| LINE | | |
| ITEM* | SUB | | |
| ITEM | Description of Item | SUB ITEM PRICE | LINE ITEM PRICE |
| 0001 | | FFP PMP |
| 0002 | NSP Data CLIN | |
| 0003 | CPFF - Emerging contaminants placeholder CLIN | |
| 0004 | CR - Travel | |
| 0005 | CR - Materials ODCs | |
| Total Firm Fixed Price: | | $ - |
| NOTE: SPREADSHEET IS FORMATTED TO COMPUTE TOTALS BASED ON SUB ITEM PRICE DATA | | |
| By submitting this cost, the Offeror guarantees their Firm Fixed Price for a period of 120 calendar days after the solicitation closing period. | | |
Schedule B CLINs IDIQ
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Basic Indefinite Delivery Inedefinite Quantity (IDIQ) Contract Line Item Numbers (CLINs) | |
| **For Information Only. DO NOT FILL OUT** | | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0001 | | Firm Fixed Price: Project Management Plan | |
| 0002 | | Not Separately Priced: Data Deliverables | |
| 0003 | | Cost Plus Fixed Fee: Emerging Requirements Not Well Defined | |
| 0004 | | Cost Reimburseable: Travel for CPFF Requirements | |
| 0005 | | Cost Reimburseable: Materials for CPFF Requirements | |
| 0006 | | Firm Fixed Price: Post-Award Conference to include travel | |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070, OT069, SS030, OT071, FT019, ST067a and ST067b, FT082, SS083 RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0009 Southwest Region Performance Based Services (non-severable) Location: George Site: CG070 Ordering Period (31 July 20 to 30 July 30) 0010 Southwest Region Performance Based Services (non-severable) Location: George Site: OT069 Ordering Period (31 July 20 to 30 July 30) 0011 Southwest Region Performance Based Services (non-severable) Location: George Site: SS030 Ordering Period (31 July 20 to 30 July 30) 0012 Southwest Region Performance Based Services (non-severable) Location: George Site: OT071 Ordering Period (31 July 20 to 30 July 30) 0013 Southwest Region Performance Based Services (non-severable) Location: George Site: FT019 Ordering Period (31 July 20 to 30 July 30) 0014 Southwest Region Performance Based Services (non-severable) Location: George Site: ST067a and ST067b Ordering Period (31 July 20 to 30 July 30) 0015 Southwest Region Performance Based Services (non-severable) Location: George Site: FT082 Ordering Period (31 July 20 to 30 July 30) 0016 Southwest Region Performance Based Services (non-severable) Location: George Site: SS083 Ordering Period (31 July 20 to 30 July 30) 0017 Southwest Region Recurring Services (severable) Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007, CG403, CG404 RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0019 Southwest Region Performance Based Services (non-severable) Location: March Site: FT007 Ordering Period (31 July 20 to 30 July 30) 0020 Southwest Region Performance Based Services (non-severable) Location: March Site: CG403 Ordering Period (31 July 20 to 30 July 30) 0021 Southwest Region Performance Based Services (non-severable) Location: March Site: CG404 Ordering Period (31 July 20 to 30 July 30) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0023 Southwest Region Recurring Services (severable) Location: Norton Sites: CG097 RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0024 Southwest Region Performance Based Services (non-severable) Location: Norton Sites: CG097 Ordering Period (31 July 20 to 30 July 30) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012, LF004, SS016, SS017, CG404 RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0027 Southwest Region Performance Based Services (non-severable) Location: Williams Sites: ST012 Ordering Period (31 July 20 to 30 July 30) 0028 Southwest Region Performance Based Services (non-severable) Location: Williams Sites: LF004 Ordering Period (31 July 20 to 30 July 30) 0029 Southwest Region Performance Based Services (non-severable) Location: Williams Sites: SS016 Ordering Period (31 July 20 to 30 July 30) 0030 Southwest Region Performance Based Services (non-severable) Location: Williams Sites: SS017 Ordering Period (31 July 20 to 30 July 30) 0031 Southwest Region Performance Based Services (non-severable) Location: Williams Sites: CG404 Ordering Period (31 July 20 to 30 July 30) Southwest Region Performance Based Services (non-severable); PFAS/PFOA emerging requirement Location: George Ordering Period (31 July 20 to 30 July 30) Southwest Region Performance Based Services (non-severable); PFAS/PFOA emerging requirement Location: March Ordering Period (31 July 20 to 30 July 30) Southwest Region Performance Based Services (non-severable); PFAS/PFOA emerging requirement Location: Norton Ordering Period (31 July 20 to 30 July 30) Southwest Region Performance Based Services (non-severable); PFAS/PFOA emerging requirement Location: Williams Ordering Period (31 July 20 to 30 July 30)
Schedule B CLINs TO1
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS TASK ORDER 1 (TO 1) Contract Line Item Numbers CLIN(s) | |
| **For Information Only. DO NOT FILL OUT** | | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0006 | Firm Fixed Price: Post-Award Conference to include travel |
| 0006AA | Firm Fixed Price: Option SubCLIN Regional Post-Award Conference to include travel |
Schedule B CLINs TO2
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Contract Line Item Numbers (CLINs) | |
| **For Information Only. DO NOT FILL OUT** | | |
| LINE | | | | | | | | | | | | |
| ITEM* | SUB | | | | | | | | | | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE | Opt 1 | Opt 2 | Opt 3 | Opt 4 | Opt 5 | Opt 6 | Opt 7 | Opt 8 | Opt 9 |
| 0001 | | Firm Fixed Price: Project Management Plan | | | | | | | | | | |
| 0002 | | Not Separately Priced: Data Deliverables | | | | | | | | | | |
| 0007 | | Southwest Region Recurring Services (severable) | | | | | | | | | | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0015 Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Response Complete Location: George Site: FT082 Ordering Period (31 July 20 to 30 July 30)
| 0015AA | George FT082 Stand Alone Option SubCLIN |
| 0015AB | George FT082 Stand Alone Option SubCLIN |
| 0015AC | George FT082 Stand Alone Option SubCLIN |
| 0015AD | George FT082 Stand Alone Option SubCLIN |
| 0015AE | George FT082 Stand Alone Option SubCLIN |
| 0015AF | George FT082 Stand Alone Option SubCLIN |
| 0015AG | George FT082 Stand Alone Option SubCLIN |
| 0016 | Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Response Complete |
Location: George Site: SS083 Ordering Period (31 July 20 to 30 July 30)
| 0016AA | George SS083 Stand Alone Option SubCLIN |
| 0016AB | George SS083 Stand Alone Option SubCLIN |
| 0016AC | George SS083 Stand Alone Option SubCLIN |
| 0016AD | George SS083 Stand Alone Option SubCLIN |
| 0016AE | George SS083 Stand Alone Option SubCLIN |
| 0016AF | George SS083 Stand Alone Option SubCLIN |
| 0016AG | George SS083 Stand Alone Option SubCLIN |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) *Sites not priced in Base Yr: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 0024 Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Site Closure Location: Norton Site: CG097 Ordering Period (31 July 20 to 30 July 30) *Notice to Proceed (NTP) for this site in 2021 (Opt 1)
| 0024AA | Norton CG097 Stand Alone Option subCLIN |
| 0024AB | Norton CG097 Stand Alone Option subCLIN |
| 0024AC | Norton CG097 Stand Alone Option subCLIN |
| 0024AD | Norton CG097 Stand Alone Option subCLIN |
| 0024AE | Norton CG097 Stand Alone Option subCLIN |
| 0024AF | Norton CG097 Stand Alone Option subCLIN |
| 0024AG | Norton CG097 Stand Alone Option subCLIN |
| 0025 | Southwest Region Recurring Services (severable) |
Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 30)
Price Instructions
| TASK Order Model Instructions |
| a. Offerors shall provide a separate Task Order Model for each region in which they are submitting a proposal, up to two (2) regions. Offeror shall propose FFP prices for each CLIN (base year and nine (9) option years) identified in the Task Order Model, Attachment XX. |
| b. The Government anticipates inclusion of Performance Based Payments (PBP) for XXXX CLINs in all six (6) regions. Offeror will be required to propose a complete PBP arrangement with proposed events and timing, event completion criteria and event values using a prescribed format provided in the Task Order Model. |
| c. For evaluation purposes only, a six (6) month extension IAW 52.217-8, Option to Extend Services, is included in the Task Order Model identified as the Six (6) Month Extension column. The six (6) month extension column will be pre-calculated to ½ of the final year's proposed prices. |
| d. The work Site (CLIN) prices proposed for the base year, each option year and the six month extension will be automatically calculated and will be used to develop the Total Evaluated Price (TEP). The six month extension column will be removed (deleted) prior to award of the basic contract, should Offeror be awarded a contract. |
| e. All Microsoft Excel spreadsheets shall be submitted in Microsoft Excel format (no PDF). |
Price TO1
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS TASK ORDER 1 (TO 1) Price Proposal | |
| **Contractor to Complete** | | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0006 | Firm Fixed Price: Post-Award Conference to include travel |
| 0006AA | Firm Fixed Price: Option SubCLIN Regional Post-Award Conference to include travel |
Price TO2 Roll up
CONTRACTOR NAME:
| BECOS TASK ORDER 2 (TO 2) Price Proposal Summary for Evaluation Purposes Only |
| **Contractor to Complete** | |
| Total Evaluated Price |
| Non-Severable Priced Items | |
| Severable Base Year |
| Severable Option Year 1 |
| Severable Option Year 2 |
| Severable Option Year 3 |
| Severable Option Year 4 |
| Severable Option Year 5 |
| Severable Option Year 6 |
| Severable Option Year 7 |
| Severable Option Year 8 |
| Severable Option Year 9 |
Price TO2 NS CLINs
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal (non-severable) items | |
| **Contractor to Complete** | | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0001 | | Firm Fixed Price: Project Management Plan | |
| 0002 | | Not Separately Priced: Data Deliverables | |
| 0015 | | Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Response Complete | |
Location: George Site: FT082 Performance Period (31 July 20 to 30 July 30)
| 0015AA | George FT082 Stand Alone Option SubCLIN (contractor propose Performance Based Payment [PBP] title) |
| 0015AB | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0015AC | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0015AD | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0015AE | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0015AF | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0015AG | George FT082 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016 | Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Response Complete |
Location: George Site: SS083 Performance Period (31 July 20 to 30 July 30)
| 0016AA | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AB | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AC | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AD | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AE | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AF | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0016AG | George SS083 Stand Alone Option SubCLIN (contractor propose PBP title) |
| 0024 | Southwest Region Performance Based Services (non-severable); Task Order 2 Performance Objective, Site Closure |
Location: Norton Site: CG097 Performance Period (31 July 20 to 30 July 30) *NTP for this site in 2021 (Opt 1)
| 0024AA | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AB | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AC | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AD | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AE | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AF | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| 0024AG | Norton CG097 Stand Alone Option subCLIN (contractor propose PBP title) |
| Total Evaluated Price on NS SubItem Prices | ERROR:#VALUE! | |
| Total Evaluated Price NS Items | | ERROR:#REF! |
Price Base Yr
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| **Contractor to Complete** | | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21)
| FT007 |
| 0022 | Southwest Region Recurring Services (severable) |
Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21) *Sites not priced in Base Yr: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 20 to 30 July 21)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt 1
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items Option 1 | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 21 to 30 July 22)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (2)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 22 to 30 July 23)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (3)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 23 to 30 July 24)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (4)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 24 to 30 July 25)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (5)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 25 to 30 July 26)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (6)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 26 to 30 July 27)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (7)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 27 to 30 July 28)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (8)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 28 to 30 July 29)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |
Price Opt (9)
TASK ORDER PRICE SCHEDULE
| CONTRACTOR NAME: | | Contract |
| | Attachment |
| | Date |
| BECOS Task Order 2 (TO2) Price Proposal severable items base year | |
| LINE | | | |
| ITEM* | SUB | | | |
| ITEM | Description of Item | Units | SUB ITEM PRICE | LINE ITEM PRICE |
| 0007 | | Southwest Region Recurring Services (severable) | |
Location: George Sites: DP003, DP004, LF007, LF012, LF014, ST054, ST057, SS084, SR401, XU400, ZZ051 LTM in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30) 0008 Southwest Region Recurring Services (severable) Location: George Sites: CG070___, OT069___, SS030___, OT071___, FT019___, ST067a and ST067b___, FT082___, SS083___ RAO in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30)
| CG070 |
| OT069 |
| SS030 |
| OT071 |
| FT019 |
| ST067a and ST067b |
| FT082 |
| SS083 |
| 0017 | Southwest Region Recurring Services (severable) |
Location: March Sites: LF004, LF006 LTM in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30) 0018 Southwest Region Recurring Services (severable) Location: March Sites: FT007___ RAO in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30) 0022 Southwest Region Recurring Services (severable) Location: Norton Sites: LF002, SA017, DP024, WT007, AT005, SR027, SA019, DP023 LTM in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30) 0025 Southwest Region Recurring Services (severable) Location: Williams Sites: SS016, SS019, SS020, SS021, SS024, DP028, FT002, CTU043, LF026, Facility 46, Facilities 1093/1094 LTM in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30) 0026 Southwest Region Recurring Services (severable) Location: Williams Sites: ST012___, LF004___, SS016___, SS017___, CG404___ RAO in accordance with Decision Document Ordering Period (31 July 29 to 30 July 30)
| ST012 |
| LF004 |
| SS016 |
| SS017 |
| CG404 |