Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx
DOCX document 53 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
24 September 2019
1.1 Scope
The former Gentile Air Force Station (AFS), also known as the Defense Electronics Supply Center (DESC), is located within the city of Kettering, in Montgomery County, Ohio. Gentile AFS closed on December 31, 1996, as part of the 1993 round of BRAC closures. The former Gentile AFS is made up of 164 acres. All former Air Force property has been transferred by deed to the City of Kettering, the recognized Local Redevelopment Authority (LRA), through an Economic Development Conveyance (EDC) Agreement.
The environmental restoration program at Gentile is currently managed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Regulatory oversight is provided primarily by Ohio EPA. The United States Environmental Protection Agency Region 5 (USEPA) is currently not involved in an oversight role. The former Gentile AFS is not listed on the National Priorities List (NPL).
Remedial activities at CERCLA sites are being performed in accordance with the existing decision documents. There are currently seven sites at Gentile. Groundwater monitoring, land use control (LUC) compliance monitoring and Five-Year Reviews are the requirements for three of the sites; LUC monitoring in conjunction with Five-Year Reviews are required for the other four legacy sites.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional scope.
Contractors are not responsible for the following:
· No base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Base Realignment and Closure (BRAC) Cleanup Team (BCT). Decision Document. Groundwater Remediation, Site R2 Floor Drain to Infiltration Pit at Defense Electronics Supply Center, Gentile Air Force Station, Ohio. |
| AR 130 |
| April 1997 |
| 2. |
| BCT. Decision Document, Parcel B Groundwater at the Defense Electronics Supply Center, Gentile Air Force Station, Ohio, September |
| AR 552 |
| September 2000 |
| 3. |
| BCT. 2003. Decision Document. Statement of Basis/Final Decision. Site C7 and D1 in Parcel E. |
| AR 682 |
| February 2003 |
| 4. |
| BCT. Statement of Basis/Final Decision, Long-Term Monitoring Program Optimization for Sites C7, R2, S1. |
| AR 657 |
| August 2007 |
| 5. |
| FPM, 2018 Semi-Annual Remedial Action-Operations Letter Report – April 2018 Results – Former Gentile Air Force Station, Kettering, Ohio |
| AR – TBD |
| August 2018 |
| 6. |
| AFRPA, Second Five Year Review |
| AR 815 |
| June 2011 |
| 7. |
| AFCEC, LUC Compliance Inspection Report - 2017 |
| AR 575292 |
| March 2018 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract Number: FA8903-09-D-8565 TO 0008 |
| Region 5 PBR |
| 06/30/2020 |
| 09/24/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· Onsite Gentile BCT meetings are held once per year and are typically scheduled to occur the same week as other Air Force BRAC meetings in Ohio (at nearby Rickenbacker ANGB and Newark AFB). Onsite meetings are typically held at the Kettering Government Center. These meetings are to be coordinated and facilitated by the PBR contractor. Post-meeting minutes (draft, draft final and final) are to be developed to document these meetings. Other as-needed meetings are generally held via PBR contractor-hosted teleconference calls (typically two per year).
2.6.2 Public Meetings and Hearings
· Not applicable. The former Gentile AFS RAB was adjourned in 2005.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· Not applicable.
2.9 Contractor Documentation
· No additional base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No additional base-specific requirements.
6.14 Land Use Controls (LUC)
· LUC inspections are required every year as long as RA-O groundwater monitoring is taking place. Thereafter, every five years, typically in the period immediately before a scheduled Five-Year Review.
6.15 Five-Year Reviews
· The third Five-Year Review will be completed under the current PBR and is due December 2018. The fourth Five-Year Review due June 2020 will be delayed and is included in this PBR. The fifth Five-Year Review is also included in this PBR.