Attch. 13 SBIWTP O&M Manual.pdf

PDF 42 MB Posted

Attached to
Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
Solicitation number
FY26OMSBIWTP
Issued by
International Boundary and Water Commission U.S.-Mexico

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0008.pdf PDF
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
191BWC26R0001 0004.pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
191BWC26R0001 0003.pdf PDF
Site Visit SB Exp-ENG 11.7.2025_rev.pptx PPTX presentation
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 002.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 03 RPM- Table 2026.xlsx XLSX spreadsheet
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPERATIONS

INTERNATIONAL

NTERNATIONAL BOUNDARY

ATER COMMISSION

PERATIONS ANDPERATIONS AND

AINTENANCE MANUAL

OUTH BAY

NTERNATIONAL

ASTEWATER TREATMENT

PLANT

OLUME 1 OF 4

S

WASTEWATER

OLUME 1 OF 4

December 2010December 2010December 2010December 2010

1991199119911991----035035035035

PERATIONS AND MAINTENAN

MANUAL

NTERNATIONAL BOUNDARY & WATER COMMISSION

MANUAL

SOUTH BAY INTERNATIONAL

ASTEWATER TREATMENT PLA

VOLUME 1 OF 4VOLUME 1 OF 4

INTERNATIONAL BOUNDARY

AND

WATER COMMISSION

OPERATION AND MAINTENANCE

MANUAL

FOR THE

SOUTH BAY

INTERNATIONAL WASTEWATER TREATMENT PLANT

Volume 1 of 4

MALCOLM PIRNIE, INC.

1525 Faraday Avenue

Suite 290

Carlsbad, California 92008

(760) 602-3800

April 2011

1991-035-702

Table of Contents −i−

TABLE OF CONTENTS

Page

VOLUME 1

TABLE OF CONTENTS ................................................................................................ i

1. INTRODUCTION

Chapter 1 Table of Contents ..................................................................... 1-i

1.1 General .................................................................................................. 1.1-1

1.2 Purpose of Manual ................................................................................ 1.2-1

1.3 Plant Schematic ..................................................................................... 1.3-1

1.4 Site Layout ............................................................................................ 1.4-1

1.5 General Description of SBIWTP Processes .......................................... 1.5-1

1.5.1 Headworks ................................................................................ 1.5-1

1.5.2 Primary Sedimentation Facilities .............................................. 1.5-2

1.5.3 Activated Sludge Facilities ....................................................... 1.5-2

1.5.4 Secondary Sedimentation Facilities .......................................... 1.5-3

1.5.5 Chlorination/Dechlorination and Non-Potable Water (NPW)

Facilities .................................................................................... 1.5-5

1.5.5.1 Chlorination ............................................................ 1.5-5

1.5.5.2 Dechlorination ............................................................... 1.5-5

1.5.5.3 Non-Potable Water Facilities ........................................ 1.5-5

1.5.6 Waste Activated Sludge (WAS) Thickening Facilities ............. 1.5-6

1.5.7 Unstabilized Sludge Storage Facilities ..................................... 1.5-6

1.5.8 Sludge Dewatering Facilities .................................................... 1.5-7

1.5.9 Sludge Conveyance and Lime Stabilization Facilities .............. 1.5-7

1.5.10 Primary Effluent Structures ...................................................... 1.5-7

1.5.11 Final Effluent Structures ........................................................... 1.5-8

1.5.12 Standby Power Generation Facilities ........................................ 1.5-9

1.5.13 Collection and Conveyance Facilities ....................................... 1.5-9

1.6 Plant Loadings and Flows ..................................................................... 1.6-1

1.6.1 Introduction ............................................................................... 1.6-1

1.6.2 Waste Loadings ......................................................................... 1.6-1

1.6.2.1 Annual Average Design Loadings ................................ 1.6-1

1.6.2.2 Planning Design Loadings ............................................ 1.6-1

1.6.3 Plant Flows................................................................................ 1.6-2

1.6.4 Hydraulic Profile ....................................................................... 1.6-3

2. PROCESS DESCRIPTION

Chapter 2 Table of Contents ..................................................................... 2-i

2.1 Headworks ............................................................................................ 2.1-1

2.1.1 Purpose ...................................................................................... 2.1-1

2.1.2 Process Description ................................................................... 2.1-1

2.1.2.1 Screenings Area ............................................................ 2.1-1

2.1.2.2 Influent Pump Station ................................................... 2.1-2

TABLE OF CONTENTS (Continued)

