This document is a comprehensive Risk Assessment for the South Bay International Wastewater Treatment Plant (SBIWTP) conducted by Veolia Water West Operating Services, Inc. under contract 19IBWC20C0003 with the United States International Boundary and Water Commission (USIBWC). The risk assessment systematically evaluated the facility's assets across multiple processes including preliminary treatment, biological treatment, filtration, liquid sludge, chemical treatment, cake sludge, sedimentation, power systems, information systems, pump stations, and building infrastructure.
The assessment used a criticality and condition scoring methodology to identify high-risk assets, with risk scores ranging from 9-16. Key findings reveal significant potential risks across critical systems, including potential failures in PLCs, pumps, blowers, valves, and control systems that could compromise operational continuity, permit compliance, and treatment capabilities. Recommended mitigation strategies include scheduled preventative maintenance, capital projects, equipment replacement, and operational inspections. The risk assessment highlights the need for immediate and near-future interventions to prevent potential equipment failures, permit violations, and operational disruptions at the wastewater treatment plant.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USIBWC SOUTHBAY INTERNATIONAL
WASTEWATER TREATMENT PLANT
SAN DIEGO, CA
RISK ASSESSMENT
March 1, 2025
Section 1- INTRODUCTION TO THE RISK ASSESSMENT PROCESS
Table 1 - Systems with Criticality Ranking 3 (Major) and 4 (Unacceptable)
Consequences
Section 2- Asset Condition Assessment Review
Table 2 - Preliminary Process Assets with Condition Ranking (Degradation) and
(Imminently Failing) Consequences
Table 3 - Biological Process Assets with Condition Ranking 3 (Degradation) an 4
(Imminently Failing) Consequences
Table 4 - Filtration Process Assets with Condition Ranking 3 (Degradation) and 4
(Imminently Failing) Consequences
Table 5 - Liquid Sludge Process Assets with Condition Ranking 3 (Degradation) and 4
(Imminently Failing) Consequences
Table 6 - Chemical Process Assets with Condition Ranking 3 (Degradation) and 4
(Imminently Failing) Consequences
Table 7 - Cake Sludge Process Assets with Condition Ranking 3 (Degradation) and 4
(Imminently Failing) Consequences
Table 8 - Sedimentation Assets with Condition Ranking 3 (Degradation) and 4
(Imminently Failing) Consequences
Table 9 - Power Systems Process Assets with Condition Ranking 3 (Degradation) and
4 (Imminently Failing) Consequences
Table 10 - Information Systems Process Assets with Condition Ranking 3
(Degradation) and 4 (Imminently Failing) Consequences
Table 11 - Goat Canyon Pump Station Process Assets with Condition Ranking 3
(Degradation) and 4 (Imminently Failing) Consequence
Table 12 - Hollister Pump Station Process Assets with Condition Ranking 3
(Degradation) and 4 (Imminently Failing) Consequences
Table 13 - Canyon Collectors System Assets with Condition Ranking 3 (Degradation) and 4 (Imminently Failing) Consequences
Table 14 - Building & Grounds System Assets with Condition Ranking 3 (Degradation) and 4 (Imminently Failing) Consequences
Section 3- Risk Evaluation
Figure 1 - The Risk Matrix as defined by the Asset Criticality Score multiplied by Asset
Condition Score
Table 15 - Preliminary Process Assets with a High Risk Ranking Score
Table 16 - Biological Process Assets with a High Risk Ranking Score
Table 17 - Filtration Process Assets with a High Risk Ranking Score
Table 18 - Liquid Sludge Assets with a High Risk Ranking Score
Table 19 - Chemical Process Assets with a High Risk Ranking Score
Table 20 - Cake Sludge Process Assets with a High Risk Ranking Score
Table 21 - Sedimentation Process Assets with a High Risk Ranking Score
Table 22 - Power System Process Assets with a High Risk Ranking Score
Table 23 - Information System Process Assets with a High Risk Ranking Score
Table 24 - Goat Canyon Pump Station Process Assets with a High Risk Ranking
Score
Table 25 - Hollister Pump Station Process Assets with a High Risk Ranking Score 116
Table 26 - Gravity Mains Process Assets with a High Risk Ranking Score
Table 27 - Building & Grounds Process Assets with a High Risk Ranking Score
END OF RISK ASSESSMENT
Section 1- INTRODUCTION TO THE RISK ASSESSMENT PROCESS
As directed by contract 19IBWC20C0003 between Veolia Water West Operating Services, Inc.
(“Veolia”) and the United States International Boundary and Water Commission (“USIBWC”), Veolia conducted a risk assessment of the South Bay International Wastewater Treatment Plant (“SBIWTP”) in accordance with OMB Circular A-123. The OMB Circular’s stated purpose is to provide “guidance to Federal managers on improving the accountability and effectiveness of Federal programs and operations by establishing, assessing, correcting, and reporting on internal control...to ensure that Federal programs operate and Federal resources are used efficiently and effectively to achieve desired objectives. Programs must operate and resources must be used consistent with agency missions, in compliance with laws and regulations, and with minimal potential for waste, fraud, and mismanagement.” Veolia’s focus remains on the safety, effectiveness, and efficiency of operations while ensuring compliance with applicable laws and regulations. Veolia considers planning and budgeting to mitigate risks as an essential part of the effectiveness of our operations of the SBIWTP.
The focus of Veolia’s Risk Assessment herein is to provide USIBWC with a summary of known risks and or liabilities for continuity of safe and compliant operations. Some of the risks identified have been shown to be mitigated through human intervention in accordance with developed procedures while others require corrective maintenance actions or plant modification consideration.
The following Veolia employees conducted this assessment:
Jacob Schmidt – Plant Superintendent Calvin Carnegie - Senior Director, Technical & Performance Aaditya Raman - President Operations, Southwest Region Roger Bolton - Asset Management
The risk review process involved both onsite and offsite activities to review material status and history, spare parts inventory, process status and history, and operating procedures.
Veolia’s Asset Management team conducted a comprehensive Criticality Risk Assessment and a completion Condition Assessment of all managed assets. Processes and systems with high risk profiles are highlighted in the sections below as are assets in poorer condition. An asset risk calculation is provided and those assets considered in the high risk profile category with high criticality and in poor condition are highlighted and action plans identified. Attached are the complete documents for the Criticality Analysis Report and Condition Assessment that supported these findings.
A systematic relative criticality analysis review was completed for the USIBWC in December 2020.
This process prioritized and ranked assets using a standardized scale accounting for consequence and likelihood of worst case failure scenarios. Key components used for evaluating and cataloging risk include the System Criticality Analysis review and the Asset Condition Assessment review.
