Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx
DOCX document 54 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
22 September 2019
1.1 Scope
The former Loring AFB is located in Aroostook County in northern Maine, approximately 3 miles west of the Canadian (New Brunswick) border. The former Loring AFB occupies approximately 9,000 acres and is bordered on the south and east by the town of Limestone, on the north by the towns of Caswell and Connor, and on the west by the city of Caribou.
The former Loring AFB was placed on EPA’s National Priorities List of sites in 1990. Under CERCLA §120, a Federal Facility Agreement (FFA) between Environmental Protection Agency (EPA) Region 1, the Maine Department of Environmental Protection (MEDEP), and the U.S. Air Force was signed in January 1991 and amended in 1995 (FFA, 1995). The FFA governs the environmental activities being conducted at the former Loring AFB. Following the signing of the FFA, the former Loring AFB was placed on the U.S. Congress Base Closure List (1991) and was closed in September 1994. All property disposal actions are complete. Recipients include: U.S. Fish and Wildlife Service for a wildlife refuge; U.S. Department of Labor for a Job Corps Center; Loring Development Authority of Maine for economic development; Department of Interior holds some parcels for the Aroostook Band of MicMacs; and others.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional scope.
Contractors are not responsible for the following:
· No base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| AR Number |
| Date Issued |
| 1. |
| Post Closure Monitoring and Maintenance Plan for Landfills, Rev. 4 |
| 562511 |
| September 2017 |
| 2. |
| Fourth Five-Year Review Report for the Former Loring AFB |
| 545762 |
| September 2015 |
| 3. |
| OU 12 2017 Annual Report |
| pending |
| 2019 |
| 4. |
| Biological Monitoring Quality Program Plan, 2018 Addendum, OU 13 |
| 575901 |
| July 2018 |
| 5. |
| OU 13 Monitoring Report for 2018 |
| Pending |
| 2019 |
| 6. |
| 2018 Corrective Action Report/ Corrective Action Work Plan Addendum No. 4, Mattawamkeag Pump Station (SS063), Searsport Pipeline |
| 579949 |
| November 2018 |
| 7. |
| Monitoring and Maintenance of Landfills 2017 Annual Report |
| 577428 |
| September 2018 |
| 8. |
| OU 12 LTMP, Rev. 6 |
| 576672 |
| August 2018 |
| 9. |
| 2012 Nonheating Season Sub-Slab Vapor and Indoor Air Sampling Report, Various Buildings within GMZ-1 (SS054) and GMZ-3 (SS056) |
| 576342 |
| February 2016 |
| 10. |
| OU 12 ROD Amendment for Vapor Intrusion |
| pending |
| December 2018 |
| 11. |
| Pilot Study Completion Report GMZ-4 |
| 585525 |
| March 2019 |
| 12. |
| Fall 2017 Field Investigation Activities Report/Remedial Action Work Plan Addendum No. 3, Groundwater Management Zone 6 (SS059) Fire Training Area, |
| 572081 |
| April 2018 |
| 13. |
| Pilot Study Completion Report GMZ-1 |
| 577141 |
| September 2018 |
| 14. |
| Corrective Action Plan Addendum for Groundwater |
| 421660 |
| June 2012 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8580-0010 |
| Performance Based Remediation at former Pease AFB and former Loring AFB |
| 6/30/2020 |
| 9/30/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· Typically conduct one in-person BCT meeting per year in the spring in Portland, Maine. Routine BCT teleconference calls are conducted every two weeks.
2.6.2 Public Meetings and Hearings
· The Loring RAB has been adjourned.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· All existing off-base easements extend beyond this PBR.
2.9 Contractor Documentation
· No additional base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No additional base-specific requirements.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct annual inspections and reviews to confirm compliance with all CERCLA and non-CERCLA environmental restrictions associated with the sites. Where possible, the Contractor shall obtain and provide copies to the Air Force of annual reporting required by state covenants for applicable sites by respective property owners. An annual inspection report shall be provided or otherwise included in site reports by the Contractor to confirm implementation of environmental restrictions.
· The Contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants.
6.15 Five-Year Reviews
· The next Five-Year Review is due September 2020 and every five years thereafter.