Table of Contents −ii−

2.1.2.3 Aerated Grit Chamber ................................................... 2.1-4

2.1.2.4 Odor Reduction Station................................................. 2.1-5

2.1.3 Design and Performance Criteria .............................................. 2.1-6

2.1.3.1 Influent Screens ............................................................. 2.1-6

2.1.3.2 Influent Pumps .............................................................. 2.1-6

2.1.3.3 Grit Chamber ................................................................ 2.1-7

2.1.3.4 Odor Reduction Station................................................. 2.1-7

2.2 Primary Sedimentation Facilities .......................................................... 2.2-1

2.2.1 Purpose ...................................................................................... 2.2-1

2.2.2 Process Description ................................................................... 2.2-1

2.2.2.1 Primary Sedimentation Tanks ....................................... 2.2-1

2.2.2.2 Channel Aeration System .............................................. 2.2-2

2.2.2.3 Rapid Mix Facilities ...................................................... 2.2-2

2.2.2.4 Sludge Collection and Pumping .................................... 2.2-2

2.2.2.5 Primary Skimmings Processing Facilities ..................... 2.2-3

2.2.2.6 PST Chemical Addition Facilities ................................ 2.2-3

2.2.2.7 Odor Reduction Station................................................. 2.2-3

2.2.3 Design and Performance Criteria .............................................. 2.2-4

2.3 Activated Sludge Facilities ................................................................... 2.3-1

2.3.1 Purpose ...................................................................................... 2.3-1

2.3.2 Process Description ................................................................... 2.3-1

2.3.2.1 Activated Sludge Tanks ................................................ 2.3-1

2.3.2.2 AST Selector Zones ...................................................... 2.3-2

2.3.2.3 Air Diffusers ................................................................. 2.3-4

2.3.2.4 Process Air Blowers ...................................................... 2.3-5

2.3.2.5 Intermediate Mixed Liquor Return ............................... 2.3-5

2.3.2.6 Tank Drainage Facilities ............................................... 2.3-6

2.3.2.7 Channel Aeration Facilities ........................................... 2.3-6

2.3.3 Design and Performance Criteria .............................................. 2.3-7

2.3.3.1 Activated Sludge Tanks ................................................ 2.3-7

2.3.3.2 Selector Zone Mixing System ....................................... 2.3-8

2.3.3.3 Air Diffusers ................................................................. 2.3-9

2.3.3.4 Process Air Blowers .................................................... 2.3-10

2.3.3.5 Intermediate Mixed Liquor Return ............................. 2.3-11

2.3.3.6 Tank Drainage Facilities ............................................. 2.3-11

2.3.3.7 Channel Aeration Facilities ......................................... 2.3-12

2.4 Secondary Sedimentation Facilities ..................................................... 2.4-1

2.4.1 Purpose ...................................................................................... 2.4-1

2.4.2 Process Description ................................................................... 2.4-1

2.4.2.1 Sedimentation Tanks ..................................................... 2.4-1

2.4.2.2 Sludge Collectors .......................................................... 2.4-2

2.4.2.3 Return Activated Sludge (RAS) System ....................... 2.4-2

Table of Contents −iii−

2.4.2.4 Waste Activated Sludge (WAS) System ....................... 2.4-2

2.4.2.5 Skimmings Facility ....................................................... 2.4-3

2.4.2.6 RAS Chlorination ......................................................... 2.4-3

2.4.2.7 Tank Drainage Facilities ............................................... 2.4-4

2.5 Chlorination, Dechlorination and Non-Potable Water Facilities .......... 2.5-1

2.5.1 Purpose ...................................................................................... 2.5-1

2.5.2 Process Description ................................................................... 2.5-1

2.5.2.1 Chlorination Facilities ................................................... 2.5-2

2.5.2.2 Dechlorination Facilities ............................................... 2.5-4

2.5.2.3 Non-Potable Water Pump Station No. 1 ....................... 2.5-4

2.5.2.4 Non-Potable Water Pump Station No. 2 ....................... 2.5-5

2.6 Waste Activated Sludge Thickening Facilities .................................... 2.6-1

2.6.1 Purpose ...................................................................................... 2.6-1

2.6.2 Process Description ................................................................... 2.6-1

2.6.2.1 Dissolved Air Flotation (DAF) Tanks .......................... 2.6-1

2.6.2.2 Pressurization and Air Injection System ....................... 2.6-2

2.6.2.3 TWAS Pumping and Metering System ......................... 2.6-2

2.6.2.4 DAF Polymer Addition System .................................... 2.6-2

2.6.3 Design and Performance Criteria .............................................. 2.6-3

2.7 Unstabilized Sludge Storage Facilities ................................................. 2.7-1

2.7.1 Purpose ...................................................................................... 2.7-1

2.7.2 Process Description ................................................................... 2.7-1

2.7.2.1 Unstabilized Sludge Storage Tanks .............................. 2.7-1

2.7.2.2 Recirculation Mixing System........................................ 2.7-2

2.7.2.3 Unstabilized Sludge Storage Odor Reduction Station .. 2.7-2

2.7.3 Design and Performance Criteria .............................................. 2.7-3

2.8 Sludge Dewatering Facilities ................................................................ 2.8-1

2.8.1 Purpose ...................................................................................... 2.8-1

2.8.2 Process Description ................................................................... 2.8-1

2.8.3 Design and Performance Criteria .............................................. 2.8-2

2.9 Sludge Conveyance and Lime Stabilization Facilities .......................... 2.9-1

2.9.1 Purpose ...................................................................................... 2.9-1

2.9.2 Process Description ................................................................... 2.9-1

2.9.3 Design and Performance Criteria .............................................. 2.9-2

2.10 Primary Effluent Structures ................................................................ 2.10-1

2.10.1 Purpose .................................................................................... 2.10-1

