Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
Solicitation number
FY26OMSBIWTP
Issued by
International Boundary and Water Commission U.S.-Mexico

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0008.pdf PDF
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
191BWC26R0001 0004.pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
191BWC26R0001 0003.pdf PDF
Site Visit SB Exp-ENG 11.7.2025_rev.pptx PPTX presentation
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 002.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 13 SBIWTP O&M Manual.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 03 RPM- Table 2026.xlsx XLSX spreadsheet
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOMS

SUBMITTAL REGISTER (SOMs)
CONTRACT NO.
TITLE AND LOCATIONSPECIFICATION SECTION
A C T I V I T Y

N O

TYPE OF SUBMITTALCLASSI-
FICATIONGOVTCONTRACTOR
SCHEDULE DATESGOVERNMENT

ACTION

SPECIFICATION/PWS PARAGRAPH NUMBERDESCRIPTION OF ITEM SUBMITTEDFrequencyD A T A
D R A W I N G S
I N S T R U C T I O N S
S C H E D U L E S
S T A T E M E N T S
R E P O R T S
C E R T I F I C A T E S
S A M P L E
R E C O R D S
INFORMATION ONLYGOVERNMENT APPROVAL NEEDEDREVIEWERSUBMIT dateAPPROVAL NEEDED BYMATERIAL NEEDED BYDate RcvdDate sent to KTRREMARKS
1PWS 4.5.1SBIWTP Contractor Quality Control Plan to include Organizational Chart w/position descriptionupdate as neededXto be provided with Proposal
2SolicitationPhase-In Planoncexto be provided with Proposal
3PWS 1.5.1Preventative Maintenance Inspection program (PMI)once, reviewed annuallyxNLT 30 SEP
4PWS 1.2.1 & 4.0Certifications, Licenses of personnelonce, update as neededxto be provided 15 days after award
5PWS 3.2Physical Inventory of Real Property to be maintanedinitialxinventory to be conducted 90 days after award
6PWS 4.7Site Safety Planonce, and update as neededxCOR to Safety Officeto be provided 15 days after award
7PWS 2.0 & 4.5Laboratory Quality Control & Management Planonce and update as neededxCOR to Env. Officeto be provided with proposal
8PWS 4.6.3Continuity of Operations Plan (COOP)once, and update as neededxCORto be provided within 30 days after award
9PWS 1.3.5SWPP storm water pollution planas neededx
10PWS 1.3.5.8SOPs Standard Operating Proceduresonce, and update as neededxNLT 30 SEPTransfer ownership from previous operator to new operator, Physical Location in Ops. Office at SBIWTP, new operator to verify SOPs and provide an update within 180 days of contract award
11PWS 1.2.3Canyon collector daily inspections, with photosmonthlyxNLT 15th of mo.submit with Monthly Report
12PWS 1.2.2Plant Log, Record keeping logsdailyxContractor shall maintain records for 5 years and originals
13PWS 1.3.7Condition & Risk Assessment ReportannuallyxNLT 30 SEP
14PWS 1.3.65 Year Capital PlanannuallyxNLT 30 SEP
15PWS 1.3.12Deferred Maintenance & Repair ReportannuallyxNLT 30 SEP
16PWS 1.3.3Monthly O&M Reportsmonthlyxto include influent effulent wwtp quality and qty., qty. of sludge produced, chemicals stored and dosage, repairs and maintenance tasks performed, pending modifications too, also include admin network maintenance performed
17PWS 1.5.4EAMS reportsas neededx
18PWS 1.2.4 & 4.2.1.1 &1.3.10Admin Network Cybersecurity Program
19PWS 4.2.1.1Sequence of Operations (SOO) manual, SCADAonce and update as neededx
20PWS 1.3.9As-Builtsas neededx
21NPDES & PWS 1.3All reports required under NPDES Monitor & Program Requirements, Attachment E