Attch. 25 Tijuana wastewater flow diagram Oct 2025.pdf

PDF 292 KB Posted

Attached to
Operation & Maintenance of the South Bay Wastewater Treatment Plant Federal contract opportunity
Solicitation number
FY26OMSBIWTP
Issued by
International Boundary and Water Commission U.S.-Mexico

About this file

This diagram depicts the estimated wastewater flows for the City of Tijuana, Baja California, showing the complex collection and treatment system as of October 2025. The diagram illustrates multiple wastewater treatment plants, pumping stations, and collectors, with flow rates measured in liters per second (LPS) and million gallons per day (MGD), including the South Bay International WWTP, San Antonio de los Buenos WWTP, and various collectors and pumping plants along the Tijuana River and near the international border between the USA and Mexico.

Key flow details include the South Bay International WWTP processing 1500 LPS (35 MGD), the Border Junction Box handling 1500 LPS, and multiple smaller collectors and pumping stations contributing flows ranging from 7 to 400 LPS. The system ultimately discharges 2055 LPS (47 MGD) to the Pacific Ocean, with river flows estimated between 1500-1900 LPS. The diagram provides a comprehensive overview of the wastewater infrastructure, showing interconnections between different treatment facilities, collectors, and discharge points across the Tijuana urban area.

View the file

Other files for this federal contract opportunity

Other files attached to Operation & Maintenance of the South Bay Wastewater Treatment Plant, newest first.
File Type Posted
191BWC26R0001 0008.pdf PDF
191BWC26R0001 0007.pdf PDF
191BWC26R0001 0006.pdf PDF
191BWC26R0001 0005.pdf PDF
191BWC26R0001 0004.pdf PDF
FY26 SBIWTP OM PWS_Amended 16 Dec 2025 (2).pdf PDF
Request For Information_ Final for Solicitation Posting (1).xlsx XLSX spreadsheet
FY26 SBIWTP OM PWS_Amended 16 Dec 2025.pdf PDF
Attch. 27 SBIWTP OM Contract PWS 2020.pdf PDF
Attch. 23 IBWC SBIWTP - Capital Improvement Plan (2025 - 2029).pdf PDF
Attch. 22A 2019 Contractor OrgChart.pdf PDF
191BWC26R0001 0003.pdf PDF
Site Visit SB Exp-ENG 11.7.2025_rev.pptx PPTX presentation
Attch. 29 CUI_SBIWTP PDB Early Work Package 1C Replace in Kind.pdf PDF
Attch. 28 SBIWTP PDB Expansion SOW Section 01.31.83.01.pdf PDF
Attch. 26 Emergency Response Plan.pdf PDF
Attch. 24 2025 IBWC Risk Assessment Final.pdf PDF
Attch. 21 IBWC Spill and Transboundary Plan 2021.pdf PDF
Attch. 20 Wage Determinations CA202100001CA20240001 07.26.2024.pdf PDF
Request For Information_ Final for Solicitation Posting.xlsx XLSX spreadsheet
Attch. 22 USIBWC SDFO Org Chart.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 10 Updated September October 2025 Chemical Dosage.pdf PDF
Attch. 04A CDO-R9-2025-0139.pdf PDF
191BWC26R0001 002.pdf PDF
FY26 SBIWTP OM PWS_Final.pdf PDF
191BWC26R0001 0001.pdf PDF
191BWC26R0001 OM Services SBIWTP.pdf PDF
Attch. 17 SBIWTP Map.pdf PDF
Attch. 15 NIST.SP.800-171r3.pdf PDF
Attch. 07 Condition Assessment Report Jan 2024.pdf PDF
Attch. 05 List-of-Permits.docx DOCX document
Attch. 02 FY26 SBIWTP O&M QASP.doc DOC document
Attch. 13 SBIWTP O&M Manual.pdf PDF
Attch. 04 NPDES Permit Order R9-2023-0009.pdf PDF
Attch. 14 SBIWTP SSP 042020.pdf PDF
Attch. 01 SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx XLSX spreadsheet
Attch. 03 RPM- Table 2026.xlsx XLSX spreadsheet
Attch. 19 SOO_V2_06192018.pdf PDF
Attch. 20 Wage Determinations CA20240001 07.26.2024.pdf PDF
Attch. 10 Monthly Chemical Dosage March 2024 to March 2025.pdf PDF
Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx XLSX spreadsheet
Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx XLSX spreadsheet
Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx XLSX spreadsheet
Attch. 12 2024 NPDES ANNUAL BIOSOLIDS.pdf PDF
Attch. 16 Plans Drawings.docx DOCX document
Attch. 18 NIST.FIPS.199.pdf PDF
Attch. 09 SBIWTP Capital Project List as of April 2025.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Bay International

WWTP

Alamar River

PBCILA

1A

PB1

3000 LPS

1B

900 LPS

1500 LPS

X

Tijuana River

X

Border

JB

1500 LPS

1500 LPS

35 MGD

New International Collector

Oriente Collector

275 LPS

325 LPS

C.S. Taboada

C. Central

C. Castillo C.V. Carranza

400 LPS

1100 LPS

PB

Playas

Smuggler's PS 228 LPS C. Mirador 13 LPS C. Laureles 14 LPS Aport. Lazaro C. 7 LPS Twin Lines 70 LPS Total- 332 LPS

SAB

Pretreatment

800 LPS

18 MGD

San Antonio de los Buenos

WWTP

1947 LPS 800 LPS

Torre la Cuspide

1832 LPS

Laureles

II

28LPS

87 LPS

Arroyo Tecolote-La Gloria

108 LPS

Discharge to Pacific Ocean

2055 LPS

47 MGD

River flow 1500-1900

LPS

5 MGD

220 LPS

City of Tijuana, Baja California

Estimated wastewater flows from collection system and from Tijuana River

LPS- liters per second MGD- million gallons per day PB- pumping plant JB- junction box

October 2025

1500 LPS

South Bay Ocean Outfall

800 LPS

92ca8413-7d56-4920-ae30-53e0b1be9f54.vsdx
Page-1

File details come from the government source that posted it. Updated .