2.10.2 Process Description ................................................................. 2.10-1

2.10.2.1 Primary Effluent Channel and Primary Effluent

Bypass Structure ..................................................... 2.10-1

2.10.2.2 Primary Effluent Bypass Metering Structure.......... 2.10-2

2.10.2.3 Primary Effluent Bypass Junction Structure........... 2.10-3

2.10.2.4 Primary Effluent Emergency Connection ............... 2.10-3

Table of Contents −iv−

2.10.3 Design and Performance Criteria ............................................ 2.10-3

2.11 Final Effluent Structures ..................................................................... 2.11-1

2.11.1 Purpose .................................................................................... 2.11-1

2.11.2 Process Description ................................................................. 2.11-1

2.11.2.1 Effluent Blending Structure .................................... 2.11-1

2.11.2.2 Effluent Metering Structure .................................... 2.11-2

2.11.3 Design and Performance Criteria ............................................ 2.11-2

2.12 Standby Power Generation Facilities .................................................. 2.12-1

2.12.1 Purpose .................................................................................... 2.12-1

2.12.2 Process Description ................................................................. 2.12-1

2.12.2.1 Standby Generators................................................. 2.12-1

2.12.2.2 Diesel Fuel Storage Tanks ...................................... 2.12-1

2.12.2.3 Diesel Fuel Transfer Pump Stations ....................... 2.12-1

2.12.2.4 Standby Power Switchgear ..................................... 2.12-2

2.12.2.5 Generator Control Panels ....................................... 2.12-2

2.12.3 Design and Performance Criteria ............................................ 2.12-2

2.13 Collection and Conveyance Facilities ................................................. 2.13-1

2.13.1 Purpose .................................................................................... 2.13-1

2.13.2 Process Description ................................................................. 2.13-1

2.13.2.1 Diversion Structures ............................................... 2.13-1

2.13.2.2 Pump Stations ......................................................... 2.13-2

2.13.2.2.1 Goat Canyon Pump Station ................... 2.13-2

2.13.2.2.2 Hollister Street Pump Station ................ 2.13-4

2.13.3 Design and Performance Criteria ............................................ 2.13-5

2.13.3.1 Diversion Structures ............................................... 2.13-5

2.13.3.2 Conveyance Pipelines ............................................. 2.13-7

2.13.3.3 Pump Stations ......................................................... 2.13-8

3. EQUIPMENT DESCRIPTION

Chapter 3 Table of Contents ..................................................................... 3-i

3.1 Headworks ............................................................................................ 3.1-1

3.1.1 Screenings Facilities ................................................................. 3.1-1

3.1.1.1 Mechanical Bar Screens ................................................ 3.1-1

3.1.1.2 Conveyors ..................................................................... 3.1-2

3.1.2 Influent Pump Station ............................................................... 3.1-4

3.1.2.1 Wetwell ......................................................................... 3.1-4

3.1.2.2 Pumping Equipment...................................................... 3.1-4

3.1.3 Grit Removal Facilities ............................................................. 3.1-5

3.1.3.1 Grit Chamber ................................................................ 3.1-5

3.1.3.2 Grit Removal Equipment .............................................. 3.1-6

3.1.3.3 Grit Classifier/Separators .............................................. 3.1-6

3.1.3.4 Aerated Grit Chamber Blowers ..................................... 3.1-7

Table of Contents −v−

3.1.4 Odor Reduction Station............................................................. 3.1-7

3.1.4.1 Odor Reduction Station Scrubber Exhaust

Fans .......................................................................... 3.1-7

3.1.4.2 Odor Reduction Station Scrubber ................................. 3.1-8

3.1.4.3 Odor Reduction Station pH and ORP

Controllers ................................................................ 3.1-9

3.1.4.4 Odor Reduction Station Recirculation Pumps .............. 3.1-9

3.1.4.5 Odor Reduction Station Sodium Hydroxide

(NaOH) Metering Pump ........................................... 3.1-9

3.1.4.6 Odor Reduction Station Sodium

Hypochlorite(NaOC1) Metering Pump System ...... 3.1-10

3.1.4.7 Odor Reduction Station NaOH Storage Tank ............. 3.1-10

3.1.4.8 Odor Reduction Station NaOC1 Storage

Tank ....................................................................... 3.1-11

3.1.4.9 NaOH and NaOC1 Containment Sump

Pumps ..................................................................... 3.1-11

3.1.4.10 Water Softening System ......................................... 3.1-11

3.1.4.11 Storage Bin/Grit Dewatering Areas Ventilation

System .................................................................... 3.1-12

3.1.4.12 Screening and Wetwell Ventilation System ........... 3.1-12

3.2 Primary Sedimentation Facilities .......................................................... 3.2-1

3.2.1 Primary Sedimentation Tanks ................................................... 3.2-1

3.2.2 Channel Aeration Facilities ....................................................... 3.2-1

3.2.3 Rapid Mix Chamber .................................................................. 3.2-2

3.2.4 Sludge Collection and Pumping Facilities ................................ 3.2-4

3.2.4.1 Sludge Collectors .......................................................... 3.2-4

3.2.4.2 Primary Sludge Pumping .............................................. 3.2-5

3.2.5 Primary Skimmings Processing Facilities ................................. 3.2-6

3.2.5.1 Surface Skimmers ......................................................... 3.2-6

3.2.5.2 Skimmings Pump Station .............................................. 3.2-7

3.2.6 Chemical Addition Facilities .................................................... 3.2-9

3.2.6.1 Polymer Addition System ............................................. 3.2-9

3.2.6.2 Ferric Chloride Addition System ................................ 3.2-11

3.2.7 Odor Reduction Station........................................................... 3.2-13

3.2.7.1 Odor Reduction Station Scrubber Exhaust

Fans ........................................................................ 3.2-14

3.2.7.2 Odor Reduction Station Scrubber ............................... 3.2-14

3.2.7.3 Odor Reduction Station pH and ORP Controllers ...... 3.2-15

3.2.7.4 Odor Reduction Station Recirculation

Pumps ..................................................................... 3.2-15