The criticality analysis review was completed in a workshop with local plant staff and the company’s Asset Management team. Systems were evaluated and defined with the hierarchy structure developed and assigned to each asset in the Computerized Maintenance Management System (CMMS). Worst case failure scenarios were set for each system considering consequence and likelihood of failure details. For each scenario, key criteria were evaluated using the following Level of Service categories: Safety, Capacity, Environmental/Water Quality, Operating Cost, Stakeholder Impact, and Collateral Impact. Based on the severity of the failure, consequences were assigned rankings of Unacceptable, Major, Undesirable, or Minor risk for each of the Level of Service categories. After final priorities are established, each system is ranked relative to other connecting or related systems in terms of Criticality. Systems and/or assets with higher Level of Service impacts are rated at a higher Criticality. Each system and asset is assigned a criticality ranking of 1, 2, 3, or 4 as defined below:
1 – Minor Failure Effects 2 - Undesirable Failure Effects 3 – Major Failure Effects 4 – Unacceptable Failure Effects
These ranking results are entered into the CMMS for each asset. Criticality ranking can then be used during the maintenance management, maintenance budgeting, and capital planning processes. By utilizing the Criticality rankings in these processes, the asset investment strategy is prioritized in terms of Level of Service impacts for repair and replacement decisions and timelines.
Updates to the criticality analysis are conducted annually.
System Criticality Analysis Results
The complete Criticality Analysis Report for 2022 is attached in the appendices to this report and contains the detailed analysis results including failure scenarios and consequences of failure. For the purposes of the risk assessment report higher risk systems will be evaluated, i.e. systems that rank a level 3 as having major potential failure effects and systems that rank a level 4 as having unacceptable failure effects.
Table 1 - Systems with Criticality Ranking 3 (Major) and 4 (Unacceptable) Consequences
Description System Hierarchy Criticality
Treatment Plant
STP00 STP00PRE00
Preliminary Treatment Process
Bar Screen System STP00PRE00SCR00 3
Headworks Junction System STP00PRE00TSP01 4
Grit Removal System STP00PRE00GRT00 3
Biological Treatment Process STP00BCB00
Process Aeration Blower System STP00BCB00AER01 4
Intermediate Mixed Liquor Recycle Pumping System
STP00BCB00PMP01 4
Aeration Basin Drainage Pumping System STP00BCB00PMP02 4
RAS (Return Activated Sludge) Pumping System
STP00BCB00PMP03 4
WAS (Waste Activated Sludge) Pumping System
STP00BCB00PMP04 4
Secondary Scum Pumping System STP00BCB00PMP05 4
Secondary Drainage Pumping System STP00BCB00PMP06 4
Non-Potable Water Pump Station No. 2 System STP00BCB00PMP07 4
Secondary Clarification System STP00BCB00STL02 3
Aeration Basin Influent Channel System STP00BCB00TSP01 3
EQ Basin Process STP00EQS00
Power & Controls System STP00EQS00ELE00 4
Pumping System STP00EQS00PMP00 4
Tank System STP00EQS00STR00 4
Filtration Process STP00FLT00
Headworks Odor Control System STP00FLT00DRC01 4
PST (Primary Settling Tank) Odor Control System
STP00FLT00DRC02 4
SP (Solids Processing) Odor Control System STP00FLT00DRC03 4
USST (Unstabilized Sludge Storage Tank) Odor Control
STP00FLT00DRC04 4
System
Liquid Sludge Treatment Process STP00SLL00
DAF (Dissolved Air Flotation) System STP00SLL00DAF00
DAF (Dissolved Air Flotation) Pressurization Pumping
STP00SLL00PMP01 4
System
TWAS (Thickened Waste Activated Sludge) Pumping
STP00SLL00PMP02 4
System
Chemical Treatment Process STP00CHM00
Old Generator Fuel Tank System STP00CHM00CHF01 3
New Generator Fuel Tank System STP00CHM00CHF02 3
Sludge Dewatering Polymer Dosing System STP00CHM00CHF19 3
SP (Solids Processing) Sulfuric Acid Dosing System
STP00CHM00CHF14 3
Lime Dosing System STP00CHM00CHF18 4
JB-1 Ferric Chloride Dosing System STP00CHM00CHF03 3
Cake Sludge Treatment Process STP00SLC00
Belt Filter Press Conveyance System STP00SLC00TSP01 4
Truck Loading System STP00SLC00TSP02 4
Belt Filter Press System STP00SLC00BTF00 4
Belt Filter Press Pumping System STP00SLC00PM01 4
Sedimentation Process STP00SED00
Primary Sludge Pumping System STP00SED00PMP01
Power System Process STP00PWR00
Motor Control Center System Standby Generators System Main Utility Switchgear System
STP00PWR00ELE00
STP00PWR00GNR00
STP00PWR00TNS00
Buildings & Grounds Process STP00BGR00BLD27
Anti-Intrusion Structure Area STP00BGR00BLD27 3
Information Systems Process STP00CST00
PLC and Remote I/O System STP00CST00CTR00 4
Fire Safety Monitoring System STP00CST00MNT01 3
SCADA and Network System STP00CST00SCA00 4
Support Systems Process STP00SPS00
Safety Equipment System STP00SPS00SAF00 3
Stormwater Collection TC
Stations TCS00
Gravity Mains System Process TCS00GMN00
Canyon Collectors System TCS00GMN00TSP00 4
Waste Water Collection SC
Stations SCS00
Pump Station Process SCS00PST01
Goat Canyon Electrical & Controls System SCS00PST01ELE00 4
Goat Canyon Odor Control System SCS00PST01FLT00 3
Goat Canyon Pumping System SCS00PST01PMP01 3
Goat Canyon Well Water Pumping System SCS00PST01PMP02 3
Pump Station Process SCS00PST02
Hollister Electrical & Controls System SCS00PST02ELE00 4
Hollister Odor Control System Hollister Pumping System
SCS00PST02FLT00
SCS00PST02PMP01
Section 2- Asset Condition Assessment Review
It is important to understand the current operating condition of the asset towards meeting Level of Service expectations to achieve more accurate maintenance and capital planning. Annual condition assessments are being completed for all assets. The condition assessment is intended to be a “snapshot” of the condition of an asset. A ranking number is assigned to the asset based on a deficiency scoring where 1 is new and 4 is failed.
The basic approach for performing the condition assessment entails the use of three major steps which Are:
1) Data Preparation – Extracting or compiling the asset registry from the
CMMS and adding it to the condition assessment tool.
