Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Southwest
| Region | Base | Site ID | Site Name | Site Alias | Operable Unit (OU) | Regulatory Program | Site Phase | Current Remedy | Notes | RC Date | SC Date |
| Southwest | George | CG070 | Northeast Disposal Area (NEDA) TCE Plume | CERCLA | Groundwater monitoring is ongoing. LUC monitoring and Five-Year Review. | -The pump and treat (P&T) remedy as specified in the March 1994 ROD was discontinued in March 2003. -Fourteen off-base groundwater monitoring wells are associated with this site. -Optimization of remedy via in-situ bioremediation in progress as of March 2019. Continuing monitoring and evaluating effectiveness of optimization is included in this PBR TO. Changes to the remedy based on optimization study are not included in this PBR TO. -Increased injections by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO. -Site contaminated with PFAS. Investigation and remediation of PFAS is not included in this TO. | FY79 | FY79 | |||
| Southwest | George | OT069 | PCE/TCE Plume | CERCLA | Monitored natural attenuation (MNA) remedy re-evaluation was completed in 2009. Groundwater monitoring is ongoing and continues in accordance with the LTMP approved in September 2009. LUC monitoring and Five-Year Review. | Increased injections by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO. | FY79 | FY79 | |||
| Southwest | George | SS030 | JP-4 Plume | RWQCB | Groundwater monitoring is ongoing since 1992. Remedial activities include free-product recovery using permanent and mobile units. LUC monitoring and Five-Year Review. | -SS030 includes operation of SVE for lower screen interval wells at ST054, ST057, and SS084. -Petroleum Sites Corrective Action Plan (CAP), Part I is under RWQCB review since 24 June 2013. Final Conceptual Site Model (CSM) is expected late 2019. Changes to the remedy are not included in this PBR TO. -Increased injections by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO. | FY40 | Indefinite | |||
| Southwest | George | OT071 | Pesticide (Dieldrin) Area of Concern (AOC071) | RWQCB | Groundwater monitoring is ongoing since 1992. LUC monitoring and Five-Year Review. | -Revised Draft Pesticide Corrective Action Plan (PCAP) under RWQCB review since 27 June 2011. Data gap field investigation was completed in fall 2016, and the Final Data Gap Installation and Soil Sampling Report was issued on 28 September 2017. Current contractor preparing Draft CAP for hot spot soil removal. Finalization of the CAP and implementation of the CAP (based on quantities identified in the Draft CAP) are included in this PBR TO. Changes in the remedy between the draft and final version are not included in this PBR TO. -Increased injections by wastewater treatment plant is impacting groundwater elevation and flow direction. Updating the CSM and installing new wells is not included in this PBR TO. | FY40 | Indefinite | |||
| Southwest | George | FT019 | Fire Training Area | CERCLA | Continue operation of SVE systems at subsites FT019a and FT019c. LUC monitoring and Five-Year Review | Current PBR contractor may expand SVE system. Operation of expanded SVE system is included in this PBR TO. | FY24 | FY24 | |||
| Southwest | George | ST067a and ST067b | LFDS Bulk Fuel Tank Farm and Buckeye Type II Hydrant Fueling System (BHFS) | RWQCB | Continue operation of SVE systems with thermal oxidizers and free product recovery. LUC monitoring and Five-Year Review. | FY39 | Indefinite | ||||
| Southwest | George | FT082 | CG070 TCE Source Area | RWQCB | LUC monitoring and Five-Year Review | Ongoing SVE to be completed under current PBR. Current PBR contractor will draft ROD for ICs only due to potential vapor intrusion. Finalization of the ROD and decommissioning the system is included in this PBR TO | FY24 | Indefinite | |||
| Southwest | George | SS083 | OT069 TCE Source Area Hangar 676 | RWQCB | LUC monitoring and Five-Year Review | Ongoing SVE to be completed under current PBR. Current PBR contractor will draft ROD for ICs only due to potential vapor intrusion. Finalization of the ROD and decommissioning the system is included in this PBR TO | FY24 | Indefinite | |||
| Southwest | George | DP003 | Acid and Oil Burial | CERCLA | Annual landfill inspections and erosion repairs along with groundwater monitoring in accordance with the long-term monitoring and maintenance (LTMM) plan, in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review. | FY99 | Indefinite | ||||
