Quality Assurance Surveillance Plan O&M for SBIWTP 2026
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Operation and Maintenance of the South Bay International Wastewater Treatment Plant and Facilities for the
United States Section, International Boundary and Water Commission (USIBWC)
TABLE OF CONTENTS
21.0
INTRODUCTION
21.1
PURPOSE
21.2
PERFORMANCE MANAGEMENT APPROACH
31.3
PERFORMANCE MANAGEMENT STRATEGY
32.0
ROLES AND RESPONSIBILITIES
33.0
IDENTIFICATION OF SERVICES TO BE PERFORMED
34.0
METHODOLOGIES TO MONITOR PERFORMANCE
45.0
QUALITY ASSURANCE REPORTING
46.0
ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
57.0.
FAILURE TO PERFORM
6Forms
Attachment I contains a table that identifies performance-based measures which will be used to monitor Contractor performance. The United State Section of the International Boundary and Water Commission (USIBWC) will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The USIBWC representative will evaluate the Contractor’s daily performance through personal dealings and direct inspections of work products and demonstrated knowledge of applicable regulations. The USIBWC may conduct random facility inspections and increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the USIBWC may decrease the number of quality control inspections if performance dictates. The USIBWC representative shall make final determination of the validity of customer complaint(s).
If any of the services do not conform to contract requirements, the USIBWC may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the USIBWC may:
(a) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(b) Reduce the contract price to reflect the reduced value of the services performed. Price reductions will be in accordance with the acceptable quality level identified in the required performance metrics table.
(c) Increase the contract price to reflect the value of the services performed. Price increase will be in accordance with the acceptable quality level identified in the required performance metrics table.
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1.0
INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) for USIBWC Administration Services of the Operation and Maintenance of the South Bay International Wastewater Treatment Plant (SBIWTP) and Facilities. This QASP sets forth the procedures and guidelines the USIBWC will use in evaluating the technical performance of the Contractor.
1.1
PURPOSE
1.1.1.
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards identified in the PWS.
1.1.2 This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the Contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2
PERFORMANCE MANAGEMENT APPROACH
1.2.1 The performance-based PWS structures the acquisition around “what” service is required as opposed to “how” the Contractor shall perform the work. This QASP and Requirement Performance Metrics (RPM) will define the performance management approach taken by the USIBWC to monitor, manage, and take appropriate action on the Contractor’s performance against expected outcomes or performance objectives communicated in the PWS. Performance management rests upon developing a capability to review and analyze information generated through performance metrics. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management. The data generated in a performance management approach provides information that indicates whether or not expected outcomes for required services are being achieved adequately by the Contractor.
1.2.2 Performance management also represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether or not outcomes are being achieved and migrates away from scrutiny on compliance with the processes and practices used to achieve the outcome. The only exceptions to process reviews are those required by law (Federal, State, and local) and compelling business situations such as safety and health. An outcome focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved at the desired levels of performance.
1.3
PERFORMANCE MANAGEMENT STRATEGY
1.3.1 The Contractor’s internal quality control system will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will utilize its internal quality control system to assess and report their performance to the designated Government representative.
1.3.2 The Government representative will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Government will make decisions based on performance measurement metric data and notify the Contractor of those decisions. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2.0
ROLES AND RESPONSIBILITIES
2.1.
The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration and cost control; and resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the Contractor’s performance.
2.2 The CO will designate one COR as the Government authority for performance management. The Government reserves the right to add additional representatives serving as Technical Inspectors due to the complexity of the services measured as well as the Contractor’s performance.
2.3 The COR is responsible for monitoring, assessing, and communicating the technical performance of the Contractor and assisting the Contractor. The COR will have the responsibility for completing QA monitoring forms (below) used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the Inspection of Services clause for any service relating to the contract.
3.0
IDENTIFICATION OF SERVICES TO BE PERFORMED
The Contractor shall provide services in accordance with the PWS. The performance standards are provided as an attachment to the contract (Refer to Attch. 3 RPM- Table) . The acceptable level of performance is provided under the acceptable quality level for each required service.
4.0
METHODOLOGIES TO MONITOR PERFORMANCE
4.1 In an effort to minimize the contract administration burden, simplified methods of surveillance techniques shall be used by the Government to evaluate Contractor Performance. The primary methods of surveillance are reports and customer input/feedback. The Government will use appointed representatives, as well as reports and input from users/customers as sources of comments on the Contractor’s performance.
