & 13: Weekly Status Reports shall be submitted weekly on the first business day of the following week. The first submission shall be within 15 DAC. Engineering Action Chits shall be submitted via Enclosure (4) to the SOW within five (5) business days of discovery. VAL/VER reports shall be submitted within five (5) business days of completion of the VAL/VER effort.
Block 9: DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S. DoD Contractors only (Administrative or Operational Use), (date of SOW generation). Other requests shall be referred to PROGRAM EXECUTIVE OFFICER, AIR ASW ASSAULT AND SPECIAL MISSION PROGRAM (PMA261), 47123 Buse Road, Bldg 2272, Room 155, Patuxent River, MD 20670.
WARNING -THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT CONTROL REFORM ACT OF 2018 (TITLE 50, U.S.C., CHAPTER 58, SEC. 4801-4852). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTRUCTION NOTICE SHALL BE IAW DODI 5230.24, ENCLOSURE 3, PARAGRAPH 17.
Block 14: This deliverable shall be submitted in digital IAVA scanned format compatible with Navy Marine Corps Intranet (https://www.homeport.navy.mil/services/ngen-core-build ); one copy as Adobe Acrobat Document Format (PDF) and one copy of Technical document shall be provided in Microsoft Office 2010 compatible format. The encrypted Deliverables shall be provided to PMA 261 DM via DoD SAFE (Secure Access File Exchange) ( https://safe.apps.mil), with notification email of CDRL availability to PMA-261 Data Manager at the following email address: PMA261_DM@navy.mil. Alternatively, in absence of authenticated CAC user at CONTRACTOR XXX Data Management, PMA261 DM will perform the file request from CONTRACTOR XXX, via DOD SAFE, after receipt of email notification.
a. ADDRESSEE
FINAL
| Reg |
| Repro |
(See Block 16)
| 1 |
| 0 |
15. TOTAL
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
File details come from the government source that posted it. Updated .