Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

22 September 2019

1.1 Scope

The former Griffiss AFB is located in Oneida County, City of Rome, New York was designated for realignment under the under Base Realignment and Closure (BRAC) in 1993 and formally realigned on September 30, 1995. Griffiss AFB was listed on the National Priorities List (NPL) in 1987 and a Federal Facility Agreement (FFA) was signed in 1990 that is supplemented by a letter reestablishing FFA review times for documentation (April 1991). A partial deletion was approved in March of 2009. Records of Decision (RODs) have been signed for all Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites included in this effort.

At the former Griffiss AFB, NY 19 of the 23 sites included in this contract are being addressed following the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. One (1) site is addressed under the Resource Conservation and Recovery Act (RCRA) with soil restrictions remaining at the site. Three (3) of the remaining sites are petroleum sites requiring closure under the New York State Department of Environmental Conservation (NYSDEC) Corrective Action (Spills) Program.

Four buildings are included as part of the SD052 Soil Vapor Intrusion (SVI) site (SD052-01 Bldgs 785 & 786 & SD052-02 Bldgs 774 & 776) governed by an SVI ROD finalized September 2016. These sites have passive sub-slab vapor mitigation systems in place with active system on stand-by and require LUC/IC monitoring and Five-Year Reviews. One (1) CERCLA site (ST006 Bldg 101) was projected for closure under the current AFCEC PBR but will not achieve SC and will require system optimization and additional operations and maintenance and monitoring of a sub-slab soil vapor extraction system.

Five (5) Landfills are capped/covered and are presently undergoing long-term groundwater monitoring, maintenance, LUC/IC monitoring, and Five-Year Reviews. Five (5) chlorinated plume sites including SD052-01 Apron 1, SD052-02 Bldg 775 Pumphouse 3, SD052-04 Landfill 6, SD052-05 Bldg 817, and SS062 AOC 9 WSA require monitoring (including one site with MNA parameters), LUC/IC monitoring and Five-Year Reviews and one site required O&M of an active pump and discharge system through August 2016 (currently inactive) and maintains an active discharge permit through August 15, 2021 in the event it needs to be restarted. Seven (7) additional CERCLA sites require LUC/IC monitoring and Five-Year Reviews only. One (1) site, SS060 Bldg. 35, is addressed under RCRA and requires LUC/IC inspections.

Three (3) petroleum sites require spill closure. Biosparging systems have been installed at SS067 Bldg 789 and SS054 Bldg 781 Pumphouse 1. These two remaining spill sites are undergoing some O&M and monitoring. The third site CSS681 requires monitoring. All spill sites require annual LUC/IC inspections and AF Policy Review every five years that aligns with the Five-Year Review at Griffiss.

All property at former Griffiss AFB has been transferred. The next Five-Year Review is projected to be finalized in September 2020 under the current PBR contract and implementation of the recommendations is required under this follow-on PBR contract. CERCLA sites that have not reached unrestricted use/unrestricted exposure (UU/UE) are to be included in a statutory Five-Year Review. Organization of the documentation associated with these sites will be dependent on regulatory and AF inputs.

In addition to the requirements presented in this PWS, this scope includes the following:

· Comprehensive annual inspection and inventory of existing wells (including monitoring wells recently installed for PFAS Investigation and any wells identified in the August 2018 Wood Well Survey) including an annual well inventory/maintenance report, review/update of locational/survey data, field verification of existing wells, and resolution of any discrepancies in existing reporting. Includes replacement of any lock, keys, caps or other appurtenances and repair of any wells (including LF vents, etc.) damaged by other activities/parties as determined necessary by the AF.

· The contractor shall be responsible for preventing/mitigating adverse flooding impacts on Air Force environmental monitoring and remediation systems as a result of beaver activity. The contractor will be responsible for removal of beavers and dams if necessary, and coordination/permitting with the property owner and local/state/federal agencies.

Contractors are not responsible for the following:

· No base-specific exclusions have been identified.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
AR Number
Date Issued
1.
Griffiss AFB Federal Facilities Agreement (FFA)
550
June 1990
2.
HQ SAC Letter (dated 04/11/91) to NYSDEC and USEPA Region 2 Legal Counsels Regarding the Griffiss AFB FFA agreement review and response timeframes
331
April 1991
3.
LF001 (Landfill 1) ROD
1907
June 2000
4.
LF002 (Landfill 2/3) ROD
1415
June 2000
5.
LF003 (Landfill 7), ROD
1418
June 2000
6.
LF007 (Landfill 5). ROD
1417
June 2000
7.
LF009 (Landfill 6), ROD
1451
June 2001
8.
Final Record of Decision for the On-base Groundwater AOC (SD-52)
2541
April 2009
9.
Final (Signed) Record of Decision, Soil Vapor Intrusion at SD-052-02 Building 775 Site (Buildings 774 and 776) and SD-052-01 Apron 2 Chlorinated Plume Site (Buildings 785 and 786), Former Griffiss AFB
540311
September 2016
10.
Final Record of Decision for Area of Concern 9 (SD-62)
2387
July 2010
11.
Final Record of Decision for SS033 Coal Yard Storage Operable Unit
2333
February 2012
12.
Final Record of Decision for Bldg 3 (DP-11), Lot 69 (SS-17), and Electrical Power Substation (SS-44)
2245
November 2004
13.
Final Record of Decision for Bldg 20 (SS-23), Bldg 112 (SS-08), Bldg 222 (DP-22), Bldg 255 (DP-13) and T-9 Storage Area (SS-25)
1554
June 2001
14.
Final Record of Decision for SD-41
2331
July 2011
15.
Explanation of Significant Differences Areas of Concern, DP-13, Building 225 Drywells, DP-15, Building 219 Drywell, DP-22 Building 222 Battery Acid Disposal Pit, SD-50, Building 214 Vehicle Maintenance Shop
186356
Sept 2003
16.
Groundwater Restriction Removal Request, Attachment A, B and C, DP013, DP015, DP022 and SD050. Attachment C 2010 5 Year Review Revision 2.1
186726
June 2011
17.
Discharge Permit (BEA-1621), Industrial Discharge Permit, City of Rome, NY POTW, August 16, 2016 - August 15, 2021
PBR Website
August 16, 2016
18.
Record of Decision - Building 101 (Site

