191BWC26R0001 0006.pdf
PDF 247 KB Posted
- Attached to
- Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
- Solicitation number
- FY26OMSBIWTP
About this file
This is an Amendment of Solicitation (Standard Form 30) for the International Boundary and Water Commission (IBWC) for South Bay IWTP Operations and Maintenance Services, Solicitation Number 191BWC26R0001. The amendment updates key submission dates and requirements for proposal submission through a secure SharePoint portal. Specifically, vendors must submit access requests by 01/15/2026 at 12:00 PM MST, will be granted SharePoint access starting January 15, 2026, and must upload proposals by Friday, January 16, 2026, at 5:00 PM MST.
The solicitation will result in a non-personal, hybrid contract with Firm-Fixed Price (FFP), Time and Materials (T&M), and Cost Reimbursable (CR) services. Vendors must submit two separate PDF volumes: a Technical Proposal and a Pricing/Business Proposal. The technical proposal must address seven evaluation factors including past performance, specialized experience, staffing, safety requirements, financial stability, a phase-in plan, and SCADA experience. Pricing proposals must include detailed cost breakdowns covering labor, materials, expenses, and other categories, with labor costs needing to be realistic and consistent with industry standards.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: 191BWC26R0001 PROCESSED Page 1 of 6
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE RATING
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
12/19/2025
4. REQUISITION/PURCHASE REQ. NUMBER
FY26R3321007A
5. PROJECT NUMBER (If applicable)
IBWC_CODE
International Boundary and Water Commission (IBWC)
USIBWC - ACQUISITIONS DIV
4191 NORTH MESA ST
EL PASO, TX 79902-1441
US
Seone M Jones
NAME
TEL.
jonessm4@state.gov
6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
191BWC26R0001
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
10/21/2025
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Update section L04B Access Request Deadline:
All access requests must be submitted no later than 01/15/2026, at 12:00 PM MST.
SharePoint Access Period:
Vendors will be granted access to upload proposals starting January 15, 2026 Proposal Submission Deadline:
All proposals must be uploaded by Friday, January 16th, 2026, at 5:00 PM MST.
Late uploads will not be accepted, and expired links will not be reactivated.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Philip Johnson
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
01/12/2026
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV.
11/2016) Prescribed by GSA FAR (48 CFR) 53.243
CGFS // CGFS
X
Document Number: 191BWC26R0001 PROCESSED Page 2 of 6
Table of Contents
Section Description Page Number
L Instructions, Conditions, and Notices to Offerors and Respondents L.04 Proposal Composition Requirements and Instructions
Document Number: 191BWC26R0001 PROCESSED Page 3 of 6
Line Item Summary
Solicitation Number:
191BWC26R0001
Contract Number: Title:
South Bay IWTP O M Services
Date of Solicitation:
01/12/2026
The resulting Contract from this Solicitation will be a Non-Personal, Hybrid, Firm-Fixed Price (FFP), Time and Materials (T&M), and Cost Reimbursable (CR) Services.
The Contractor shall provide all personnel, supervision, management, equipment, transportation, supplies, and any other items necessary to perform all work as identified in this contract.
CLIN Funding: Cost:
Base Totals: Original: $0.00
Change: $0.00
Current: $0.00
Original: $0.00
Change: $0.00
Current: $0.00
Exercised Options Totals: Original: $0.00
Change: $0.00
Current: $0.00
Original: $0.00
Change: $0.00
Current: $0.00
Unexercised Options Totals: Original: $0.00
Change: $0.00
Current: $0.00
Original: $0.00
Change: $0.00
Current: $0.00
Base and Options Totals: Original: $0.00
Change: $0.00
Current: $0.00
Original: $0.00
Change: $0.00
Current: $0.00
Section L - Instructions, Conditions, and Notices to Offerors and Respondents
L.04 - Proposal Composition Requirements and Instructions
L.04.A. In order to assess the Offeror's Qualifications, the Offeror shall submit a proposal in accordance with the instructions contained in this provision. The Offeror is advised to carefully read the entire Solicitation.
