Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southwest

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyType of SystemFrequency of MonitoringNotesPerformance ObjectiveRC DateSC Date
SouthwestGeorgeCG070Northeast Disposal Area (NEDA) TCE Plume1CERCLARA-OGroundwater monitoring is ongoing. LUC monitoring and Five-Year Review.NoneAs per the 14 August 2019 BCT Meeting Minutes, some monitoring wells are sampled annually, some biannually' and the remainder are every five-years.The pump and treat (P&T) remedy as specified in the March 1994 ROD was discontinued in March 2003. -Optimization of remedy via in-situ bioremediation in progress as of March 2019. Continuing monitoring and evaluating effectiveness of optimization is included in this PBR TO. Changes to the remedy based on optimization study are not included in this PBR TO. -Increased off-base percolation by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO. -Site contaminated with PFAS. Investigation and remediation of PFAS is not included in this TO.RA-OFY79FY79
SouthwestGeorgeOT069PCE/TCE Plume3CERCLARA-OMonitored natural attenuation (MNA) remedy re-evaluation was completed in 2009. Groundwater monitoring is ongoing and continues in accordance with the LTMP approved in September 2009. LUC monitoring and Five-Year Review.NoneAnnually as per the 2012 LTMP.Increased off-base percolation by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO.RA-OFY79FY79
SouthwestGeorgeSS030JP-4 PlumeRWQCBRA-OGroundwater monitoring is ongoing since 1992. Remedial activities include free-product recovery using permanent and mobile units. LUC monitoring and Five-Year Review.x - Permanent Free Product Recovery Systems
x - Mobile Free Product Recovery SystemsNon free product monitoring wells are sampled annually.SS030 includes operation of SVE for lower screen interval wells at ST054, ST057, and SS084. -Petroleum Sites Corrective Action Plan (CAP), Part I is under RWQCB review since 24 June 2013. Final Conceptual Site Model (CSM) is expected late 2019. Changes to the remedy are not included in this PBR TO. -Increased off-base percolation by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO.RA-OFY40Indefinite
SouthwestGeorgeOT071Pesticide (Dieldrin) Area of Concern (AOC071)RWQCBRA-OGroundwater monitoring is ongoing since 1992. LUC monitoring and Five-Year Review.NoneMonitoring wells along with one the City of Adelanto production well #4 on an annually basis.Revised Draft Pesticide Corrective Action Plan (PCAP) under RWQCB review since 27 June 2011. Data gap field investigation was completed in fall 2016, and the Final Data Gap Installation and Soil Sampling Report was issued on 28 September 2017. Current contractor preparing Draft Final CAP for hot spot soil removal. Finalization of the CAP and implementation of the CAP (based on quantities identified in the Draft Final CAP) are included in this PBR TO. Changes in the remedy between the draft and final version are not included in this PBR TO. -Increased off-base percolation by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO.RA-OFY40Indefinite
SouthwestGeorgeFT019Fire Training AreaOU3CERCLARA-OContinue operation of SVE systems at subsites FT019a and FT019c. LUC monitoring and Five-Year Review2 - SVE SystemsSoil Source Area with monthly soil vapor compliance sampling events with an semi-annual full site soil vapor sampling event.Current PBR contractor may expand SVE system. Operation of expanded SVE system is included in this PBR TO.RA-OFY24FY24
SouthwestGeorgeST067a and ST067bLFDS Bulk Fuel Tank Farm (LFDS)RWQCBRA-OContinue operation of SVE systems with thermal oxidizers and free product recovery. LUC monitoring and Five-Year Review.2 - SVE Systems (Thermal Oxidizer)
1 - Free Product Recovery SystemSoil Source Area with monthly soil vapor compliance sampling events with an semi-annual full site soil vapor sampling event. For groundwater, sampling frequency is annually to all non free-product monitoring wells.RA-OFY39Indefinite