2) Assessment – A process and set of tools by which field evaluation of assets can be accomplished and the results recorded, based on ranking standards. Where available performance testing is completed. Each asset is ranked in multiple areas such as performance, appearance, vibration, reliability, safety, etc.
3) Review – When the ranking is complete, using filtering to review the final scores and make replacement recommendations.
The summary condition score is an integer value on a scale from 1 to 4. The scale is generally as follows:
1 – Like New Condition
2 – Good Condition, Later in Aging
3 – Indications of Wear, Degradation, or Decrease in Performance
4 4 – Failed or Imminently Failing
Higher numerical values represent worst case conditions based on deficiency scoring. Evidence of defects, excessive wear, or aging warrants higher value condition scores. If an asset is in an advanced state of wear or aging, an “end-of-life” can be predicted. For the remaining assets – those in a condition not indicating near term failure – one can “calibrate” the mean expected lifetimes and better predict probable mean lifetimes for the assets. While this predicted end-of-life rating may not be reliable for any one asset, the statistical aggregate provides for a good budgetary planning means and for any given asset, it provides an indicator gauge to help prevent the early onset of failure probabilities. Applying this process to each asset ensures that maintenance management and capital decisions meet the Level of Service business objectives.
Asset Condition Assessment Results
The complete Condition Assessment Report for 2022 is attached in the appendices to this report and contains the detailed analysis results including the scoring for all assets. For the purposes of the risk assessment report poorer condition assets will be evaluated, i.e. assets that rank a level 3 as having indications of wear, degradation, or decrease in performance and assets that rank a level 4 as having failed or are imminently failing
Table 2 - Preliminary Process Assets with Condition Ranking (Degradation) and (Imminently Failing) Consequences
Asset ID
Preliminary Process Asset Condition Score 3 -4
Asset Description
A v e ra g e C o n d it io n
S c o re
E-00000803 PLC, REMOTE, I/O 1, HW 00107-RPLC-HWE1 3
E-00001015 BLOWER 1, AIR, GRIT 00301-GB1 4
E-00001017 BLOWER 2, AIR, GRIT 00302-GB2 3
E-00001020 CLASSIFIER/SEPARATOR 1, GRIT 00341-GC1 4
E-00001021 CLASSIFIER/SEPARATOR 2, GRIT 00342-GC2 4
E-00001031
PUMP 1, DISCFLO, GRIT, PRIMARY 00311- DISCFLO-GP1
E-00001034
PUMP 4, DISCFLO, GRIT, PRIMARY 00314- DISCFLO-GP4B
E-00001035
PUMP 5, DISCFLO, GRIT, PRIMARY 00315- DISCFLO-GP5B
E-00001091
PANEL, CONTROL, LOCAL, JB-1 00100-LCP-JB1
E-00001095
GATE, SLUICE, 96", JB-1 00100-GATE-JB1-96
E-00001096
SAMPLER, PORTABLE 00101-HJBX1
E-00001097
STRUCTURE, JB-1 00050-JB1-BUILDING
E-00001098
WELL, WET, JB-1 00100-WELL-JB1
E-00001681
PIPING, GRIT REMOVAL 00300-PG
E-00001682
VALVES, GRIT REMOVAL 00300-VG
E-00001683
PIPING, GRIT BLOWER 00300-GB-PG
E-00001684
VALVES, GRIT BLOWER 00300-GB-VG
E-00001686
VALVES, PUMP, INFLUENT 00200-VG
E-00001716
CONVEYOR 2, SCREENING, HW 00170-CNV2
E-00002654
STRUCTURE, JB-2 00050-JB2-BUILDING
Table 3 - Biological Process Assets with Condition Ranking 3 (Degradation) an 4
Biological Treatment Process
Asset Condition Score 3-4
Asset Description A v e ra g e C o n d it io n
S c
E-00000119 BLOWER 3, AIR, PROCESS PAB3 4
E-00000137
PUMP 1, MIXED LIQUOR, INTERMEDIATE IMLRP1
E-00000138
PUMP 2, MIXED LIQUOR, INTERMEDIATE IMLRP2
E-00000139
PUMP 3, MIXED LIQUOR, INTERMEDIATE IMLRP3
E-00000140
PUMP 4, MIXED LIQUOR, INTERMEDIATE IMLRP4
E-00000141
PUMP 5, MIXED LIQUOR, INTERMEDIATE IMLRP5
E-00000142
PUMP 6, MIXED LIQUOR, INTERMEDIATE IMLRP6
E-00000143
PUMP 7, MIXED LIQUOR, INTERMEDIATE IMLRP7
E-00000196
DIFFUSERS, TANK 1, ACTIVATED SLUDGE AST1-DG
E-00000198
DIFFUSERS, TANK 2, ACTIVATED SLUDGE AST2-DG
E-00000200
DIFFUSERS, TANK 3, ACTIVATED SLUDGE AST3-DG
E-00000202
DIFFUSERS, TANK 4, ACTIVATED SLUDGE AST4-DG
E-00000204
DIFFUSERS, TANK 5, ACTIVATED SLUDGE AST5-DG
E-00000206
DIFFUSERS, TANK 6, ACTIVATED SLUDGE AST6-DG
E-00000208
DIFFUSERS, TANK 7, ACTIVATED SLUDGE AST7-DG
E-00001305 VFD, PUMP 1, NPW2P NPW2P-1-VFD 4
E-00001307 VFD, PUMP 2, NPW2P NPW2P-2-VFD 4
E-00001310 VFD, PUMP 4, NPW2P NPW2P-4-VFD 3
E-00001311 PUMP 4, JOCKEY, NPW2P NPW2P-4 4
E-00001313 VFD, PUMP 5, NPW2P NPW2P-5-VFD 3
E-00001333 PIPING, NPW2P NPW2PPG 4
E-00001334 VALVES, NPW2P NPW2PVG 4
E-00001639
VALVES, MANUAL VALVES, BLOWER, AIR, PROCESS PAB-VG
Table 4 - Filtration Process Assets with Condition Ranking 3 (Degradation) and 4
Filtration Process
Asset Condition Score 3 - 4 v e ra g e C o n d it io n