ST-06)

460282
September 2012
19.
Griffiss LUCIP
PBR Website
TBD

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

GSA Order GS10F0312K, FA8903-16-F-0012
Environmental Remediation at BRAC Eastern Region Bases including Griffiss, Plattsburgh, Myrtle Beach and England AFBs, Bhate Environmental Associates, Inc., awarded 8 June 2016
15 June 2021
15 June 2021

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· Bi-weekly internal contract status teleconferences are held prior to engaging with the regulators to update the technical team on site remedial status and coordinate document review efforts

· Monthly BRAC Clean-up Team (BCT) teleconferences are held to update regulators on site status and coordinate document review efforts

· Semiannual face-to-face BCT meeting are usually conducted in the 2nd and 4th Quarter of each year (June and December)

2.6.2 Public Meetings and Hearings

· Annual Restoration Advisory Board (RAB) meetings have been held in the 3rd Quarter of each fiscal year (usually aligns with the 1st BCT meeting of the year). RAB adjournment is being considered and may occur within the next year (2020) depending on coordination with stakeholders; this activity will require support by the contractor as requested by the base POC. If delayed until the initiation of this contract, this adjournment process may require additional support including public notice and court reporter activities.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· For Building 775, the groundwater extraction and discharge system on standby since 2016 was designed to contain the contamination plume (>50 μg/L) upgradient of extraction wells (EW) EW-1R and EW-3, extract contaminants from the aquifer, and discharge them to the existing sanitary sewer system for treatment at the City of Rome Water Pollution Control Facility (see site list and applicable documentation to learn more about the site). The Special Permit for Discharge of Contaminated Groundwater (Permit Number BEA-1621) was issued Aug 16, 2016 and is set to expire August 15, 2021. This permit details annual and per gallon discharge fees and sets conditions governing the authorized discharge of wastewater to the Rome POTW.

· The contractor shall coordinate with the county airport to obtain access to the flightline area in order to facilitate inspection of sites and any site work within the boundaries of the airfield.

2.9 Contractor Documentation

· No base-specific requirements.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· The contractor shall provide GIS support to produce environmental property condition maps including land-use controls, tables, and other graphics, which shall depict environmental conditions at the base making use of existing computer hardware already deployed at the installations (i.e. Griffiss AFB). The GIS will incorporate information gathered from field surveys, records searches, computer-aided design (CAD) files and base drawings, chemistry and geology data, information from interviews, historical photos, Environmental Baseline Survey (EBS) and Environmental Impact Statement (EIS) data, and property transfer information including parcel boundaries, deeds, and environmental disclosure documents. GIS layers will be provided for AFCEC. This solicitation includes all necessary mapping and applicable surveys, GIS and map plotting support necessary to accomplish ad hoc real estate transactions including removal/application of environmental restrictions on applicable parcels/deeds. This includes all items included in the environmental baseline survey (EBS) and associated updates and management and development of restricted areas using GIS. This will involve managing existing LUC/IC data as well as further definition as the LUC/IC management is expanded. The contractor shall supply necessary maps as required.

· State Required Electronic Data Deliverable (EDD): submitted IAW requirements outlined in Environmental Information Management System (EIMS) database software application EQuISTM from EarthSoft® Inc. for data submissions to manage environmental data, NYSDEC, Pursuant to 6 NYCRR 375-1.11(a).

6.14 Land Use Controls (LUC)

· LUC inspections are required annually.

· The Contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants.

6.15 Five-Year Reviews

· Preparation of the statutory Five-Year Reviews including one in 2025 (to be initiated in 2024). CERCLA sites that have not reached UU/UE are to be included in a statutory Five-Year review. A second Five-Year Review will be required in 2030 with initiation date in 2029. Non-CERCLA Five-Year Reviews (aka AF Policy Review) is required at non-CERCLA sites per AF policy following the same timing as the CERCLA FYRs. Organization of the documentation associated with these sites will be dependent on regulatory and AF inputs.

· Implementation of the 2020 Five-Year Review recommendations (expected to be finalized by Sept 2020) and recommendations from subsequent five-year reviews.