3.2.7.5 Odor Reduction Station Sodium Hydroxide (NaOH)

Metering Pump ....................................................... 3.2-16

Table of Contents −vi−

3.2.7.6 Odor Reduction Station Sodium Hypochlorite

(NaOC1) Metering Pump ...................................... 3.2-16

3.2.7.7 Odor Reduction Station NaOH Storage Tank ............. 3.2-16

3.2.7.8 Odor Reduction Station NaOC1 Storage Tank ........... 3.2-17

3.2.7.9 NaOH and NaOC1 Containment Sump Pumps .......... 3.2-17

3.2.7.10 Water Softening System ......................................... 3.2-18

3.3 Activated Sludge Facilities ................................................................... 3.3-1

3.3.1 Activated Sludge Tanks ............................................................ 3.3-1

3.3.2 Selector Zone Mixing System ................................................... 3.3-2

3.3.2.1 Pre-Anoxic Zone (Cell “A”) ......................................... 3.3-4

3.3.2.2 Anaerobic Zone (Cells “B” and “C”) ............................ 3.3-4

3.3.2.3 Anoxic Zones (Cells “D”, “E” and “F”) ....................... 3.3-5

3.3.2.4 Aerobic Zone................................................................. 3.3-6

3.3.2.4.1 Air Diffusers .................................................. 3.3-7

3.3.2.4.2 Intermediate Mixed Liquor Return .............. 3.3-12

3.3.3 Tank Drainage Facilities ......................................................... 3.3-14

3.3.4 Process Air Blowers ................................................................ 3.3-16

3.3.5 Channel Aeration Facilities ..................................................... 3.3-19

3.4 Secondary Sedimentation Facilities ..................................................... 3.4-1

3.4.1 Sedimentation Tanks ................................................................. 3.4-1

3.4.2 Sludge Collection and Pumping Facilities ................................ 3.4-2

3.4.2.1 Sludge Collectors .......................................................... 3.4-2

3.4.2.2 Return Activated Sludge (RAS) Pumping .................... 3.4-3

3.4.2.3 Waste Activated Sludge (WAS) Pumping .................... 3.4-4

3.4.3 Secondary Skimmings Processing Facilities ............................. 3.4-5

3.4.3.1 Surface Rotary Skimmers ............................................. 3.4-5

3.4.3.2 Skimmings Pump Station .............................................. 3.4-5

3.4.4 RAS Chlorination ..................................................................... 3.4-6

3.4.5 Tank Drainage Facilities ........................................................... 3.4-7

3.5 Chlorination, Dechlorination and Non-Potable Water Facilities .......... 3.5-1

3.5.1 Chlorination Facilities ............................................................... 3.5-1

3.5.1.1 Sodium Hypochlorite Supply ........................................ 3.5-1

3.5.1.2 Sodium Hypochlorite Storage ....................................... 3.5-4

3.5.2 Dechlorination Facilities ........................................................... 3.5-4

3.5.2.1 Sodium Bisulfite Supply ............................................... 3.5-4

3.5.2.2 Sodium Bisulfite Storage .............................................. 3.5-5

3.5.3 Non-Potable Water (NPW) Pump Station No. 1 ...................... 3.5-6

3.5.3.1 Hydropneumatic Tank ................................................... 3.5-7

3.5.3.2 Make-Up Air System .................................................... 3.5-7

3.5.3.3 Non-Potable Water Pumps ............................................ 3.5-7

3.5.3.4 Water Supply and Storage ............................................. 3.5-8

Table of Contents −vii−

3.5.4 Non-Potable Water (NPW) Pump Station No. 2 ...................... 3.5-8

3.5.4.1 Non-Potable Water Pumps ............................................ 3.5-8

3.5.4.2 Water Supply and Storage ............................................. 3.5-9

3.6 Waste Activated Sludge Thickening Facilities ..................................... 3.6-1

3.6.1 Dissolved Air Flotation (DAF) Thickeners .............................. 3.6-1

3.6.2 Pressurization and Air Injection System ................................... 3.6-2

3.6.3 TWAS Pumping and Metering System ..................................... 3.6-3

3.6.4 DAF Polymer Addition System ................................................ 3.6-3

3.6.4.1 Polymer Bulk Storage Tank .......................................... 3.6-4

3.6.4.2 Bulk Polymer Transfer Pumps ...................................... 3.6-4

3.6.4.3 Polymer Mix Tanks ....................................................... 3.6-4

3.6.4.4 Polymer Feed Pumps .................................................... 3.6-5

3.7 Unstabilized Sludge Storage Facilities ................................................. 3.7-1

3.7.1 Sludge Storage Tanks ............................................................... 3.7-1

3.7.2 Sludge Mixing System .............................................................. 3.7-1

3.7.3 Ferric Chloride and Sodium Hypochlorite Addition Systems .. 3.7-2

3.7.4 Odor Reduction Station............................................................. 3.7-2

3.7.4.1 Odor Reduction Station Scrubber Exhaust

Fans .......................................................................... 3.7-3

3.7.4.2 Odor Reduction Station Scrubber ................................. 3.7-3

3.7.4.3 Odor Reduction Station pH and ORP Controllers ........ 3.7-4

3.7.4.4 Odor Reduction Station Recirculation Pumps .............. 3.7-4

3.7.4.5 Odor Reduction Station Sodium Hydroxide

(NaOH) Metering Pump ........................................... 3.7-5

3.7.4.6 Odor Reduction Station Sodium Hypochlorite

(NaOCl) Metering Pump .......................................... 3.7-5

3.7.4.7 Odor Reduction Station NaOH Storage Tank ............... 3.7-6

3.7.4.8 Odor Reduction Station NaOCl Storage Tank .............. 3.7-6

3.7.4.9 NaOH and NaOC1 Containment Sump Pumps ............ 3.7-7

3.7.4.10 Water Softening System ........................................... 3.7-7

3.8 Sludge Dewatering Facilities ................................................................ 3.8-1

3.8.1 General ...................................................................................... 3.8-1

3.8.2 Dewatering System Pumping Facilities .................................... 3.8-1

3.8.3 Dewatering System Polymer Conditioning Facilities ............... 3.8-3

3.8.3.1 Polymer Bulk Storage ................................................... 3.8-3

3.8.3.2 Bulk Polymer Transfer Pumps ...................................... 3.8-4

3.8.3.3 Polymer Mixing Tanks.................................................. 3.8-5

3.8.3.4 Polymer Feed Pumps .................................................... 3.8-5

3.8.4 Belt Filter Presses ..................................................................... 3.8-6

3.8.5 Odor Reduction Station........................................................... 3.8-10

3.8.5.1 Odor Reduction Station Scrubber Exhaust Fans ......... 3.8-11

3.8.5.2 Odor Reduction Station Scrubber ............................... 3.8-11

Table of Contents −viii−

3.8.5.3 Odor Reduction Station Scrubber No. 1 pH

Controller ................................................................ 3.8-12