SouthwestGeorgeFT082CG070 TCE Source AreaOU5RWQCBRA-OLUC monitoring and Five-Year ReviewNoneSoil Source Area with monthly soil vapor compliance sampling events with an semi-annual full site soil vapor sampling event.Ongoing SVE to be completed under current PBR. Current PBR contractor will draft ROD for ICs only due to potential vapor intrusion. Finalization of the ROD and decommissioning the system is included in this PBR TORCFY24Indefinite
SouthwestGeorgeSS083OT069 TCE Source Area Hangar 676OU5RWQCBRA-OLUC monitoring and Five-Year ReviewNoneSoil Source Area with monthly soil vapor compliance sampling events with an semi-annual full site soil vapor sampling event.Ongoing SVE to be completed under current PBR. Current PBR contractor will draft ROD for ICs only due to potential vapor intrusion. Finalization of the ROD and decommissioning the system is included in this PBR TORCFY24Indefinite
SouthwestGeorgeDP003Acid and Oil BurialOU3CERCLALTMAnnual landfill inspections and erosion repairs along with groundwater monitoring (every five years) in accordance with the long-term monitoring and maintenance plan (LTMMP), in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review.NoneGroundwater sampling is every five-years as per fourth LTMMP.LTMFY99Indefinite
SouthwestGeorgeDP004Pesticide and Oil BurialOU3CERCLALTMAnnual landfill inspections and erosion repairs along with groundwater monitoring (every five years) in accordance with the long-term monitoring and maintenance plan (LTMMP), in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review.NoneGroundwater sampling is every five-years as per fourth LTMMP.LTMFY99Indefinite
SouthwestGeorgeLF007Base Landfill, Part of the SEDAOU3CERCLALTMAnnual landfill inspections and erosion repairs along with groundwater monitoring (every five years) in accordance with the long-term monitoring and maintenance plan (LTMMP), in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review.NoneGroundwater sampling is every five-years as per fourth LTMMP.LTMFY99Indefinite
SouthwestGeorgeLF012Landfill Street Sweepings Disposal SiteOU3CERCLALTMAnnual landfill inspections and erosion repairs along with groundwater monitoring (every five years) in accordance with the long-term monitoring and maintenance plan (LTMMP), in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review.NoneGroundwater sampling is every five-years as per fourth LTMMP.LTMFY99Indefinite
SouthwestGeorgeLF014Base LandfillOU3CERCLALTMAnnual landfill inspections and erosion repairs along with annual groundwater monitoring in accordance with the long-term monitoring and maintenance plan (LTMMP), in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review.NoneGroundwater sampling is annually as per fourth LTMMP.Landfill cap was rebuilt in 2012.LTMFY99Indefinite
SouthwestGeorgeST054Liquid Fuel Distribution System (LFDS), Building 708 UST and Pipeline LeakRWQCBLTMLUC monitoring and Five-Year Review.NoneAnnuallyCurrent SVE supports free-product removal under SS030LTMFY16Indefinite
SouthwestGeorgeST057LFDS, Fuel Pit #1RWQCBLTMLUC monitoring and Five-Year Review.NoneAnnuallyCurrent SVE supports free-product removal under SS030LTMFY16Indefinite
SouthwestGeorgeSS084LFDS Fuel Pit #6 Leak, (AOC MW-32)RWQCBLTMLUC monitoring and Five-Year Review.NoneAnnuallyCurrent SVE supports free-product removal under SS030LTMFY16Indefinite
SouthwestGeorgeSR401Small Arms Range and Practice Grenade Range (East and West)MMRPLTMLUC monitoring and Five-Year Review.NoneAnnuallyLTMIndefinite
SouthwestGeorgeXU400Old Borrow/Open Detonation (OB/OD) AreaMMRPLTMLUC monitoring and Five-Year Review.NoneAnnuallySite boundary has been expanded to include Sites DP033, DP034, WP040, SS052, and SR401.LTMIndefinite
SouthwestGeorgeZZ051OT-51 Test Cell 7993MMRPLTMLUC monitoring and Five-Year Review.NoneAnnuallyCurrent PBR contractor pursuing Site ClosureLTMIndefinite
SouthwestMarchFT007Fire Protection Training Area No. 2, Area of Concern (AOC) 0487CERCLARA-OOngoing SVE interim remedy, ICs and Five-Year Reviews1 - SVE SystemQuarterly-Five new source areas identified at the site; however, not included in this TO at this time.

-Site contaminated with PFAS. Investigation of PFAS is not included in this contract.

