This document is an Amendment of Solicitation (Standard Form 30) for Solicitation Number 191BWC26R0001 issued by the International Boundary and Water Commission (IBWC) in El Paso, Texas. Amendment 0008, dated 12/19/2025, provides clarification on proposal requirements, specifically detailing the contents of the Qualifications Proposal (Phase 1 submission). The Qualifications Proposal must include project team qualifications, corporate experience, technical competence, capacity to accomplish requirements, past performance, project locality knowledge, and a high-level schedule.

Key details include instructions that the Qualifications Proposal should follow Section L formatting guidelines, exclude pricing information, and be evaluated on seven core elements with equal importance. The amendment also clarifies that a Phase-In Plan addendum should be included as an appendix to the Technical Volume, addressing transition timeline, staffing, coordination, risk mitigation, and system handoff. Additionally, the document introduces guidance on "Client authorization letters" - documents from past or current clients granting permission to disclose project-specific information for proposal evaluation purposes.

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
191BWC26R0001 0004.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
191BWC26R0001 0003.pdf PDF
Site Visit SB Exp-ENG 11.7.2025_rev.pptx PPTX presentation
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
191BWC26R0001 002.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Attch. 13 SBIWTP O&M Manual.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 03 RPM- Table 2026.xlsx XLSX spreadsheet
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 191BWC26R0001 PROCESSED Page 1 of 4

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

12/19/2025

4. REQUISITION/PURCHASE REQ. NUMBER

FY26R3321007A

5. PROJECT NUMBER (If applicable)

IBWC_CODE

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

US

Seone M Jones

NAME

TEL.

jonessm4@state.gov

EMAIL

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

191BWC26R0001

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

10/21/2025

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0008 See below

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Philip Johnson

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

01/13/2026

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

CGFS // CGFS

X

Document Number: 191BWC26R0001 PROCESSED Page 2 of 4

Table of Contents

Section Description Page Number

A Solicitation/Contract Form A.1 Description of Amendment/Modification

Document Number: 191BWC26R0001 PROCESSED Page 3 of 4

Section A - Solicitation/Contract Form

A.1 - Description of Amendment/Modification

Question:

Amendment 0007 states that “the Qualifications Proposal is a required submission as introduced in the RFI responses,” but it does not, by itself (nor in Section L), define the specific contents of that Qualifications Proposal. In addition, 52.209-1 doesn't seem to specify required inclusion of the Qualifications Proposal. Can you please specify the required sections, formatting, and evaluation criteria for the Qualifications Proposal? Also, when did or does "Phase 1" begin?

Answer:

*Contents.* The “Qualifications Proposal” is the Phase 1 submission. It shall, at a minimum, include:

1) Project team and professional qualifications (key personnel, certifications; submit résumés) for the size of this plant and per state of California requirements

2) Corporate relevant experience and technical competence on comparable work;

3) Capacity to accomplish requirements within the required schedule;

4) Past performance (cost control, quality, schedule compliance) with Government/private clients;

5) Location and knowledge of the project locality;

6) Technical understanding of the scope; and

7) Proposed high-level schedule for completing major tasks (not pricing).

- *Formatting.* Follow Section L proposal format (headings/numbering, page numbering, PDF quality), and do **not** include cost or price information in Phase 1. If Section L does not specify Phase#1 page limits, apply the Technical Volume conventions (cover page, table of contents, divider pages, resumes excluded from page count, and use of 11×17 only for schedules) to maintain consistency.

- *Evaluation.* Phase 1 is evaluated on the qualifications elements listed above; subfactors are of equal importance unless otherwise stated in Section M. No price/cost is evaluated in Phase 1.

- *Phase 1 start.* Phase 1 begins upon issuance of the solicitation (Phase 1 invitation) and runs through the Phase 1 due date specified in the solicitation posting. We will restate the applicable dates within the amendment/Q&A for clarity. – Phase in plan (or transition period) begins upon contract award.

Question:

Amendment 0006 states that "The Technical Volume shall contain an addendum consisting of the proposed Phase-In Plan to provide for..." Is the aforementioned addendum in addition to Factor 6: Phase-In Plan? If so, should it be included in the appendix?

Answer:

- The Technical Volume addendum for the **Phase#In Plan** is **supplemental to Factor 6** and does **not** replace Factor 6 content.

- Include the Phase#In addendum **as an appendix to Volume II (Technical)** and **cross#reference Factor 6** in the main body.

The addendum should address: transition timeline, continuity of operations, staffing and onboarding, coordination with incumbent (phase#out/phase#in touchpoints), risk mitigation, and data/system handoff, consistent with the PWS Transition/Phase#In requirements.

Question:

Are attachments outside of the required appendix items in Section M allowed?

Answer:

- Only appendices/attachments **explicitly required or allowed** by Section L/M and the amendments will be accepted and evaluated.

Unrequested supplemental attachments may be removed from consideration and will not be evaluated. Offerors should integrate essential information within the required volumes/appendices and adhere to page limits and format requirements.

Question:

Please describe and define any requirements associated with ‘Client authorization letters’ as referenced in Amendment 0007. This is the first mention of ‘Client authorization letters’ in any document released in relation to this solicitation.

Document Number: 191BWC26R0001 PROCESSED Page 4 of 4

Answer:

Client authorization letters are documents provided by an offeror’s past or current client granting permission for the offeror to disclose project-specific information in its proposal for Solicitation No. 191BWC26R0001. These letters confirm that the client authorizes the use of project details, performance information, and contact data for evaluation purposes. They are only required when an offeror includes past performance or project references that require client consent for disclosure, are not evaluated as a separate factor, and do not count toward page limits. Each letter should be legible, submitted in PDF format, and signed by an authorized representative of the client.

File details come from the government source that posted it. Updated .