This is a geotechnical information sheet for the Flagler County Beach Nourishment Project - Reach II, prepared by Flagler County, Florida for competitive sealed bidding (ITB #25-ITB-078). The document serves as Sheet 26 of 33 in the bid set and presents borrow area geotechnical data critical for sand sourcing and placement operations. The sheet displays vibracore data from 2011, 2019, and 2023 surveys, seabed elevation information, dredge zone boundaries, and design excavation depths of -64.5 feet (NAVD88), with survey data current as of March 2025. Bidders are required to submit questions by April 3, 2026 at 2:00 p.m., attend the optional pre-bid meeting on March 27, 2026 at 10:00 a.m., and submit sealed bids through the OpenGov Procurement portal by April 16, 2026 at 2:00 p.m. The successful contractor must complete the project within 240 calendar days of Notice to Proceed, with a total contract performance period of 365 calendar days for final completion and acceptance. The project involves placing approximately 1.8 million cubic yards of offshore beach-compatible sand across 5.5 miles of critically eroded coastline in Painter's Hill, Beverly Beach, and northern Flagler Beach.

The project is funded through the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2) with $44,544,369.25 allocated in total state cost sharing and no local match requirement. The contract is eligible for Federal Emergency Management Agency hurricane recovery funding, subjecting all work to federal compliance requirements including the Contract Work Hours and Safety Standards Act, Clean Air Act, and Federal Water Pollution Control Act standards. The successful contractor must furnish performance and payment bonds equal to 100 percent of the contract amount and maintain comprehensive insurance coverage including worker's compensation, commercial general liability, automobile liability, and builder's risk insurance, with a one-year warranty bond required following project acceptance. Liquidated damages will be assessed at rates ranging from $904 to $10,224 per calendar day depending on contract value, with payment issued under Florida's Local Government Prompt Payment Act with five percent retainage held until satisfactory completion. No set-aside designations, disadvantaged enterprise restrictions, or incumbent contractor information are identified in the procurement documents, and the award will be made to the lowest responsible bidder meeting all contract requirements.

View the file

Other files

File Type Posted
Flagler_County_Beach_Nourishment_Project_-_Reach_II_FPN_429573-1-38-01_(Addendum_#7_Revision).pdf PDF
Example_Photography_of_Concrete_Debris.pdf PDF
Contract_Form.pdf PDF
Contract_Form.pdf PDF
Federal_Requirements.pdf PDF
Federal_Requirements.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
2025-03_BeachProfiles_NAVD88.CSV CSV file
2025-03_BeachProfiles_NAVD88.CSV CSV file
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
2019-05_BorrowArea_NAVD88.txt TXT text file
2019-05_BorrowArea_NAVD88.txt TXT text file
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
README.txt TXT text file
README.txt TXT text file
Project_Contract_Forms.pdf PDF
Project_Contract_Forms.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
Flagler_Reach_2_Tech_Specs_Formatted.pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18-33

18-34

18-35

18-36

18-37

18-38

18-39

18-40

18-41

18-42

18-43

18-44

18-45

18-46

18-47

18-48

11-5

23-01 23-06 23-07

23-12

23-13

23-14

23-15

23-16

23-17

23-18

23-19

23-20

23-21

23-22

A

B C

D

E F

G

H

GRAPHIC SCALE

0 700 FT350

VIBRACORE

(TYP)

VIBRACORE

SEABED ELEV.

(TYP)

DREDGE ZONE

BOUNDARY (TYP) PROJECT NO:

CHECKED

DESIGNED

DRAWN

SURVEYED

BY DATE

DATE OF PREPARATION

N O

BY

D

AT

E D

ES

C

R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET NUMBER

SHEET TITLE:

ISSUANCE:

1 2 3 4 5

PE STAMP (COA 32549)

BID SET

BORROW AREA

GEOTECHNICAL

INFORMATION

ML 3/4/2026

SG/ZB 3/4/2026

FL

A

G

LE

R C

O U

N

TY

, F L

VIBRACORE

FOR BID

PURPOSES

ONLY

A

A'

B

EA

C H

A N

D D

U N

E R

ES

TO

R A

TI

O

N P

R O

JE

C

T R

EA

C

H

NOTES:

1) HOR. - NAD83 SPC FL EAST, VERT. - NAVD88, FEET.

2) SURVEY DATE: MARCH 2025.

PROJECT BORROW AREA

DESIGN EXCAVATION DEPTH

-64.5 FT (NAVD88), TYP.

25-ITB-078

ZONE 1