Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx
DOCX document 55 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
24 September 2019
1.1 Scope
The former Wurtsmith Air Force Base (AFB), located in Champaign County, Charter Township of Oscoda, Michigan, was closed in 1993. The former Wurtsmith AFB is not listed on the National Priorities List (NPL) consequently there is no Federal Facility Agreement. The environmental restoration program is being conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) with the Michigan Department of Environmental Quality functioning as the lead regulator. Records of Decision (RODs)/Decision Documents (DDs) have been signed for 15 CERCLA sites included in this PBR with 2 sites requiring RODs/DDs to be completed under current PBR contract (SS072 and LF027).
There are twenty three sites included in this PBR TO that are being addressed following the CERCLA process. The sites are listed in the site list below with ongoing activities that include the performance of routine, preventive, predictive, scheduled, and unscheduled operations and maintenance tasks and/or land use controls (LUCs) monitoring.
In 2018/2019 under the current PBR contract, the Air Force installed or is installing supplemental remedies at sites FT002 and SS057. The Central Treatment System (GTS) became operational on 11 July 2018 and includes a granular-activated carbon (GAC) adsorption unit (a three-bed GAC system) for the primary removal of PFOS and PFOA.
Eight sites have ongoing groundwater pump and treat operations (FT002, SS006, SS008, SS021, OT024, LF030, LF031, SS047). Operations and maintenance (O&M) of all treatment systems will be required under this PBR contract.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional scope.
Contractors are not responsible for the following:
· PFAS sampling other than those identified above with active treatment systems in place.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| FT002 Final ROD for VOCs |
| AR #1262 |
| Nov 2016 |
| 2. |
| FT002 Final RAP/DD |
| AR #929 |
| April 1998 |
| 3. |
| ESD for the Remedial Action Plans/Decision Documents for Sites WP-04 and SS-71 |
| AR#451192 |
| Sep 2014 |
| 4. |
| WP004 Final RAP/DD |
| AR# 1107 |
| March 1998 |
| 5. |
| SS005 Final RAP/DD |
| AR #1112 |
| April 1998 |
| 6. |
| SS006, SS013, ST040, ST046 Final RAP/DD |
| AR #764 |
| February 1998 |
| 7. |
| SS008 Final RAP/DD |
| AR #1116 |
| April 1998 |
| 8. |
| OT016 Final RAP/DD |
| AR #931 |
| April 1998 |
| 9. |
| SS017, SS021, and SS047 Final RAP |
| AR #932 |
| April 1998 |
| 10. |
| SS017/021/047 ESD |
| AR# 1482 |
| October 2005 |
| 11. |
| LF023 Final NARAP DD |
| AR #1111 |
| April 1998 |
| 12. |
| OT024 NFRAP Final DD |
| AR #1120 |
| September 1997 |
| 13. |
| OT024 Final RAP/DD |
| AR #1165 |
| November 1996 |
| 14. |
| LF026 Final NARA/DD |
| AR #1106 |
| March 1998 |
| 15. |
| LF027 Final RAP/DD |
| AR #1114 |
| April 1998 |
| 16. |
| LF030/LF031 Final ROD |
| AR#300140 |
| April 2013 |
| 17. |
| SS051 Final Closure Memo |
| AR 577200 |
| December 1996 |
| 18. |
| SS057 Final RAP/DD |
| AR #1276 |
| September 2002 |
| 19. |
| SS057 ESD |
| AR #1383 |
| August 2004 (signed) |
| 20. |
| ST068 Final RAP/DD |
| AR #1489 |
| November 2003 |
| 21. |
| ST069 Final RAP/DD |
| AR#1488 |
| Dec 2008 |
| 22. |
| WP070 Final RAP/DD |
| AR #1398 |
| September 2002 |
| 23. |
| SS071 Final Closure Memo |
| AR#1460 |
| March 2007 |
| 24. |
| SS072 DD |
Pending
| 25. |
| SS017 Final Closure Memo |
pending
| 26. |
| LF027 LUC/IC only ROD |
pending
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract GS10F0280V, Order Number FA8903-16-F-0014 |
| PBR, Central Region BRAC Installations |
| 4/27/2021 |
| 6/27/2021 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· BCT meetings are generally held monthly. Typically every other month they are held in person at the PBR contractor site office and the others are held via PBR contractor-hosted teleconference calls. PBR contractor to attend all BCT meetings and prepare and present briefings for each meeting.
2.6.2 Public Meetings and Hearings
· RAB meetings are held quarterly. RAB meetings are typically held at the former base in the Public Library. PBR contractor to attend all BCT meetings and are expected to participate in two RAB meetings per year and prepare and present briefings for each meeting.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· UST permit B5092
· USFS MOA for IRP sites OT024, FT002, OT016 is in place for LUC/ICs and requires AF renewal every 5 years, last renewed in 2018
· USFS well permit for all MWs on USFS lands
· MDNR well permit for one well on MDNR land SS005
· Multitude real estate easements and/or access agreements for IRP infrastructure and MWs on the former base and adjacent property are in place.
2.9 Contractor Documentation
· Sharepoint site currently in operation will be required to be taken over and maintained by PBR contractor.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· Web based GIS and database system located at url:https://geo.baywest.com/applications/WurtsmithAFB/ will be required to be taken over and maintained by PBR contractor.
6.14 Land Use Controls (LUC)
· Annual LUC inspections are required.
6.15 Five-Year Reviews
· The fourth Five-Year Review will be completed under the current PBR and is due in 2020. The fifth Five-Year Review due September 2025 is included in this PBR.