3.8.5.4 Odor Reduction Station Scrubber No. 1 and No. 2

Recirculation Pumps ............................................... 3.8-12

3.8.5.5 Odor Reduction Station Scrubber No. 1 Sulfuric

Acid (H2SO4) Metering Pumps .............................. 3.8-13

3.8.5.6 Odor Reduction Station Scrubber No. 1 H2SO4

Storage Tank ........................................................... 3.8-13

3.8.5.7 Odor Reduction Station Scrubber No. 2 pH and

ORP Controllers ..................................................... 3.8-14

3.8.5.8 Odor Reduction Station Scrubber No. 2 Sodium

Hydroxide (NaOH) Metering Pump ....................... 3.8-14

3.8.5.9 Odor Reduction Station Scrubber No. 2 Sodium

Hypochlorite (NaOC1) Metering Pump ................. 3.8-14

3.8.5.10 Odor Reduction Station Scrubber No. 2 NaOH

Storage Tank ........................................................... 3.8-15

3.8.5.11 Odor Reduction Station Scrubber No. 2 NaOC1

Storage Tank ........................................................... 3.8-15

3.8.5.12 H2SO4, NaOH and NaOC1 Containment Sump

Pumps ..................................................................... 3.8-16

3.8.5.13 Water Softening System ......................................... 3.8-16

3.8.5.14 Sludge Dewatering Building Air Supply Fans ....... 3.8-16

3.8.5.15 Sludge Dewatering Building Exhaust Fans ............ 3.8-17

3.8.5.16 Truck Loading Air Supply Fans ............................. 3.8-17

3.9 Sludge Conveyance and Lime Stabilization Facilities .......................... 3.9-1

3.9.1 General ...................................................................................... 3.9-1

3.9.2 Dewatered Sludge Conveyance System .................................... 3.9-1

3.9.3 Lime Storage Facilities ............................................................. 3.9-3

3.9.4 Lime Conveyance Facilities ...................................................... 3.9-4

3.9.5 Sludge/Lime Mixing Facilities.................................................. 3.9-5

3.9.6 Stabilized Sludge Conveyance/Truck Loading System ............ 3.9-6

3.10 Primary Effluent Structures ................................................................ 3.10-1

3.10.1 Primary Effluent Channel and Primary Effluent Bypass

Structure .................................................................................. 3.10-1

3.10.2 Primary Effluent Bypass Metering Structure .......................... 3.10-2

3.10.3 Primary Effluent Bypass Junction Structure ........................... 3.10-2

3.10.4 Primary Effluent Emergency Connection (PEEC) .................. 3.10-3

3.11 Final Effluent Structures ..................................................................... 3.11-1

3.11.1 Effluent Blending Structure .................................................... 3.11-1

3.11.2 Effluent Metering Structure .................................................... 3.11-2

3.11.3 Canyon Collector Meter Vault ................................................ 3.11-2

3.11.4 Tank Drain/Canyon Collector Structure ................................. 3.11-3

Table of Contents −ix−

3.12 Standby Power Generation Facilities .................................................. 3.12-1

3.12.1 Containerized Standby Generators .......................................... 3.12-1

3.12.2 Diesel Fuel Storage Tanks ...................................................... 3.12-2

3.12.3 Diesel Fuel Transfer Pump Stations ....................................... 3.12-3

3.12.3.1 Diesel Fuel Transfer Pumps .................................. 3.12-3

3.12.3.2 Diesel Fuel Day Tanks ........................................... 3.12-4

3.12.3.3 Diesel Fuel Overflow Tanks ................................... 3.12-5

3.12.3.4 Diesel Fuel Return Pumps ...................................... 3.12-5

3.12.4 Fuel Oil System Control Panels .............................................. 3.12-6

3.12.4.1 Generator No. 1 Fuel Oil Control Panel ................. 3.12-6

3.12.4.2 Generator No. 2 Fuel Oil Control Panel ................. 3.12-6

3.12.5 12kV Generator Switchgear SG-GDB .................................... 3.12-6

3.12.5.1 Generator Breakers VCB-G1, VCB-G2 ................. 3.12-6

3.12.5.2 Standby Power Tie Breakers

VCB-AGT, VCB-BGT ........................................... 3.12-6

3.12.5.3 Generator Paralleling Control Panels ..................... 3.12-7

3.13 Collection and Conveyance Facilities ................................................. 3.13-1

3.13.1 Diversion Structures ................................................................ 3.13-1

3.13.2 Conveyance Pipelines ............................................................. 3.13-2

3.13.2.1 Gravity Piping ........................................................ 3.13-2

3.13.2.2 Force Main Piping .................................................. 3.13-4

3.13.3 Goat Canyon Pump Station ..................................................... 3.13-4

3.13.3.1 Isolation Valve, Wetwell, and Pumps .................... 3.13-4

3.13.3.2 Surge Control System ............................................. 3.13-7

3.13.3.3 Odor Reduction Station .......................................... 3.13-8

3.13.3.4 Standby Generator ................................................ 3.13-12

3.13.4 Hollister Street Pump Station ............................................... 3.13-14

3.13.4.1 Isolation Valve, Wetwell, and Pumps .................. 3.13-14

3.13.4.2 Surge Control System ........................................... 3.13-16

3.13.4.3 Odor Reduction Station ........................................ 3.13-18

3.13.4.4 Standby Generator ................................................ 3.13-21

VOLUME 2

TABLE OF CONTENTS ................................................................................................ i

4. OPERATIONAL PROCEDURES

Chapter 4 Table of Contents ..................................................................... 4-i

4.0 Foreword ............................................................................................... 4.0-1

4.0.1 Process Control and Instrumentation ........................................ 4.0-1

4.0.1.1 General Concept ............................................................ 4.0-1

4.0.1.2 Local Control Center Locations .................................... 4.0-2

Table of Contents −x−

4.0.1.3 Plant Control Center & Operations Building

Control Center (OBCC) ................................................ 4.0-3

4.0.1.4 Operational Control ...................................................... 4.0-4

4.0.2 General Start-Up Procedures .................................................... 4.0-5

4.0.3 General Shutdown Procedures .................................................. 4.0-6

4.0.4 General Alarm and Status Annunciation Strategies .................. 4.0-7

4.0.5 General Requirements to Daily Operations Checks .................. 4.0-8

4.0.6 Training Record ........................................................................ 4.0-8

4.1 Headworks ............................................................................................ 4.1-1

4.1.1 Description of Controls and Operation ..................................... 4.1-1

4.1.1.1 General ......................................................................... 4.1-1

4.1.1.2 Screening Equipment ................................................... 4.1-2

4.1.1.3 Influent Pump Station .................................................. 4.1-9

4.1.1.4 Grit Handling Equipment ........................................... 4.1-13

4.1.1.5 Grit Screening Storage Bin Winches ......................... 4.1-18

4.1.1.6 Odor Reduction Station.............................................. 4.1-18

4.1.2 Step by Step Start-Up Procedures ........................................... 4.1-26

4.1.2.1 General System Start-Up Procedures ......................... 4.1-26

4.1.2.2 Individual Equipment Start-Up Procedures ............... 4.1-28

4.1.2.2.1 Screening Facilities ..................................... 4.1-28

4.1.2.2.2 Influent Pump Station ................................. 4.1-31

4.1.2.2.3 Grit Handling Equipment ............................ 4.1-32

4.1.2.2.4 Odor Reduction Station............................... 4.1-34

4.1.3 Step by Step Shutdown Procedures ........................................ 4.1-43

4.1.3.1 General System Shutdown Procedures ...................... 4.1-43

4.1.3.2 Individual Equipment Shutdown Procedures ............. 4.1-44

4.1.3.2.1 Screening Facilities ..................................... 4.1-42

4.1.3.2.2 Influent Pump Station ................................. 4.1-45

4.1.3.2.3 Grit Handling Equipment ............................ 4.1-46

4.1.3.2.4 Odor Reduction Station............................... 4.1-47

4.1.4 Alarm and Status Annunciation .............................................. 4.1-52

4.1.4.1 Screenings Facilities .................................................. 4.1-52

4.1.4.2 Influent Pump Station ................................................ 4.1-54

4.1.4.3 Aerated Grit Chamber ................................................ 4.1-56

4.1.4.4 Odor Reduction Station.............................................. 4.1-58

4.1.5 Daily Operational Checks ....................................................... 4.1-65

4.1.5.1 General ....................................................................... 4.1-65

4.1.5.2 Screening Equipment ................................................. 4.1-65

4.1.5.3 Influent Pump Station ................................................ 4.1-67

4.1.5.4 Grit Handling Equipment ........................................... 4.1-68

4.1.5.5 Odor Reduction Station.............................................. 4.1-71

Table of Contents −xi−

4.1.6 Training Record ...................................................................... 4.1-78

4.1.6.1 Reading Assignment .................................................. 4.1-78

4.1.6.2 Field Instruction ......................................................... 4.1-78

4.2 Primary Sedimentation Facilities .......................................................... 4.2-1

4.2.1 Description of Controls and Operation ..................................... 4.2-1

4.2.1.1 General ......................................................................... 4.2-1

4.2.1.2 Channel Aeration System ............................................. 4.2-1

4.2.1.3 Rapid Mix Facilities ..................................................... 4.2-3

4.2.1.4 Sludge Collection and Pumping ................................... 4.2-4

4.2.1.5 Primary Skimmings Processing Facilities .................... 4.2-7

4.2.1.6 PST Chemical Addition Facilities ............................. 4.2-14

4.2.1.6.1 PST Polymer Addition Facilities ................ 4.2-15

4.2.1.6.2 PST Ferric Chloride Addition Facilities ..... 4.2-20

4.2.1.7 Odor Reduction Station.............................................. 4.2-25

4.2.2 Step by Step Start-Up Procedures ........................................... 4.2-31

4.2.2.1 General System Start-Up Procedures ......................... 4.2-31

4.2.2.2 Individual Equipment Start-Up Procedures ............... 4.2-35

4.2.2.2.1 Channel Aeration System ............................ 4.2-35

4.2.2.2.2 Rapid Mix Facilities .................................... 4.2-36

4.2.2.2.3 Sludge Collection and Pumping .................. 4.2-39

4.2.2.2.4 Primary Skimmings Processing Facilities ... 4.2-43

4.2.2.2.5 Chemical Addition Facilities ...................... 4.2-46

4.2.2.2.5.1 PST Polymer Addition

Facilities ................................... 4.2-46

4.2.2.2.5.2 PST Ferric Chloride Addition

Facilities ................................... 4.2-49

4.2.2.2.6 Odor Reduction Station............................... 4.2-53

4.2.3 Step by Step Shutdown Procedures ........................................ 4.2-59

4.2.3.1 General System Shutdown Procedures ...................... 4.2-59

4.2.3.2 Individual Equipment Shutdown Procedures ............. 4.2-62

4.2.3.2.1 Channel Aeration System ............................ 4.2-62

4.2.3.2.2 Rapid Mix Facilities .................................... 4.2-63

4.2.3.2.3 Sludge Collection and Pumping .................. 4.2-65

4.2.3.2.4 Primary Skimmings Processing Facilities ... 4.2-66

4.2.3.2.5 Chemical Addition Facilities ...................... 4.2-67

4.2.3.2.5.1 PST Polymer Addition

Facilities ................................... 4.2-68

4.2.3.2.5.2 PST Ferric Chloride Addition

Facilities ................................... 4.2-70

4.2.3.2.6 Odor Reduction Station............................... 4.2-72

4.2.4 Alarm and Status Annunciation .............................................. 4.2-77

4.2.4.1 Channel Aeration Facilities ........................................ 4.2-77

Table of Contents −xii−

4.2.4.2 Rapid Mix Chamber ................................................... 4.2-78

4.2.4.3 Sludge Collection and Pumping Facilities ................. 4.2-80

4.2.4.4 Primary Skimmings Processing Facilities .................. 4.2-83

4.2.4.5 Chemical Addition Facilities ..................................... 4.2-86

4.2.4.5.1 Polymer Addition System ......................... 4.2-87

4.2.4.5.2 Ferric Chloride Addition System .............. 4.2-89

4.2.4.6 Odor Reduction Station.............................................. 4.2-93

4.2.5 Daily Operational Checks ....................................................... 4.2-98

4.2.5.1 General ....................................................................... 4.2-98

4.2.5.2 Primary Sedimentation Tanks .................................... 4.2-98

4.2.5.3 Channel Aeration System ........................................... 4.2-99

4.2.5.4 Rapid Mix Chamber ................................................. 4.2-100

4.2.5.5 Sludge Collection and Pumping Facilities ............... 4.2-102

4.2.5.6 Primary Skimmings Processing Facilities ................ 4.2-104

4.2.5.7 Chemical Addition Facilities ................................... 4.2-106

4.2.5.7.1 Polymer Addition System ....................... 4.2-106

4.2.5.7.2 Ferric Chloride Addition System ............ 4.2-108

4.2.5.8 Odor Reduction Station............................................ 4.2-110

4.2.6 Training Record .................................................................... 4.2-116

4.2.6.1 Reading Assignment ................................................ 4.2-116

4.2.6.2 Field Instruction ....................................................... 4.2-116

4.3 Activated Sludge Facilities ................................................................... 4.3-1

4.3.1 Description of Controls and Operation ..................................... 4.3-1

4.3.1.1 General ......................................................................... 4.3-1

4.3.1.2 Activated Sludge Tanks ............................................... 4.3-1

4.3.1.3 Selector Zone Mixing System ...................................... 4.3-2

4.3.1.4 Air Diffusers ................................................................ 4.3-3

4.3.1.5 Intermediate Mixed Liquor Return .............................. 4.3-5

4.3.1.6 Tank Drainage Facilities .............................................. 4.3-6

4.3.1.7 Process Air Blowers ..................................................... 4.3-7

4.3.1.8 Channel Aeration Facilities ........................................ 4.3-12

4.3.2 Step by Step Start-Up Procedures ........................................... 4.3-13

4.3.2.1 Initial Start-Up Procedures ......................................... 4.3-13

4.3.2.2 General Start-Up Procedures ..................................... 4.3-15

4.3.2.3 Individual Equipment Start-Up Procedures ............... 4.3-17

4.3.2.3.1 Activated Sludge Tanks .............................. 4.3-17

4.3.2.3.2 Selector Zone Mixing System ..................... 4.3-18

4.3.2.3.3 Air Diffusers ............................................... 4.3-19

4.3.2.3.4 Intermediate Mixed Liquor Return ............. 4.3-21

4.3.2.3.5 Tank Drainage Facilities ............................. 4.3-22

4.3.2.3.6 Process Air Blowers .................................... 4.3-24

4.3.2.2.7 Channel Aeration Facilities ......................... 4.3-29

Table of Contents −xiii−

4.3.3 Step by Step Shutdown Procedures ........................................ 4.3-30

4.3.3.1 General Shutdown Procedures ................................... 4.3-30

4.3.3.2 Individual Equipment Shutdown Procedures ............. 4.3-31

4.3.3.2.1 Selector Zone Mixing System ..................... 4.3-31

4.3.3.2.2 Air Diffusers ............................................... 4.3-32

4.3.3.2.3 Intermediate Mixed Liquor Return ............. 4.3-33

4.3.3.2.4 Tank Drainage Facilities ............................. 4.3-34

4.3.3.2.5 Process Air Blowers .................................... 4.3-35

4.3.3.2.6 Channel Aeration Blowers .......................... 4.3-37

4.3.4 Alarm and Status Indication .................................................... 4.3-38

4.3.4.1 Activated Sludge Tanks .............................................. 4.3-38

4.3.4.2 Selector Zone Mixing System ..................................... 4.3-38

4.3.4.3 Air Diffusers ............................................................... 4.3-42

4.3.4.4 Intermediate Mixed Liquor Return ............................. 4.3-50

4.3.4.5 Tank Drainage Facility ................................................ 4.3-52

4.3.4.6 Process Air Preparation Facility.................................. 4.3-53

4.3.4.7 Channel Aeration Blowers .......................................... 4.3-65

4.3.5 Daily Operational Checks ....................................................... 4.3-67

4.3.5.1 General ........................................................................ 4.3-67

4.3.5.2 Activated Sludge Tanks .............................................. 4.3-67

4.3.5.3 Selector Zone Mixing System ..................................... 4.3-68

4.3.5.4 Air Diffusers ............................................................... 4.3-68

4.3.5.5 Intermediate Mixed Liquor Return ............................. 4.3-70

4.3.5.6 Tank Drainage Facility ................................................ 4.3-71

4.3.5.7 Process Air Preparation Facility.................................. 4.3-72

4.3.5.8 Channel Aeration Blowers .......................................... 4.3-74

4.3.6 Training Record ...................................................................... 4.3-75

4.3.6.1 Reading Assignment .................................................. 4.3-75

4.3.6.2 Field Instruction ......................................................... 4.3-76

