Site Visit SB Exp-ENG 11.7.2025_rev.pptx

PPTX presentation 1 MB Posted

Attached to
Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
Solicitation number
FY26OMSBIWTP
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

This PowerPoint presentation provides a detailed overview of the South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion project. The presentation outlines major infrastructure upgrades including new electrical buildings, additional sedimentation tanks, sludge thickening and storage systems, integrated headworks, and enhanced chemical treatment capabilities. Key improvements include replacing influent pumps with submersible types, installing new coarse and fine screens, implementing advanced grit removal technology, and increasing plant capacity by 35 MGD.

The project timeline indicates major construction will be completed by 8/28/25, with ongoing fine-tuning of operations and SCADA integration. Significant benefits include decreased dry-weather sewage flows in the Tijuana River, improved hydrogen sulfide levels, and overall environmental improvements. The expansion includes mobile sludge dewatering units, new chemical systems, repairs to influent pump stations, and the ability to bypass 10 MGD of primary treated flows while maintaining 25 MGD through secondary treatment. The current estimated construction completion date is 7/30/2031, with design completion projected for 7/30/2026.

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0008.pdf PDF
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
191BWC26R0001 0004.pdf PDF
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
191BWC26R0001 0003.pdf PDF
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 002.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Attch. 13 SBIWTP O&M Manual.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 03 RPM- Table 2026.xlsx XLSX spreadsheet
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERNATIONAL BOUNDARY AND WATER COMMISSION

UNITED STATES SECTION

SBIWTP Expansion

November 7, 2025

SBIWTP Rehabilitation and Expansion Current Design Completion: 7/30/2026* *Pending time impact/extension for design of incremental increase Current Estimated Construction Completion: 7/30/2031 Construction is still phased with primary treatment and headworks completing sooner than secondary treatment expansion Construction issued in various packages to start construction early:

Grit Rehab in progress Concrete Repairs Replace in kind Site Work Long Lead Procurement AST Rehabilitation Major Concrete Structures Planning for potential acceleration to the expansion in progress but not yet finalized or executed

MIKE

SBIWTP Rehabilitation and Expansion Overview New 12 kV Electrical Building 2 Additional Primary Sedimentation Tanks

10 New SSTs

New Sludge Thickening and Storage Expanded Operations Personnel Building and Rehab New Sludge Dewatering and Odor Control System Rehabbed Grit Facility (Temporary) New Chemical Enhanced Primary Treatment 7 New ASTs New Integrated Headworks 2 New PSTs New 12kV Electrical Building and Generators New Warehouse Storage New Chemical Storage

MIKE

Replaces influent pumps with submersible type that are more effective for our type of influent Better Coarse Screens New Fine Screens (does not currently exist) Grit Removal through advanced technology Redundancy for operations and maintenance

Fine Screens Grit Removal New Headworks Influent Pump Station & Coarse Screens

ROBUST HEADWORKS PLANNED

35 MGD Capacity Increase SBIWTP Rehab and Expansion Major construction completed 8/28/25; fine tuning operations and SCADA integration ongoing Reestablished Chemically Enhanced Primary Treatment (CEPT) to provide Advanced Primary Treatment for 35 MGD (increase of 10MGD) Installed additional solids handling equipment (rented and purchased) Solids thickening (rented-gravity belt thickeners, to be purchased-rotary drum thickeners) Solids dewatering (screw presses) Completed necessary upgrades to receive temporary equipment for increased flows Bypass 10 MGD of primary treated flows around the secondary process and blend at the effluent outfall structure Flows and processes will be monitored using existing SCADA system Performed SBOO modifications Worked with RWQCB to issue CDO to allow 35MGD blended effluent (25MGD Secondary & 10MGD Primary) Benefits:

Decrease dry-weather sewage flows in the Tijuana River Improvement in H2S levels Overall environmental improvement

Replacement of American Canal

ESD-AG

35 MGD Operation Schematic SBIWTP Rehab and Expansion

Mobile sludge dewater unit and integration with existing dewatering system (2 screw presses) New chem systems and rehab of mech systems Repairs to influent PS and grit equipment Mobile sludge thickening units (2 GBTs) 10MGD Primary Bypassed to Effluent 25MGD Continues through Secondary Treatment

Replacement of American Canal

ESD-AG

Q&A

International Boundary and Water Commission United States Section image4.png image5.jpeg image6.png image7.png image3.png image8.png image9.png image2.png image1.png

File details come from the government source that posted it. Updated .