| Southwest | George | DP004 | Pesticide and Oil Burial | CERCLA | Annual landfill inspections and erosion repairs along with groundwater monitoring in accordance with the LTMM, in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review. | FY99 | Indefinite | ||||
| Southwest | George | LF007 | Base Landfill, Part of the SEDA | CERCLA | Annual landfill inspections and erosion repairs along with groundwater monitoring in accordance with the LTMM, in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review. | FY99 | Indefinite | ||||
| Southwest | George | LF012 | Landfill Street Sweepings Disposal Site | CERCLA | Annual landfill inspections and erosion repairs along with groundwater monitoring in accordance with the LTMM, in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review. | FY99 | Indefinite | ||||
| Southwest | George | LF014 | Base Landfill | CERCLA | Annual landfill inspections and erosion repairs along with groundwater monitoring in accordance with the LTMM, in accordance with OU 3 ROD. LUC and groundwater monitoring, and Five-Year Review. | Landfill cap was rebuilt in 2012. | FY99 | Indefinite | |||
| Southwest | George | ST054 | Liquid Fuel Distribution System (LFDS), Building 708 UST and Pipeline Leak | RWQCB | LUC monitoring and Five-Year Review. | Current SVE included under SS030 | FY16 | Indefinite | |||
| Southwest | George | ST057 | LFDS, Fuel Pit #1 | RWQCB | LUC monitoring and Five-Year Review. | Current SVE included under SS030 | FY16 | Indefinite | |||
| Southwest | George | SS084 | LFDS Fuel Pit #6 Leak, (AOC MW-32) | RWQCB | LUC monitoring and Five-Year Review. | Current SVE included under SS030 | FY16 | Indefinite | |||
| Southwest | George | SR401 | Small Arms Range | MMRP | LUC monitoring and Five-Year Review. | Indefinite | |||||
| Southwest | George | XU400 | Old Borrow Area (OB/OD) | MMRP | LUC monitoring and Five-Year Review. | Indefinite | |||||
| Southwest | George | ZZ051 | OT-51 Test Cell 799 | MMRP | LUC monitoring and Five-Year Review. | Indefinite | |||||
| Southwest | March | FT007 | Fire Protection Training Area No. 2, Area of Concern (AOC) 048 | 7 | CERCLA | Ongoing SVE interim remedy, ICs and Five-Year Reviews | -Focused investigation at former burn pits to be completed in 2019 by current contractor. PBR contractor responsible for Final ROD Amendment for soil and implementing/ operating expanded SVE remedy (anticipate similar to the Interim ROD Amendment). -Site contaminated with PFAS. Investigation of PFAS is not included in this contract. -Annual SLUC inspection being performed by MJPA. | FY25 | FY25 | ||
| Southwest | March | LF004 | Landfill 6 | 4 | CERCLA | Ongoing capped landfill OM&M, ICs and Five-Year Reviews | -PBR contractor not responsible for maintenance of extraction wells, groundwater monitoring, extraction, and treatment, and reporting(EGETs paid by the Air Force.) -Annual SLUC inspection being performed by City of Moreno Valley | FY09 | Indefinite | ||
| Southwest | March | LF006 | Landfill 4 | 6 | CERCLA | Ongoing capped landfill OM&M; leachate monitoring, collection, and disposal; landfill gas perimeter probes monitoring; ICs and Five-Year Reviews | -Leachate can be disposed of at Site 31 at no cost. - Annual SLUC inspection being performed by MJPA. | FY04 | Indefinite | ||
| Southwest | March | FT007 | Fire Training Area | PFOS/PFOA Site | |||||||
| Southwest | March | CG403 | Eastern OU1 PFC Groundwater Plume | PFOS/PFOA Site | |||||||
| Southwest | March | CG404 | West March PFC Groundwater Site | PFOS/PFOA Site | |||||||
| Southwest | Norton | CG097 | TCE plume (CBA OU in FY94) | CBA Plume | CERCLA | Groundwater monitoring discontinued and regulators have concurred that remedial action objectives have been achieved. PBR contractor must prepare a Remedial Action Completion Report (RACR) and decommission wells | FY23 | FY23 | |||
| Southwest | Norton | LF002 | IRP-02 Landfill no. 2 | Site 2 Landfill | CERCLA | Ongoing post-closure cap LTM (cap maintenance, active landfill gas venting, landfill gas monitoring); LRA maintains asphalt cap; ICs and Five-Year Reviews | FY05 | Indefinite | |||
| Southwest | Norton | SA017 | IRP-17 Drummed waste storage | Site 17 and IWL | CERCLA/ RCRA | ICs and Five Year Reviews | Current PBR is drafting a ROD Amendment. Completion of the ROD Amendment is included in this PBR. | FY21 | Indefinite | ||
