Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx

DOCX document 55 KB Posted

Attached to
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

20 September 2019

1.1 Scope

The former March AFB is located in the City of Riverside, Riverside County, California. March AFB was placed on the National Priority List (NPL) in November 1989. A Federal Facility Agreement (FFA) was signed in September 1990 by the United States Air Force (USAF); the Department of Toxic Substances Control (DTSC); United States Environmental Protection Agency (USEPA) Region 9 (USEPA); and the Regional Water Quality Control Board (RWQCB), Santa Ana Region. The Air Force Reserve Command (AFRC) and the Air Force Real Property Agency (AFRPA) signed a Memorandum of Agreement in FY99 for sharing environmental restoration responsibility. Whole-base property transfer was completed in 2007.

The Installation Restoration Program (IRP) at former March AFB and MARB are executed collaboratively by the AFCEC/CIB under the BRAC Program and AFCEC/CZRW, under the Air Force Reserve Command (AFRC), respectively. Site cleanup requirements are based on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and California State Water Resources Control Board. Regulatory oversight is provided by the DTSC, successor to the California Health Services (the Lead State agency per the FFA); USEPA; and the RWQCB.

Groundwater elevations at the installation rose approximately 40 to 50 feet between 1970 and 1984. Since 1992, groundwater levels have risen at a rate of 1-foot to 2 feet per year in the central part of the base. At LF004, the wastes on the northern end of the landfill are in contact with the groundwater. However, groundwater monitoring conducted in 2007 and 2008 suggested that the submerged waste was not a continuing source of contamination. The RWQCB agreed that the existing remedy was adequate, and that further action would not be necessary.

As of May 2018, there are three remaining open CERCLA sites managed by the AFCEC/CIB: LF004, LF006, and FT007. Remedial activities at these sites are being conducted, in accordance with the existing Records of Decision (RODs).

As of 9 November 2012, all groundwater plumes beneath the installation, except LF004, were consolidated into a single basewide groundwater site (i.e., CG049), managed by MARB as OU-5. This includes groundwater beneath FT007, which is currently remediated in accordance with the OU-1 ROD groundwater remedy (i.e., extraction and treatment and deed restrictions to prohibit well installation and groundwater use) and being implemented by MARB.

At FT007, increasing concentrations of chlorinated solvents in groundwater from 2000 to 2007 suggested the potential presence of an unknown source of soil contamination that may be impacting groundwater. An Interim ROD Amendment for soil was signed on June 2017 to modify the NFA remedy established in the OU-1 ROD and establish SVE and LUCs as the interim remedy. On March 2017, additional focused investigation at the five former burn pits/disposal areas was initiated and expected to be completed in 2019.

In addition to the requirements presented in this PWS, this scope includes the following:

· Assessment of potential impacts to remedy due to rising groundwater

· Submittal of electronic versions of documents to the State of California GeoTracker.

· Perform biological surveys, avoidances, and measures, as needed to avoid and/or minimize potential effects to biological resources within the area of the proposed action. This includes implementation of recognized survey protocols and avoidance and minimization measures for the California Burrowing Owl and Stephens Kangaroo Rat.

Contractors are not responsible for the following:

· Implementation of modifications to remedy due to rising groundwater.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Federal Facility Agreement
AR 53
September 1990
2.
OU-1 ROD
AR 544
June 1996
3.
OU-2 ROD
AR 2226
April 2004
4.
Third Five-Year Review Report
AR 421538
September 2014
5.
Fourth Five-Year Review Report
TBD
September 2019
6.
OU-1 Interim ROD Amendment
AR 562439
June 2017
7.
FT007 Focused Investigation Report
TBD
July 2019

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-09-D-8547
March PBR
11/06/2019
6/25/2020
FA8903-16-D-0026
Basewide Remedial Action-Operation and Monitoring – FT007, Focused Investigation at Former Burn Pits
3/13/2021
3/13/2021

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· Semiannual BCT meetings in-person are currently held at March ARB.

2.6.2 Public Meetings and Hearings

· Semiannual RAB meetings are currently held in Spring and Fall at March ARB.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· South Coast Air Quality Management District (SCAQMD) Permit. Because Site FT007 is a CERCLA site, the SVE system at the site is exempt from SCAQMD permitting. However, compliance with the regulations will include analytical sampling over the operational lifetime of the system. Disposal of the vapor-phase GAC will require administrative tracking and reporting of the storage, transportation, and disposal or recycling of the generated waste. All this information must be reported in the SVE O&M Report.

2.9 Contractor Documentation

· No base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements.

6.14 Land Use Controls (LUC)

· The contractor shall conduct annual inspections and reviews to confirm compliance with all CERCLA and non-CERCLA environmental restrictions associated with the sites. Where possible, the contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners. An annual inspection report shall be provided or otherwise included in site reports by the contractor to confirm implementation of environmental restrictions.

· The contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants.

6.15 Five-Year Reviews

· The next combined statutory and policy 5th and 6th Five-Year Reviews are due in September 2024.