S c
E-00000897 FAN 1, EXHAUST, ORHW 00352-OREF1 4
E-00000910 PUMP 2, RECIRCULATION, ORHW 00362- ORRP2B 4
E-00000917 FAN 3, EXHAUST, ORPST 00652-OREF3 4
E-00000919 FAN 4, EXHAUST, ORPST 00653-OREF4 4
E-00000928 PUMP 3, RECIRCULATION, ORPST 00661- ORRP3 4
E-00000939
FAN 8, EXHAUST, ORSP 03703-OREF8 4
E-00000941
FAN 9, EXHAUST, ORSP 03704-OREF9 4
E-00000945
PUMP 10, RECIRCULATION, ORSP 03722- ORRP10 4
E-00000949
PUMP 8, RECIRCULATION, ORSP 03712- ORRP8 4
E-00000964
PUMP 5, RECIRCULATION, ORUSS 02261- ORRP5 4
E-00000975
FAN 6, EXHAUST, ORUSS 02253-OREF6 4
E-00001673
PIPING/DUCTING, ORHW 00350-PG 4
E-00001674
VALVES, DUCTING, ORHW 00350-VG 4
E-00001676
VALVES, DUCTING, ORPST 00660-VG 4
E-00001675
PIPING/DUCTING, ORPST 00660-PG 4
E-00001677
PIPING/DUCTING, ORSP 03700-PG 4
E-00001678
VALVES, DUCTING, ORSP 03700-VG 4
E-00001679
PIPING/DUCTING, ORUSS 02250-PG 4
E-00001680
VALVES, DUCTING, ORUSS 02250-VG 4
E-00000979
SCRUBBER, TOWER 3, ORUSS 02255- ORSC3 3
Table 5 - Liquid Sludge Process Assets with Condition Ranking 3 (Degradation) and 4 (Imminently Failing) Consequences
Liquid Sludge Process e ra g e C o n d it io n
S c
E-00001700
VALVES, PRESSURIZATION, DAF DPP-VG
Table 6 - Chemical Process Assets with Condition Ranking 3 (Degradation) and 4
Chemical Treatment Process v e ra g e C o n d it io n
S c
E-00000623
TANK 1, DAY, GENERATOR 1, DIESEL ENGINE 04202-
DAYTANK1
E-00000625
TANK 1, OVERFLOW, GENERATOR 1, DIESEL ENGINE 04202-
OVF-TANK1
E-00000632 TANK, STORAGE, FUEL, DIESEL 00109- FUEL-STORAGE 4
E-00000635
TANK, STORAGE, FUEL, 10,000 GAL, GENERATOR 1 04220-
DIESEL-TANK-10K
E-00000643
TANK 1, BULK STORAGE, FERRIC CHLORIDE, PST 00581-
PFBT1
E-00000644
TANK 2, BULK STORAGE, FERRIC CHLORIDE, PST 00582-
PFBT2
E-00000719 TANK, STORAGE, SULFURIC ACID, ORSP 03735-ORSAT1 4
E-00000767 SILO 1, STORAGE, LIME 02810-LSS1 4
E-00000768 SILO 2, STORAGE, LIME 02811-LSS2 4
E-00000773 SCREW 1, TRANSFER, LIME 02830-LTC1 4
E-00000774 SCREW 2, TRANSFER, LIME 02831-LTC2 4
E-00000775 FEEDER 1, VOLUMETERIC, LIME 02820- LVF1 4
E-00001645 PIPING, FERRIC CHLORIDE 00588-PG 4
E-00001646 VALVES, FERRIC CHLORIDE 00588-VG 4
E-00001647 PIPING, ADDITION, POLYMER, PST 00550- PG 4
E-00001648 VALVES, ADDITION, POLYMER, PST 00550-VG 4
E-00001665 PIPING, SULFURIC ACID, ORSP 03735-PG 4
E-00001666 VALVES, SULFURIC ACID, ORSP 03735- VG 4
Table 7 - Cake Sludge Process Assets with Condition Ranking 3 (Degradation)
Cake Sludge Process e ra g e C o n d it io n
S c
E-00000791
PLC 1, PRESS 1, FILTER, BELT 02695-BFP1- PLC1
E-00000793
PLC 1, PRESS 2, FILTER, BELT 02696-BFP2- PLC1
E-00000795
PLC 1, PRESS 3, FILTER, BELT 02697-BFP3- PLC1
E-00000797
PLC 1, PRESS 4, FILTER, BELT 02698-BFP4- PLC1
E-00001480
CONVEYOR 1A, BELT PRESS (BFP) 02715- BFPC1A
E-00001481
CONVEYOR 1B, BELT PRESS (BFP) 02715- BFPC1B
E-00001482
CONVEYOR 2A, BELT PRESS (BFP) 02716- BFPC2A
E-00001486 CONVEYOR 1, TRUCK LOADING 02850-TLC1 4
E-00001489 CONVEYOR 2, TRUCK LOADING 02851-TLC2 4
E-00001695
PIPING, FEED, SLUDGE, BELT PRESS (BFP) 02635-PG
E-00001696
VALVES, FEED, SLUDGE, BELT PRESS (BFP) 02635-VG
Table 8 - Sedimentation Assets with Condition Ranking 3 (Degradation) and 4
Sedimentation Process
A v e ra g e C o n d it io n
S c
E-00000847
PLC I/O 1, REMOTE, ODOR REDUCTION, PST 00419-RPLC-
ORPST1
E-00000849
PLC 1, PST 00416-PLC-PSTE1
E-00000850
PLC 2, PST 00416-PLC-PSTE2
E-00000851
PLC, REMOTE, I/O 1, PST 00416-RPLC- PSTE1
E-00000852
PLC, REMOTE, I/O 2, PST 00416-RPLC- PSTE2
E-00000853
PLC, REMOTE, I/O 3, PST 00416-RPLC- PSTE3
E-00000854
PLC, REMOTE, I/O 4, PST 00416-RPLC- PSTE4
E-00000855
PLC I/O, REMOTE, PUMP, SKIMMINGS, PST 00418-RPLC-PSKPS
E-00001142
PANEL, DISTRIBUTION, DPC1, PST 00300- DPC1-PST
E-00001143
PANEL, DISTRIBUTION, DPL1, PST 00300- DPL1-PST
E-00001144
PANEL, DISTRIBUTION, DPP1, PST 00300- DPP1-PST
E-00001145
PANEL, DISTRIBUTION, DPP3, PST 00300- DPP3-PST
E-00001222
TRANSFORMER, TC1, PST 00300-TC1-PST
E-00001223
TRANSFORMER, TL1, PST 00300-TL1-PST
E-00001266
GRINDER 1, PRIMARY SLUDGE 00475-PSG1
E-00001622
VALVES, PST SKIMMINGS SUMP 00616- PSKSP-VG
E-00001689
PIPING, PRIMARY SLUDGE 00450-PG
E-00001690
VALVES, PRIMARY SLUDGE 00450-VG
E-00001692
VALVES, PRIMARY SKIMMINGS 00500-VG
E-00001694
VALVES, NPW 01340-VG
E-00001728
UPS, PANEL, CONTROL, LOCAL, FECL3- POLY, PST 00416-UPS
E-00001729
UPS, PANEL, CONTROL, PRIMARY SKIMMINGS, PST 00418-UPS
E-00002763
PLC, MISSION RTU
E-00002762
PLC, SECONDARY AND REMOTE I/O(13 SETS OF REMOTE IO)
E-00002761
PANEL, SECONDARY AERATION BLOWER LCP AND IO
E-00002760
PLC, SECONDARY AERATION BLOWER 2
E-00002759
PLC, SECONDARY AERATION BLOWER 3
E-00002758
PLC, SECONDARY AERATION BLOWER 1
Table 9 - Power Systems Process Assets with Condition Ranking 3 (Degradation)