To safeguard sensitive procurement data, the U.S. Section of the International Boundary and Water Commission (USIBWC) utilizes its secure FEDRAMP Microsoft SharePoint environment for the submission of bids and proposals. SharePoint is a cloud-based platform that integrates with Microsoft 365 and leverages enterprise-level security protocols, including data encryption at rest and in transit, multi-factor authentication (MFA), and role-based access controls. When folders are shared with external users for bid submission, access is limited to specific, authenticated email addresses. External users must verify their identity through a secure email link and authentication code prior to gaining access, ensuring that only authorized parties can view or upload content.
Permissions can be tailored (view or edit), and access can be revoked or expire automatically. All activities on the platform are logged and monitored, providing traceability and accountability. These measures collectively ensure that procurement documents are handled with confidentiality, integrity, and compliance with federal IT security standards.
L.04.B (a). Due to the schedule and security requirements associated with this solicitation, all proposals must be submitted exclusively via the U.S. IBWC's secure Microsoft SharePoint portal. This replaces prior instructions for submitting hard copy or physical media (DVD/CD) proposals.
Instructions for Access:
1. Email Access Request:
Document Number: 191BWC26R0001 PROCESSED Page 4 of 6
Vendors must submit an email request to the Contracting Officer to gain access to their designated SharePoint upload folder.
Send request to:
Philip.johnson@ibwc.gov, CC Suzette Smith (suzette.smith@ibwc.gov) and Seone Jones (seone.jones@ibwc.gov.
Subject line: “Request for SharePoint Access – Solicitation 191BWC26R0001” Include the following in your request:
• Company name
• Name of the authorized representative
• Email address (this must be the individual uploading the proposal)
• Contact phone number
1. Access Request Deadline:
All access requests must be submitted no later than 01/15/2026, at 12:00 PM MST.
1. SharePoint Access Period:
Vendors will be granted access to upload proposals starting January 15, 2026
1. Proposal Submission Deadline:
All proposals must be uploaded by Friday, January 16th, 2026, at 5:00 PM MST.
Late uploads will not be accepted, and expired links will not be reactivated.
1. Submission Restrictions:
• Only one access request per vendor will be honored.
• The SharePoint link is non-transferable and must not be forwarded or shared.
• Access credentials must not be used by unauthorized personnel.
• Violations may be reported as breaches of FAR Subpart 3.1 and FAR 3.104 (Procurement Integrity Act).
1. Prohibited Submission Methods:
• Email, fax, mailed, or hand-delivered proposals will not be accepted under any circumstances.
L.04.B (b). Arrangement of Proposal. The proposal shall consist of two (2) clearly separated electronic volumes, each submitted as a separate PDF file titled as follows:
Volume Title File Format
I Technical Proposal 1 PDF II Pricing and Business Proposal 1 PDF
Each file must be titled in the following format: [OfferorName]_Vol_[I/II]_[ProposalType].pdf Example:
ABCConstruction_Vol_II_TechnicalProposal.pdf
L.04.B (c). Technical Proposal (Volume I). Refer to the requirements contained in the Technical Proposal Instructions provision of this Solicitation.
L.04.B (d). Pricing and Business Proposal (Volume II). Refer to the requirements contained in the Pricing Proposal Instruction provision of this Solicitation.
L.04.C (a) Instructions concerning the content and organization of the proposal.
Each Offeror shall propose to satisfy the requirement as set forth in this solicitation. The proposals will be evaluated on the basis of content (what is written in the documents). No extraneous information will be used for evaluation purposes with the exception of past performance.
The USIBWC may utilize written and/or verbal communications with past performance references and/or information available in the Past Performance Information Retrieval System (PPIRS).
L.04.C (b) Each Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal from both a technical and management standpoint. Each Offeror shall identify technical uncertainties and assumptions within the requirement set forth in this solicitation and provide specific proposals for their resolution. The Government will not make assumptions concerning the Offeror's intent, capabilities, facilities and experiences. Clear identification is the sole responsibility of each Offeror. The Offeror shall be prepared to provide all services as described in their proposal. In the case of a conflict between the Offeror's proposal and the PWS, the PWS takes precedence.
L.04.C (c) Proposals shall be as brief as possible but sufficiently detailed to completely and adequately describe what is proposed.