4.2 The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of professional communication between employees and customers is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. Performance management drives the Contractor to be customer focused through initially addressing customer complaints and investigating the issues and/or problems.
NOTE: The customer always has the option to communicate complaints to the COR as opposed to the Contractor. The COR will accept the customer complaints and will investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation identified at the end of the QASP.
4.3 The acceptable quality levels (AQL) located in Attachment 4, Required Performance Metrics Table, for Contractor performance, are structured to provide negative or positive incentives for performance shortfalls. All are keyed to the relative importance of the task to the overall mission performance.
5.0
QUALITY ASSURANCE REPORTING
5.1 The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and measured by the required performance metrics.
5.2 The Government’s QA monitoring, accomplished by the COR (and others as designated) will be reported using the monitoring forms below. The forms, when completed, will document the COR’s understanding of the Contractor’s performance under the contract to ensure that the PWS requirements are being met. The COR will provide these findings in a monthly COR report to the CO.
5.2.1 The COR will retain a copy of all completed QA monitoring forms.
6.0
ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS
6.1 The Government shall use the observation methods cited to determine whether the AQLs have been met. The Government’s evaluation is then translated into the specific negative or positive incentives that cause adjustments to the Contractor’s monthly payments.
6.2 At the end of each month, the COR will prepare a written report for the CO summarizing the overall results of the quality assurance monitoring of the Contractor’s performance. This written report consists of the Contractor’s submitted monthly progress report and the completed Quality Assurance Monitoring Forms (below) will become part of the QA documentation.
6.3 The CO may require the Contractor’s project manager, or a designated alternate, to meet with the CO and other Government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, however if the need arises, the Contractor will meet with the CO as often as required or per the Contractor’s request. The agenda of the reviews may discuss:
· Monthly performance measured by the metrics and trends
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trend
· Recommendations made by the COR based on Contractor information
· Issues arising from independent reviews and inspections
6.4 In addition to QA monitoring, the COR will use the information contained in the Contractor’s monthly report to assess the Contractor’s level of performance for each objective measured in Attachment 4. The COR must coordinate and communicate with the Contractor to resolve issues and concerns of marginal or unacceptable performance. The Contractor will discuss with the CO/COR satisfaction ratings receiving a “less than acceptable” rating. For such cases, the Contractor shall highlight its perspective on factors driving customer satisfaction and present plans to adjust service levels accordingly to bring the satisfaction rating up to an acceptable level.
6.5 The CO/COR and Contractor shall jointly formulate tactical and long–term courses of action. Decisions regarding changes to metrics, thresholds, or service levels shall be clearly documented. Changes to service levels, procedures, and metrics must be incorporated as a contract modification at the convenience of the CO.
7.0.
FAILURE TO PERFORM
7.1 The Contractor may receive deductions or even termination based on failure to perform. The following criteria apply for determining appropriate action:
1. Notifications. Consistent with FAR Part 49, the CO shall notify the service provider of failure to meet standards through QA monitoring forms, cure notices, or show cause notices and shall inform the service provider project manager or designated alternate of such notices.
2. Deductions. The Government has the right to withhold a percentage of payment of the monthly cost for performing particular services based on failure to meet performance standards. The percentage or monthly deducted amount of such withholding is identified in the Required Performance Metrics (RPM) Table of Attachment 4.
3. Termination. If the CO determines that the Contractor has failed to perform to the extent that a termination for default is justified, the CO shall issue a notice of termination, consistent with FAR Part 49.
QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Reports
100% Inspection
Periodic Inspection
Customer Input/Feedback LEVEL OF SURVEILLANCE SELECTED (Check):
Monthly
Quarterly
As needed
ANALYSIS OF RESULTS:
SERVICE PROVIDER’S PERFORMANCE (Check):
Meets Standards
Does Not Meet Standards
NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
PREPARED BY: ___________________________________
DATE: _____________________
CUSTOMER (Stakeholder) COMPLAINT INVESTIGATION SERVICE or STANDARD: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SURVEY PERIOD:
DATE/TIME COMPLAINT RECEIVED:
________ AM / PM
SOURCE OF COMPLAINT:
_______________________________ (NAME)
_______________________________ (ORGANIZATION)
_______________________________ (PHONE NUMBER)
_______________________________ (EMAIL ADDRESS)
NATURE OF COMPLAINT: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________RESULTS OF COMPLAINT INVESTIGATION: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT: _____________ _________ AM / PM
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
RECEIVED AND VALIDATED BY: _____ __ ____
PREPARED BY: ___________________________________
DATE: ______________________