-Annual SLUC inspection being performed by MJPA.RA-OTBDTBD
SouthwestMarchLF004Landfill 64CERCLALTMOngoing capped landfill OM&M, ICs and Five-Year ReviewsNoneSemiannually-PBR contractor not responsible for maintenance of extraction wells, groundwater monitoring, extraction, and treatment, and reporting(EGETs paid by the Air Force.)
-Annual SLUC inspection being performed by City of Moreno ValleyLTMFY09Indefinite
SouthwestMarchLF006Landfill 46CERCLALTMOngoing capped landfill OM&M; leachate monitoring, collection, and disposal; landfill gas perimeter probes monitoring; ICs and Five-Year ReviewsNoneSemiannually-Leachate can be disposed of at Site 31 at no cost.
-Annual SLUC inspection being performed by MJPA.LTMFY04Indefinite
SouthwestNortonCG097TCE plume (CBA OU in FY94)CBA PlumeCERCLARA-OGroundwater monitoring discontinued and regulators have concurred that remedial action objectives have been achieved. PBR contractor must prepare a Remedial Action Completion Report (RACR) and decommission wellsNoneNASCFY23FY23
SouthwestNortonLF002IRP-02 Landfill no. 2Site 2 LandfillCERCLALTMOngoing post-closure cap LTM (cap maintenance, active landfill gas venting, landfill gas monitoring); LRA maintains asphalt cap; ICs and Five-Year ReviewsNoneSemi-AnnualLTMFY05Indefinite
SouthwestNortonSA017IRP-17 Drummed waste storageSite 17 and IWLCERCLA/ RCRALTMICs and Five Year ReviewsNoneAnnuallyCurrent PBR is drafting a ROD Amendment. Completion of the ROD Amendment is included in this PBR.LTMFY21Indefinite
SouthwestNortonDP024AOC-33 Building 747 IWL SumpAOC33CERCLA/ RCRALTMICs and Five Year ReviewsNoneAnnuallyCurrent PBR is drafting a ROD Amendment. Completion of the ROD Amendment is included in this PBRLTMFY21Indefinite
SouthwestNortonWT007IRP-07 IWTP Sludge Drying BedsSite 7CERCLA/ RCRALTMICs and Five Year ReviewsNoneAnnually-Final site closeout for WT007 is dependent on RCRA corrective action termination associated with the IWTP Interim Status Facility (which includes sites SA017 and DP024 which will not achieve SC). -CERCLA NFA site.LTMFY21Indefinite
SouthwestNortonAT005IRP-05 Fire Training AreaSite 5CERCLALTMICs and Five Year ReviewsNoneAnnuallyLTMFY05Indefinite
SouthwestNortonSR027Small Arms RangeCERCLALTMICs and Five-Year ReviewsNoneAnnuallyAlso includes post-revegetation maintenance and monitoring for recent excavations as required by the Habitat Restoration and Revegetation Plan for calendar years 2020 through 2025.LTMFY20Indefinite
SouthwestNortonSA019IRP-19 Waste Drum StorageSite 19CERCLALTMICs and Five-Year ReviewsNoneAnnuallyLTMFY05Indefinite
SouthwestNortonDP023AOC 4, Building 301, Solids Collection Pit and Trench DrainsCERCLALTMICs and Five-Year ReviewsNoneAnnuallyLTMFY05Indefinite
SouthwestWilliamsST012Liquid Fuels Storage Area2CERCLARA-OSVE, enhanced bioremediation of groundwater, groundwater monitoring, institutional controls and Five-Year Review. A SEE phase of the remedy has been completed.Soil vapor extraction and groundwater treatment (air stripper and granular activated carbon); EBR mixing and storage equipment.Quarterly sampling with data submittals and annual groundwater/SVE/EBR ReportPilot study initiated for enhanced bioremediation. Additional performance confirmation/evaluation, extent characterization and active remediation phases may be required. New monitoring wells, replacment monitoring wells and well abandonment. Site groundwater levels are rising.OESFY38FY38
SouthwestWilliamsLF004Landfill1CERCLALTMPermeable (non-RCRA) soil cap with rock cover; cap inspection and maintenance; groundwater monitoring; and Five-Year ReviewNonePerformance confirmation sampling of selected groundwater wells quarterly until concentrations confirmed below cleanup standards. Detection monitoring to check for new releases for indefinite period. AFCEC monitoring for IC compliance annual per LUCIP.This remedy applies to both Sites LF004 and DP028; DP028 was added in the April 1995 ESD to the April 1994 OU-1 ROD. All costs, excluding Five-Year Reviews, are included under LF004.