Power System Process e ra g e C o n d it io n
S c
E-00001123
DISTRIBUTION, DPLC-20, CONTROL ROOM, GENERATOR 04220-
DPLC-20
E-00001180
SUBSTATION, TRANSFORMER, 12KV, HW 00240-SUBSTATION, A
& B
E-00001226
SUBSTATION, TRANSFORMER, 12KV, SP 02633-SUBSTATION, A
& B
E-00001230
TRANSFORMER, 12KV-460/277V AST-T- 5A
E-00001231
TRANSFORMER, 12KV-460/277V AST-T- 5B
E-00001232
TRANSFORMER, 12KV-460/277V SST-T- 6A
E-00001233
TRANSFORMER, 12KV-460/277V SST-T- 6B
Table 10 - Information Systems Process Assets with Condition Ranking 3 (Degradation) and 4 (Imminently Failing) Consequences
Information Systems Process
A v e ra g e C o n d it io n
S c
E-00000800
PLC 1, EDS 01540-PLC1-EDS
E-00000804
PLC, REMOTE, I/O 2, HW 00107-RPLC-HWE2
E-00000809
PLC I/O 1, REMOTE, ODOR REDUCTION, HW 00350-RPLC-ORHW1
E-00000811
PLC 1, HW 00107-PLC-HWE1
E-00000812
PLC 2, HW 00107-PLC-HWE2
E-00000815
PLC 1, LCP-LS1, LIME STABILIZATION 02800- LS1-PLC1
E-00000816
PLC 1, LCP-LS2, LIME STABILIZATION 02800- LS2-PLC1
E-00000818 PLC, REMOTE, I/O 3, MSB 03175-RPLC- NaOCL3
E-00000824
PLC, REMOTE, I/O 1, ORSP 03700-RPLC- ORSP1
E-00000825
PLC, REMOTE, I/O 2, ORSP 03700-RPLC- ORSP2
E-00000833
PLC, REMOTE, I/O 1, PEB 00620-RPLC-PEB1
E-00000839
PLC 1, CENTER, CONTROL, PLANT 03102- PLC-PCC1
E-00000840
PLC 2, CENTER, CONTROL, PLANT 03102- PLC-PCC2
E-00000841
PLC, REMOTE, I/O 1, CENTER, CONTROL, PLANT 03102-RPLC-
PCC1
E-00000842
PLC, REMOTE, I/O 2, CENTER, CONTROL, PLANT 03150-RPLC-
PCC2
E-00000856 PLC 1, SODIUM HYPOCHLORITE 01309-PLC- NaOCL1
E-00000857 PLC 2, SODIUM HYPOCHLORITE 01309-PLC- NaOCL2
E-00000858 PLC 1, REMOTE, SODIUM HYPOCHLORITE 01309-RPLC-NaOCL1
E-00000859 PLC 2, REMOTE, SODIUM HYPOCHLORITE 01309-RPLC-NaOCL2
E-00000864
PLC 1, SOLIDS PROCESSING 02204-PLC- SP1
E-00000865
PLC 2, SOLIDS PROCESSING 02204-PLC- SP2
E-00000866
PLC 1, MAKEUP, POLYMER, SOLIDS PROCESSING 02204-PLC-
POLYDYNE
E-00000867
PLC, REMOTE, I/O 1, SOLIDS PROCESSING 02204-RPLC-SP1
E-00000868
PLC, REMOTE, I/O 2, SOLIDS PROCESSING 02204-RPLC-SP2
E-00000874
PLC I/O 1, REMOTE, ODOR REDUCTION, USS 02250-RPLC-
ORUSS1
E-00001010
METER, FLOW, MAGNETIC, 48", PLANT EFFLUENT 01506-FLOW-
PE
E-00001090
PLC 1, JB-1 00100-PLC-JB1
Table 11 - Goat Canyon Pump Station Process Assets with Condition Ranking 3 (Degradation) and 4 (Imminently Failing) Consequence
Goat Canyon Pump Station Process v e ra g e C o n d it io n
S c
E-00000012
RACK, REMOTE I/O, PLC, GCPS 04100-
RPLC1-GCPS (includes Adaptors)
E-00000013
PLC 1, GCPS 04100-PLC1-GCPS 4
E-00000014
PLC 2, GCPS 04100-PLC2-GCPS 4
E-00000024
BLOWER, ODOR REDUCTION, GCPS 04113- BLOWER-ORGCPS
E-00000037
PUMP 1, SUBMERSIBLE, GCPS 04103-P1 4
E-00000038
VFD, PUMP 1, SUBMERSIBLE, GCPS 04103- ASD-P1
E-00000039
PUMP 2, SUBMERSIBLE, GCPS 04104-P2 4
E-00000040
VFD, PUMP 2, SUBMERSIBLE, GCPS 04104- ASD-P2
E-00000041
PUMP 3, SUBMERSIBLE, GCPS 04105-P3 4
E-00000042
VFD, PUMP 3, SUBMERSIBLE, GCPS 04105- ASD-P3
E-00000043
PUMP 4, SUBMERSIBLE, GCPS 04106-P4 4
E-00000044
VFD, PUMP 4, SUBMERSIBLE, GCPS 04106- ASD-P4
Table 12 - Hollister Pump Station Process Assets with Condition Ranking 3
Hollister Pump Station Process e ra g e C o n d it io n
S c
E-00000062
RACK, REMOTE I/O, PLC, HPS 04300-RPLC1-
HPS (includes Adaptors)
E-00000065 PLC 1, HPS 04300-PLC1-HPS 4
E-00000066 PLC 2, HPS 04300-PLC2-HPS 4
E-00000074
BLOWER, ODOR REDUCTION, HPS 04313- BLOWER-ORHPS
E-00000095
COMPRESSOR, AIR, ARRESTOR, SURGE, HPS 04310-AC1
E-00000097 TANK 1, SURGE, HPS 04308-SA1 4
E-00000098 TANK 2, SURGE, HPS 04309-SA2 4
E-00000099
VALVE, INLET, WET WELL, HPS 04301-MV- HPS
E-00001608 VALVES, HPS 04300-VG-HPS 4
Table 13 - Canyon Collectors System Assets with Condition Ranking 3
Gravity Mains System
A v e ra g e C o n d it io n
S c
E-00001894
Controller, Recycled Water Flowmeter, Influent Sampler Area, Teledyne-Isco, 60-4
Table 14 - Building & Grounds System Assets with Condition Ranking 3
Building & Grounds Process
A v e ra g e C o n d it io n
S c
E-00000538
STRUCTURE, ANTI-INTRUSION 01541-BLDG- AIS
E-00000601
DISK, RUPTURE, 42", STRUCTURE, ANTI- INTRUSION 01541-
RUPTURE_DISK
E-00000602
GATE, FLAP, 36", STRUCTURE, ANTI- INTRUSION 01541-FGATE-
AIS
E-00000603
PANEL, BUBBLER, STRUCTURE, ANTI- INTRUSION 01541-AIS-
BUBBLER
E-00000604
VALVE 1, AIR, COMB., STRUCTURE, ANTI- INTRUSION 01541-SAV-
AIS-1
E-00000605
VALVE 2, AIR, COMB., STRUCTURE, ANTI- INTRUSION 01541-SAV-
AIS-2
E-00000620
VALVE 1, AIR, COMB., DROP SHAFT, SBOO 01541-SAV-DS-1
E-00000621
VALVE 2, AIR, COMB., DROP SHAFT, SBOO 01541-SAV-DS-2
E-00002764
CATHODIC PROTECTION
Section 3- Risk Evaluation
