Attachment_L1_TechLibraryContents.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- H-53 Depot Level Modifications IDIQ Federal contract opportunity
- Solicitation number
- N0001922R0044
About this file
This notice announces an industry day for a Department of the Navy, Naval Air Systems Command indefinite-delivery/indefinite-quantity contract to perform non-recurring and recurring efforts required for depot level modifications to H-53 aircraft designated by the H-53 Program Office. The industry day will include both in-person and virtual components on December 7, 2021 in Lexington Park, Maryland to provide information to prospective offerors and collect written questions. The solicitation number is N0001922R0044 and the effort is set aside for small businesses. The draft solicitation is expected for release in the second quarter of fiscal year 2022. Questions and answers from the industry day will be made available approximately two weeks after the event. Attendance at the industry day is not required to submit a proposal in response to any forthcoming solicitations.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Document Number | Document Title | Date | Notes |
| AFC-519 Pt 3 | H-53E INTEGRATED MECHANICAL DIAGNOSTIC SYSTEMS/TELEMETRIC DATA RECORDING SET (IMDS/TDRS) MONITORING OF THE TAIL ROTOR DISCONNECT COUPLING (TRDC) | 28-Feb-22 DRAFT | |
| 21A676 | INSTALLATION DATA INSTRUCTIONS, INTEGRATED MECHANICAL DIAGNOSTIC SYSTEM PT 3 | 14-Dec 21 DRAFT | |
| 21C1656 | BRACKET, BI-AXIAL ACCELEROMETER | 25-Oct-21 | |
| 21C1673 | INSTALLATION, DISCONNECT COUPLING BI-AXIAL ACCELEROMETER | 15-Nov-21 | |
| 21C1674 | INSTALLATION, TAIL DRIVE SHAFT SECTION VI BI-AXIAL ACCELEROMETER | 25-Oct-21 | |
| 21C1675 | TEMPLATE F-1, H-53 SENSOR ORIENTATION | 25-Oct-21 | |
| 21C1733 | LABEL, IDENT IMDS TRDC | 30-Jan-20 | |
| 21C1737 | LABEL, HARNESS, IMDS TRDC | 3-Nov-21 | |
| 21D1678 | HARDWARE INSTALL KITS, IMDS TRDC | 3-Nov-21 | |
| 21E1677 | ELECTRICAL INSTALLATION, IMDS TRDC | 16-Nov-21 | |
| 21E1679 | HARNESS ASSEMBLY, IMDS TRDC | 30-Jan-20 | |
| 21E1680 | INSTALLATION SCHEMATIC, IMDS TRDC | 3-Nov-21 | |
| 21E1681 | REMOVAL SCHEMATIC, IMDS TRDC | 6-Jan-20 | |
| 21E1682 | LOOSE WIR GROUP, IMDS TRDC | 2-Nov-21 | |
| 21E1683 | HARNESS MODIFICATION, MPU MOUNT, IMDS TRDC | 13-Dec-21 | |
| AFC-540 | MH-53E ADVANCED DIGITAL ANTENNA PRODUCTION (ADAP) SYTEM INSTALLATION | 17-Dec-10 | |
| AFC-540 Pt 2 | CH-53E ADVANCED DIGITAL ANTENNA PRODUCTION (ADAP) SYTEM INSTALLATION | 9-Jul-13 | |
| AFC-546 Pt 4 | MH-53E AN/AYK-28(V)2 BLUE FORCE TRACKING (BFT) SYSTEM WIRING, INSTALLATION | 14-Feb-20 | |
| AFC-549RA | CH-53E RT-185A(c) ARC-210 SATELLITE COMMUNICATION (SATCOM) RADIOINSTALLATION | 27-Mar-13 | |
| AFC-553RA | CH-53E, AN/AAQ-24(V) DIRECTIONAL INFRARED COUNTERMEASURES (DIRCM), INSTALLATION | 30-May-13 | |
| AFC-555RA | CH-53E, HELICOPTER EMERGENCY EGRESS LIGHTING SYSTEM (HEELS), INSTALLATION | 22-Aug-12 | |
| AFC-562 | CH-53E CRASH ATTENUATING CREW CHIEF SEAT, INSTALLATION | 17-Dec-09 | |
| AFC-565 Pt 2 | MH-53E ALE-47 DUAL DISPENSER POD SYSTEM, INSTALLATION | 17-May-12 | |
| AFC-571 | CH-53E, EMBEDDED GLOBAL POSITIONING SYSTEM/INERTIAL NAVIGATIONAL SYSTEM (EGI), INTEGRATION | 10-Jul-13 | |
| AFC-572 | CH-53E, BLUE FORCE TRACKER (8FT) 1.5, INSTALLATION | 10-Jul-13 | |
| AFC-576 | CH-53E AN/APX-123 IFF TRANSPONDER, INSTALLATION | 4-Aug-15 | |
| AFC-585 | CH-53E MULTI-FUNCTION COLOR DISPLAY (MFCD), INSTALLATION | 30-Jan-17 | |
| AFC-586 | H-53E IMPROVED ENGINE NACELLE PANELS, (NO. 1 and NO. 3 POSITION) INSTALLATION | 1-Sep-20 | |
| AFC-589 | MH-53E, AN/APX-123 IFF TRANSPONDER, INSTALLATION | 10-Jul-18 | |
| AFC-591 | MH-53E EMBEDDED GLOBAL POSITIONING SYSTEM/INERTIAL NAVIGATION SYSTEM (EGI) INSTALLATION | 16-Jul-18 | |
| AFC-591 Pt 2 | MH-53E EMBEDDED GLOBAL POSITIONING SYSTEM/INERTIAL NAVIGATION SYSTEM (EGI) INSTALLATION | 7-May-20 | |
| AFC-601 | CH-53E RADAR SIGNALS DETECTING SET AN/APR-39D(V)2, INSTALLATION | 2/2/2022 DRAFT | |
| 21A1684 | INSTALLATION DATA INSTRUCTIONS, CH-53E RADAR DETECTION SET AN/APR-309D(V)2 | 12/8/2021 DRAFT | |
| 21D1709 | DATA BUS COUPLER, INSTALLATION | 6-Jul-21 | |
| 21E1694 | REMOVAL AN/APR-39A(V)2 WIRING DIAGRAM | 8-Jul-21 | |
| 21E1696 | REMOVAL ARC-174 SCHEMATIC | 8-Jul-21 | |
| 21E1697 | REMOVAL ARC-74 SCHEMATIC | 8-Jul-21 | |
| 21E1698 | REMOVAL AN/APR-39A(V)1 WIRING SCHEMATIC | 8-Jul-21 | |
| 21E1699 | REMOVAL SCHEMATIC AAR-47 | 8-Jul-21 | |
| 21E1724 | ANTENNA MOUNT INSTALLATION | 13-Sep-21 | |
| 21E1725 | FWD DETECTOR ANTENNA AND RECEIVER INSTALLATION | 3-Aug-21 | |
| 21E1726 | AFT RECEIVER MOUNT AND SHIM INSTALLATION | 14-Sep-21 | |
| 21E1727 | CH-53E APR-39 STRUCTURAL INSTALLATION | 23-Jul-21 | |
| 21E1728 | PROCESSOR INSTALLATION | 3-Aug-21 | |
| 21E1735 | DIRCM TRU TRAY ASSEMBLY | 15-Sep-21 | |
| 21E1750 | CENTER CONSOLE APR-39D(V)2 | 21-Jul-21 | |
| 21E1787 | REMOVAL MISCELLANEOUS APR-39D(V)2 | 21-Jul-21 | |
| 21E1797 | WIRING INSTALLATION, APR-39D(V)2 RADAR WARNING RECEIVER | 20-Sep-21 | |
| AFC-TBD | CH-53E Fire Suppression Installation | GFI Not Available to date: Pending FST | |
| AFC-TBD | H-53E IVHMU Installation | GFI Not Available to date: TBD | |
| AFC-TBD | CH-53E Digital Interoperability-Medium (DI-Med) | GFI Not Available to date: TBD | |
| AFC-TBD | CH-53K DDSR Installations | GFI Not Available to date: Pending FST | |
| AFC-TBD | CH-53K Cabin Armor | GFI Not Available to date: Pending FST | |
| AFC-TBD | CH-53K Cargo Floors | GFI Not Available to date: Pending FST | |
| AFC-TBD | CH-53K Digital Interoperability-Medium (DI-Med) | GFI Not Available to date: TBD |
File details come from the government source that posted it. Updated .