Attachment_L7_Proposed_Additional_GFP_Requirements.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
H-53 Depot Level Modifications IDIQ Federal contract opportunity
Solicitation number
N0001922R0044
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document provides information on an upcoming federal contract opportunity with the Department of the Navy for H-53 Depot Level Modifications. The indefinite-delivery/indefinite-quantity contract will be set aside for small businesses and include efforts to perform non-recurring and recurring work required for engineering changes, prototyping, system integration and installation on H-53 aircraft. An industry day will be held on December 7th in Lexington Park, Maryland and virtually to provide information on the planned effort and collect written questions from prospective offerors. The final date to submit advanced questions is December 2nd. While attendance at the industry day is not required, prospective offerors must RSVP by December 2nd if interested in attending in person or virtually. If funding is available, a formal RFP will be released for this requirement in the second quarter of fiscal year 2022.

View the file

Other files for this federal contract opportunity

Other files attached to H-53 Depot Level Modifications IDIQ, newest first.
File Type Posted
N0001922R0044 Q_A RFP Amendment 3.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
Attachment_L6_Section B CLINs and Prices_2ndDraft.docx DOCX document
DRAFT Exhibit_A_DD1423_CDRLS_2ndDraft.docx DOCX document
Attachment_1_SOW_DEPOTMODIDIQCOMP_2ndDraft.docx DOCX document
Enclosure (1) H53 Depot Mod FY Schedule and Locations_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(3)_GfpAttachmentTemplate_2ndDraft.pdf PDF
Attachment_L2_Corporate Experience Table T1_T2_2ndDraft.xlsx XLSX spreadsheet
Attachment_L3_Contract Reference Experience Tables_2ndDraft.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
Attachment_L7_Proposed_Additional_GFP_Requirements_2ndDraft.xlsx XLSX spreadsheet
Summary of Changes_2ndDraft.docx DOCX document
Attachment_L8_Offeror_Information_Table_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(4)_Blank_Engineering_Action_Chit_2ndDraft.pdf PDF
Draft N001922R0044_2ndDraft.docx DOCX document
Enclosure_(5)_Over_and_Above_Work_Request_2ndDraft.docx DOCX document
Attachment_4_N00019-22-R-0044_BID_DD254_signed_2ndDraft.pdf PDF
Attachment_L1_TechLibraryContents_2ndDraft.xlsx XLSX spreadsheet
Attachment_L9_Business_System_Status_2ndDraft.xlsx XLSX spreadsheet
N0001922R0044 IndustryDay 2 Brief.pptx PPTX presentation
Attachment_L5_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Enclosure (2) SOW_TD Alignment.xlsx XLSX spreadsheet
Draft N0001922R0044_4-20-22.docx DOCX document
Attachment_L5_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L1_TechLibraryContents.xlsx XLSX spreadsheet
DRAFT Exhibit_A_DD1423_CDRLS.docx DOCX document
Attachment_L2_Corporate Experience Table T1_T2.xlsx XLSX spreadsheet
Enclosure_(4)_Blank_Engineering_Action_Chit.pdf PDF
Enclosure (1) H53 Depot Mod FY Schedule and Locations.xlsx XLSX spreadsheet
Enclosure (3)_GfpAttachment.pdf PDF
Attachment_4_N00019-22-R-0044_BID_DD254_signed.pdf PDF
Attachment_L8_Offeror_Information_Table.xlsx XLSX spreadsheet
Attachment_L3_Contract Reference Experience Tables.xlsx XLSX spreadsheet
Attachment_3_ Labor Categories_ Rates.xlsx XLSX spreadsheet
Attachment_1_SOW_DEPOTMODIDIQCOMP.docx DOCX document
Enclosure_(6)_TechLibraryContents.xlsx XLSX spreadsheet
Enclosure_(5)_Over_and_Above_Work_Request.docx DOCX document
QA N0001922R0044 Form.xlsx XLSX spreadsheet
Attachment L6_Section B CLINs and Prices.docx DOCX document
N0001922R0044 Industry Day QA.xlsx XLSX spreadsheet
Draft Section B_NTC (1).xlsx XLSX spreadsheet
CUI_STATEMENT OF WORK_DEPOTCOMP_DRAFT FOR INDUSTRY DAY 24 Nov 21 (1).docx DOCX document
DRAFT DD1423 CDRLS_11.16.2021 (v2)_NTC.docx DOCX document
Draft N0001922R0044.docx DOCX document
Enclosure (X) H53 Depot Mod FY Schedule and Locations 24 Nov 21.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions **NOTE: This tab contains instructions for completing the Additional GFP Requirements**. DO NOT ADD TEXT TO SHADED CELLS.

Instructions for the Offeror Information Table
Row 3Fill in the Offeror's Name.
Column A
CLINsList the CLINs the additional GFE/GFP/GFF/GFI is required to support.
Column B
DescriptionProvide a description of the additional GFE/GFP/GFF/GFI that is required. Include as much descriptive data (Part Number, CAGE, NSN, Drawing Number, etc) as possible.
Column C
Location(s)List the location(s) where the GFE/GFP/GFF/GFI is required.
Column D
Other Government ContractsIf the GFE/GFP/GFF/GFI is already available via another Government contract, list the contract number and attach the letter authorizing the use of the GFE/GFP/GFF/GFI.
Column E
Monetary ImpactList the monetary impact to the Offeror’s proposal if the additional GFE/GFP/GFF/GFI is not provided as GFE/GFP/GFF/GFI.

&"Times New Roman,Regular"&10Instructions &"Times New Roman,Regular"&10FOSR #: N00421-20-R-0105 TO-0001 Attachment (F3)

&"Times New Roman,Regular"&10&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

Offeror Information Additional GFP

Offeror:
CLIN(s)Description of GFE/GFP/GFF/GFILocation(s)Other Gov't Contracts (if applicable, attach authorizing corresponcence)
Monetary Impact if not provided.

&"Times New Roman,Regular"&10FOSR #: N00421-20-R-0105 TO-0001 Attachment (F3)

&"Times New Roman,Regular"&10&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .