Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx

DOCX document 54 KB Posted

Attached to
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

20 September 2019

1.1 Scope

The former Norton AFB is listed on the National Priorities List (NPL) and has a Federal Facility Agreement (FFA) in place. A Preliminary Closeout Report was prepared by the United States Environmental Protection Agency (USEPA) in 2006. Records of Decision (RODs) have been signed for all Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites included in this task order and Last Remedy in Place (LRIP) has been achieved for the base.

The nine sites included in this task order are being addressed following the CERCLA and/or Resource Conservation and Recovery Act (RCRA) processes. One CERCLA site (CG097) has achieved remedial action objectives as specified in the ROD. This contract includes the Remedial Action Completion Report and well decommissioning. One CERCLA site (LF002) is a capped landfill with ongoing post-closure maintenance, active landfill gas venting and landfill gas compliance monitoring. LF002 groundwater monitoring wells are dry and would only be sampled if water is present during annual water level measurements. The Local Redevelopment Authority (LRA) maintains the asphalt cap. The Industrial Waste Line (IWL), an Interim Status RCRA Facility, was closed in-place and applicable RCRA restrictions were included in the transfer deed. Sites WT007, SA017 and DP024 are CERCLA sites that are part of the IWL RCRA Facility and each had applicable RCRA restrictions included in the transfer deeds. WT007 was closed as a CERCLA no further action site as remedial actions were completed in 2004. For SA017, the Air Force has been unsuccessful in achieving site closure without restrictions, thus a Record of Decision Amendment is in process to change the remedy from unlimited use/unrestricted exposure (UU/UE) closure to response complete with institutional land use controls. Also for Site DP024 (AOC-33), which is managed under both RCRA and CERCLA, the Air Force has been unsuccessful in achieving site closure. The Air Force is pursuing a change in remedy from UU/UE closure to response complete with institutional land use controls. An annual inspection and letter report are required to confirm implementation of the RCRA restrictions for the IWL and sites WT007, SA017 and DP024. All other sites included in this task order have achieved Response Complete (RC) with institutional controls (ICs) and Five-Year Reviews as the only remaining requirements. Implementation of approved recommendations from the Fifth Five Year Review (2020) is to be included in this contract. The Sixth Five Year Review is due September 2025.

In addition to the requirements presented in this PWS, this scope includes the following:

· Contractor is responsible for decommissioning wells that are already approved for decommissioning and are listed in Table 2-2 of the Basewide Groundwater Monitoring 2017 Annual Report, Former Norton Air Force Base, available on the reference website (refer to Table 1D, Alternative Endpoints).

· Upon approval of SC for Site CG097, contractor is responsible for assisting the Air Force with NPL delisting.

Contractors are not responsible for the following:

· No additional base-specific exclusions.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
FFA
AR 215
June 29, 1989
2.
ROD, Central Base Area (CBA) Operable Unit (OU)
AR 1039
November 24, 1993
3.
ROD, Basewide OU
AR4221
September 1, 2005

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-16-F-0018
Castle/Mather/Norton PBR Contract
9/30/2021
9/30/2021

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· BRAC Cleanup Team (BCT) meetings are conducted annually at the former Norton AFB. Periodic technical meetings are conducted as needed by teleconference.

2.6.2 Public Meetings and Hearings

· The RAB has been adjourned and no other public meetings are currently scheduled. The contractor shall support public meeting requirements as necessary in association with contractor’s implementation plans.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· Base-specific requirements include renewal and annual inspection fees for off-base well permits (P-21992063 and Permit P-21993034) for the San Bernardino County Department of Public Works until which time the wells are decommissioned and LF002 landfill permit fees for the San Bernardino County Department of Public Health.

2.9 Contractor Documentation

· No base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct annual inspections and reviews to confirm compliance with all CERCLA and non-CERCLA environmental restrictions associated with the sites. Where possible, the Contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners. An annual inspection report shall be provided or otherwise included in site reports by the Contractor to confirm implementation of environmental restrictions.

· An annual inspection and letter report are required to confirm implementation of the RCRA deed restrictions for the IWL and sites WT007, SA017, and DP024. The IWL is not listed as a separate site for the purpose of this contract.

· The Contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove RCRA restrictive covenants.

6.15 Five-Year Reviews

· Current PBR contractor is completing the Fifth Five-Year Review due September 2020. Sixth Five-Year Review Report for Norton AFB is due September 2025.