TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx
DOCX document 52 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
20 September 2019
1.1 Scope
The former Eaker Air Force Base (AFB) is located in Blytheville, Arkansas. Eaker AFB was closed on 15 December 1992. Whole-base transfer completed in September 2002. The Gosnell Regional Airport Authority now operates the airfield as the Arkansas International Airport.
At the former Eaker AFB, the 17 sites are being addressed following the RCRA process or Military Munitions Response Program (MMRP). Eaker AFB and the United States Environmental Protection Agency (USEPA) signed an administrative consent order indicating sites were subject to RCRA corrective action and would be addressed under a RCRA facility investigation. DDs have been completed for all RCRA sites and remedies are in place. At the former Eaker AFB, one RCRA site requires groundwater monitoring (Site SS003). Three other RCRA sites are anticipated to achieve closure in FY19 (Sites FT001, ST012, and ST005). If closure is not achieved, these sites will be included in this PBR contract. All 17 Sites require Visual Site Inspections (VSIs) and Five-Year Reviews.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional requirements.
Contractors are not responsible for the following:
· No additional base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Final Remedial Action Decision Document (RADD) for Corrective Action |
| AR#331 |
| October 1999 |
| 2. |
| Consent Administrative Order and Agreement, Eaker AFB, Blytheville, Arkansas |
| AR#Pending |
| August 1993 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565-0007 |
| Performance-Based Remediation at Former Bergstrom AFB, TX, Former Carswell AFB, TX, Former Eaker AFB, AR, Former Homestead AFB, FL, Former Richards-Gebaur AFB, MO |
| 9/24/2020 |
| 9/24/2020 |
| W9128F-14-D-0036 |
| Air Force Military Munitions Response Program Site Inspections, Former Bergstrom AFB, TX, and Former Eaker AFB, AR |
| 9/30/2020 |
| 9/30/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· The Contractor participate in Quarterly Teleconferences with the United States Air Force (USAF) representatives to discuss the progress toward accomplishing project objectives.
2.6.2 Public Meetings and Hearings
· There are no base-specific meetings or hearing requirements.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· There are no base-specific permit/easement requirements.
2.9 Contractor Documentation
· No base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct annual Visual Site Inspections at all sites and prepare a report. The next VSI event is due in 2020.
6.15 Five-Year Reviews
· The Contractor shall prepare a Five-Year Review Report for sites managed under the RCRA/MMRP MMRP as a policy review. The signature date for the Fourth Five-Year Review Report is due March 2021.