This philosophy of risk management is at the core of asset management. Risks are primarily related to the consequences (criticality) associated with the failure occurring on any process equipment (that may, for instance, adversely impact health & safety, the environment or any financial results), and to the likelihood of failure occurrence (condition). Veolia has developed an overall Risk Score by multiplying the asset criticality score by the asset condition score.
When criticality and condition are expressed as numbers, it is common to express the risk index as the product of both figures.
Figure 1 - The Risk Matrix as defined by the Asset Criticality Score multiplied by Asset Condition Score
Condition
4 3 2 1 4 16 12 8 4
Criticality 3 12 9 6 3 2 8 6 4 2 1 4 3 2 1
Asset Risk Evaluation Results
For the purposes of the risk assessment report, poorer condition assets in higher criticality systems will be identified and reviewed. This evaluation included assets with a Criticality score that ranks a level 3 as having major potential failure effects and a level 4 as having unacceptable failure effects and assets with a Condition score that ranks a level 3 as having indications of wear, degradation, or decrease in performance and and a level 4 as having failed or is imminently failing.
Table 15 - Preliminary Process Assets with a High Risk Ranking Score
ASSET ID
Preliminary Process
ASSET RISK SCORE 9-16
CRITICALITY
SCORE
CONDITION
RISK SCORE
E-00001091
PANEL, CONTROL, LOCAL, JB-1 00100-
LCP-JB1
E-00001095
GATE, SLUICE, 96", JB-1 00100-GATE-JB1-
4 4 16
E-00001097
STRUCTURE, JB-1 00050-JB1-BUILDING
E-00001098
WELL, WET, JB-1 00100-WELL-JB1
E-00001686 VALVES, PUMP, INFLUENT 00200-VG 4 4 16
E-00000803
PLC, REMOTE, I/O 1, HW 00107-RPLC-
HWE1
E-00001015
BLOWER 1, AIR, GRIT 00301-GB1
E-00001020
CLASSIFIER/SEPARATOR 1, GRIT 00341-
GC1
E-00001021
CLASSIFIER/SEPARATOR 2, GRIT 00342-
GC2
E-00001031
PUMP 1, DISCFLO, GRIT, PRIMARY 00311-
DISCFLO-GP1
E-00001034
PUMP 4, DISCFLO, GRIT, PRIMARY 00314-
DISCFLO-GP4B
3 4 12
E-00001035
PUMP 5, DISCFLO, GRIT, PRIMARY 00315-
DISCFLO-GP5B
3 4 12
E-00001096 SAMPLER, PORTABLE 00101-HJBX1 4 3 12
E-00001681 PIPING, GRIT REMOVAL 00300-PG 3 4 12
E-00001682 VALVES, GRIT REMOVAL 00300-VG 3 4 12
E-00001683 PIPING, GRIT BLOWER 00300-GB-PG 3 4 12
E-00001684 VALVES, GRIT BLOWER 00300-GB-VG 3 4 12
E-00001716
CONVEYOR 2, SCREENING, HW 00170-
CNV2
3 4 12
E-00002654 STRUCTURE, JB-2 00050-JB2-BUILDING 3 4 12
E-00001017 BLOWER 2, AIR, GRIT 00302-GB2 3 3 9
HIGH RISK: 1091 - PANEL, CONTROL, LOCAL, JB-1 00100-LCP-JB1
a. Impact: Ability to Remotely Supervise, Control, and Data collection would be compromised.
b. Likelihood: Failed
c. Overall Risk Score: 16
d. Current Action: Operational inspection
e. Mitigation: Operational inspection
f. Resources Needed: Capital Project under development
g. External Partners: None
h. Risk Response: Immediate
i. Reporting Requirements: Potential reporting to the Federal Government.
j. Monitoring Update: N/A
HIGH RISK: 1095 - GATE, SLUICE, 96", JB-1 00100-GATE-JB1-96
a. Impact: 96” Valve is fixed in place after raising to 56” open, preventing flow control and isolation to the plant. The result of this failure is NPDES permit compliance issues.
b. Likelihood: Failed
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 1097 - STRUCTURE, JB-1 00050-JB1-BUILDING
a. Impact: Minor, as it’s unlikely that the structure would fail. Any failure would be structural and the impact could be severe. A detailed inspection of the structure will be conducted as part of the Capital Project to replace the isolation valves.
b. Likelihood: Unlikely
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds inspection.
f. Resources Needed: 1Operator
g. External Partners: None, unless a failure occurred with the structure. Then a contractor would be needed.
h. Risk Response: As soon as possible
HIGH RISK: 1098 - WELL, WET, JB-1 00100-WELL-JB1
a. Impact: Minor, as it’s unlikely that the structure would fail. Any failure would be structural and the impact could be severe. A detailed inspection of the structure will be conducted as part of the Capital Project to replace the isolation valves.
b. Likelihood: Unlikely
c. Overall Risk Score: 16
d. Current Action: 96” gate raised to reduce head pressure and surcharging.
e. Mitigation: Rehabilitation as necessary during construction.
f. Resources Needed: Construction funding and final design
g. External Partners: Filanc Construction and Veolia
h. Risk Response: As soon as possible
HIGH RISK: 1686 - VALVES, PUMP, INFLUENT 00200-VG
a. Impact: Not allow influent pump to be changed out.
b. Likelihood: possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds inspection.
f. Resources Needed: Capital project needed. Requires bypass.
g. External Partners: None
h. Risk Response: Immediate
i. Reporting Requirements: Potential reporting to federal Government.