Document Number: 191BWC26R0001 PROCESSED Page 5 of 6
L.04.C (d) Offerors shall comply with all requirements of the proposal submission instructions. Deviations shall be fully explained;
however, inclusion of cost/price information with the technical/management volume of the proposal is not considered an acceptable deviation.
Each Offeror is cautioned that "parroting" of the requirements with a statement of intent to perform does not reveal the Offeror's understanding of the problem or his capability to solve it. The inclusion of filler material from previous proposals or commercial applications shall be avoided unless there is a direct application to the objective of this solicitation.
L.04.C (e) Unless the Offeror inserts a longer period of time on the Standard Form (SF) 33, page 1, block 12, proposals will remain valid for a period of 120 calendar days from the date specified for receipt of proposals in Block 9.
1) TECHNICAL PROPOSAL, VOLUME I: The technical volume shall contain sufficient quantitative and qualitative details (without reference to cost or price) to permit a complete and accurate evaluation of the proposal from strictly a technical viewpoint. Offerors are cautioned to keep in mind the criteria set forth in Section M against which the proposals will be evaluated. Proposals shall be organized into separate sections responding to each merit factor in the order listed below. The Technical Volume shall contain:
a. Factor 1: Past performance of wastewater treatment plant operations and maintenance service contract (s).
b. Factor 2: Specialized experience and technical competence in secondary activated sludge with aeration tanks wastewater treatment plant operations and maintenance.
c. Factor 3: Staffing and key personnel experience and qualifications/certifications for the operation and maintenance of the SBIWTP.
d. Factor 4: Safety and other regulatory requirements.
e. Factor 5: Financial stability and professional reputation of the firm.
f. Factor 6: Phase-In Plan.
g. Factor 7: Supervisory Control and Data Acquisition (SCADA) experience. The contractor shall submit a self-attestation that their Corporate System has implemented or will implement all the agency designated security controls selected from NIST 800-171.
The Technical Volume shall contain an addendum consisting of the proposed Phase-In Plan to provide for (1) a complete and orderly phase-in, (2) a timetable for orderly assumptions of each responsibility, as required, (3) performance of all functions, (4) adequate resources, and (5) plans covering key functional areas during the phase-in period. It is estimated that a transition period of sixty (60) days will be sufficient for the successful Offeror to be up to full strength and fully operational.
(1) The Phase-In Plan is subject to review and approval by the Contracting Officer.
(2) The Phase-In Plan will be evaluated. An Acceptable or higher rated Phase-In Plan is mandatory and will be evaluated during the initial evaluation. A Marginal or Unacceptable Phase-In Plan is one which demonstrates a lack of commitment on the part of the Offeror to meet the requirements in which would require substantial clarification, revision, and/or rewrite to stand a reasonable chance of being made Acceptable.
2) PRICE AND BUSINESS PROPOSAL, VOLUME II: Volume II shall include the SF 33, Amendments, Section K, Section L, Section 508 Compliance, Pricing, and Small Business Subcontracting Plan (if applicable).
a. SF 33: Offerors shall provide a completed SF 33 as part of its Price and Business Proposal.
b. Amendments: Offerors shall provide acknowledgement of ALL amendments issued against the Solicitation as part of its Price and Business Proposal.
c. Section K: Offerors shall provide a completed Section K for ALL provisions as a part of its Price and Business Proposal. NOTE:
In accordance with the provision at 52.204-8, if the provision at 52.204-7 is included in the Solicitation, paragraph (d) of 52.204-8 applies.
Offerors shall check the appropriate box for the provisions at 52.209-7 as part of their submission.
d. Section L: Offerors shall provide a completed L.03 as a part of its Price and Business Proposal.
e. Section 508 Compliance: The Offeror shall provide information as to how the solution meets all applicable standards and functional performance criteria of Section 508 identified in the attached accessibility determination template. The vendor shall complete the attached accessibility determination template or provide similar information in alternative format (Attachment 15). This deliverable is required as part of the response to this solicitation and will be evaluated prior to award.
f. Pricing: The Contract Line Item Number (CLIN) structure is provided in Section B, Supplies or Services and Price/Costs. Offerors shall utilize this structure for its firm-fixed price. Offerors shall propose the necessary labor, material, equipment, and services to meet the full performance objectives outlined in the PWS. Pricing shall be provided for the base year and ALL option years. Pricing assumptions associated with each task in the PWS shall be included. If there are any pricing assumptions that relate to the entire scope of the PWS then that information shall be provided as well.
(1) Offeror shall include a detailed breakdown of their pricing for the Firm Fixed Price, Time and Materials, and Cost Reimbursable.
The breakdown shall include but not limited to:
Labor, Fringe Benefits, Travel, Vehicle Expense, Office Supplies and Equipment Expenses, Delivery/Postage, Professional Fees, Dues and Subscriptions, Business Insurance, Telephone Expense, Subcontractors, Laboratory/Safety Supplies, Chemical Costs, Scrap/ Sludge, Repair & Maintenance, Utilities, Taxes, Depreciation/Amortization, Other Expenses, Indirect Rates (Overhead and General & Administrative), Profit, and Escalation Rate for Option Years.
(2) Labor costs must be realistic, reasonable, and consistent with industry, market average and trends, and the work to be performed as outlined in the Offeror's proposal
Document Number: 191BWC26R0001 PROCESSED Page 6 of 6
(3) A separate breakdown of labor by category, contract period as set forth in the solicitation, and basis for labor estimates shall be furnished. The breakdown and estimates shall include the proposed technical level-of-effort, management, administrative, quality assurance and any other personnel proposed to perform under the resultant contract.
(4) A separate breakdown of direct material indicating quantity and unit price shall be furnished.
(5) Rationale followed in the development of overhead rates shall be furnished.
(6) Phase-in costs shall be shown separately. Offerors shall propose phase-in costs in correlation to their phase-in plan.
(7) A narrative shall be provided for each cost category provided in the detailed breakdown. The narrative shall describe how the contractor arrived at that cost. For Chemical Costs this shall be broken down into the various chemicals required by the PWS.
(8) At this time the USIBWC does not require the submission of certified cost or pricing data. However, the USIBWC reserve the right to request certified cost or pricing data if determined necessary by the CO. If certified cost or pricing data is required, then the following clauses will be incorporated into the Solicitation and resulting Contract:
FAR 52.215-10 Price Reduction for Defective Cost or Pricing Data (Oct 1997) FAR 52.215-11 Price Reduction for Defective Cost or Pricing Data—Modifications (Oct 1997) FAR 52.215-12 Subcontractor Cost or Pricing Data (Oct 1997) FAR 52.215-13 Subcontractor Cost or Pricing Data—Modifications (Oct 1997) FAR 52.215-14 Integrity of Unit Prices (Oct 1997) FAR 52.215-15 Pension Adjustments and Asset Reversions (Oct 2004) FAR 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions (July 2005) FAR 52.215-19 Notification of Ownership Changes (Oct 1997) FAR 52.215-20 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data (Oct 1997) FAR 52.215-21 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data—Modifications (OCT 1997) FAR 52.230-1 Cost Accounting Standards Notices and Certifications (May 2012) FAR 52.230-2 Cost Accounting Standards (May 2014) FAR 52.230-3 Disclosure and Consistency of Cost Accounting Practices (May 2014) FAR 52.230-6 Administration of Cost Accounting Standards (Jun 2010) FAR 52.230-7 Proposal Disclosure - Cost Accounting Practice Changes (Apr 2005) The Offeror will have seven (7) calendar days from the date of the CO's request to furnish the certified cost or pricing data.
g. Small Business Subcontracting Plan: If an Offeror is classified as "Other than Small" the Offeror shall submit a Small Business Subcontracting Plan consistent with Contract Clause 52.219-9 Alt II. Consistent with Alt II the plan shall be negotiated within thirty
(30) calendar days of the CO's notice of intent to negotiate the Subcontracting Plan. Failure to submit and negotiate a Subcontracting Plan shall make the Offeror ineligible for award of a contract. NOTE: The Subcontracting Plan will be made available to the Small Business Administration (SBA) and will be subject to their review and approval.
File details come from the government source that posted it. Updated .