Site contaminated with PFOS/PFOA. Investigation of PFOS/PFOA is not included in this contract. New monitoring wells, replacment monitoring wells and well abandonment. Site groundwater levels are rising.OESFY95Indefinite
SouthwestWilliamsSS016Electroplating/Chemical Cleaning Shop4CERCLALTMFive year review only.NoneMonitoring for IC compliance by airport under DEUR; AF summarizes in five-year reviewsDEUR restricting property to nonresidential use in placeLTMFY00Indefinite
SouthwestWilliamsSS017Old Pesticide/ Paint Shop6CERCLALTMGroundwater monitoring and Five-Year Review.NoneGroundwater monitoring events are quarterly but not all wells require sampling quarterly. IC monitoring will be by deed recipient ASU under DEUR.Groundwater monitoring is anticipated to cease in September 2030. New monitoring wells, replacment monitoring wells and well abandonment. Site groundwater levels are rising.
The ROD was issued in March 2018. Air Force will coordinate finalizing the DEUR. Property transfer to ASU pending.OESFY17Indefinite
SouthwestWilliamsSS019Former Skeet Range4CERCLALTMFive year review only.NoneASU reports semiannaul Protective Cap Inspection per O&M manual and ADEQ/ ASU Agreement (VEMUR); AF summarizes in five-year reviews.Air Force implemented a VEMUR on the site and the Arizona State University has the responsibility to monitor for compliance with the VEMUR and an operations plan adopted by ASU as specified in the OU-4 ROD.LTMFY00Indefinite
SouthwestWilliamsSS020Firing Range4CERCLALTMFive year review only.NoneMonitoring for IC compliance by airport under DEUR; AF summarizes in five-year reviewsA DEUR restricting property to nonresidential use in place for the Firing Range. Also, a separate DEUR addresses Skeet Range, restricting property to nonresidential use in place for Skeet Range.LTMFY00Indefinite
SouthwestWilliamsSS021Facilities 1020 & 1051 and Surrounding Area4CERCLALTMFive year review only.NoneMonitoring for IC compliance by airport under DEUR; AF summarizes in five-year reviewsDEUR restricting property to nonresidential use in place.LTMFY00Indefinite
SouthwestWilliamsSS024Building 10104CERCLALTMFive year review only.NoneAnnual reporting by City of Mesa; AF summarizes in five-year reviewA DEUR restricts property to nonresidential useLTMFY00Indefinite
SouthwestWilliamsDP028Sewage Sludge Trenches1 & 5CERCLALTMRemedy included in LF004. PBR contractor to provide Five-Year Review cost only for DP028.See LF004See LF004LTMFY98Indefinite
SouthwestWilliamsFT002Fire Training Area Number 23CERCLALTMFive year review only.NoneAF annual reporting per LUCIP and DEURDEUR in place. Site contaminated with PFOS/PFOA. PBR contractor only required to discuss in 5YR. ROD ESD pending to retain the DEUR.LTM*non-PFA Date of FY20Indefinite
SouthwestWilliamsCTU043UST 1085-2Non-CERCLALTMFive year review only.NoneShould be included in reporting for SS016LTMFY11Indefinite
SouthwestWilliamsLF026Concrete HardfillNon-CERCLASCFive year review only.NoneMonitoring for deed restriction compliance only annual per LUCIP; no reporting required of landownerThis deed restiction was because of possible asbestos in soil at the site; monitoring per the LUCIP.LTMFY98Indefinite
SouthwestWilliamsTBDFacility 46Non-CERCLATBD (LTM) (not yet in IIT)Five year review only.NoneAFCEC to summarize in five-year reviews; no reporting required of landownerVEMUR in place.LTMTBD (not yet in IIT)Indefinite
SouthwestWilliamsTBD1093/1094Non-CERCLATBD (LTM) (not yet in IIT)Five year review only.NoneAFCEC to summarize in five-year reviews; no reporting required of landownerVEMUR in place.LTMTBD (not yet in IIT)Indefinite

File details come from the government source that posted it. Updated .