HIGH RISK: 803 - PLC, REMOTE, I/O 1, HW 00107-RPLC-HWE1
a. Impact: Critical. The Remote I/O failing would prevent any automation from occurring and Headworks would have to be operated, for each piece of equipment, manually and locally by operations staff until the issue is resolved.
b. Likelihood: Probable
c. Overall Risk Score: 16
d. Current Action: Preventative Maintenance tasks are scheduled periodically.
e. Mitigation: Scheduled PM’s in the CMMS.
f. Resources Needed: Primarily 1 SCADA System Analyst, and possibly: 1 Instrumentation Tech, and 1
Electrician as well as spare on hand parts.
g. External Partners: None
h. Risk Response: As soon as possible
i. Reporting Requirements: Potential Reporting to the Federal Government.
HIGH RISK: 1015 - BLOWER 1, AIR, GRIT 00301-GB1
a. Impact: Secondary blower would leave us with one blower. If no blowers online, grit would plug pumps constantly. Could potentially fail PST’s and jeopardize compliance.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development
g. External Partners: PCL
h. Risk Response: Near future
HIGH RISK: 1020 - CLASSIFIER/SEPARATOR 1, GRIT 00341-GC1
a. Impact: There are 3 redundant units with2 required to be in service at all times. The result of this unit failing is the loss of a standby unit in the event of another failure.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project underdevelopment.
g. External Partners: PCL
h. Risk Response: Near future
HIGH RISK: 1021 - CLASSIFIER/SEPARATOR 2, GRIT 00342-GC2
a. Impact: There are 3 redundant units with2 required to always be in service. The result of this unit failing is the loss of a standby unit in the event of another failure.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project underdevelopment.
g. External Partners: PCL
h. Risk Response: Near future
HIGH RISK: 1031 - PUMP 1, DISCFLO, GRIT, PRIMARY 00311-DISCFLO-GP1
a. Impact: Hopper will become plugged. Possibly affecting surrounding Hoppers. Also causing more wear and tear on the 2 other pumps.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development.
g. External Partners: PCL
h. Risk Response: Immediate
i. Reporting Requirements: Potential reporting to Federal Government.
HIGH RISK: 1034 - PUMP 4, DISCFLO, GRIT, PRIMARY 00314-DISCFLO-GP4B
wear and tear on the 2 other pumps.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development.
g. External Partners: PCL
h. Risk Response: Immediate
HIGH RISK: 1035 - PUMP 5, DISCFLO, GRIT, PRIMARY 00315-DISCFLO-GP5B
wear and tear on the 2 other pumps.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development.
g. External Partners: PCL
h. Risk Response: Immediate
HIGH RISK: 1096 - SAMPLER, PORTABLE 00101-HJBX1
a. Impact: Sampler failure would not have a spare.
b. Likelihood: Failed
c. Overall Risk Score: 12
d. Current Action: New Portable Sampler on order.
e. Mitigation: Maintaining samplers on site
f. Resources Needed: Purchasing
g. External Partners: None.
h. Risk Response: Immediate
HIGH RISK: 1681 - PIPING, GRIT REMOVAL, 00300-PG
a. Impact: Failure of this piping would disable the grit removal system sending grit to downstream processes and problems with those systems. The result of this failure is potential NPDES permit compliance issues.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM. Temporary piping installed.
f. Resources Needed: Capital Project under development
g. External Partners: PCL
h. Risk Response: Immediate
HIGH RISK: 1682 - VALVES, GRIT REMOVAL 00300-VG
a. Impact: Failure of this piping would disable the grit removal system sending grit to downstream processes and problems with those systems. The result of this failure is potential NPDES permit compliance issues.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development
g. External Partners: PCL
h. Risk Response: Immediate
HIGH RISK: 1683 - PIPING, GRIT BLOWER 00300-GB-PG
a. Impact: If no blowers online, grit would plug pumps constantly. Could potentially fail PST’s and jeopardize compliance.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development
g. External Partners: PCL
h. Risk Response: Near future
HIGH RISK: 1684 - VALVES, GRIT BLOWER 00300-GB-VG
a. Impact: If no blowers online, grit would plug pumps constantly. Could potentially fail PST’s and jeopardize compliance.
b. Likelihood:
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: : Capital Project under development
g. External Partners: PCL
h. Risk Response: Near future
HIGH RISK: 1716 - CONVEYOR 2, SCREENING, HW 00170-CNV2
a. Impact: Halt Barscreen 2 operations
b. Likelihood: Possible.
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed:
g. External Partners: None.
h. Risk Response: Near future
HIGH RISK: 2654 - STRUCTURE, JB-2 00050-JB2-BUILDING
a. Impact: Effect influent entering Facility.