4.4 Secondary Sedimentation Facilities ..................................................... 4.4-1

4.4.1 Description of Controls and Operation ..................................... 4.4-1

4.4.1.1 General .......................................................................... 4.4-1

4.4.1.2 Sludge Collectors .......................................................... 4.4-1

4.4.1.3 Return Activated Sludge (RAS) Pumping .................... 4.4-2

4.4.1.4 Waste Activated Sludge (WAS) Pumping .................... 4.4-6

4.4.1.5 Surface Skimmers ......................................................... 4.4-7

4.4.1.6 Skimmings Pump Station .............................................. 4.4-8

4.4.1.7 RAS Chlorination ....................................................... 4.4-12

4.4.1.8 Tank Drainage Facilities ............................................. 4.4-12

4.4.2 Step by Step Start-Up Procedures ........................................... 4.4-14

4.4.2.1 General Start-Up Procedures ..................................... 4.4-14

4.4.2.2 Individual Equipment Start-Up Procedures ................ 4.4-15

Table of Contents −xiv−

4.4.2.2.1 Sludge Collectors ........................................ 4.4-15

4.4.2.2.2 Return Activated Sludge (RAS) Pumping .. 4.4-16

4.4.2.2.3 Waste Activated Sludge (WAS) Pumping .. 4.4-17

4.4.2.2.4 Surface Skimmers ....................................... 4.4-17

4.4.2.2.5 Skimmings Pump Station ............................ 4.4-18

4.4.2.2.6 RAS Chlorination ....................................... 4.4-19

4.4.2.2.7 Tank Drainage Facilities ............................. 4.4-19

4.4.3 Step by Step Shutdown Procedures ........................................ 4.4-20

4.4.3.1 General Shutdown Procedures ................................... 4.4-20

4.4.3.2 Individual Equipment Shutdown Procedures .............. 4.4-22

4.4.3.2.1 Sludge Collectors ........................................ 4.4-22

4.4.3.2.2 Return Activated Sludge (RAS) Pumping .. 4.4-22

4.4.3.2.3 Waste Activated Sludge (WAS) Pumping .. 4.4-23

4.4.3.2.4 Surface Skimmers ....................................... 4.4-23

4.4.3.2.5 Skimmings Pump Station ............................ 4.4-24

4.4.3.2.6 RAS Chlorination ....................................... 4.4-25

4.4.3.2.7 Tank Drainage Facilities ............................. 4.4-25

4.4.4 Alarms, Indicators, and Status Alerts ...................................... 4.4-25

4.4.4.1 Sludge Collectors ........................................................ 4.4-25

4.4.4.2 Return Activated Sludge (RAS) Pumping .................. 4.4-27

4.4.4.3 Waste Activated Sludge (WAS) Pumping .................. 4.4-27

4.4.4.4 Surface Skimmers ....................................................... 4.4-28

4.4.4.5 Skimmings Pump Station ............................................ 4.4-29

4.4.4.6 RAS Chlorination ....................................................... 4.4-30

4.4.4.7 Tank Drainage Facilities ............................................. 4.4-30

4.4.5 Daily Operational Checks ....................................................... 4.4-30

4.4.5.1 General ........................................................................ 4.4-30

4.4.5.2 Secondary Sedimentation Tanks ................................. 4.4-30

4.4.5.3 Sludge Collectors ........................................................ 4.4-31

4.4.5.4 Return Activated Sludge (RAS) Pumping .................. 4.4-32

4.4.5.5 Waste Activated Sludge (WAS) Pumping .................. 4.4-32

4.4.5.6 Surface Skimmers ....................................................... 4.4-33

4.4.5.7 Skimmings Pump Station ............................................ 4.4-33

4.4.5.8 RAS Chlorination ....................................................... 4.4-34

4.4.6 Training Record ...................................................................... 4.4-34

4.4.6.1 Reading Assignment .................................................. 4.4-34

4.4.6.2 Field Instruction ......................................................... 4.4-35

4.5 Chlorination, Dechlorination and Non-Potable Water .......................... 4.5-1

4.5.1 Description of Controls and Operation ..................................... 4.5-1

4.5.1.1 General ......................................................................... 4.5-1

4.5.1.2 Chlorination Facilities .................................................. 4.5-1

4.5.1.3 Dechlorination Facilities .............................................. 4.5-6

Table of Contents −xv−

4.5.1.4 Non-Potable Water Pump Station No. 1 (NPWPS1) ... 4.5-9

4.5.1.5 Non-Potable Water Pump Station No. 2 (NPWPS2) . 4.5-13

4.5.2 Step by Step Start-Up Procedures ........................................... 4.5-17

4.5.2.1 Chlorination Facilities ................................................ 4.5-17

4.5.2.1.1 General System Start-Up Procedures ......... 4.5-17

4.5.2.1.2 Individual Equipment Start-Up

Procedures ........................................................ 4.5-17

4.5.2.2 Dechlorination Facilities ............................................ 4.5-24

4.5.2.2.1 General System Start-Up Procedures ......... 4.5-24

4.5.2.2.2 Individual Equipment Start-Up

Procedures ........................................................ 4.5-24

4.5.2.3 Non-Potable Water Pump Station No. 1 Start-Up

Procedures ......................................................... 4.5-27

4.5.2.3.1 General System Start-Up Procedures .......... 4.5-27

4.5.2.3.2 Individual Equipment Start-Up

Procedures ........................................................ 4.5-29

4.5.2.4 Non-Potable Water Pump Station No. 2 Start-Up

Procedures ......................................................... 4.5-31

4.5.2.4.1 General System Start-Up Procedures ......... 4.5-31

4.5.2.4.2 Individual Equipment Start-Up Procedures 4.5-32

4.5.3 Step by Step Shutdown Procedures ........................................ 4.5-33

4.5.3.1 Chlorination Facilities ................................................. 4.5-33

4.5.3.1.1 General System Shutdown Procedures ....... 4.5-33

4.5.3.1.2 Individual Equipment Shutdown

Procedures ......................................................... 4.5-34

4.5.3.2 Dechlorination Facilities ............................................. 4.5-38

4.5.3.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .