Draft Section B_NTC (1).xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- H-53 Depot Level Modifications IDIQ Federal contract opportunity
- Solicitation number
- N0001922R0044
About this file
This document provides details for a federal contract opportunity to perform depot level modifications for CH-53 aircraft. The Naval Air Systems Command is seeking proposals for an indefinite-delivery/indefinite-quantity contract to conduct non-recurring and recurring engineering changes, fabrication, assembly, system integration and installation efforts. The effort will be formally solicited under solicitation number N0001922R0044 as a small business set-aside. An industry day will be held on December 7th, 2021 both in-person and virtually to provide information and answer questions. The final date to submit advanced questions is December 2nd, 2021. The draft solicitation is expected to be released in the second quarter of fiscal year 2022. Work will include efforts such as engine nacelle, avionics, and system installations for CH-53, MH-53, and CH-53K aircraft. Pricing will consist of both fixed-price and cost-plus-fixed-fee contract line items.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section B | ||||||||
| CLIN | Description | Statement of Work | ||||||
| Paragraph | Type | FOB | PSC | |||||
| 0001 | CH-53E | AFC-586 Engine Nacelles Installation | 3.11.1.1 | FFP | Destination | K016 | ||
| 0002 | CH-53E | AFC-601 APR-39D(V)2 Installation | 3.11.1.2 | FFP | Destination | K016 | ||
| 0003 | CH-53E | AFC-TBD Fire Suppression Installation | 3.11.1.3 | FFP | Destination | K016 | ||
| 0004 | CH-53E | AFC-519 PT3 IMDS Installation | 3.11.1.4 | FFP | Destination | K016 | ||
| 0005 | CH-53E | AFC-571 Embedded Global System/Inertial Navigation System (EGI) Installation | 3.11.1.5 | FFP | Destination | K016 | ||
| 0006 | CH-53E | AFC-548RA SATCOM Installtion | 3.11.1.6 | FFP | Destination | K016 | ||
| 0007 | CH-53E | AFC-553RA DIRCM Installation | 3.11.1.7 | FFP | Destination | K016 | ||
| 0008 | CH-53E | AFC-540PT2 ADAP Antenna | 3.11.1.8 | FFP | Destination | K016 | ||
| 0009 | CH-53E | AFC-585 SMFCD Installation | 3.11.1.9 | FFP | Destination | K016 | ||
| 0010 | CH-53E | AFC-576 APX-123 Installation | 3.11.1.10 | FFP | Destination | K016 | ||
| 0011 | CH-53E | AFC-572 Blue Force Tracking (BFT) 1.5 System Installtion | 3.11.1.11 | FFP | Destination | K016 | ||
| 0012 | CH-53E | AFC-TBD IVHMU Installation | 3.11.1.12 | FFP | Destination | K016 | ||
| 0013 | MH-53E | AFC-586 Engine Nacelles Installation | 3.11.2.1 | FFP | Destination | K016 | ||
| 0014 | MH-53E | AFC-519 PT3 IMDS Installation | 3.11.2.2 | FFP | Destination | K016 | ||
| 0015 | MH-53E | AFC-589 APX-123 Installation | 3.11.2.3 | FFP | Destination | K016 | ||
| 0016 | MH-53E | AFC-591 Embedded Global System/Inertial Navigation System (EGI Installation) | 3.11.2.4 | FFP | Destination | K016 | ||
| 0017 | MH-53E | AFC-591 Part 2 Full Integration of Embedded Global System/Inertial Navigation System (EGI Installation) | 3.11.2.5 | FFP | Destination | K016 | ||
| 0018 | MH-53E | AFC-565 Part 2 ALE-47 Dual Dispenser POD System | 3.11.2.6 | FFP | Destination | K016 | ||
| 0019 | MH-53E | AFC-546- Part 4 AN/AYK-28(V)2 Blue Force Tracking (BFT) System Wiring Installation | 3.11.2.7 | FFP | Destination | K016 | ||
| 0020 | MH-53E | AFC-TBD IVHMU Installation | 3.11.2.8 | FFP | Destination | K016 | ||
| 0021 | CH-53K | AFC-TBD DDSR Installations | 3.11.3.1 | FFP | Destination | K016 | ||
| 0022 | CH-53K | AFC-TBD Cabin Armor | 3.11.3.2 | FFP | Destination | K016 | ||
| 0023 | CH-53K | AFC-TBD Cargo Floors | 3.11.3.3 | FFP | Destination | K016 | ||
| 0024 | CH-53K | AFC-TBD Digital Interoperability-Medium (DI-Med) | 3.11.3.4 | FFP | Destination | K016 | ||
| 0025 | CH-53K | Emergent Modifications | 3.11.3.5 | CPFF | Destination | K016 | ||
| 0026 | ALL | Building Aircraft Retro Fit Kits | 3.1.3 | CPFF | Destination | K016 | ||
| 0027 | ALL | Building Aircraft Retro Fit Kits Overtime in support of CLIN 0018 | 3.1.3 | CPFF | Destination | K016 | ||
| 0028 | ALL | Prototyping/ Validation (VAL)/Verification (VER) Support | 4.1 | CPFF | Destination | K016 | ||
| 0029 | Level of Effort (Annual) | 3.14, 3.15, 3.16, 4.2, 5.0, 7.0 | FFP | Destination | K016 | |||
| 0030 | Technical Data | |||||||
| Data in support of CLINS 0001- 0029 | N/A | NSP | Destination | K016 | ||||
| 0031 | Over and Above (FFP) | 3.10 | CPFF | Destination | K016 | |||
| 0032 | Over and Above (CPFF) | 3.10 | CPFF | Destination | K016 | |||
| 0033 | Material | N/A | Cost | Destination | K016 | |||
| 0034 | Travel | 8.0 | Cost | Destination | K016 |
File details come from the government source that posted it. Updated .