This document contains details for an industry day event regarding a forthcoming solicitation for depot level modifications to the CH-53 helicopter for the Department of the Navy Naval Air Systems Command. The industry day will provide an overview of the planned indefinite-delivery, indefinite-quantity contract for non-recurring and recurring engineering changes, prototyping, system integration, and installation support. The event will take place both in-person with a limit of 48 attendees and virtually on December 7, 2021. Interested small businesses are asked to register by December 2 to receive additional information. Questions regarding the draft solicitation are due by December 2 as well. The solicitation is expected to be formally released in the second quarter of fiscal year 2022 as a small business set-aside for a single award IDIQ contract to support the H-53 program office's depot modification requirements.

View the file

Other files

File Type Posted
N0001922R0044 Q_A RFP Amendment 3.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
DRAFT Exhibit_A_DD1423_CDRLS_2ndDraft.docx DOCX document
Enclosure_(4)_Blank_Engineering_Action_Chit_2ndDraft.pdf PDF
Enclosure (1) H53 Depot Mod FY Schedule and Locations_2ndDraft.xlsx XLSX spreadsheet
Attachment_L3_Contract Reference Experience Tables_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(3)_GfpAttachmentTemplate_2ndDraft.pdf PDF
Draft N001922R0044_2ndDraft.docx DOCX document
Attachment_1_SOW_DEPOTMODIDIQCOMP_2ndDraft.docx DOCX document
Attachment_L5_Other Entity Cost Summary_2ndDraft.xlsx XLSX spreadsheet
Attachment_L1_TechLibraryContents_2ndDraft.xlsx XLSX spreadsheet
Attachment_4_N00019-22-R-0044_BID_DD254_signed_2ndDraft.pdf PDF
Attachment_L7_Proposed_Additional_GFP_Requirements_2ndDraft.xlsx XLSX spreadsheet
Attachment_L6_Section B CLINs and Prices_2ndDraft.docx DOCX document
Attachment_L9_Business_System_Status_2ndDraft.xlsx XLSX spreadsheet
Enclosure_(5)_Over_and_Above_Work_Request_2ndDraft.docx DOCX document
Attachment_L4_CostPrice Summary Table_2ndDraft.xlsx XLSX spreadsheet
Summary of Changes_2ndDraft.docx DOCX document
Attachment_L8_Offeror_Information_Table_2ndDraft.xlsx XLSX spreadsheet
N0001922R0044 IndustryDay 2 Brief.pptx PPTX presentation
Attachment_L4_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Attachment_L5_CostPrice Summary Table 4-27-22.xlsx XLSX spreadsheet
Draft N0001922R0044_4-20-22.docx DOCX document
Enclosure (2) SOW_TD Alignment.xlsx XLSX spreadsheet
DRAFT Exhibit_A_DD1423_CDRLS.docx DOCX document
Attachment_L2_Corporate Experience Table T1_T2.xlsx XLSX spreadsheet
Enclosure_(4)_Blank_Engineering_Action_Chit.pdf PDF
QA N0001922R0044 Form.xlsx XLSX spreadsheet
Enclosure_(6)_TechLibraryContents.xlsx XLSX spreadsheet
Attachment_3_ Labor Categories_ Rates.xlsx XLSX spreadsheet
Enclosure_(5)_Over_and_Above_Work_Request.docx DOCX document
Attachment_L5_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L4_CostPrice Summary Table.xlsx XLSX spreadsheet
Attachment_L1_TechLibraryContents.xlsx XLSX spreadsheet
Attachment L6_Section B CLINs and Prices.docx DOCX document
Attachment_1_SOW_DEPOTMODIDIQCOMP.docx DOCX document
Enclosure (1) H53 Depot Mod FY Schedule and Locations.xlsx XLSX spreadsheet
Attachment_4_N00019-22-R-0044_BID_DD254_signed.pdf PDF
Attachment_L3_Contract Reference Experience Tables.xlsx XLSX spreadsheet
Attachment_L7_Proposed_Additional_GFP_Requirements.xlsx XLSX spreadsheet
Attachment_L8_Offeror_Information_Table.xlsx XLSX spreadsheet
Enclosure (3)_GfpAttachment.pdf PDF
N0001922R0044 Industry Day QA.xlsx XLSX spreadsheet
CUI_STATEMENT OF WORK_DEPOTCOMP_DRAFT FOR INDUSTRY DAY 24 Nov 21 (1).docx DOCX document
Draft Section B_NTC (1).xlsx XLSX spreadsheet
DRAFT DD1423 CDRLS_11.16.2021 (v2)_NTC.docx DOCX document
Draft N0001922R0044.docx DOCX document
Enclosure (X) H53 Depot Mod FY Schedule and Locations 24 Nov 21.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions **NOTE: This tab contains instructions for completing Tables T-1 and T-2**. DO NOT ADD TEXT TO SHADED CELLS.

Instructions for the Table T-1 Offeror Summary
Row 3Fill in the Offeror's Name.
Column B
Entity NameList the names of the Principal Entities proposed for this solicitation. Add rows as necessary.
Column C
Physical Location of EntityList the physical location of the entity.
Column D
CAGE Codes/DUNSProvide the CAGE Codes/DUNS numbers associated with the entity that is proposing to perform the work for this solicitation.
Column E
Description of Work and/or Program ResponsibilityProvide a brief description of the proposed effort performed by each Contractor or Team Member.
Column F
% of Total Proposed PriceIndicate the % of the Total Proposed Price allocated to each Contractor or Team Member.
Instructions for the Table T-2 Contract Summary
Row 3Fill in the Offeror's Name.
Column B
Entity NameList the names of the Principal Entities proposed for this solicitation. Add rows as necessary.
Column C
Contract NumberProvide the Contract Number (e.g., N00019-12-R-0001) for the contract reference.
Column D
Contract TitleProvide the Contract Name of the contract reference.
Column E Work Performed as Prime
Identify whether Offeror performed the work as a Prime

&"Times New Roman,Regular"&10Instructions &"Times New Roman,Regular"&10FOSR #: N00421-20-R-0105 TO-0001 Attachment (F3)

&"Times New Roman,Regular"&10&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

T-1 Offeror Summary Table T-1 Offeror Summary

Offeror:
Entity TypeEntity NamePhysical Location of EntityCAGE Codes/DUNSDescription of Work and/or Program Responsibility% of Total Proposed Price
Prime (includes Joint Venture)
JV Member 1 (where applicable)
JV Member 2 (where applicable)
JV Member 3 (where applicable)

&"Times New Roman,Regular"&10FOSR #: N00421-20-R-0105 TO-0001

&"Times New Roman,Regular"&10&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

T-2 Contract Summary Table T-2 Contract Summary

Offeror:
Contract
Reference NumberEntity Name Performing WorkContract NumberContract TitleWork Performed as Prime
P1
P2
The Offeror shall not provide more than 2 contract references.

&"Times New Roman,Regular"&10FOSR #: N00421-20-R-0105 TO-0001

&"Times New Roman,Regular"&10&KFF0000SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .