Attch. 03 RPM- Table 2026.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
Solicitation number
FY26OMSBIWTP
Issued by
International Boundary and Water Commission U.S.-Mexico

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0008.pdf PDF
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
191BWC26R0001 0004.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
191BWC26R0001 0003.pdf PDF
Site Visit SB Exp-ENG 11.7.2025_rev.pptx PPTX presentation
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
191BWC26R0001 002.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Attch. 13 SBIWTP O&M Manual.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FY26 O&M for South Bay IWTP Contract
Required Performance Metrics (RPM)
Required ServicePerformance StandardsAcceptable Quality Levels (AQL)Method of SurveillanceAdditional Clarification(FFP), Incentive: Positive or Negative
Notes
The Contractor shall efficiently operate and maintain the wastewater treatment plant and collection system to safely collect, treat and dispose of wastewater to ensure all sewage requirements are continually met.PWS100%Reports and notices of violationsSewage is continuously and safely collected, treated and disposed.

Effluent complies with the regulatory discharge permit.

No spills are the result of Contractor negligence.

Firm Fixed Price (FFP)
The Contractor shall coordinate with Mexican Pumping Stations maintain an average daily/monthly inflow of 25 million gallons per dayPWS100%Monthly flow report reviewFirm Fixed Price (FFP)
The Contractor shall attend bi-national meetings and/or discussions with Mexican stakeholdersPWS100%Weekly, monthly, meetings minutesFirm Fixed Price (FFP)
DeliverablesSOMS100%Files review,initial, then periodic dependent on SOMs and frequency(Cost-Reimbursement Type) Negative (-) Incentive of 5% of monthly O&M payment if deliverable not met at the due date
Key Staffing levelsPWS100%Periodic and random inspection, complaints(Cost-Reimbursement Type) Negative (-) If within thirty (30) calendar days of notification the Contractor has failed to provide additional staff or perform necessary work, the Contracting Officer may cause the work to be done by a third party. The cost of said work shall be the responsibility of the Contractor, and the gross salary of each vacant position shall be deducted from the monthly progress payment amount.
Minimum Operator AttendancePWS100%Periodic and random inspection, complaintsAll personnel operating the plant shall meet the training and certification standards per local, state, and federal regulations. The minimum numbers and types of wastewater treatment plant operators, support personnel, and supervisory operators in direct responsible charge, shall comply, by each applicable shift, with the regulatory discharge permit and O&M manuals.Firm Fixed Price (FFP)
Complying with all governmental agencies having jurisdiction permits and requirements.PWS100%files review, periodic and/or random inspection, complaintsThe Contractor shall be responsible for the payment of fines and or civil penalties levied against the Government and/or the Contractor by any regulatory agency having jurisdiction, as a result of failure to comply with the terms and conditions of any duly authorized permit, court order, administrative order, law, statute, or ordinance, for reasons resulting from the Contractor's found and proven negligence or poor performance during the period of the contract.Firm Fixed Price (FFP)
Canyon Collector structures cleaningPWS100%files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Canyon Collectors, off-site disposal of the debris (trash, garbage, sand, rocks, miscellaneous materials, etc.)PWS100%files review, periodic and/or random inspection, complaints(Cost-Reimbursement Type)Negative(-) $10,000 shall be deducted from the monthly progress payment amount for each canyon if off-site disposal is not completed within seven (7) calendar days of each cleaning event.
ChemicalsPWS100%files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Maintain and repair of all equipment, machinery, instrumentation, structures, and plant furnishings to an operational condition.PWS80%PMI program is followed, files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Maintain and repair of all equipment, machinery, instrumentation, structures, and plant furnishings to a fully operational condition.PWS100%PMI program is followed, files review, periodic and/or random inspection, complaints(Cost-Reimbursement Type) Positive (+) $5,000 shall be awarded to the monthly progress payment amount if ALL equipment is brought back to 100% operational status after a failure event
Laboratory ManagementPWS100%files review, periodic and/or random inspection, complaintsWastewater effluent complies with the regulatory discharge permit.Firm Fixed Price (FFP)
Spill and Transboundary Wastewater Flow EventsPWS100%files review, periodic and/or random inspection, complaintsCategory 2, 3, 4, 5, 6 events; any noncompliance that may endanger health/env; any unanticipated bypass; any upset that exceeds effluent limitations(Cost-Reimbursement Type)Negative(-) $10,000/event shall be deducted from the contract amount if the Contractor did not report spills and transboundary wastewater flows, and failed to collect data for the reports, in accordance with Section VI.C.2.d of the NPDES Permit No. CA018928, Order No. R9-2014-0009, As Amended. The Contractor did not report to COR within two (2) hours Category 1 flow event specified in Section VI.C.2.d.i.a) of the NPDES Permit No. CA018928, Order No. R9-2023-0009, As Amended. The Contactor did not notify by telephone the County of San Diego Health Department and the City of Imperial Beach within two (2) hours of discovery of Category 1 flow event.
`PWS100%files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Draft and final Monthly NPDES Monitoring Report (influent and effluent sampling)PWS100%files review, periodic and/or random inspection, complaintsDue by 15th of each month. Govt to provide comments within 5 business days. Contractor shall submit revised report within 5 days.
Contractor shall prepare cover letter and upload DMR data in CIWQS.Cost-Reimbursement, Negative (-) $10,000 shall be deducted from the contract amount if the Contractor delivers, submits and uploads incorrect information to CIWQS
Annual Report for Storm Water Discharges (SWPPP)PWS100%files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Monthly Operations and Maintenance ReportPWS100%files review, periodic and/or random inspection, complaintsFirm Fixed Price (FFP)
Markups/red-lines to the Plant as-builtsPWS100%files review, periodic and/or random inspection, complaintsMarkups shall include date of modification, contractor, cost.$5,000 shall be deducted from the contract amount if the Contractor did not provide markups/red-lines to the Plant as-builts within 30 calendar days of completion of each modification to the Plant.
Daily Canyon Collector inspectionsPWS100%files review, periodic and/or random inspection, complaintsDaily inspections sheet, to include photo documentation & rain gauge readings.

Additional inspections to address issues or concerns. Inspections following rain events. $1,000 shall be deducted from the contract amount if the Contractor did not collect all data for the inspection forms as required by USIBWC and submit the reports or other data required by USIBWC in a timeframe required by USIBWC.

File details come from the government source that posted it. Updated .