| Southwest | Norton | DP024 | AOC-33 Building 747 IWL Sump | AOC33 | CERCLA/ RCRA | ICs and Five Year Reviews | Current PBR is drafting a ROD Amendment. Completion of the ROD Amendment is included in this PBR | FY21 | Indefinite | ||
| Southwest | Norton | WT007 | IRP-07 IWTP Sludge Drying Beds | Site 7 | CERCLA/ RCRA | ICs and Five Year Reviews | -Final site closeout for WT007 is dependent on RCRA corrective action termination associated with the IWTP Interim Status Facility (which includes sites SA017 and DP024 which will not achieve SC). -CERCLA NFA site. | FY21 | Indefinite | ||
| Southwest | Norton | AT005 | IRP-05 Fire Training Area | Site 5 | CERCLA | ICs and Five Year Reviews | FY05 | Indefinite | |||
| Southwest | Norton | SR027 | Small Arms Range | CERCLA | ICs and Five-Year Reviews | Also includes post-revegetation maintenance and monitoring for recent excavations as required by the Habitat Restoration and Revegetation Plan for calendar years 2020 through 2025. | FY20 | Indefinite | |||
| Southwest | Norton | SA019 | IRP-19 Waste Drum Storage | Site 19 | CERCLA | ICs and Five-Year Reviews | FY05 | Indefinite | |||
| Southwest | Norton | DP023 | AOC 4, Building 301, Solids Collection Pit and Trench Drains | CERCLA | ICs and Five-Year Reviews | FY05 | Indefinite | ||||
| Southwest | Williams | ST012 | Liquid Fuels Storage Area | 2 | CERCLA | Groundwater monitoring and Five-Year Review. | Pilot study initiated for enhanced bioremediation. Additional characterization and remediation may be required. | FY38 | FY38 | ||
| Southwest | Williams | LF004 | Landfill | 1 | CERCLA | Permeable (non-RCRA) soil cap with rock cover; cap inspection and maintenance; groundwater monitoring; and Five-Year Review | -This remedy applies to both Sites LF004 and DP028; DP028 was added in the April 1995 ESD to the April 1994 OU-1 ROD. All costs, excluding Five-Year Reviews, are included under LF004. -Site contaminated with PFAS. Investigation of PFAS is not included in this contract. | FY95 | Indefinite | ||
| Southwest | Williams | SS016 | Electroplating/Chemical Cleaning Shop | 4 | CERCLA | Five year review only. | DEUR restricting property to nonresidential use in place | FY00 | Indefinite | ||
| Southwest | Williams | SS017 | Old Pesticide/ Paint Shop | 6 | CERCLA | Groundwater monitoring and Five-Year Review. | -Groundwater monitoring is anticipated to cease in September 2025. -The ROD was issued in March 2018. Air Force will coordinate finalizing the DEUR. | FY17 | Indefinite | ||
| Southwest | Williams | SS019 | Former Skeet Range | 4 | CERCLA | Five year review only. | Air Force implemented a VEMUR on the site and the Arizona State University has the responsibility to monitor for compliance with the VEMUR and an operations plan adopted by ASU as specified in the OU-4 ROD. | FY00 | Indefinite | ||
| Southwest | Williams | SS020 | Firing Range | 4 | CERCLA | Five year review only. | A DEUR restricting property to nonresidential use in place for the Firing Range. Also, a separate DEUR addresses Skeet Range, restricting property to nonresidential use in place for Skeet Range. | FY00 | Indefinite | ||
| Southwest | Williams | SS021 | Facilities 1020 & 1051 and Surrounding Area | 4 | CERCLA | Five year review only. | DEUR restricting property to nonresidential use in place. | FY00 | Indefinite | ||
| Southwest | Williams | SS024 | Building 1010 | 4 | CERCLA | Five year review only. | A DEUR restricts property to nonresidential use | FY00 | Indefinite | ||
| Southwest | Williams | DP028 | Sewage Sludge Trenches | 1 & 5 | CERCLA | Remedy included in LF004. PBR contractor to provide Five-Year Review cost only for DP028. | FY98 | Indefinite | |||
| Southwest | Williams | FT002 | Fire Training Area Number 2 | 3 | CERCLA | Five year review only. | -DEUR in place. -Site contaminated with PFAS. PBR contractor only required to discuss in 5YR. | *non-PFA Date of FY20 | Indefinite | ||
| Southwest | Williams | CTU043 | UST 1085-2 | Non-CERCLA | Five year review only. | FY11 | Indefinite | ||||
| Southwest | Williams | LF026 | Concrete Hardfill | Five year review only. | FY98 | Indefinite | |||||
| Southwest | Williams | TBD | Facility 46 | Five year review only. | VEMUR in place. | Indefinite | |||||
| Southwest | Williams | TBD | 1093/1094 | Five year review only. | VEMUR in place. | Indefinite | |||||
| Southwest | Williams | CG404 | OU1 PFC Groundwater Plume | PFOS/PFOA Site |