b. Likelihood: Possible
c. Overall Risk Score: 12
d. Current Action: Visual Inspection
e. Mitigation: Visual Inspection
f. Resources Needed: Rehab
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 1017 - BLOWER 2, AIR, GRIT 00302-GB2
a. Impact: Secondary blower would leave us with one blower. If no blowers online, grit would plug pumps constantly. Could potential fail PST’s and jeopardize compliance.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS
e. Mitigation: PM’s (shown above).Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Capital Project under development
g. External Partners: PCL
h. Risk Response: Near future
Table 16 - Biological Process Assets with a High Risk Ranking Score
Biological Treatment Process
RISK
E-00000119 BLOWER 3, AIR, PROCESS PAB3 4 4 16
E-00001305
VFD, PUMP 1, NPW2P NPW2P-1-VFD
E-00001307
VFD, PUMP 2, NPW2P NPW2P-2-VFD
E-00001311
PUMP 4, JOCKEY, NPW2P NPW2P-4
E-00001333
PIPING, NPW2P NPW2PPG
E-00001334
VALVES, NPW2P NPW2PVG
E-00000137
PUMP 1, MIXED LIQUOR, INTERMEDIATE
IMLRP1
E-00000138
PUMP 2, MIXED LIQUOR, INTERMEDIATE
IMLRP2
E-00000139
PUMP 3, MIXED LIQUOR, INTERMEDIATE
IMLRP3
E-00000140
PUMP 4, MIXED LIQUOR, INTERMEDIATE
IMLRP4
E-00000141
PUMP 5, MIXED LIQUOR, INTERMEDIATE
IMLRP5
E-00000142
PUMP 6, MIXED LIQUOR, INTERMEDIATE
IMLRP6
E-00000143
PUMP 7, MIXED LIQUOR, INTERMEDIATE
IMLRP7
E-00000196
DIFFUSERS, TANK 1, ACTIVATED
SLUDGE AST1-DG
E-00000198
DIFFUSERS, TANK 2, ACTIVATED
SLUDGE AST2-DG
E-00000200
DIFFUSERS, TANK 3, ACTIVATED
SLUDGE AST3-DG
3 4 12
E-00000202
DIFFUSERS, TANK 4, ACTIVATED
SLUDGE AST4-DG
3 4 12
E-00000204
DIFFUSERS, TANK 5, ACTIVATED
SLUDGE AST5-DG
3 4 12
E-00000206
DIFFUSERS, TANK 6, ACTIVATED
SLUDGE AST6-DG
3 4 12
E-00000208
DIFFUSERS, TANK 7, ACTIVATED
SLUDGE AST7-DG
3 4 12
E-00001310
VFD, PUMP 4, NPW2P NPW2P-4-VFD
4 3 12
E-00001313
VFD, PUMP 5, NPW2P NPW2P-5-VFD
4 3 12
E-00001639
VALVES, MANUAL VALVES, BLOWER, AIR,
PROCESS PAB-VG
HIGH RISK: 119 - BLOWER 3, AIR, PROCESS PAB3
a. Impact: Could not supply enough air to microorganisms and could lose compliance.
b. Likelihood: Failed
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PM’s in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Electrical study (Capital Project).
g. External Partners: None
h. Risk Response: Near future.
HIGH RISK: 1305 - VFD, PUMP 1, NPW2P NPW2P-1-VFD
a. Impact: Force to use primary NPW to feed plant equipment for seal/make-up water.
b. Likelihood: Possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: VFD has been purchased. Contractor to install.
g. External Partners: CVE
h. Risk Response: Immediate
HIGH RISK: 1307 - VFD, PUMP 2, NPW2P NPW2P-2-VFD
b. Likelihood: Possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: VFD has been purchased. Contractor to install.
g. External Partners: CVE
h. Risk Response: Immediate
HIGH RISK: 1311 - PUMP 4, JOCKEY, NPW2P NPW2P-4
b. Likelihood: Possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: VFD has been purchased. Contractor to install.
g. External Partners: CVE
h. Risk Response: Immediate
HIGH RISK: 1333 - PIPING, NPW2P NPW2PPG
a. Impact: Force to use primary NPW to feed plant equipment for seal/make-up water. May need to valve off certain equipment
b. Likelihood: Possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 2 operators and 3 maintenance staff. Piping.
g. External Partners: None.
h. Risk Response: Immediate
HIGH RISK: 1334 - VALVES, NPW2P NPW2PVG
b. Likelihood: Possible
c. Overall Risk Score: 16
d. Current Action: Operational inspection in daily rounds. Also, there are Quarterly, Semi-annual and
Annual PMs in the CMMS.
e. Mitigation: PM’s (shown above). Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: VFD has been purchased. Contractor to install.
g. External Partners: CVE
h. Risk Response: Immediate
HIGH RISK: 137 - PUMP 1, MIXED LIQUOR, INTERMEDIATE IMLRP1
a. Impact: Pump is required to be always run. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PMs in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite.
g. External Partners: None
h. Risk Response: Immediate
i. Reporting Requirements: Potential to the Client
HIGH RISK: 138 - PUMP 2, MIXED LIQUOR, INTERMEDIATE IMLRP2
a. Impact: Pump is required to be always run. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PMs in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite.
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 139 - PUMP 3, MIXED LIQUOR, INTERMEDIATE IMLRP3
a. Impact: Pumps is required to be always run. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PMs in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 140 - PUMP 4, MIXED LIQUOR, INTERMEDIATE IMLRP4
a. Impact: Pumps is required to be run at all times. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 141 - PUMP 5, MIXED LIQUOR, INTERMEDIATE IMLRP5
a. Impact: Pump is required to be run at all times. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite.
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 142 - PUMP 6, MIXED LIQUOR, INTERMEDIATE IMLRP6
a. Impact: Pump is required to be run at all times. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the
CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 143 - PUMP 7, MIXED LIQUOR, INTERMEDIATE IMLRP7
a. Impact: Pumps is required to be run at all times. Potential major impact due to probability of failure.
Process strategy is available with limited ability to mitigate the impact.
b. Likelihood: Probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the CMMS.
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: 1 Operator and 1 Electronic Technician. Pump onsite.
g. External Partners: None
h. Risk Response: Immediate
HIGH RISK: 196 - DIFFUSERS, TANK 1, ACTIVATED SLUDGE AST1-DG
a. Impact: Reduced efficiency of air distribution. Potential process effects
b. Likelihood: probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the CMMS
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Diffusers, 3 mechanics and 1 operator.
g. External Partners: None
h. Risk Response: Near future
HIGH RISK: 198 - DIFFUSERS, TANK 2, ACTIVATED SLUDGE AST2-DG
b. Likelihood: probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PM’s in the CMMS
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Diffusers, 3 mechanics and 1 operator.
g. External Partners: None
h. Risk Response: Near future
HIGH RISK: 200 - DIFFUSERS, TANK 3, ACTIVATED SLUDGE AST3-DG
b. Likelihood: probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PMs in the CMMS
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Diffusers, 3 mechanics and 1 operator.
g. External Partners: None
h. Risk Response: Near future
HIGH RISK: 202 - DIFFUSERS, TANK 4, ACTIVATED SLUDGE AST4-DG
b. Likelihood: probable
c. Overall Risk Score: 12
d. Current Action: Operational inspection in daily rounds. Also, there are two distinct Annual PMs in the CMMS
e. Mitigation: Creation of corrective action work orders if defects are found during operational rounds or PM.
f. Resources Needed: Diffusers, 3…